Takt Time Module 8.1



Similar documents
Machining Operations- Cycle Time

Standardized Work Module 6.1

Continuous Flow Operations Module 8.3

Six Sigma Systems Principles Module 2.1

Team/Work Group Structure and Roles Socio-Tech vs Lean Teams SPL 4.1

Brownfield / Greenfield Contrast SPL 3.1

Hoshin Planning / Policy Deployment Module 10.2

Front-Line Leadership Capability and Motivation SPL 4.2

Forecast push, customer pull, and hybrid models Module 11.1

Toyota Production System. Lecturer: Stanley B. Gershwin

Achieving Basic Stability By Art Smalley

MOS 3330 Test 2 Review Problems & Solutions

The Tools of Lean - Value Stream Mapping

DISCUSSION AND CONCLUSIONS

Lean Specialist Certification Program

Getting Started with Lean Process Management

At the end of this module, you should be able to:

Lean Test Management. Ban Waste,Gain Efficiency. Bob van de Burgt Professional Testing

Lean Six Sigma Lean 201 Introduction. TECH QUALITY and PRODUCTIVITY in INDUSTRY and TECHNOLOGY

A Book Review: Lean Thinking by Womack and Jones

Appendix Lean Glossary Page 1

Tovota Production System: Beyond Large-Scale Production. by Taiichi Ohno

Lean Manufacturing Essential Principles

Lean Sales, Operations & Financial Planning: Using the Box Score to eliminate annual budgeting

Metrics-Based Process Mapping (MBPM)

THE BEGINNER S GUIDE TO LEAN

VALUE STREAM MAPPING ICONS

Understanding the Variety of Total Quality Management Applications. Eric M. Gatmaitan

School of Management and Languages Capacity Planning

Lean Management Standards: Manufacturing

Louisiana Tech University Lean Manufacturing Courses

The Need for Lean Training

WHITE PAPER. The Lean Workforce. Applying Lean principles to improve workforce management

Lean Manufacturing and Six Sigma

Operational Excellence using Lean Six Sigma Amit Dasgupta

Lean Management and the Role of Lean Leadership

IMPACT OF PROCESS VARIABILITY ON LEAN MANUFACTURING SYSTEMS

LEAN Office & Business Processes Participant Handout Value Stream Mapping

The Internet of Things and the future of manufacturing

Value Stream Mapping

Map the Value Stream

The Principles of the Lean Business System: #5 Prevention. Lean in the 21 st Century Series Professor Peter Hines

LEAN TECHNIQUES. Some of Our Lean Courses: --How to Implement Lean in Small Companies --Flow control/management

Article Creating Basic Stability by Art Smalley, The Lean Enterprise Institute

Lean enterprise Boeing 737 manufacturing Lean Production System

June 2014 exam. (4CW) SME Cash and Working Capital. Instructions to students:

Quality Thinking in other Industries. Dominic Parry Inspired Pharma Training. WEB GMP BLOG inspiredpharmablog.

Managing capacity Nissan cuts production

Business Process Optimization w/ Innovative Results

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling

Misunderstandings About Value-Stream Mapping, Flow Analysis, and Takt Time

Creating Continuous Flow

Lean Healthcare Simulation Segment I: Baseline Performance

I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.

For Improved Efficiency, look at the supply Chain and Outsourcing Management

Chapter 11. MRP and JIT

Manufacturing Planning and Control

MGT 025 Operations Management

Evaluation of Supply Chain Management Systems Regarding Discrete Manufacturing Applications

BQF Lean Certification Process

: Dr. A.Satyanandini (Professor & HOD, Management Studies &Research Centre, BMS College of Engineering, Bangalore)

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

Lean in the Supply Chain! MNASQ 10/12/2015. Advance your supply chain

Introduction to Business Interruption Insurance. Module 5: Increased Costs and Savings

In today s economic environment many companies are turning to

Value Stream Mapping Basics

Leaning a Training Process for a Leading Irish Retail Bank

Lecture No. 12: Delivery Improvement and Inventory System. Takahiro Fujimoto

Achieving Lean Transformation in High-Variation Environments

ENGR 1181 Lab 2: Quality and Productivity Lab

Dial-in Number: Access code: # Go to: Use the JOIN A SESSION button Enter the Access Code:

Overview on milk prices and production costs world wide

Integrating Leader Standard Work with Visual Management Tools. with Joe Murli

Celestica. Push Versus Pull Model. You can start the show whenever you re ready

Manufacturing Flow Management

HUMANIZING TAKT TIME AND PRODUCTIVITY IN THE LABOR- INTENSIVE MANUFACTURING SYSTEMS

ENTERPRISE BUSINESS SYSTEMS PROGRAM MANAGEMENT

Trends in Aeronautical Information Management

Scrum vs. Kanban vs. Scrumban

Fluid Automation: The Unsung Contributor to Plant Economic Performance. A Management Brief From ASCO Numatics

Lean Management. KAIZEN Training of Trainers. KAIZEN Facilitators Guide Page to.

STANDARDIZED WORK 2ND SESSION. Art of Lean, Inc. 1

Using the Lean Model for Performance Improvement

Lean Kitting: A Case Study

Five Tips to Achieve a Lean Manufacturing Business

IN TOUGH ECONOMIC TIMES: 4 Key Considerations & 7 Creative Solutions for Immediate Savings

Lean Manufacturing: Part 2. Charles Theisen, CPIM, CIRM. Lean Manufacturing Part 1I

Graduate Certificate Supply Chain Management

This can be done by simply counting pieces in the line or subtracting total number of pieces loaded to total number of pieces unloaded from the line.

High Performance Culture Change by. Curt J. Howes Organization Performance Strategies

The European PCB Industry in 2015 What is the future of our industry? Where are we going? Is the Future already written or can we change it?

Lean Supply Chain and Logistics Management

Fujitsu s Lean Solutions Group Lean Healthcare in Canada

LOGISTICS & SUPPLY CHAIN MANAGEMENT

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

SIMERO Software System Design and Implementation

Managing Staffing in High Demand Variability Environments

Single Manufacturing Site with. Extended Manufacturing Site(s)

Hessel Visser NCOI Les 6 A P 373. Operations Management, 7E: Chapter 14 en15

Lean Construction A New Path for the Construction Industry

Transcription:

Takt Time Module 8.1 Colin Ducharme, LFM 06 Todd Ruddick, LFM 06 Mark Graban, Internal Lean Consultant for Honeywell (LFM 99) Presentation for: ESD.60 Lean/Six Sigma Systems MIT Leaders for Manufacturing Program (LFM) Summer 2004 These materials were developed as part of MIT's ESD.60 course on "Lean/Six Sigma Systems." In some cases, the materials were produced by the lead instructor, Joel Cutcher-Gershenfeld, and in some cases by student teams working with LFM alumni/ae. Where the materials were developed by student teams, additional inputs from the faculty and from the technical instructor, Chris Musso, are reflected in some of the text or in an appendix

Overview Learning Objectives Clearly define the concept of Takt time Show the relationship between cycle and Takt time Illustrate difficulties with meeting Takt time Describe real-world sideeffects of controlling an operation via Takt time Session Design Part I: A Short History Part II: Takt Time: Defined Part III: Examples and Applications of the Concept Part IV: Common Disconnects and Measure of Level of Implementation Part V: Summary and Questions 6/ 28/04 -- 2

Short History Takt: German word for baton Refers to beat, timing, and regulation of speed 1930 s: Germany, Japan collaborated within the Axis Powers After WWII, Japan uses concept to organize its Just In Time system Adapted from MIT LFM thesis by Sean Hilbert 6/ 28/04 -- 3

Takt Time: Defined GENERAL DEFINITION: Takt Time is the desired time that it takes to make one unit of production output.** *CUSTOMER DRIVEN: Available Operating Time / Customer Demand e.g.-- 8 hours of Daily Operating Time / 4 units of daily demand = Takt Time of 2 Hours *OPERATION DRIVEN: Available Operating Time / Forecasted Demand e.g. 8 hours of Daily Operating Time / 5.7 units of forecasted demand = Takt Time of 1.4 Hours Nominally this is an initial design variable that dictates the architecture of the entire manufacturing operation Takt Time differs from Cycle Time, which is the actual time it takes to make one unit of production output. 6/ 28/04 -- 4

Real World Example: WWII B-24 s ~1940: Charles Sorensen builds plant to output a bomber an hour Stabilized operation by preventing inventory buildups, consequential stops and starts A balance to the assembly process that ensures that all pieces arrive when they are needed RESULT: Syncopated system with all pieces working in concert and a balance a balanced assembly line 6/ 28/04 -- 5

Automobile Supplier Data 30 Part A 3 Part B Production Time ( Minutes / Unit ) 25 20 15 10 5 0 Customer Demand Takt Time Operationa l Takt Time Operation Cycle Time 1 2 3 4 5 6 7 8 9 10 Production Dates ( Days) Production Time ( Minutes/Unit ) 2.5 2 1.5 1 0.5 0 Customer Demand Takt Time Operationa l Takt Time Operation Cycle Time 1 2 3 4 5 6 7 8 9 10 Production Dates ( Days) 6 Part C 30 Part D Production Time ( Minutes/Unit ) 5 4 3 2 1 0 Customer Demand Takt Time Operationa l Takt Time Operation Cycle Time 1 2 3 4 5 6 7 8 9 10 Production Time ( Minutes/Unit ) 25 20 15 10 5 0 Customer Demand Takt Time Operationa l Takt Time Operation Cycle Time 1 2 3 4 5 6 7 8 9 10 Production Dates (Days) Production Dates ( Days) What are the major issues with the production of these parts? 6/ 28/04 -- 6

Takt Time Disconnects Technical Factors Need to be able to properly set the takt time for each operation Once the operational takt time is set it can be very difficult to change (example: speeding up or slowing down an assembly line) Hard to control customer demand fluctuations (order stability) Difficult to ensure processes remain in control Social Factors Workforce can be resistive to being told what speed to work at A company controlled by finance may throw the system out of whack by forcing products to be made in order to meet/exceed a quarter point Lack of trust in management s commitment to employees (Why should we work to improve a process if management will just lay us off?) There are numerous reasons plants have trouble implementing takt time 6/ 28/04 -- 7

Measures of Takt Time Implementation How well do the operational takt times meet the customer demand? Are the takt times and cycle times synchronized? What percentage of operations are controlled by takt time? Is there a system in place to handle fluctuations in customer demand? (Overtime, temporary workers, etc.) Does the plant conform to the takt time and not deviate from following it? It is necessary to evaluate the implementation of a takt time driven operation 6/ 28/04 -- 8

Summary and Questions Takt time is the rhythm or heartbeat at which an organization should operate A truly Lean operation will synchronize takt and cycle times as well as make sure that operational takt times meet customer demand Taken alone takt time can lead to disconnects and issues, but within a Lean mind frame it is a powerful tool Questions??? 6/ 28/04 -- 9

Appendix: Instructor s Comments and Class Discussion for 8.1 Takt time is at the heart of a value stream map Operations on the critical path work to the takt time, regulated by the constraint in the process Feeder operations need not work to the takt time, but as waste is eliminated, interdependency increases and the takt time becomes more relevant 6/ 28/04 -- 10

Bibliography http://www.strategosinc.com/takt_time.htm http://www.isixsigma.com/dictionary/takt_time-455.htm Pascal, Dennis. Lean Production Simplified: A Plain- Language Guide to the World s Most Powerful Production System. Productivity Press: New York, 2002. 6/ 28/04 -- 11

Slide 1-2 Time 2-3 min Appendix: Instructor s Guide Topic Additional Talking Points Introduction, overview and learning Identify overall themes objectives Clearly defining takt times is easier said than done 3-4 5-6 7 8 9 3-5 min 7-10 min 5-7 min 2-3 min Short History and Definition Examples/Exercises/Activities Disconnects Measurables Concept is not originally Japanese Customer driven takt time is the accepted academic definition and operational driven takt time is often the design variable in real world applications Use the B-24 example to highlight how takt time can be used to balance material flow (example: 4 propellers need to be completed per hour in order to balance with the flow of one aircraft per hour) Part A: Fluctuating orders & disconnect between cycle time and takt time (over capacity) Part B: Disconnect with customer orders (under capacity) Part C: Operational takt time arbitrarily changed, but cycle time is physically constrained and can t adapt Part D: End of a quarter, product pushed out the door Relate disconnects to the part data from the previous slide Specifically address the trust in management issue by highlighting how good Lean organizations react to the issue (example: job security via kaizen teams as in NUMMI Plant) Examples of questions an organization should ask itself to determine it s commitment to takt time 1-2 min Concluding comments Takt time is part of the entire Lean mindset and is most powerful when used in conjunction with other tools Takt time is a design variable that stays relatively constant once it is set, it is rarely changed 6/ 28/04 -- 12