TECHNIP IN NORWAY GENERAL PRESENTATION



Similar documents
Worldwide Technip in Norway

Technip in Norway. 1 Technip in Norway

How To Get Gas From A Boat

The Norwegian Petroleum Directorate Annual Report. Offshore Norway 2001

How to find field candidates for enhanced recovery by water additives on the NCS

FIELDS UNDER DEVELOPMENT. Ga p fr FACTS 111

Technip Presentation. Knut Bø, Nyttårsoil Seminar, Orkanger 14. januar 2009

Bundle Pipeline Systems & Shell FRAM Development Iain Watson & Peter Walker

Risk management and major accident potential in a safe late phase. Experience from Supervisory Activities.

The Competitive Edge. The Foundation For Competing

Topsides, Floaters & Onshore Facilities

Technip, Share Fair Caroline BENNETT Contracts & Insurance Manager Debbie WYNESS UKBU Supply Chain Manager 5 th November 2014, Share Fair

Subsea Technology. Alain Marion, Senior VP Assets & Subsea Technology. Investor Day in Brazil, October 4, 2011

Technology services for existing facilities

Technip Offshore Finland

Norwegian Operators Conference Bernd Schrimpf Managing Director Wintershall Norge AS Stavanger 19 th November 2014

Kårstø. Gas processing plant FACTS

The Technology Challenge. Agenda - The Technology Challenge

Det norske oljeselskap - Our first diving operation. Annual Conference The Norwegian Oil and Gas Association Stavanger, Norway

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

Packing and labelling guideline. for deliveries to Statoil ASA and Statoil Petroleum AS

Metrology using SICAMS

Pipelines and land facilities

Parker Maritime AS. 11. AICON 3D Forum - March 12th Metrology subsea using AICON's photogrammetry - The timesaver.

Subsea Systems. in Norway. Fueling the future with comprehensive technologies and support services for the most extreme conditions.

Total Subsea Solutions

Saipem UK Ltd. Saipem. Eni. for graduate engineer recruitment

TECHNIP AT A GLANCE 2014

Technip Offshore Finland

Press Kit Jette Well PL 027D, PL 169C og PL 504 REV. : 01 DATE : PAGE : 2 of 6

Graduate Engineer Development Scheme (GEDS)

PIPELINES AND ONSHORE FACILITIES. ruc FACTS 127

Outline of presentation. Prosjekt 2005 Mulighetenes arena Lillestrøm 12 oktober 2005

Reference List - Offshore Projects to date

Det norske a new large independent. Odd Ragnar Heum, Det norske oljeselskap ASA

Subsea processing. Oslo 8. September 2011 Håvard Eidsmoen, Statoil

Kodiak Deepwater Project Challenges and Solutions

Offshore Wind China 2010 Bergen, 15th March Olivier Angoulevant Nexans Norway AS

Offshore Wind. Cable Installation Cable Trenching Survey & Seabed Mapping IMR

Languages: : French (Mother tongue), English (Fluent), Portuguese (Basic Level)

Classification: Statoil internal Status: Draft. Key Technology Challenges. Flow Assurance and Subsea processing

Life-of-Field. seabed-to-surface

Facilities Asiaflex Products

Facilities Flexibras Tubos Flexíveis Ltda

havard.bo[at] gmail.com

Engineering and technologies Floating LNG

Classification: Internal Status: Draft. Peon discovery. Unlocking unconventional resources in the North Sea

UNDERSTANDING IN DEPTH, COMMITTED TO CORE.

PRESS KIT IVAR AASEN DET NORSKE OLJESELSKAP ASA

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Announcement on Providing Guarantee for the Subsidiary Company - Offshore Oil Engineering (Qingdao) Co., Ltd. by Offshore Oil Engineering Co., Ltd.

Ageing and life extension

Optimization of offshore natural gas field development

Worldwide Engineering centers in the Middle East

Birth of a Norwegian. giant

Baltic Pipe Polish diversification project

HIPPS Application in the Gulf of Mexico. Christopher Lindsey-Curran BP Senior Subsea Engineer

Lundin Petroleum. Corporate Presentation. March Lundin Petroleum. WF12176 p

A reliable gas supplier FACTS

Subsea Power Grid The key enabler for increased oil recovery IOR

THE NORWEGIAN PETROLEUM SECTOR

Customer Type of contract Vessel / location Month / Year

Facilities Pori construction yard

RAISED ACCESS FLOOR KAPP ALUMINIUM TRETUM OFFSHORE

Electric heat tracing

Always finding new solutions. modulesolutions.no

2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm

Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications

Port of Farsund. The exotic choice. Your first and foremost port in Norway

MEK4450. Templates & Manifolds. 29 August Templates and Manifolds. This module will cover:

Contents. Appendix A: Table of Decommissioned Pipelines In the North Sea Region 39 Appendix B: Case Studies of Pipeline Decommissioning Projects 44

Taking it further with Technip

Hydraulic Solutions keep your operations running specialist services

ARCTIC OIL & GAS CHALLENGES AND OPPORTUNITIES UNIS, LONGYEARBYEN, APRIL 12TH, 2016

We strive continuously for zero harm to people, the environment, material and non-material assets

Our business approach Technip PMC

SWEDBANK SUMMIT. Det norske presentation. Oslo, 20 March 2014

13. FPSO Operational Problems Don Smith, OGP

MERMAID FLEET PROFILE SUBSEA SERVICES

Revolutionary Inspection Technology by FORCE Technology

Edvard Grieg Anders Henriksson, Lundin Petroleum Prosjektleder.

Murchison Snorre A Gullfaks C. Kvitebjørn. N. Alwyn Oseberg. Bruce. Heimdal Jotun B. Alvheim. Ringhorne Grane. Glitne Volve Sleipner.

Offshore Developments

Offshore Work Packages

NATURAL GAS IN NORWAY

Curriculum Vitae. Current Status Hired by Technip Norge. Planned end date: End of June 2011

THE BALTIC SEA OFFSHORE PROJECTS

Ceragon Offshore Communication Reference

NLI Asker Subseas' main Subsea Connection deliveries consisting of Subsea Stabs, Subsea Pressure Caps, Subsea Hydraulic Stabs and Subsea Receptacles

Wintershall Norge ASA Maria Development Project. Maria Åpenbaring - Nytt felt og Nye muligheter i Haltenbanken området

Transcription:

TECHNIP IN NORWAY GENERAL PRESENTATION

Technip Technip Among the top five major players in the field of oil, gas and petrochemical engineering, construction and services Global corporation with entities in all oil & gas sectors Workforce of 22,000 worldwide Annual revenues of almost 7 billion euros (2006) Headquarters located in Paris, La Défense Owns and operates several high-quality industrial and construction facilities in addition to a world-class fleet of offshore construction vessels Technip in Norway Main office at Stabekk (Oslo) Spoolbase in Orkanger (near Trondheim) New offices in Stavanger and Haugesund opened in 2006 More than 250 personnel Office in Stabekk Oslo Office in Stabekk Oslo

History/Status History: Operating in Norway since 1985 Established offices in Norway since 1988 Facilities: Oslo (Stabekk) offices Stavanger and Haugesund offices (from 2006) Orkanger spoolbase Orkanger Haugesund Stavanger Oslo

Technip in Norway In Norway, operations are mainly linked to EPCI subsea, umbilicals, risers and flowlines (SURF) projects for development of floating production systems and subsea oil & gas fields. Operating on the Norwegian Continental Shelf, Technip Oslo s core services are: Project management and engineering Underwater contracting Manned (diving) and unmanned (ROV) underwater operations Design, engineering & procurement for the supply and installation of flexible pipe, flowlines and risers, umbilicals, spooled rigid pipe and associated underwater activities (SURF) Inspection, Maintenance and Repair (IMR) services Subsea structure decommissioning

Major flexible pipe references in Norway Balder Balder Åsgard A, B, C Kristin Åsgard B, C, A Åsgard A, B, C Njord Fram Vest Visund Njord Norne Snorre TLP+B + B Varg Varg

Project Experience over the last 10 years Statoil Norne Gullfaks Åsgard Statfjord NF Heidrun Sleipner-Loke Tommeliten (LWI) Heidrun (LWI) Sygna Sigyn Yme β Vest Huldra condensate Åsgard Q Kristin Marine Kristin Risers Snøhvit Marine Norne Satellites Veslefrikk jumpers Åsgard Export riser Diving/Repair Frame Contract PRS Frame Agreement Tyrihans Tampen Link Reeled pipe frame agreement Esso Balder Ringhorne Ringhorne Jurrasic Norsk Hydro Njord Visund Varg Snorre B Fram Vest Oseberg J Fram Øst Vilje Shell Garn West Rogn South Total (Elf) NE Frigg (LWI) Frigg/Frøy BP Norge Tambar Ula-Gyda Valhall Phillips Ekofisk Marathon Alvheim

Most recent contracts 2005-2007 Completed Contracts Offshore 2005 Client Statoil Statoil Statoil Statoil Statoil Statoil Talisman Project name Kristin Marine Operations Kristin Risers Snøhvit Åsgard Q Norne Satellites Veslefrikk Jumpers Varg Riser Current Contracts Offshore 2006 and 2007 Statoil Statoil Norsk Hydro Norsk Hydro Marathon Statoil Statoil BP Statoil Statoil Veslefrikk Jumpers Diving & PRS Fram East Vilje Alvheim Development Åsgard Riser Replacement Tyrihans Tambar Tampen Link Reeled Pipe Frame Agreement

Project references: Kristin marine operations Scope of work Client: Statoil Subsea tie-back to Kristin A Platform Water Depth: 370 m E(P)CI contract Installation 2004 & 2005 Vessels used from the Technip fleet Apache Wellservicer Fabrication: 3 manifolds in 2004 16 km of 3.5 ID Carbon Steel Service Line Umbilical Bundles 40 km off 10 ID 13% Chrome 23 km off 12 Carbon Steel oil export line (to Åsgard C) 7 spools with protection covers 46 Tie-ins and 1 fiber optic cable to Åsgard / Midgard, simultaneous laying-trenching

Kristin marine operations

Project references: Kristin risers Scope of work Client: Statoil Flexible riser to Kristin semi-submersible Water depth: 315 m EPCI contract Fabrication: 7 off 10 flexible production risers (incl. one spare) 2 off 11.6 oil export/import risers (one at Åsgard C) 2 off 16 gas export risers All accessories for Pliant Wave risers 30 off riser anchors Installation : Aug/Sept 2004 (prior to Kristin semi-submersible arrival) Install vertical and horizontal risers anchors Vessels used from the Technip fleet: Constructor Wellservicer Pre-installation: 2 off 11.6 oil export risers 2 off 16 gas export risers 3 off DEH risers

Kristin risers

Project references: Snøhvit marine operations - Scope of work Client: Statoil Subsea tie-back to onshore LNG plant Water depth: from 18 m to 440 m EPCI contract Vessels used from the Technip fleet: Apache Constructor Fabrication: 152 km of 8 carbon rigid line 286 km of 4 piggy-backed coiled tubing line 19 km of 14 13% chrome rigid line 8 spools (8 to 28 ) Protection covers Installation: Rigid flowlines 187 km umbilicals 20 km cables Tie-ins with ICARUS and PSS tools Protection system Flooding/testing of infield lines

Snøhvit

Project references: Åsgard Q Scope of work Client: Statoil Water depth: 300 m EPCI Contract Joint venture: Technip and Subsea 7 Fabrication: 2 off 10 13% chromium infield flowlines, each 13.5 km long. Welding and coating at Orkanger Spoolbase. Initiation piles, anode joints, etc. Installation: Initiation piles installation (Technip) Flowline installation (Subsea 7) Pre-commissioning (joint venture) Vessel used from the Technip fleet: Wellservicer

Åsgard Q

Project references: Norne Satellites marine operations Scope of work Client: Statoil Subsea tie-back of Svale and Stær to Norne FPSO Water depth: 380 m (E)(P)CI contract: installation 2005 Delivery 9 km of 15 production pipeline with DEH cable and CPS, carbon steel with 316L cladding 2 PLEMs + 1 T-piece 12 km of 5 gaslift pipeline 4 flexible tails Vessels used Apache

Norne Satellites marine operations

Project references: Alvheim development Scope of work Client: Marathon Petroleum Company Subsea tie-back to FPSO Odin Water depth: 120 m EPCI contract: installation 2006 Engineering, Procurement & Fabrication 4 production manifolds 3 riser bases including subsea isolation valve Sage tie-in skid 75 km subsea pipelines (from 4 to 14 ) 8 flexible risers (10 12.5 ) 3 dynamic umbilicals 16 km static umbilical 46 spools inclusive diver tie-ins 3 riser support systems (Mid Water Arch) Vessels used from the Technip fleet: Deep Pioneer Apache Normand Pioneer Wellservicer

Project references: Fram Øst flowlines Scope of work Client: Norsk Hydro Subsea tie-back to Troll C platform Water depth: 320 m EPCI contract: installation 2006 Delivery 18 km of 12.6 ID clad pipe 18 km of 12.9 ID water injection pipe Linepipe coating 11.5 km of flexible risers and flowlines 20 km static service umbilical 0.7 km dynamic service umbilical 17 off tie-ins Trenching (water jetting) Structures: PLEMs, Gas Lift Skid, Protection covers Pre-commissioning Rock dumping (approx. 230,000 tonnes) Linepipe and 2 manifolds Vessels used from the Technip Fleet: Apache Deep Pioneer Normand Pioneer

Project references: Vilje project - Scope of work Client: Norsk Hydro Subsea tie-back to Alvheim FPSO Water depth: 120 m EPCI contract Fabrication: ~19 km 12 carbon steel oil production flowline ~19 km 6 carbon steel gas lift flowline ~19 km steel tube service umbilical 12 & 6 spools and umbilical jumper 12 and 6 pig traps Protection covers Installation: 12 & 6 flowlines Umbilical 12 & 6 spools and umbilical jumper at Vilje (Alvheim project installing spools at Alvheim) Tie-ins to Vilje satellites Diving tie-ins to Alvheim Riser Bases (carried out for Alvheim project) Vilje flowbases and protection structures Protection covers Trenching, backfilling and rockdumping Vessels used from the Technip fleet: Apache Normand Pioneer Wellservicer

Project references: PRS/Diving Frame Agreement Scope of work Client: Statoil ASA Hydro and Esso included for diving / PRS work Type of Contract: Frame Contract Exclusive contract for all diving work for Statoil Duration: 5 years (01/01/2007 to 31/12/2011) + options Principal Particular - New DSV Scope of Work - Main Work categories: Contingency for Pipeline repair work, manned- or remote Contingency for other repair work at subsea equipment and structures Planned maintenance, modification and installation work, diver assisted or remote operated Diving contingency preparedness Area of Operation British, Dutch, Danish, German, Belgian, French and Norwegian continental shelf. May be extended to other areas based on Company's future requirements. FRAME CONTRACT DIVING WHAT DOES IT ENTAIL? Established new office in Stavanger, in June 2006 New state-of-the-art DSV under construction New Hyperbaric Rescue Unit on Wellservicer 1Q 2007 Development of new personal diving technology Rebreathers for divers Divers umbilical Divers suit

Orkanger Spoolbase The Spoolbase is located in Orkanger some 65 km south west of Trondheim and is well placed to service the Norwegian Sea developments planned over the next decade. The Spoolbase is used for the fabrication of steel pipe for reeling onto the Installation vessel. The fabrication building is 220 m in length and is able to accept double jointed lengths of coated pipe onto the production line which has 8 welding stations, two mobile radiography bunkers and 6 field joint coating stations. The production pipe is pulled from the fabrication building along a set of production rollers until a 920 m stalk is completed after which the stalk is rolled over onto the 30 m wide stalk racks. The Spoolbase has permanently located facilities and ancillary storage racks for pipe up to 16" in diameter (~400 mm). The capacity of the racks based on 12" three layer coated pipe is 90 stalks each 920 m in length. This represents 82 km of pipe fully fabricated and ready to load out via the rollers located at the opposite end of the racks and in line with the tie-in building and specially constructed quay where the Installation vessels can berth, stern on, to accept the stalks of pipe.

Orkanger Spoolbase

Orkanger Spoolbase

Orkanger Spoolbase

Facilities In addition to being Norway's leading SURF contractor, Technip Oslo also has a concept development team for non-surf projects. Through this team the technologies and experience of the entire Technip group are made available to clients located in Norway. Facilities studies have included: Spar concept study & tests for artic conditions Jack-up (TPG 500) concept studies in central North Sea Spar pre-feed studies Platform de-commissioning studies Through a cooperation with other Technip units Technip Oslo offer full EPC services for floaters and jack-ups on the NSC.