2. ASTM Standard E 185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels".



Similar documents
Reply to Request for Additional Information Reaardina License Renewal Awwlication

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 22, 2015

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD PRE-FILED WRITTEN SUPPLEMENTAL REPLY TESTIMONY OF REGARDING CONTENTION NYS-38 / RK-TC-5

Criteria for Development of Evacuation Time Estimate Studies

April 15, Dear Dr. Williams:

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Texas Engineering Experiment Station/Texas A&M University System

ATTACHMENT I TO IPN RELATED TO LOAD TESTING AND,24 MONTH OPERATING CYCLES

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT

CODE/NAME ENCL CODE/NAME ENCL

New Trustee for NFS Standby Trust Agreement

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSIN AVENUE BETHESDA, MARYLAND

A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC CFR Docket No.:

VAAS CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM. March 2, 2016 CY CFR (e)

Subject: 30-day Report of Event Criticality Accident Alarm System Degradation

Apr; 1 5, CFR U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C

!EEE~ New Trustee for NFS Standby Trust Agreements and New Letter of Credit. Subject: 21 G GOV ACF

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

Should you have any questions in regard to this submittal, please contact Ms. Margaret Earle at

M0okc. OPower. -Nuclear. February 6,

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 8.4 (Draft was issued as DG-8036, dated April 2010)

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION. Before the Atomic Safety and Licensing Board

[Docket No. FAA ; Directorate Identifier 2008-NM-171-AD; Amendment ; AD ]

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

NUCLEAR REGULATORY COMMISSION [EA ; NRC ] In the Matter of Northern States Power Company, Minnesota

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

ORNL/TM-2004/44 ARN-Atucha-I Reactor Pressure-Vessel Embrittlement March 2004 Jy-An Wang

91/09/20 Energy Center, AFFILIATION MINECK,D.L. Iowa Electric Light RECIP.NAME. DPR-49,moving list from Section 3.

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk Rockville Pike Rockville, MD 20852

COMBINED LICENSE SOUTH TEXAS PROJECT UNIT 3 NUCLEAR INNOVATION NORTH AMERICA LLC STP NUCLEAR OPERATING COMPANY NINA TEXAS 3 LLC

October 22, 2015 EA

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Pacific Gas and Electric Company;

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37

Licensing a Repository at Yucca Mountain

B.Arc ie. Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC Dear Sir / Madam:

Crystal River Unit 3 License Transfer Notification of Transfer Date

October 1, Exemption No A Regulatory Docket No. FAA

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

March 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

STATE OF CONNECTICUT

AoDI. December 9, 2015 NOC-AE CFR U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC

August 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

A Regulatory Approach to Cyber Security

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3

SMitsui USA. Aug 6, 2001

Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC Compliance Filing Docket No.

STATE OF CONNECTICUT INSURANCE DEPARTMENT ORDER

NRC INSPECTION MANUAL INSPECTION PROCEDURE 88045

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

Westinghouse. Westinghouse Electric Company

Packaging Licenses and Guaranteed Renewal Requirements

August 24, 2009 NRC INSPECTION REPORT / AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS

Risk Evaluation and Mitigation Strategies: Modifications and Revisions Guidance for Industry

Annex B. The Proposed Amendments AMENDMENTS TO NATIONAL INSTRUMENT MARKETPLACE OPERATION

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

ooo- I542 (314 Brlngrng tnnovation to patient care worldwide April 23,2003

March 1, Mr. Brian Cook Vice President Airline and Passenger Solution Line 3100 Cumberland Blvd. Atlanta, GA Dear Mr.

A Role-Based Access Control (RBAC) Schema for REAP

Rules on Southern Companies Energy Auction Participation

Quality Management System-A Revision 7 (NRC-approved Version)

Order No. EA RS

78776 Federal Register / Vol. 80, No. 242 / Thursday, December 17, 2015 / Notices

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Defense Logistics Agency; DLA Strategic Materials

2880 International Circle Colorado Springs, CO Telephone Executive Summary Pikes Peak Regional Building Code Revisions

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

August 15, Docket No License No Control No

Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020

August 27, Docket No License No Control No

Regulatory Guide Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.

Part 1 General and Administrative Information. Part 3 Applicant s Environmental Report Combined License Stage

Standard CIP Cyber Security Security Management Controls

STATE OF CONNECTICUT

July 31, Dear Dr. Biegalski:

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

LETTER OF TRANSMITTAL

TG TRANSITIONAL GUIDELINES FOR ISO/IEC :2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

VIA ELECTRONIC MAIL TO

Deregulation, Consolidation, and Efficiency: Evidence from U.S. Nuclear Power

January 3, 2007 EA

SWITCH KIT. Switching is as easy as 1-2-3

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

EXHIBIT A. Rule Asset Duration/ Close Time Action Effective Date

Fission fragments or daughters that have a substantial neutron absorption cross section and are not fissionable are called...

NRC INSPECTION MANUAL

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

Southern LNG Company, L.L.C. ( SLNG ) submits for filing the following section to its FERC Gas Tariff, First Revised Volume No.

Federal Register / Vol. 73, No. 146 / Tuesday, July 29, 2008 / Proposed Rules

June 19, 2015 Advice Letter 4809

Transcription:

ENT000670 Submitted: August 10, 2015 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 John A. Ventosa Site Vice President Administration August 12, 2013 NL-13-106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11545 Rockville Pike, TWFN-2 F1 Rockville, MD 20852-2738 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 05000286 Exhibit #: ENT000670-00-BD01 Identified: 11/5/2015 Admitted: 11/5/2015 Withdrawn: Rejected: Stricken: Other: SUBJECT: Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Per 10 CFR 50 Appendix H Indian Point Unit Number 2 License No. DPR-26 REFERENCES: 1. NRC Administrative Letter 97-04, "NRC Staff Approval For Changes to 10 CFR 50, Appendix H, Reactor Vessel Surveillance Specimen 2. ASTM Standard E 185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels". Dear Sir or Madam: Entergy Nuclear Operations, Inc. (Entergy) hereby requests NRC approval of a revision to the reactor vessel surveillance capsule withdrawal schedule pursuant to 10 CFR 50, Appendix H, Section III.B.3 which requires that withdrawal schedules be submitted in accordance with 10 CFR 50.4 and that the proposed schedule must be approved by the NRC prior to implementation. Reference 1 allows NRC approval of the proposed changes to the withdrawal schedule without a license amendment if the changes conform with the American Society for Testing and Materials (ASTM) Standard Practice E 185-82 (Reference 2). The proposed changes comply with the recommendations of ASTM Standard Practice E 1985-82 as discussed in. Indian Point Unit 2 applied for a twenty year extension to the current operating license which is still under review. This letter proposes to change the surveillance capsule withdrawal schedule to cover the additional twenty year period of extended operation. As a result of this change, Entergy proposes to revise the withdrawal date for the next capsule from the end of life to refueling outage 28, currently scheduled for March 2028. This is consistent with the requirements of ASTM E 185-82 for a sixty year operating period. Additional details are provided in.

ATTACHMENT 1 TO NL-13-106 PROPOSED REVISION TO REACTOR VESSEL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE PER 10 CFR 50 APPENDIX H ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NO. 2 DOCKET NO. 50-247

Page 1 of 4 1.0 REQUIREMENTS Appendix H of 10 CFR 50 (Reference 1) describes reactor vessel material surveillance program requirements. Paragraph (lll)(b)(3) requires "A proposed withdrawal schedule must be submitted with a technical justification as specified in Section 50.4. The schedule must be approved prior to implementation." Reference 2 allows NRC approval of the proposed changes to the withdrawal schedule without a license amendment if the changes conform with the American Society for Testing and Materials (ASTM) standard E 185 (Reference 3). 2.0 PROPOSED CHANGES The proposed change revises the withdrawal schedule for one of the surveillance capsules which remain in the reactor vessel by revising the withdrawal date from the end of life to RFO 28 currently scheduled for March 2028. It also makes an administrative change to delete the Capsule S note since the 2RFO19 is past. The current schedule and proposed changes are identified in Tables 1 and 2, respectively. The current surveillance capsule withdrawal was submitted by Entergy in references 5 and 6 and it was approved by the NRC in reference 7. Table 1 - Current Withdrawal Schedule Capsule Location Lead Factor Withdrawal Date T 320 3.42 End of Cycle 1 Y 220 3.48 End of Cycle 2 Z 40 3.53 End of Cycle 5 V 4 1.18 End of Cycle 8 S 140 3.5 Retired in Place ** U* 176 1.2 Spare W* 184 1.2 End of Life *** X* 356 1.2 Spare *The withdrawal schedule of these capsules is interchangeable due to common materials and lead factors. ** Capsule S may be withdrawn during RFO 19 if modified tooling is capable of removing the capsule is available. If not withdrawn, no capsule is required. If withdrawn, testing will be coordinated with industry to optimize the usefulness of the test data. *** At the end of life as currently licensed, Capsule W (or U or X) will be withdrawn. The proposed revised schedule based on a 60 year operating term is provide in Table 2 below and includes a change to the Capsule W withdrawal schedule from End of Life to End of Cycle 28. This revised schedule allows capsule W to be subjected to a fluence which corresponds to the peak vessel fluence at the clad/base metal interface at the end of the 60 year operating term.

Page 2 of 4 Table 2 - Proposed Revised Withdrawal Schedule Capsule Location Lead Factor Withdrawal Date T 320 3.42 End of Cycle 1 Y 220 3.48 End of Cycle 2 Z 40 3.53 End of Cycle 5 V 4 1.18 End of Cycle 8 S 140 3.5 Retired in Place U* 176 1.2 Spare W* 184 1.2 End of Cycle 28 X* 356 1.2 Spare *The withdrawal schedule of these capsules is interchangeable due to common materials and lead factors. The following table provides detailed fluence levels for each of the capsules. Capsule Capsule Lead Withdrawal Withdrawal Capsule Location Factor Outage EFPY (vessel) Fluence (n/cm 2 ) T 320 3.42 RFO1 1.42 2.53 x 10 18 Y 220 3.48 RFO2 2.34 4.55 x 10 18 Z 40 3.53 RFO5 5.17 1.02 x 10 19 V 4 1.18 RFO8 8.6 4.92 x 10 18 S 140 3.5 Retired in place N/A N/A U* 176 1.2 Spare Spare N/A W* 184 1.2 RFO28 Approx. 42 2.0 x 10 19 EFPY X* 356 1.2 Spare Spare N/A Notes: *The withdrawal schedule for these three capsules is interchangeable due to the common lead factor and the common materials in the capsules. 3.0 TECHNICAL ANALYSIS This request proposes to revise the surveillance capsule withdrawal schedule to add the removal and testing of one additional capsule during the period of extended operation when it reaches a capsule fluence of at least one times the peak vessel, end of extended life fluence as required by ASTM E 185-82. It also administratively deletes the note to capsule S since it was not withdrawn in RFO 19. Removal and testing of one additional capsule during the

Page 3 of 4 period of extended operation will provide additional reactor vessel material embrittlement information which will be incorporated into the 10CFR50.61 and Appendix G evaluations. As listed in Table 1 above, Indian Point Unit 2 has previously removed and tested four capsules and has four additional capsules remain in the vessel. However, capsule S has been retired in place since previous attempts to remove this capsule were unsuccessful given its location in the vessel and the adjacent interferences which prevent the capsule removal tool from directly (i.e. vertically) accessing the capsule. The three remaining capsules available for removal are identical in that they contain similar material specimens and similar lead factors and therefore are interchangeable. Based on fluence calculations provided in Reference 4, the Indian Point 2 reactor vessel is projected to reach a peak fluence at the clad/base metal interface of approximately 1.906 x 10 19 n/cm 2 (E >1.0 MeV) by the end of extended operation (i.e. 60 calendar years or 48 Effective Full Power Years, EFPY). At the current projected flux for the period of extended operation, the three remaining capsules are projected to reach the vessel peak fluence of 1.906 x 10 19 n/cm 2 (E >1.0 MeV) at approximately 40 EFPY. Since the three remaining capsules have a lead factor of approximately 1.2, a capsule fluence of 1.906 x 10 19 n/cm 2 (E >1.0 MeV) corresponds to a peak vessel fluence of approximately 1.588 x 10 19 n/cm 2 (E >1.0 MeV). Assuming that the duration of future fuel cycles remain constant at approximately 1.81 EFPY per fuel cycle, the fluence for the remaining capsules is projected to reach 1.906 x 10 19 n/cm 2 (E >1.0 MeV) at approximately refueling outage 27 (i.e. 2R27). To ensure that the next capsule has been exposed to a minimum of 1.906 x 10 19 n/cm 2 (E >1.0 MeV), the proposed schedule will require removal of the next capsule during refueling 28 (2R28) currently scheduled for March 2028 resulting in a capsule fluence of approximately 2.0 x 10 19 n/cm 2 (E >1.0 MeV). 10CFR50, Appendix H requires that the surveillance capsule program must meet the requirements of the edition of ASTM E 185 that is current on the issue date of the ASME Code to which the reactor vessel was purchased. For IP2, this is the 1966 Edition of ASTM E 185. Appendix H also requires that For each capsule withdrawal, the test procedures and reporting requirements must meet the requirements of ASTM E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Therefore, for IP2 the surveillance capsule withdrawal schedule is based on the 1966 Edition of ASTM E 185 although the IP2 schedule has been upgraded to meet the requirements of the 1982 Edition of ASTM E 185 to the extent practicable. Since the peak ΔRT PTS increase due to fluence exceeds 200 0 F, ASTM E 185 requires that five capsules be withdrawn. To date, four capsules have been withdrawn (capsules T, Y, Z and V) with four capsules (i.e. capsules S, U, W and X) remaining in the vessel. Capsule W is currently scheduled to be the fifth capsule and therefore satisfy the withdrawal requirements of ASTM E 185.

Page 4 of 4 4.0 REFERENCES 1. 10 CFR 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." 2. NRC Administrative Letter 97-04, "NRC Staff Approval For Changes to 10 CFR 50, Appendix H, Reactor Vessel Surveillance Specimen Withdrawal Schedules," dated September 30, 1997. 3. ASTM Standard E185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels". 4. WCAP-16752-NP, Indian Point 2 Heatup and Cooldown Limit Curves for Normal Operation, Revision 0 dated January 2008. 5. Entergy letter NL-10-025, Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50, Appendix H, dated March 4, 2010. 6. Entergy letter NL-10-030, Revised Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule per 10 CFR 50, Appendix H, dated March 8, 2010. 7. NRC Letter, Indian Point Nuclear Generating Unit No. 2 Reactor Vessel Surveillance Capsule Withdrawal Schedule Change (TAC No. ME3477), Dated March 15, 2010.