Continuous Flow Operations Module 8.3



Similar documents
Machining Operations- Cycle Time

Standardized Work Module 6.1

Takt Time Module 8.1

Six Sigma Systems Principles Module 2.1

Front-Line Leadership Capability and Motivation SPL 4.2

Hoshin Planning / Policy Deployment Module 10.2

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT

Forecast push, customer pull, and hybrid models Module 11.1

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.

The Tools of Lean - Value Stream Mapping

Enhance Production in 6 Steps Using Preventive Maintenance

Chapter 5: Strategic Capacity Planning for Products and Services

TEACHING AGGREGATE PLANNING IN AN OPERATIONS MANAGEMENT COURSE

I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.

Operations Management OPM-301-TE

SC21 Manufacturing Excellence. Process Overview

AGGREGATE & CAPACITY PLANNING

MGT 025 Operations Management

Introduction to Manufacturing Process

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Linear functions Increasing Linear Functions. Decreasing Linear Functions

of The New England Water Works Association

Syllabus for the course: Operations Management. Index

Management Accounting and Control Spring 2007

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1

Understanding Manufacturing Execution Systems (MES)

PART A: For each worker, determine that worker's marginal product of labor.

Implementing Automation after Making Lean Improvements

Long-Run Average Cost. Econ 410: Micro Theory. Long-Run Average Cost. Long-Run Average Cost. Economies of Scale & Scope Minimizing Cost Mathematically

Operational Business Intelligence in Manufacturing

Antti Salonen KPP227 KPP227 1

Basic Factory Dynamics

EXERCISES. Testing Equipment Vehicle Estimated average annual income: $24,300/6... $4,050 $15,000/8... $1,875

Chapter 4 SUPPLY CHAIN PERFORMANCE MEASUREMENT USING ANALYTIC HIERARCHY PROCESS METHODOLOGY

TPM OVERVIEW. Manufacturing & Administrative Excellence. 1

Reliability Modeling Software Defined

4 Macroeconomics LESSON 6

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines

Chapter 04 Firm Production, Cost, and Revenue

Processing of Insurance Returns. An EMC Lean Six Sigma Project. Author: Aidan Trindle. Editor: Mohan Mahadevan

Does enterprise resource planning software support lean? ERP goes 44 TARGET AME.ORG/TARGET

Chapter 5 Supporting Facility and Process Flows

THE BEGINNER S GUIDE TO LEAN

SUPPLY CHAIN MANAGEMENT (SCM) WITH APPROACH TO QUALITY CONTROL IN MILLING INDUSTRY

Overall Equipment Effectiveness (OEE) A General Discussion with Calculation Methods

Understanding Lean Principles that Dramatically Impact Process Performance

3 SYSTEMS DESIGN AND CAPACITY

Chapter 6. Inventory Control Models

Louisiana Tech University Lean Manufacturing Courses

Energy Conservation for a Paint Company Using Lean Manufacturing Technique

Working Capital Management Nature & Scope

Manufacturing Operations Management

Introduction to OpStat

Case Study on Forecasting, Bull-Whip Effect in A Supply Chain

Teaching lean thinking through game: some challenges

Lean Six Sigma Black Belt Body of Knowledge

School of Management and Languages Capacity Planning

MSc in Lean Operations. Module Descriptions

White Paper Operations Research Applications to Support Performance Improvement in Healthcare

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

ENGINEERING ECONOMICS AND FINANCE

Lean Six Sigma Black Belt-EngineRoom

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

Toyota Production System. Lecturer: Stanley B. Gershwin

INSERT COMPANY LOGO HERE. Solutions for Discrete Product Industries Leadership New Product Award Innovation Award

High Flying Factors of Production LESSON 3 HIGH FLYING FACTORS OF PRODUCTION

Management Accounting and Control Spring 2007

Determining the Optimum Staffing Levels for a Maintenance and Reliability Department

At the end of this module, you should be able to:

2012 Americas School of Mines

HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS

CHAPTER 6 MARKET STRUCTURE

Managing Staffing in High Demand Variability Environments

Reliability-Centered Maintenance: A New Approach

APS1028 Operations and Production Management - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom)

The Ten Principles of Material Handling

Spreadsheet simulation for industrial application: a case study

15. How would you show your understanding of the term system perspective? BTL 3

Business Solutions that Create Value for Aluminium Producers

Sales Forecasting System for Chemicals Supplying Enterprises

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Review 3. Table The following table presents cost and revenue information for Soper s Port Vineyard.

Experiences with The Trimrian factory game - a production game within the education of Bachelor Production Engineers

APICS Certified in Production and Inventory Management [CPIM] Exam Content Manual. Preview

ANALYSIS OF THE POTENTIALS OF ADAPTING ELEMENTS OF LEAN METHODOLOGY TO THE UNSTABLE CONDITIONS IN THE MINING INDUSTRY

Value Stream Mapping

Transcription:

Continuous Flow Operations Module 8.3 Bret Awbrey & Jacob Silber Chris Musso, MIT ESD Presentation for: ESD.60 Lean/Six Sigma Systems MIT Leaders for Manufacturing Program (LFM) Summer 2004 These materials were developed as part of MIT's ESD.60 course on "Lean/Six Sigma Systems." In some cases, the materials were produced by the lead instructor, Joel Cutcher-Gershenfeld, and in some cases by student teams working with LFM alumni/ae. Where the materials were developed by student teams, additional inputs from the faculty and from the technical instructor, Chris Musso, are reflected in some of the text or in an appendix

Overview Learning Objectives What is a continuous flow operation? What considerations are critical to the business? How do lean principles apply to a continuous flow operation? Session Design (20-30 min.) Part I: Introduction and Learning Objectives (1-2 min.) Part II: Key Concept or Principle Defined and Explained (3-5 min.) Part III: Exercise or Activity Based on Field Data that Illustrates the Concept or Principle (7-10 min.) Part IV: Common Disconnects, Relevant Measures of Success, and Potential Action Assignment(s) to Apply Lessons Learned (7-10 min.) Part V: Evaluation and Concluding Comments (2-3 min.) 6/ 9/04 -- 2

Continuous Flow Operations The ability to maintain steady state conditions in flow and concentration through the modules of the system 1 Examples include: chemical synthesis Some food manufacturing (chocolate, beer) water processing energy generation information technology 6/ 9/04 -- 3

Continuous Flow Defining Factors High product volume Special purpose equipment (low flexibility) Uninterrupted product flow Few schedule changes Low number of standardized products Low variable cost (up to capacity level) Low labor skill (operators) during regular operations 2,3 6/ 9/04 -- 4

Continuous Flow Critical Factors Capital intensive (start-up) Storage of in-process and finished goods Material waste or loss Maintenance costs Fluctuations in demand Supply of finished goods is usually constant Products often become commodities Economies of scale (usually bigger is better) 6/ 9/04 -- 5

Continuous Flow Lean Parameters Initial engineering design is critical Change in production quantity Introducing additional equipment In-line sensing Preventative Maintenance Overall Equipment Effectiveness Equalization of Takt times (Line balance) Accurate forecasting of demand 6/ 9/04 -- 7

Initial design and sensing concerns Initial design should take into account: Ease of maintenance Ability to expand/reduce production Changing input costs Preventative maintenance Sensing: Can evaluate qualitative factors with quantitative information Helps drive process improvement Can detect equipment problems in un-viewable areas 6/ 9/04 -- 8

Chocolate Production Flow Mixing 200 g/m Refining 100 g/m Conching 50 g/m Liquid Coatings 75 g/m Std. & Inspection 75 g/m Mixing = Bulk 5 t/d Tempering 25 g/m Depositing 25 g/m Moulding 25 g/m 6/ 9/04 -- 9

Overall Equipment Effectiveness OEE = Availability x Performance Rate x Quality Rate between capability and real output Options: Inspect equipment for flaws, repair Test equipment Check original design document (original specifications) Add inline tempering/conching unit (additional capacity) Availability (operating time/net available time) X Performance ((ideal cycle time x total parts run)/operating time) X Quality ((total parts run - total defects)/total parts run) 6/ 9/04 -- 11

Disconnects Technical Factors Supply is typically constant, hard to change in a Brownfield operation Initial design might not account for later improvements Maintenance more difficult (downtimes may not exist) High cost of production step-function Social Factors Demand is typically variable Operators typically have little input (chemical reactors, generators), so harder to get continuous improvement High competition for lowest cost, commodity game 6/ 9/04 -- 12

Measurables OEE = Availability x Performance Rate x Quality Rate Improved forecasting of demand can lead to more narrow control limits (σ) Statistical data from sensing to improve quality 6/ 9/04 -- 13

Concluding Comments Typical situations are Brownfield operations where initial design is sub-optimal. In these cases capital improvements may be difficult based on earlier designs. Cost of changing capacity can also be high because of similar Brownfield considerations. (Ex. Power plant) Important tools include the OEE for establishing line balance and reducing bottlenecks. 6/ 9/04 -- 14

Appendix: Instructor s Comments and Class Discussion Key issue in continuous flow industries: balancing supply and demand Economies of scale lead to continuous, large scale production often more than market demands Apparent economies become disabilities Process industries often use financial instruments to make up for inability to scale to demand Socio-tech teams are often used instead of lean teams, since there is more meeting time and global focus on plant is required Scope of OEE is important: it can be for an individual machine, the bottleneck operation, an production operation or line, or an entire plant 6/ 9/04 -- 15

Appendix: Instructor s Guide Slide Time Topic Additional Talking Points 1-2 2-3 min Introduction, overview and learning objectives 3 2 min Key Concepts - Continuous Flow Operations 4-8 5-8 min Key Concepts (con) - Defining factors, Critical factors, Graph, and lean parameters. 9-10 7 10 min Exercises/Activities - Chocolate factory 11 1-2 min Overall Equipment Effectiveness What is a CF process? Business Applications? Lean applications in CF environment? A perfectly lean discrete operation could be considered continuous. However, this is not subject of this SPL. The characteristics (defining factors) Example of capital expenses are a plant being run even though it is losing money because it costs more money to shut it down. Maintenance costs - sometimes as high as 10% of sales Commoditization of product - price set by market, lowest cost provider is winner For graph (slide 6) - Area under curves match, but costs of straight supply are in not meeting demand (losing customers) and excess finished goods inventory. Ideally the will match and any system that is designed to be responsive over a shorter and shorter piece of time will be more effective. Look at system flow and its constraints. If we are looking at different objectives, then the limiting factor will change. This example looks at maximum available for depositing and moulding. Basic method for balancing line flow. As a consultant you would first look at this. 12 5-7 min Disconnects Look for personal examples either from audience or from your own experiences 13 2-3 min Measurables OEE 14 1-2 min Concluding comments Bret Awbrey & Jacob Silber ESD.60 Lean/Six Sigma Systems, Lean LFM, happens MIT at design. Design responsiveness to demand. 6/9/04 -- 16

References Figure 1 - Image 1 - Image 2 - Image 3 - Reference 1 - http://weather.nmsu.edu/teaching_material/soil698/student_material/autoanalyzer/flow.html Reference 2 Adam, Everett E., Ebert, Ronald J. Production and Operations Management. Englewood Cliffs, NJ. Prentice- Hall. 1978. Reference 3 - Reference 4 - http://www.netmba.com/operations/process/structure/ http://www.maintenanceworld.com/articles/feedforward/overall.htm http://www.nestle.com.au/baking/beantoblock/images/diagram_story_of_choc.gif http://www.eia.doe.gov/kids/images/amoco.jpg http://www.waega.de/6thoct3.jpg http://www.titanicbrewery.com/images/brewery.jpg 6/ 9/04 -- 17