The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity



Similar documents
BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

WHEN IS A PERMIT REQUIRED?

Schedule B to By-law

City of Riverside. Building & Safety Division Phone: (951)

Schedule B to By-law Part A Fees Payable for Permits

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

BUILDING PERMITS. Santa Rosa County Building Inspection

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

BUILDING DIVISION CONSTRUCTION PERMIT FEES

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

Building Permits: When are they required?

EXPRESS PERMITS (No Plan Check Required)

HOMEOWNER S PERMIT GUIDE

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

Guideline for Implementation of California Civil Code Sections Water-Conserving Plumbing Fixtures

How To Get A Building Permit In Florida

2. What building projects are exempted? (permit not required)

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

The City of Basehor, Kansas

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

C I T Y O F P E A R S A L L

ARTICLE 22: FEE SCHEDULE

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

APPLICATION FOR NEW CONSTRUCTION

Building Permit, Fire Inspection and Operating Permit Fee Schedule

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

2016 BUILDING PERMIT FEES*

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

PERMITS REQUIRED & PERMIT EXEMPTIONS

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Building Code Inspections and Fees

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

CITY OF TWO RIVERS Inspections Department

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Building Condition Assessment Report

Construction Services & Permitting List of Exempted Permits Created March 1, 2002 Effective April 1, 2011 Revised January 1, 2014

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

PLAN SUBMITTAL INFORMATION

Development Services Guidelines

Certification: Building Plans Examiner. Exam ID: B3

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

Building Permit Application

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

CHARLOTTE COUNTY Community Development Department

City of Milford, Connecticut Information Regarding Permits

Does Wall Township require an inspection by the building department on resale of a home?

City of Elk River BASEMENT Office Use Only

City of Oviedo Commercial Shell Building Permit Application Guidelines

Botetourt County, Virginia. Frequently Asked Questions

How To Plan A Building

DRAPER ELEMENTARY SCHOOL

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Single Family Residential Building Permit Questions & Answers

Concord Building Department Frequently Asked Questions

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

Bureau Veritas Contact Information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Exterior Condition Report

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Building Description Project Description Estimated Cost Notes Total Deferred

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section Green Building Standards Code

How to Obtain a Building, Electrical, Plumbing Permit for the Remodeling of Single and Two-Family Dwellings in the City and County of San Francisco

Self-Home Inspection Checklist

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES CITY FIRE PROGRAM UNDERWRITING ITEMS OF IMPORTANCE

C-2 Construction, Inc. - NAICS Codes

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

Development Services Permit Application

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Transcription:

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 108 Electric car charging system each $ 108 Firepalce Insert/upgrade each $ 287 Furnace/heater replacement each $ 108 Graywater/Rainwater Harvesting System each $ 66 Insulation/energy upgrade per project $ 104 Re-roof with added ventilation per project $ 104 Solar photovoltaic system per project $ 149 Water heater replacement each $ 108 Window retrofits (non-structural only) per project $ 174 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 980 ea add'l 100 s.f per project $ 100 Canopy / Awning per project $ 340 Cellular Tower / Antenna First Antenna / Tower each $ 806 each add'l antenna/ tower each $ 88 Antenna/Tower w/ Equipment Shelter each $ 587 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,052 Upgrades such as reception counter, registers, signage, etc. each $ 842 Commercial Coach Installation each $ 1,397 Demolition Interior or garage - utlity building per project $ 398 Entire Building, residence or commercial per project $ 697 Dry rot/termite Repair per project $ 207 Fence or Non-Engineered Wall per project $ 599 Fireplace Retrofit / Chimney Repair per project $ 573 Flag, Light, or Sign Pole - Install / Replace per project $ 713 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,195 Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 597 Garage Conversion First 500 s.f. per project $ 796 Ea add'l 100 s.f. per project $ 100 Grading 1,000 CY or less per project $ 697 1,001-10,000 CY per project $ 896 >10,001 CY per project $ 1,095 Paint Booth per project $ 896 Partition per project $ 666 Patio Cover Open per project $ 599 Enclosed per project $ 1,045 Pool / Spa - Commercial per project $ 995 Pool / Spa - Residential per project $ 796 Re-Roof - Residential per project $ 207 Re-Roof - Commercial First 300 s.f. per project $ 398 Ea add'l 100 s.f. per project $ 100 Misc Page 1 of 4

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee Roof Structure Replacement First 300 s.f. per project $ 896 Ea add'l 100 s.f. per project $ 120 Retaining Wall Engineered per project First 100 l.f. per project $ 1,095 Ea add'l 100 l.f. per project $ 100 Non-Engineered per project $ 699 Stair Repair / Replace per project $ 896 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 796 Siding / Stucco per project $ 378 Sign Wall per project $ 299 Monument per project $ 532 Solar / PV System - Commercial / Multi-family per project $ 697 Store Front/Façade Alterations: Minor per project $ 896 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 597 Trash Enclosure per project $ 995 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 498 Window / Door - Non-Structural First 10 windows / doors per project $ 348 each add'l 10 windows/doors per project $ 17 Window / Door - Structural First 10 windows / doors per project $ 514 each add'l 10 windows/doors per project $ 67 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 273 Minor Code Corrections per project $ 207 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,195 MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 215 Appeal of Building Official Decision per project $ 995 Handicap Board of Appeals per project $ 995 Fire Permit Handling Fee per project $ 398 Supplemental Plan Check per project $ 199 Supplemental Inspection per project $ 199 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 398 Preliminary Project Consultation / Code Analysis (per hour) per project $ 199 Misc Page 2 of 4

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 100 UNIT FEES: A/C (Residential) - each $ 66 Furnaces (F.A.U., Floor) $ 66 Heater (Wall) $ 66 Refrigeration Compressor/Condenser $ 83 Boiler $ 83 Chiller $ 83 Heat Pump (Package unit) $ 50 Heater (Unit, Radiant, etc.) $ 50 Air Handler $ 50 Duct Work only $ 50 Evaporative Cooler $ 50 Make-up Air System $ 50 Vent Fan (Single Duct) - each $ 50 Exhaust Hood and Duct (Residential) $ 50 Exhaust Hood - Type I (Commercial Grease Hood) $ 100 Exhaust Hood - Type II (Commercial Steam Hood) $ 66 Walk-in Box/Refrigerator Coil $ 66 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 66 Other Mechanical Inspections (per hour) $ 199 Mechanical Volume and Current Fee Analysis $ 61 PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 199 UNIT FEES: Fixtures (each) $ 50 Gas System Replace/Repair/Extend (First Outlet) $ 50 Gas Outlets (Each Additional) $ 7 Building Sewer $ 66 Grease Trap $ 50 Water Heater (First Heater) $ 66 Water Heater (Each Additional Heater) $ 17 Water Pipe Repair/Replacement $ 50 Drain-Vent Repair/Alterations $ 50 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 66 Graywater Systems (each) $ 133 Miscellaneous Plumbing Items NOS $ 66 Other Plumbing and Gas Inspections (per hour) $ 199 Plumbing Volume and Current Fee Analysis $ 60 Misc Page 3 of 4

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 100 Add/Replace Service (not over 200 amps) $ 66 Add/Replace Service (over 200 amps) $ 100 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ 50 25 or 40 amp circuits (each) $ 33 50 to 175 amp circuits (each) $ 40 200 amp and larger circuits (each) $ 50 Temporary Service (each) $ 50 Generator Installation (each) $ 76 Miscellaneous Electrical Items NOS $ 66 Other Electrical Inspections (per hour) $ 199 Electrical Volume and Current Fee Analysis $ 61 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 Code Enforcement Fee $ 323 Construction Tax $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 261 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,643 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,484 Misc Page 4 of 4

New Construction Fee Schedule - Plan Check Fees 1.03 Effective 7/1/12 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,514 $ 1.67 $ 2,095 $ 1.39 $ 1,676 $ 1.08 5,000 per project $ 10,058 $ 0.50 $ 8,382 $ 0.41 $ 6,705 $ 0.32 10,000 per project $ 12,573 $ 0.18 $ 10,477 $ 0.15 $ 8,382 $ 0.12 50,000 per project $ 20,117 $ 0.10 $ 16,764 $ 0.08 $ 13,411 $ 100,000 per project $ 25,146 $ 0.25 $ 20,955 $ 0.20 $ 16,764 $ 0.16 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,766 $ 1.84 $ 2,305 $ 1.53 $ 1,844 $ 1.19 5,000 per project $ 11,064 $ 0.55 $ 9,220 $ 0.46 $ 7,376 $ 0.35 10,000 per project $ 13,830 $ 0.20 $ 11,525 $ 0.17 $ 9,220 $ 0.13 50,000 per project $ 22,128 $ 0.11 $ 18,440 $ 0.09 $ 14,752 $ 0.07 100,000 per project $ 27,661 $ 0.27 $ 23,051 $ 0.23 $ 18,440 $ 0.17 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,825 $ 0.40 $ 1,521 $ 0.33 $ 1,217 $ 0.26 5,000 per project $ 3,651 $ 0.14 $ 3,042 $ 0.12 $ 2,434 $ 0.09 10,000 per project $ 4,381 $ 0.02 $ 3,651 $ 0.02 $ 2,921 $ 0.01 50,000 per project $ 5,476 $ 0.03 $ 4,564 $ 0.03 $ 3,651 $ 0.02 100,000 per project $ 7,302 $ 0.07 $ 6,085 $ $ 4,868 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,514 $ 1.67 $ 2,095 $ 1.39 $ 1,676 $ 1.08 5,000 per project $ 10,058 $ 0.50 $ 8,382 $ 0.41 $ 6,705 $ 0.32 10,000 per project $ 12,573 $ 0.18 $ 10,477 $ 0.15 $ 8,382 $ 0.12 50,000 per project $ 20,117 $ 0.10 $ 16,764 $ 0.08 $ 13,411 $ 100,000 per project $ 25,146 $ 0.25 $ 20,955 $ 0.20 $ 16,764 $ 0.16 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 640 $ 1.45 $ 534 $ 1.21 $ 427 $ 0.94 400 per project $ 931 $ 1.35 $ 776 $ 1.12 $ 621 $ 0.87 600 per project $ 1,203 $ 0.30 $ 1,002 $ 0.25 $ 802 $ 0.19 1,000 per project $ 1,323 $ 0.24 $ 1,102 $ 0.20 $ 882 $ 0.15 3,000 per project $ 1,804 $ 0.60 $ 1,503 $ 0.50 $ 1,203 $ 0.38 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 640 $ 1.45 $ 534 $ 1.21 $ 427 $ 0.94 400 per project $ 931 $ 1.35 $ 776 $ 1.12 $ 621 $ 0.87 600 per project $ 1,203 $ 0.30 $ 1,002 $ 0.25 $ 802 $ 0.19 1,000 per project $ 1,323 $ 0.24 $ 1,102 $ 0.20 $ 882 $ 0.15 3,000 per project $ 1,804 $ 0.60 $ 1,503 $ 0.50 $ 1,203 $ 0.38 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,508 $ 1.00 $ 1,257 $ 0.83 $ 1,005 $ 0.65 5,000 per project $ 6,035 $ 0.30 $ 5,029 $ 0.25 $ 4,023 $ 0.19 10,000 per project $ 7,543 $ 0.11 $ 6,286 $ 0.09 $ 5,029 $ 0.07 50,000 per project $ 12,070 $ $ 10,058 $ 0.05 $ 8,046 $ 0.03 100,000 per project $ 15,087 $ 0.15 $ 12,573 $ 0.12 $ 10,058 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,257 $ 0.83 $ 1,047 $ 0.69 $ 838 $ 0.54 5,000 per project $ 5,029 $ 0.25 $ 4,191 $ 0.20 $ 3,352 $ 0.16 10,000 per project $ 6,286 $ 0.09 $ 5,238 $ 0.07 $ 4,191 $ 50,000 per project $ 10,058 $ 0.05 $ 8,382 $ 0.04 $ 6,705 $ 0.03 100,000 per project $ 12,573 $ 0.12 $ 10,477 $ 0.10 $ 8,382 $ 0.08 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,308 $ 0.87 $ 1,090 $ 0.72 $ 872 $ 0.58 5,000 per project $ 5,235 $ 0.26 $ 4,362 $ 0.21 $ 3,490 $ 0.17 10,000 per project $ 6,544 $ 0.09 $ 5,453 $ 0.08 $ 4,362 $ 50,000 per project $ 10,470 $ 0.05 $ 8,725 $ 0.04 $ 6,980 $ 0.03 100,000 per project $ 13,088 $ 0.13 $ 10,906 $ 0.10 $ 8,725 $ 0.08 PlanCheck 12 13, 1 of 2

New Construction Fee Schedule - Plan Check Fees 1.03 Effective 7/1/12 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 2,997 $ 1.99 $ 2,498 $ 1.66 $ 1,998 $ 1.33 2,500 per project $ 5,995 $ 0.39 $ 4,996 $ 0.33 $ 3,997 $ 0.26 4,000 per project $ 6,595 $ 0.44 $ 5,496 $ 0.37 $ 4,396 $ 0.29 6,000 per project $ 7,494 $ 0.74 $ 6,245 $ 0.62 $ 4,996 $ 0.49 8,000 per project $ 8,993 $ 1.12 $ 7,494 $ 0.93 $ 5,995 $ 0.74 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 968 $ 0.64 $ 807 $ 0.53 $ 645 $ 0.43 2,500 per project $ 1,937 $ 0.12 $ 1,614 $ 0.10 $ 1,291 $ 0.08 4,000 per project $ 2,131 $ 0.14 $ 1,776 $ 0.12 $ 1,420 $ 0.09 6,000 per project $ 2,421 $ 0.24 $ 2,018 $ 0.20 $ 1,614 $ 0.16 8,000 per project $ 2,906 $ 0.36 $ 2,421 $ 0.30 $ 1,937 $ 0.24 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 192 $ 0.43 $ 160 $ 0.36 $ 128 $ 0.29 400 per project $ 279 $ 0.40 $ 232 $ 0.33 $ 186 $ 0.27 600 per project $ 360 $ 0.09 $ 300 $ 0.07 $ 240 $ 1,000 per project $ 397 $ 0.07 $ 330 $ $ 264 $ 0.04 3,000 per project $ 541 $ 0.18 $ 451 $ 0.15 $ 360 $ 0.12 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 824 $ 1.98 $ 687 $ 1.65 $ 549 $ 1.32 500 per project $ 1,618 $ 3.23 $ 1,348 $ 2.69 $ 1,079 $ 2.15 1,000 per project $ 3,237 $ 0.64 $ 2,697 $ 0.53 $ 2,158 $ 0.43 1,500 per project $ 3,560 $ 0.64 $ 2,967 $ 0.53 $ 2,373 $ 0.43 2,000 per project $ 3,884 $ 1.94 $ 3,237 $ 1.61 $ 2,589 $ 1.29 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 591 $ 0.41 $ 493 $ 0.34 $ 394 $ 0.27 500 per project $ 759 $ 1.32 $ 632 $ 1.10 $ 506 $ 0.88 1,000 per project $ 1,420 $ 0.28 $ 1,183 $ 0.23 $ 946 $ 0.18 1,500 per project $ 1,562 $ 0.28 $ 1,301 $ 0.23 $ 1,041 $ 0.18 2,000 per project $ 1,704 $ 0.85 $ 1,420 $ 0.71 $ 1,136 $ 0.56 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 848 $ 0.56 $ 706 $ 0.47 $ 565 $ 0.37 5,000 per project $ 3,392 $ 0.16 $ 2,826 $ 0.14 $ 2,261 $ 0.11 10,000 per project $ 4,240 $ $ 3,533 $ 0.05 $ 2,826 $ 0.04 50,000 per project $ 6,784 $ 0.03 $ 5,653 $ 0.02 $ 4,523 $ 0.02 100,000 per project $ 8,480 $ 0.08 $ 7,067 $ 0.07 $ 5,653 $ 0.05 $ - $ - $ - $ - $ - $ - PlanCheck 12 13, 2 of 2

New Construction Fee Schedule - Inspection Fees Effective 7/1/12 1.03 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,024 $ 1.35 $ 1,687 $ 1.12 $ 1,350 $ 0.87 5,000 per project $ 8,097 $ 1.21 $ 6,748 $ 1.01 $ 5,398 $ 0.79 10,000 per project $ 14,170 $ 0.15 $ 11,809 $ 0.13 $ 9,447 $ 0.10 50,000 per project $ 20,243 $ 0.16 $ 16,870 $ 0.13 $ 13,496 $ 0.10 100,000 per project $ 28,341 $ 0.28 $ 23,617 $ 0.24 $ 18,894 $ 0.18 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,037 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ 1.31 5,000 per project $ 12,146 $ 1.82 $ 10,122 $ 1.52 $ 8,097 $ 1.18 10,000 per project $ 21,256 $ 0.23 $ 17,713 $ 0.19 $ 14,170 $ 0.15 50,000 per project $ 30,365 $ 0.24 $ 25,304 $ 0.20 $ 20,243 $ 0.16 100,000 per project $ 42,511 $ 0.43 $ 35,426 $ 0.35 $ 28,341 $ 0.28 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,826 $ 0.41 $ 1,521 $ 0.34 $ 1,217 $ 1.31 5,000 per project $ 3,651 $ 0.15 $ 3,043 $ 0.12 $ 2,434 $ 1.18 10,000 per project $ 4,382 $ 0.03 $ 3,651 $ 0.02 $ 2,921 $ 0.15 50,000 per project $ 5,477 $ 0.04 $ 4,564 $ 0.03 $ 3,651 $ 0.16 100,000 per project $ 7,303 $ 0.07 $ 6,085 $ $ 4,868 $ 0.28 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,024 $ 1.35 $ 1,687 $ 1.12 $ 1,350 $ 0.87 5,000 per project $ 8,097 $ 1.21 $ 6,748 $ 1.01 $ 5,398 $ 0.79 10,000 per project $ 14,170 $ 0.15 $ 11,809 $ 0.13 $ 9,447 $ 0.10 50,000 per project $ 20,243 $ 0.16 $ 16,870 $ 0.13 $ 13,496 $ 0.10 100,000 per project $ 28,341 $ 0.28 $ 23,617 $ 0.24 $ 18,894 $ 0.18 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,581 $ 0.77 $ 1,318 $ 0.64 $ 1,054 $ 0.51 400 per project $ 1,735 $ 4.24 $ 1,446 $ 3.53 $ 1,156 $ 2.83 600 per project $ 2,583 $ 1.27 $ 2,152 $ 1.06 $ 1,722 $ 0.85 1,000 per project $ 3,091 $ 1.03 $ 2,576 $ 0.86 $ 2,061 $ 0.68 3,000 per project $ 5,145 $ 1.72 $ 4,288 $ 1.43 $ 3,430 $ 1.14 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,449 $ 0.60 $ 1,207 $ 0.50 $ 966 $ 0.40 400 per project $ 1,569 $ 3.98 $ 1,307 $ 3.32 $ 1,046 $ 2.66 600 per project $ 2,366 $ 1.18 $ 1,971 $ 0.99 $ 1,577 $ 0.79 1,000 per project $ 2,839 $ 0.95 $ 2,366 $ 0.79 $ 1,892 $ 0.63 3,000 per project $ 4,731 $ 1.60 $ 3,943 $ 1.31 $ 3,154 $ 1.05 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,297 $ 0.79 $ 1,081 $ 0.66 $ 865 $ 0.53 5,000 per project $ 4,858 $ 0.73 $ 4,049 $ 0.61 $ 3,239 $ 0.49 10,000 per project $ 8,502 $ 0.09 $ 7,085 $ 0.08 $ 5,668 $ 50,000 per project $ 12,146 $ 0.10 $ 10,122 $ 0.08 $ 8,097 $ 100,000 per project $ 17,005 $ 0.17 $ 14,170 $ 0.14 $ 11,336 $ 0.12 Inspect 12 13, 1 of 2

New Construction Fee Schedule - Inspection Fees Effective 7/1/12 1.03 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 962 $ 0.69 $ 802 $ 0.57 $ 642 $ 0.46 5,000 per project $ 4,049 $ 0.61 $ 3,374 $ 0.51 $ 2,699 $ 0.40 10,000 per project $ 7,085 $ 0.08 $ 5,904 $ $ 4,723 $ 0.05 50,000 per project $ 10,122 $ 0.08 $ 8,435 $ 0.07 $ 6,748 $ 0.05 100,000 per project $ 14,170 $ 0.14 $ 11,809 $ 0.12 $ 9,447 $ 0.09 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 972 $ 0.65 $ 810 $ 0.54 $ 648 $ 0.43 5,000 per project $ 3,886 $ 0.58 $ 3,238 $ 0.49 $ 2,591 $ 0.39 10,000 per project $ 6,801 $ 0.07 $ 5,667 $ $ 4,534 $ 0.05 50,000 per project $ 9,715 $ 0.08 $ 8,096 $ $ 6,477 $ 0.05 100,000 per project $ 13,601 $ 0.14 $ 11,334 $ 0.11 $ 9,067 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,036 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ 1.35 2,500 per project $ 6,071 $ 1.01 $ 5,060 $ 0.84 $ 4,048 $ 0.67 4,000 per project $ 7,589 $ 2.28 $ 6,324 $ 1.90 $ 5,060 $ 1.52 6,000 per project $ 12,143 $ 3.04 $ 10,119 $ 2.53 $ 8,095 $ 2.02 8,000 per project $ 18,214 $ 2.28 $ 15,179 $ 1.90 $ 12,143 $ 1.52 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,036 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ 1.35 2,500 per project $ 6,071 $ 1.01 $ 5,060 $ 0.84 $ 4,048 $ 0.67 4,000 per project $ 7,589 $ 2.28 $ 6,324 $ 1.90 $ 5,060 $ 1.52 6,000 per project $ 12,143 $ 3.04 $ 10,119 $ 2.53 $ 8,095 $ 2.02 8,000 per project $ 18,214 $ 2.28 $ 15,179 $ 1.90 $ 12,143 $ 1.52 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,449 $ 0.60 $ 1,207 $ 0.50 $ 966 $ 0.40 400 per project $ 1,569 $ 3.98 $ 1,307 $ 3.32 $ 1,046 $ 2.66 600 per project $ 2,366 $ 1.18 $ 1,971 $ 0.99 $ 1,577 $ 0.79 1,000 per project $ 2,839 $ 0.95 $ 2,366 $ 0.79 $ 1,892 $ 0.63 3,000 per project $ 4,731 $ 1.58 $ 3,943 $ 1.31 $ 3,154 $ 1.05 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,201 $ 2.74 $ 1,001 $ 2.29 $ 801 $ 1.83 500 per project $ 2,298 $ 2.30 $ 1,915 $ 1.92 $ 1,532 $ 1.53 1,000 per project $ 3,447 $ 2.30 $ 2,873 $ 1.92 $ 2,298 $ 1.53 1,500 per project $ 4,596 $ 2.30 $ 3,830 $ 1.92 $ 3,064 $ 1.53 2,000 per project $ 5,746 $ 2.87 $ 4,788 $ 2.39 $ 3,830 $ 1.92 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 100 per project $ 1,093 $ 2.73 $ 911 $ 2.28 $ 729 $ 1.82 500 per project $ 2,186 $ 2.19 $ 1,821 $ 1.82 $ 1,457 $ 1.46 1,000 per project $ 3,279 $ 2.19 $ 2,732 $ 1.82 $ 2,186 $ 1.46 1,500 per project $ 4,371 $ 2.19 $ 3,643 $ 1.82 $ 2,914 $ 1.46 2,000 per project $ 5,464 $ 2.73 $ 4,554 $ 2.28 $ 3,643 $ 1.82 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 500 per project $ 671 $ 0.45 $ 559 $ 0.37 $ 447 $ 0.30 5,000 per project $ 2,682 $ 0.40 $ 2,235 $ 0.34 $ 1,788 $ 0.27 10,000 per project $ 4,694 $ 0.05 $ 3,912 $ 0.04 $ 3,129 $ 0.03 50,000 per project $ 6,706 $ 0.05 $ 5,588 $ 0.04 $ 4,471 $ 0.04 100,000 per project $ 9,388 $ 0.09 $ 7,823 $ 0.08 $ 6,259 $ $ - $ - $ - $ - $ - $ - Inspect 12 13, 2 of 2

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.017 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 110 Electric car charging system each $ 110 Firepalce Insert/upgrade each $ 292 Furnace/heater replacement each $ 110 Graywater/Rainwater Harvesting System each $ 67 Insulation/energy upgrade per project $ 106 Re-roof with added ventilation per project $ 106 Solar photovoltaic system per project $ 152 Water heater replacement each $ 110 Window retrofits (non-structural only) per project $ 177 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 997 ea add'l 100 s.f per project $ 102 Canopy / Awning per project $ 346 Cellular Tower / Antenna First Antenna / Tower each $ 820 each add'l antenna/ tower each $ 89 Antenna/Tower w/ Equipment Shelter each $ 597 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,070 Upgrades such as reception counter, registers, signage, etc. each $ 856 Commercial Coach Installation each $ 1,421 Demolition Interior or garage - utlity building per project $ 405 Entire Building, residence or commercial per project $ 709 Dry rot/termite Repair per project $ 211 Fence or Non-Engineered Wall per project $ 609 Fireplace Retrofit / Chimney Repair per project $ 583 Flag, Light, or Sign Pole - Install / Replace per project $ 725 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,215 Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 607 Garage Conversion First 500 s.f. per project $ 810 Ea add'l 100 s.f. per project $ 102 Grading 1,000 CY or less per project $ 709 1,001-10,000 CY per project $ 911 >10,001 CY per project $ 1,114 Paint Booth per project $ 911 Partition per project $ 677 Patio Cover Open per project $ 609 Enclosed per project $ 1,063 Misc Page 1 of 5

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.017 Fee Activity Fee Description Fee Pool / Spa - Commercial per project $ 1,012 Pool / Spa - Residential per project $ 810 Re-Roof - Residential per project $ 211 Re-Roof - Commercial First 300 s.f. per project $ 405 Ea add'l 100 s.f. per project $ 102 Roof Structure Replacement First 300 s.f. per project $ 911 Ea add'l 100 s.f. per project $ 122 Retaining Wall Engineered per project First 100 l.f. per project $ 1,114 Ea add'l 100 l.f. per project $ 102 Non-Engineered per project $ 711 Stair Repair / Replace per project $ 911 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 810 Siding / Stucco per project $ 384 Sign Wall per project $ 304 Monument per project $ 541 Solar / PV System - Commercial / Multi-family per project $ 709 Store Front/Façade Alterations: Minor per project $ 911 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 607 Trash Enclosure per project $ 1,012 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 506 Window / Door - Non-Structural First 10 windows / doors per project $ 354 each add'l 10 windows/doors per project $ 17 Window / Door - Structural First 10 windows / doors per project $ 523 each add'l 10 windows/doors per project $ 68 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 278 Minor Code Corrections per project $ 211 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,215 Misc Page 2 of 5

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.017 Fee Activity Fee Description Fee MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 219 Appeal of Building Official Decision per project $ 1,012 Handicap Board of Appeals per project $ 1,012 Fire Permit Handling Fee per project $ 405 Supplemental Plan Check per project $ 202 Supplemental Inspection per project $ 202 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 405 Preliminary Project Consultation / Code Analysis (per hour) per project $ 202 MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 102 UNIT FEES: A/C (Residential) - each $ 67 Furnaces (F.A.U., Floor) $ 67 Heater (Wall) $ 67 Refrigeration Compressor/Condenser $ 84 Boiler $ 84 Chiller $ 84 Heat Pump (Package unit) $ 51 Heater (Unit, Radiant, etc.) $ 51 Air Handler $ 51 Duct Work only $ 51 Evaporative Cooler $ 51 Make-up Air System $ 51 Vent Fan (Single Duct) - each $ 51 Exhaust Hood and Duct (Residential) $ 51 Exhaust Hood - Type I (Commercial Grease Hood) $ 102 Exhaust Hood - Type II (Commercial Steam Hood) $ 67 Walk-in Box/Refrigerator Coil $ 67 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 67 Other Mechanical Inspections (per hour) $ 202 Mechanical Volume and Current Fee Analysis $ 62 Misc Page 3 of 5

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.017 Fee Activity Fee Description Fee PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 202 UNIT FEES: Fixtures (each) $ 51 Gas System Replace/Repair/Extend (First Outlet) $ 51 Gas Outlets (Each Additional) $ 7 Building Sewer $ 67 Grease Trap $ 51 Water Heater (First Heater) $ 67 Water Heater (Each Additional Heater) $ 17 Water Pipe Repair/Replacement $ 51 Drain-Vent Repair/Alterations $ 51 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 67 Graywater Systems (each) $ 135 Miscellaneous Plumbing Items NOS $ 67 Other Plumbing and Gas Inspections (per hour) $ 202 Plumbing Volume and Current Fee Analysis $ 61 Misc Page 4 of 5

MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.017 Fee Activity Fee Description Fee ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 102 Add/Replace Service (not over 200 amps) $ 67 Add/Replace Service (over 200 amps) $ 102 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ 51 25 or 40 amp circuits (each) $ 34 50 to 175 amp circuits (each) $ 41 200 amp and larger circuits (each) $ 51 Temporary Service (each) $ 51 Generator Installation (each) $ 77 Miscellaneous Electrical Items NOS $ 67 Other Electrical Inspections (per hour) $ 202 Electrical Volume and Current Fee Analysis $ 62 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 Code Enforcement Fee $ 328 Construction Tax **This fee does not increase by CPI $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 265 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,671 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,543 Misc Page 5 of 5

New Construction Fee Schedule - Plan Check Fees 1.017 Effective 7/1/13 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,557 $ 1.70 $ 2,131 $ 1.41 $ 1,704 $ 1.10 5,000 per project $ 10,229 $ 0.51 $ 8,524 $ 0.42 $ 6,819 $ 0.33 10,000 per project $ 12,787 $ 0.18 $ 10,655 $ 0.15 $ 8,524 $ 0.12 50,000 per project $ 20,459 $ 0.10 $ 17,049 $ 0.08 $ 13,639 $ 100,000 per project $ 25,573 $ 0.25 $ 21,311 $ 0.20 $ 17,049 $ 0.16 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,813 $ 1.87 $ 2,344 $ 1.56 $ 1,875 $ 1.21 5,000 per project $ 11,252 $ 0.56 $ 9,377 $ 0.47 $ 7,501 $ 0.36 10,000 per project $ 14,065 $ 0.20 $ 11,721 $ 0.17 $ 9,377 $ 0.13 50,000 per project $ 22,504 $ 0.11 $ 18,753 $ 0.09 $ 15,003 $ 0.07 100,000 per project $ 28,131 $ 0.27 $ 23,443 $ 0.23 $ 18,753 $ 0.17 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,856 $ 0.41 $ 1,547 $ 0.34 $ 1,238 $ 0.26 5,000 per project $ 3,713 $ 0.14 $ 3,094 $ 0.12 $ 2,475 $ 0.09 10,000 per project $ 4,455 $ 0.02 $ 3,713 $ 0.02 $ 2,971 $ 0.01 50,000 per project $ 5,569 $ 0.03 $ 4,642 $ 0.03 $ 3,713 $ 0.02 100,000 per project $ 7,426 $ 0.07 $ 6,188 $ $ 4,951 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,557 $ 1.70 $ 2,131 $ 1.41 $ 1,704 $ 1.10 5,000 per project $ 10,229 $ 0.51 $ 8,524 $ 0.42 $ 6,819 $ 0.33 10,000 per project $ 12,787 $ 0.18 $ 10,655 $ 0.15 $ 8,524 $ 0.12 50,000 per project $ 20,459 $ 0.10 $ 17,049 $ 0.08 $ 13,639 $ 100,000 per project $ 25,573 $ 0.25 $ 21,311 $ 0.20 $ 17,049 $ 0.16 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 651 $ 1.47 $ 543 $ 1.23 $ 434 $ 0.96 400 per project $ 947 $ 1.37 $ 789 $ 1.14 $ 632 $ 0.88 600 per project $ 1,223 $ 0.31 $ 1,019 $ 0.25 $ 816 $ 0.19 1,000 per project $ 1,345 $ 0.24 $ 1,121 $ 0.20 $ 897 $ 0.15 3,000 per project $ 1,835 $ 0.61 $ 1,529 $ 0.51 $ 1,223 $ 0.39 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 651 $ 1.47 $ 543 $ 1.23 $ 434 $ 0.96 400 per project $ 947 $ 1.37 $ 789 $ 1.14 $ 632 $ 0.88 600 per project $ 1,223 $ 0.31 $ 1,019 $ 0.25 $ 816 $ 0.19 1,000 per project $ 1,345 $ 0.24 $ 1,121 $ 0.20 $ 897 $ 0.15 3,000 per project $ 1,835 $ 0.61 $ 1,529 $ 0.51 $ 1,223 $ 0.39 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,534 $ 1.02 $ 1,278 $ 0.84 $ 1,022 $ 0.66 5,000 per project $ 6,138 $ 0.31 $ 5,114 $ 0.25 $ 4,091 $ 0.19 10,000 per project $ 7,671 $ 0.11 $ 6,393 $ 0.09 $ 5,114 $ 0.07 50,000 per project $ 12,275 $ $ 10,229 $ 0.05 $ 8,183 $ 0.03 100,000 per project $ 15,343 $ 0.15 $ 12,787 $ 0.12 $ 10,229 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,278 $ 0.84 $ 1,065 $ 0.70 $ 852 $ 0.55 5,000 per project $ 5,114 $ 0.25 $ 4,262 $ 0.20 $ 3,409 $ 0.16 10,000 per project $ 6,393 $ 0.09 $ 5,327 $ 0.07 $ 4,262 $ 50,000 per project $ 10,229 $ 0.05 $ 8,524 $ 0.04 $ 6,819 $ 0.03 100,000 per project $ 12,787 $ 0.12 $ 10,655 $ 0.10 $ 8,524 $ 0.08 PlanCheck 13 14, 1 of 2

New Construction Fee Schedule - Plan Check Fees 1.017 Effective 7/1/13 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,330 $ 0.88 $ 1,109 $ 0.73 $ 887 $ 0.59 5,000 per project $ 5,324 $ 0.26 $ 4,436 $ 0.21 $ 3,549 $ 0.17 10,000 per project $ 6,655 $ 0.09 $ 5,546 $ 0.08 $ 4,436 $ 50,000 per project $ 10,648 $ 0.05 $ 8,873 $ 0.04 $ 7,099 $ 0.03 100,000 per project $ 13,310 $ 0.13 $ 11,091 $ 0.10 $ 8,873 $ 0.08 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,048 $ 2.02 $ 2,540 $ 1.69 $ 2,032 $ 1.35 2,500 per project $ 6,097 $ 0.40 $ 5,081 $ 0.34 $ 4,065 $ 0.26 4,000 per project $ 6,707 $ 0.45 $ 5,589 $ 0.38 $ 4,471 $ 0.29 6,000 per project $ 7,621 $ 0.75 $ 6,351 $ 0.63 $ 5,081 $ 0.50 8,000 per project $ 9,146 $ 1.14 $ 7,621 $ 0.95 $ 6,097 $ 0.75 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 984 $ 0.65 $ 821 $ 0.54 $ 656 $ 0.44 2,500 per project $ 1,970 $ 0.12 $ 1,641 $ 0.10 $ 1,313 $ 0.08 4,000 per project $ 2,167 $ 0.14 $ 1,806 $ 0.12 $ 1,444 $ 0.09 6,000 per project $ 2,462 $ 0.24 $ 2,052 $ 0.20 $ 1,641 $ 0.16 8,000 per project $ 2,955 $ 0.37 $ 2,462 $ 0.31 $ 1,970 $ 0.24 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 195 $ 0.44 $ 163 $ 0.37 $ 130 $ 0.29 400 per project $ 284 $ 0.41 $ 236 $ 0.34 $ 189 $ 0.27 600 per project $ 366 $ 0.09 $ 305 $ 0.07 $ 244 $ 1,000 per project $ 404 $ 0.07 $ 336 $ $ 268 $ 0.04 3,000 per project $ 550 $ 0.18 $ 459 $ 0.15 $ 366 $ 0.12 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 838 $ 2.01 $ 699 $ 1.68 $ 558 $ 1.34 500 per project $ 1,646 $ 3.28 $ 1,371 $ 2.74 $ 1,097 $ 2.19 1,000 per project $ 3,292 $ 0.65 $ 2,743 $ 0.54 $ 2,195 $ 0.44 1,500 per project $ 3,621 $ 0.65 $ 3,017 $ 0.54 $ 2,413 $ 0.44 2,000 per project $ 3,950 $ 1.97 $ 3,292 $ 1.64 $ 2,633 $ 1.31 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 601 $ 0.42 $ 501 $ 0.35 $ 401 $ 0.27 500 per project $ 772 $ 1.34 $ 643 $ 1.12 $ 515 $ 0.89 1,000 per project $ 1,444 $ 0.28 $ 1,203 $ 0.23 $ 962 $ 0.18 1,500 per project $ 1,589 $ 0.28 $ 1,323 $ 0.23 $ 1,059 $ 0.18 2,000 per project $ 1,733 $ 0.86 $ 1,444 $ 0.72 $ 1,155 $ 0.57 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 862 $ 0.57 $ 718 $ 0.48 $ 575 $ 0.38 5,000 per project $ 3,450 $ 0.16 $ 2,874 $ 0.14 $ 2,299 $ 0.11 10,000 per project $ 4,312 $ $ 3,593 $ 0.05 $ 2,874 $ 0.04 50,000 per project $ 6,899 $ 0.03 $ 5,749 $ 0.02 $ 4,600 $ 0.02 100,000 per project $ 8,624 $ 0.08 $ 7,187 $ 0.07 $ 5,749 $ 0.05 PlanCheck 13 14, 2 of 2

New Construction Fee Schedule - Inspection Fees Effective 7/1/13 1.017 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,058 $ 1.37 $ 1,716 $ 1.14 $ 1,373 $ 0.88 5,000 per project $ 8,235 $ 1.23 $ 6,863 $ 1.03 $ 5,490 $ 0.80 10,000 per project $ 14,411 $ 0.15 $ 12,010 $ 0.13 $ 9,608 $ 0.10 50,000 per project $ 20,587 $ 0.16 $ 17,157 $ 0.13 $ 13,725 $ 0.10 100,000 per project $ 28,823 $ 0.28 $ 24,018 $ 0.24 $ 19,215 $ 0.18 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,089 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ 1.33 5,000 per project $ 12,352 $ 1.85 $ 10,294 $ 1.55 $ 8,235 $ 1.20 10,000 per project $ 21,617 $ 0.23 $ 18,014 $ 0.19 $ 14,411 $ 0.15 50,000 per project $ 30,881 $ 0.24 $ 25,734 $ 0.20 $ 20,587 $ 0.16 100,000 per project $ 43,234 $ 0.44 $ 36,028 $ 0.36 $ 28,823 $ 0.28 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,857 $ 0.42 $ 1,547 $ 0.35 $ 1,238 $ 1.33 5,000 per project $ 3,713 $ 0.15 $ 3,095 $ 0.12 $ 2,475 $ 1.20 10,000 per project $ 4,456 $ 0.03 $ 3,713 $ 0.02 $ 2,971 $ 0.15 50,000 per project $ 5,570 $ 0.04 $ 4,642 $ 0.03 $ 3,713 $ 0.16 100,000 per project $ 7,427 $ 0.07 $ 6,188 $ $ 4,951 $ 0.28 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,059 $ 1.37 $ 1,716 $ 1.14 $ 1,373 $ 0.89 5,000 per project $ 8,235 $ 1.23 $ 6,863 $ 1.03 $ 5,490 $ 0.80 10,000 per project $ 14,411 $ 0.15 $ 12,009 $ 0.13 $ 9,608 $ 0.10 50,000 per project $ 20,588 $ 0.16 $ 17,156 $ 0.14 $ 13,725 $ 0.11 100,000 per project $ 28,823 $ 0.29 $ 24,019 $ 0.24 $ 19,215 $ 0.19 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,608 $ 0.78 $ 1,340 $ 0.65 $ 1,072 $ 0.52 400 per project $ 1,764 $ 4.31 $ 1,470 $ 3.59 $ 1,176 $ 2.87 600 per project $ 2,626 $ 1.29 $ 2,189 $ 1.08 $ 1,751 $ 0.86 1,000 per project $ 3,144 $ 1.05 $ 2,620 $ 0.87 $ 2,096 $ 0.69 3,000 per project $ 5,233 $ 1.75 $ 4,361 $ 1.45 $ 3,489 $ 1.16 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,474 $ 0.61 $ 1,228 $ 0.51 $ 982 $ 0.41 400 per project $ 1,596 $ 4.05 $ 1,329 $ 3.38 $ 1,064 $ 2.71 600 per project $ 2,406 $ 1.20 $ 2,005 $ 1.01 $ 1,604 $ 0.80 1,000 per project $ 2,887 $ 0.97 $ 2,406 $ 0.80 $ 1,924 $ 0.64 3,000 per project $ 4,811 $ 1.63 $ 4,010 $ 1.33 $ 3,208 $ 1.07 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,319 $ 0.80 $ 1,099 $ 0.67 $ 880 $ 0.54 5,000 per project $ 4,941 $ 0.74 $ 4,118 $ 0.62 $ 3,294 $ 0.49 10,000 per project $ 8,647 $ 0.09 $ 7,205 $ 0.08 $ 5,764 $ 50,000 per project $ 12,353 $ 0.10 $ 10,294 $ 0.08 $ 8,235 $ 100,000 per project $ 17,294 $ 0.17 $ 14,411 $ 0.14 $ 11,529 $ 0.12 Inspect 13 14, 1 of 2

New Construction Fee Schedule - Inspection Fees Effective 7/1/13 1.017 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 978 $ 0.70 $ 816 $ 0.58 $ 653 $ 0.47 5,000 per project $ 4,118 $ 0.62 $ 3,431 $ 0.52 $ 2,745 $ 0.41 10,000 per project $ 7,205 $ 0.08 $ 6,005 $ $ 4,803 $ 0.05 50,000 per project $ 10,294 $ 0.08 $ 8,578 $ 0.07 $ 6,863 $ 0.05 100,000 per project $ 14,411 $ 0.14 $ 12,009 $ 0.12 $ 9,608 $ 0.09 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 989 $ 0.66 $ 824 $ 0.55 $ 659 $ 0.44 5,000 per project $ 3,952 $ 0.59 $ 3,293 $ 0.50 $ 2,635 $ 0.40 10,000 per project $ 6,917 $ 0.07 $ 5,763 $ $ 4,611 $ 0.05 50,000 per project $ 9,880 $ 0.08 $ 8,234 $ $ 6,587 $ 0.05 100,000 per project $ 13,832 $ 0.14 $ 11,527 $ 0.11 $ 9,221 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,088 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ 1.37 2,500 per project $ 6,174 $ 1.03 $ 5,146 $ 0.85 $ 4,117 $ 0.68 4,000 per project $ 7,718 $ 2.32 $ 6,432 $ 1.93 $ 5,146 $ 1.55 6,000 per project $ 12,349 $ 3.09 $ 10,291 $ 2.57 $ 8,233 $ 2.05 8,000 per project $ 18,524 $ 2.32 $ 15,437 $ 1.93 $ 12,349 $ 1.55 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,088 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ 1.37 2,500 per project $ 6,174 $ 1.03 $ 5,146 $ 0.85 $ 4,117 $ 0.68 4,000 per project $ 7,718 $ 2.32 $ 6,432 $ 1.93 $ 5,146 $ 1.55 6,000 per project $ 12,349 $ 3.09 $ 10,291 $ 2.57 $ 8,233 $ 2.05 8,000 per project $ 18,524 $ 2.32 $ 15,437 $ 1.93 $ 12,349 $ 1.55 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,474 $ 0.61 $ 1,228 $ 0.51 $ 982 $ 0.41 400 per project $ 1,596 $ 4.05 $ 1,329 $ 3.38 $ 1,064 $ 2.71 600 per project $ 2,406 $ 1.20 $ 2,005 $ 1.01 $ 1,604 $ 0.80 1,000 per project $ 2,887 $ 0.97 $ 2,406 $ 0.80 $ 1,924 $ 0.64 3,000 per project $ 4,811 $ 1.61 $ 4,010 $ 1.33 $ 3,208 $ 1.07 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,221 $ 2.79 $ 1,018 $ 2.33 $ 815 $ 1.86 500 per project $ 2,337 $ 2.34 $ 1,948 $ 1.95 $ 1,558 $ 1.56 1,000 per project $ 3,506 $ 2.34 $ 2,922 $ 1.95 $ 2,337 $ 1.56 1,500 per project $ 4,674 $ 2.34 $ 3,895 $ 1.95 $ 3,116 $ 1.56 2,000 per project $ 5,844 $ 2.92 $ 4,869 $ 2.43 $ 3,895 $ 1.95 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,112 $ 2.78 $ 926 $ 2.32 $ 741 $ 1.85 500 per project $ 2,223 $ 2.23 $ 1,852 $ 1.85 $ 1,482 $ 1.48 1,000 per project $ 3,335 $ 2.23 $ 2,778 $ 1.85 $ 2,223 $ 1.48 1,500 per project $ 4,445 $ 2.23 $ 3,705 $ 1.85 $ 2,964 $ 1.48 2,000 per project $ 5,557 $ 2.78 $ 4,631 $ 2.32 $ 3,705 $ 1.85 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 682 $ 0.46 $ 569 $ 0.38 $ 455 $ 0.31 5,000 per project $ 2,728 $ 0.41 $ 2,273 $ 0.35 $ 1,818 $ 0.27 10,000 per project $ 4,774 $ 0.05 $ 3,979 $ 0.04 $ 3,182 $ 0.03 50,000 per project $ 6,820 $ 0.05 $ 5,683 $ 0.04 $ 4,547 $ 0.04 100,000 per project $ 9,548 $ 0.09 $ 7,956 $ 0.08 $ 6,365 $ Inspect 13 14, 2 of 2

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 112 $ 110 Electric car charging system each $ 112 $ 110 Firepalce Insert/upgrade each $ 299 $ 292 Furnace/heater replacement each $ 112 $ 110 Graywater/Rainwater Harvesting System each $ 69 $ 67 Insulation/energy upgrade per project $ 108 $ 106 Re-roof with added ventilation per project $ 108 $ 106 Solar photovoltaic system per project $ 155 $ 152 Water heater replacement each $ 112 $ 110 Window retrofits (non-structural only) per project $ 181 $ 177 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 1,020 $ 997 ea add'l 100 s.f per project $ 104 $ 102 Canopy / Awning per project $ 354 $ 346 Cellular Tower / Antenna First Antenna / Tower each $ 839 $ 820 each add'l antenna/ tower each $ 92 $ 89 Antenna/Tower w/ Equipment Shelter each $ 611 $ 597 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,094 $ 1,070 Upgrades such as reception counter, registers, signage, etc. each $ 876 $ 856 Commercial Coach Installation each $ 1,453 $ 1,421 Demolition Interior or garage - utlity building per project $ 414 $ 405 Entire Building, residence or commercial per project $ 725 $ 709 Dry rot/termite Repair per project $ 215 $ 211 Fence or Non-Engineered Wall per project $ 623 $ 609 Fireplace Retrofit / Chimney Repair per project $ 596 $ 583 Flag, Light, or Sign Pole - Install / Replace per project $ 742 $ 725 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,243 $ 1,215 Misc Page 1 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 621 $ 607 Garage Conversion First 500 s.f. per project $ 828 $ 810 Ea add'l 100 s.f. per project $ 104 $ 102 Grading 1,000 CY or less per project $ 725 $ 709 1,001-10,000 CY per project $ 932 $ 911 >10,001 CY per project $ 1,139 $ 1,114 Paint Booth per project $ 932 $ 911 Partition per project $ 693 $ 677 Patio Cover Open per project $ 623 $ 609 Enclosed per project $ 1,087 $ 1,063 Pool / Spa - Commercial per project $ 1,035 $ 1,012 Pool / Spa - Residential per project $ 828 $ 810 Re-Roof - Residential per project $ 215 $ 211 Re-Roof - Commercial First 300 s.f. per project $ 414 $ 405 Ea add'l 100 s.f. per project $ 104 $ 102 Roof Structure Replacement First 300 s.f. per project $ 932 $ 911 Ea add'l 100 s.f. per project $ 125 $ 122 Retaining Wall Engineered per project First 100 l.f. per project $ 1,139 $ 1,114 Ea add'l 100 l.f. per project $ 104 $ 102 Non-Engineered per project $ 727 $ 711 Stair Repair / Replace per project $ 932 $ 911 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 828 $ 810 Siding / Stucco per project $ 393 $ 384 Misc Page 2 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Sign Wall per project $ 311 $ 304 Monument per project $ 553 $ 541 Solar / PV System - Commercial / Multi-family per project $ 725 $ 709 Store Front/Façade Alterations: Minor per project $ 932 $ 911 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 621 $ 607 Trash Enclosure per project $ 1,035 $ 1,012 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 518 $ 506 Window / Door - Non-Structural First 10 windows / doors per project $ 362 $ 354 each add'l 10 windows/doors per project $ 18 $ 17 Window / Door - Structural First 10 windows / doors per project $ 535 $ 523 each add'l 10 windows/doors per project $ 70 $ 68 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 284 $ 278 Minor Code Corrections per project $ 215 $ 211 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,243 $ 1,215 MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 224 $ 219 Appeal of Building Official Decision per project $ 1,035 $ 1,012 Handicap Board of Appeals per project $ 1,035 $ 1,012 Fire Permit Handling Fee per project $ 414 $ 405 Supplemental Plan Check per project $ 207 $ 202 Supplemental Inspection per project $ 207 $ 202 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 414 $ 405 Preliminary Project Consultation / Code Analysis (per hour) per project $ 207 $ 202 Misc Page 3 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 104 $ 102 UNIT FEES: A/C (Residential) - each $ 69 $ 67 Furnaces (F.A.U., Floor) $ 69 $ 67 Heater (Wall) $ 69 $ 67 Refrigeration Compressor/Condenser $ 86 $ 84 Boiler $ 86 $ 84 Chiller $ 86 $ 84 Heat Pump (Package unit) $ 52 $ 51 Heater (Unit, Radiant, etc.) $ 52 $ 51 Air Handler $ 52 $ 51 Duct Work only $ 52 $ 51 Evaporative Cooler $ 52 $ 51 Make-up Air System $ 52 $ 51 Vent Fan (Single Duct) - each $ 52 $ 51 Exhaust Hood and Duct (Residential) $ 52 $ 51 Exhaust Hood - Type I (Commercial Grease Hood) $ 104 $ 102 Exhaust Hood - Type II (Commercial Steam Hood) $ 69 $ 67 Walk-in Box/Refrigerator Coil $ 69 $ 67 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 69 $ 67 Other Mechanical Inspections (per hour) $ 207 $ 202 Mechanical Volume and Current Fee Analysis $ 63 $ 62 Misc Page 4 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 207 $ 202 UNIT FEES: Fixtures (each) $ 52 $ 51 Gas System Replace/Repair/Extend (First Outlet) $ 52 $ 51 Gas Outlets (Each Additional) $ 7 $ 7 Building Sewer $ 69 $ 67 Grease Trap $ 52 $ 51 Water Heater (First Heater) $ 69 $ 67 Water Heater (Each Additional Heater) $ 18 $ 17 Water Pipe Repair/Replacement $ 52 $ 51 Drain-Vent Repair/Alterations $ 52 $ 51 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 69 $ 67 Graywater Systems (each) $ 138 $ 135 Miscellaneous Plumbing Items NOS $ 69 $ 67 Other Plumbing and Gas Inspections (per hour) $ 207 $ 202 Plumbing Volume and Current Fee Analysis $ 62 $ 61 Misc Page 5 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.023 Fee Description Proposed Fee Current Fee ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 104 $ 102 Add/Replace Service (not over 200 amps) $ 69 $ 67 Add/Replace Service (over 200 amps) $ 104 $ 102 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ 52 $ 51 25 or 40 amp circuits (each) $ 34 $ 34 50 to 175 amp circuits (each) $ 42 $ 41 200 amp and larger circuits (each) $ 52 $ 51 Temporary Service (each) $ 52 $ 51 ELECTRICAL PERMIT FEES, continued Generator Installation (each) $ 79 $ 77 Miscellaneous Electrical Items NOS $ 69 $ 67 Other Electrical Inspections (per hour) $ 207 $ 202 Electrical Volume and Current Fee Analysis $ 63 $ 62 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 $ 40 Code Enforcement Fee $ 336 $ 328 Construction Tax **This fee does not increase by CPI $ 150 $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 272 $ 265 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,709 $ 1,671 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,625 $ 3,543 Misc Page 6 of 6

New Construction Fee Schedule - Plan Check Fees 1.023 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,616 $ 1.74 $ 2,180 $ 1.45 $ 1,744 $ 1.12 5,000 per project $ 10,464 $ 0.52 $ 8,721 $ 0.43 $ 6,976 $ 0.33 10,000 per project $ 13,081 $ 0.19 $ 10,900 $ 0.16 $ 8,721 $ 0.12 50,000 per project $ 20,930 $ 0.10 $ 17,441 $ 0.08 $ 13,953 $ 100,000 per project $ 26,162 $ 0.26 $ 21,801 $ 0.21 $ 17,441 $ 0.17 Commercial Residential and Multifamily Residential Uses - (All newly constructed added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,878 $ 1.91 $ 2,398 $ 1.59 $ 1,918 $ 1.24 5,000 per project $ 11,511 $ 0.57 $ 9,592 $ 0.48 $ 7,674 $ 0.36 10,000 per project $ 14,389 $ 0.21 $ 11,991 $ 0.18 $ 9,592 $ 0.14 50,000 per project $ 23,022 $ 0.11 $ 19,185 $ 0.09 $ 15,348 $ 0.07 100,000 per project $ 28,778 $ 0.28 $ 23,982 $ 0.24 $ 19,185 $ 0.18 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residentia Uses 500 per project $ 1,899 $ 0.42 $ 1,582 $ 0.34 $ 1,266 $ 0.27 5,000 per project $ 3,798 $ 0.15 $ 3,165 $ 0.12 $ 2,532 $ 0.09 10,000 per project $ 4,558 $ 0.02 $ 3,798 $ 0.02 $ 3,039 $ 0.01 50,000 per project $ 5,697 $ 0.03 $ 4,748 $ 0.03 $ 3,798 $ 0.02 100,000 per project $ 7,597 $ 0.07 $ 6,331 $ $ 5,065 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,616 $ 1.74 $ 2,180 $ 1.45 $ 1,744 $ 1.12 5,000 per project $ 10,464 $ 0.52 $ 8,721 $ 0.43 $ 6,976 $ 0.33 10,000 per project $ 13,081 $ 0.19 $ 10,900 $ 0.16 $ 8,721 $ 0.12 50,000 per project $ 20,930 $ 0.10 $ 17,441 $ 0.08 $ 13,953 $ 100,000 per project $ 26,162 $ 0.26 $ 21,801 $ 0.21 $ 17,441 $ 0.17 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 666 $ 1.51 $ 556 $ 1.26 $ 444 $ 0.98 400 per project $ 969 $ 1.40 $ 807 $ 1.17 $ 646 $ 0.91 600 per project $ 1,252 $ 0.31 $ 1,042 $ 0.26 $ 834 $ 0.20 1,000 per project $ 1,376 $ 0.25 $ 1,147 $ 0.21 $ 918 $ 0.16 3,000 per project $ 1,877 $ 0.62 $ 1,564 $ 0.52 $ 1,252 $ 0.40 PlanCheck 15 16, 1 of 3

New Construction Fee Schedule - Plan Check Fees 1.023 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 666 $ 1.51 $ 556 $ 1.26 $ 444 $ 0.98 400 per project $ 969 $ 1.40 $ 807 $ 1.17 $ 646 $ 0.91 600 per project $ 1,252 $ 0.31 $ 1,042 $ 0.26 $ 834 $ 0.20 1,000 per project $ 1,376 $ 0.25 $ 1,147 $ 0.21 $ 918 $ 0.16 3,000 per project $ 1,877 $ 0.62 $ 1,564 $ 0.52 $ 1,252 $ 0.40 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,569 $ 1.04 $ 1,308 $ 0.86 $ 1,046 $ 0.68 5,000 per project $ 6,279 $ 0.31 $ 5,232 $ 0.26 $ 4,185 $ 0.20 10,000 per project $ 7,848 $ 0.11 $ 6,540 $ 0.09 $ 5,232 $ 0.07 50,000 per project $ 12,558 $ $ 10,464 $ 0.05 $ 8,371 $ 0.03 100,000 per project $ 15,696 $ 0.16 $ 13,081 $ 0.12 $ 10,464 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,308 $ 0.86 $ 1,089 $ 0.72 $ 872 $ 0.56 5,000 per project $ 5,232 $ 0.26 $ 4,360 $ 0.21 $ 3,487 $ 0.17 10,000 per project $ 6,540 $ 0.09 $ 5,450 $ 0.07 $ 4,360 $ 50,000 per project $ 10,464 $ 0.05 $ 8,721 $ 0.04 $ 6,976 $ 0.03 100,000 per project $ 13,081 $ 0.12 $ 10,900 $ 0.10 $ 8,721 $ 0.08 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,361 $ 0.91 $ 1,134 $ 0.75 $ 907 $ 0.60 5,000 per project $ 5,446 $ 0.27 $ 4,538 $ 0.22 $ 3,631 $ 0.18 10,000 per project $ 6,808 $ 0.09 $ 5,673 $ 0.08 $ 4,538 $ 50,000 per project $ 10,893 $ 0.05 $ 9,077 $ 0.04 $ 7,262 $ 0.03 100,000 per project $ 13,617 $ 0.14 $ 11,347 $ 0.10 $ 9,077 $ 0.08 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,118 $ 2.07 $ 2,599 $ 1.73 $ 2,079 $ 1.38 2,500 per project $ 6,237 $ 0.41 $ 5,198 $ 0.34 $ 4,158 $ 0.27 4,000 per project $ 6,861 $ 0.46 $ 5,718 $ 0.38 $ 4,574 $ 0.30 6,000 per project $ 7,797 $ 0.77 $ 6,497 $ 0.65 $ 5,198 $ 0.51 8,000 per project $ 9,356 $ 1.17 $ 7,797 $ 0.97 $ 6,237 $ 0.77 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 1,007 $ 0.67 $ 840 $ 0.55 $ 671 $ 0.45 2,500 per project $ 2,015 $ 0.12 $ 1,679 $ 0.10 $ 1,343 $ 0.08 4,000 per project $ 2,217 $ 0.15 $ 1,848 $ 0.12 $ 1,477 $ 0.09 6,000 per project $ 2,519 $ 0.25 $ 2,100 $ 0.21 $ 1,679 $ 0.17 8,000 per project $ 3,023 $ 0.37 $ 2,519 $ 0.31 $ 2,015 $ 0.25 PlanCheck 15 16, 2 of 3

New Construction Fee Schedule - Plan Check Fees 1.023 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 200 $ 0.45 $ 166 $ 0.37 $ 133 $ 0.30 400 per project $ 290 $ 0.42 $ 241 $ 0.34 $ 194 $ 0.28 600 per project $ 375 $ 0.09 $ 312 $ 0.07 $ 250 $ 1,000 per project $ 413 $ 0.07 $ 343 $ $ 275 $ 0.04 3,000 per project $ 563 $ 0.19 $ 469 $ 0.16 $ 375 $ 0.12 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 857 $ 2.06 $ 715 $ 1.72 $ 571 $ 1.37 500 per project $ 1,683 $ 3.36 $ 1,402 $ 2.80 $ 1,123 $ 2.24 1,000 per project $ 3,368 $ 0.67 $ 2,806 $ 0.55 $ 2,245 $ 0.45 1,500 per project $ 3,704 $ 0.67 $ 3,087 $ 0.55 $ 2,469 $ 0.45 2,000 per project $ 4,041 $ 2.02 $ 3,368 $ 1.68 $ 2,694 $ 1.34 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 615 $ 0.43 $ 513 $ 0.35 $ 410 $ 0.28 500 per project $ 790 $ 1.37 $ 658 $ 1.14 $ 526 $ 0.92 1,000 per project $ 1,477 $ 0.29 $ 1,231 $ 0.24 $ 984 $ 0.19 1,500 per project $ 1,625 $ 0.29 $ 1,354 $ 0.24 $ 1,083 $ 0.19 2,000 per project $ 1,773 $ 0.88 $ 1,477 $ 0.74 $ 1,182 $ 0.58 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 882 $ 0.58 $ 735 $ 0.49 $ 588 $ 0.38 5,000 per project $ 3,529 $ 0.17 $ 2,940 $ 0.15 $ 2,352 $ 0.11 10,000 per project $ 4,411 $ $ 3,676 $ 0.05 $ 2,940 $ 0.04 50,000 per project $ 7,058 $ 0.03 $ 5,881 $ 0.02 $ 4,706 $ 0.02 100,000 per project $ 8,823 $ 0.08 $ 7,352 $ 0.07 $ 5,881 $ 0.05 PlanCheck 15 16, 3 of 3

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.023 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,106 $ 1.40 $ 1,755 $ 1.17 $ 1,405 $ 0.91 5,000 per project $ 8,424 $ 1.26 $ 7,021 $ 1.05 $ 5,616 $ 0.82 10,000 per project $ 14,742 $ 0.16 $ 12,286 $ 0.14 $ 9,829 $ 0.10 50,000 per project $ 21,061 $ 0.17 $ 17,551 $ 0.14 $ 14,041 $ 0.10 100,000 per project $ 29,486 $ 0.29 $ 24,571 $ 0.25 $ 19,657 $ 0.19 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,160 $ 2.10 $ 2,632 $ 1.76 $ 2,106 $ 1.36 5,000 per project $ 12,637 $ 1.89 $ 10,531 $ 1.58 $ 8,424 $ 1.23 10,000 per project $ 22,115 $ 0.24 $ 18,428 $ 0.20 $ 14,742 $ 0.16 50,000 per project $ 31,591 $ 0.25 $ 26,326 $ 0.21 $ 21,061 $ 0.17 100,000 per project $ 44,228 $ 0.45 $ 36,857 $ 0.36 $ 29,486 $ 0.29 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,900 $ 0.43 $ 1,582 $ 0.35 $ 1,266 $ 1.36 5,000 per project $ 3,798 $ 0.16 $ 3,166 $ 0.12 $ 2,532 $ 1.23 10,000 per project $ 4,559 $ 0.03 $ 3,798 $ 0.02 $ 3,039 $ 0.16 50,000 per project $ 5,698 $ 0.04 $ 4,748 $ 0.03 $ 3,798 $ 0.17 100,000 per project $ 7,598 $ 0.07 $ 6,331 $ $ 5,065 $ 0.29 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,106 $ 1.40 $ 1,755 $ 1.17 $ 1,404 $ 0.91 5,000 per project $ 8,424 $ 1.26 $ 7,020 $ 1.05 $ 5,616 $ 0.82 10,000 per project $ 14,743 $ 0.16 $ 12,286 $ 0.13 $ 9,829 $ 0.10 50,000 per project $ 21,061 $ 0.17 $ 17,551 $ 0.14 $ 14,041 $ 0.11 100,000 per project $ 29,486 $ 0.29 $ 24,571 $ 0.25 $ 19,657 $ 0.19 Inspect 15 16, 1 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.023 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,645 $ 0.80 $ 1,371 $ 0.67 $ 1,097 $ 0.53 400 per project $ 1,805 $ 4.41 $ 1,504 $ 3.68 $ 1,203 $ 2.94 600 per project $ 2,687 $ 1.32 $ 2,239 $ 1.10 $ 1,791 $ 0.88 1,000 per project $ 3,216 $ 1.07 $ 2,680 $ 0.89 $ 2,144 $ 0.71 3,000 per project $ 5,353 $ 1.79 $ 4,461 $ 1.49 $ 3,569 $ 1.19 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,507 $ 0.62 $ 1,256 $ 0.52 $ 1,005 $ 0.42 400 per project $ 1,632 $ 4.14 $ 1,360 $ 3.45 $ 1,088 $ 2.77 600 per project $ 2,461 $ 1.23 $ 2,051 $ 1.03 $ 1,641 $ 0.82 1,000 per project $ 2,953 $ 0.99 $ 2,461 $ 0.82 $ 1,968 $ 0.66 3,000 per project $ 4,922 $ 1.66 $ 4,102 $ 1.36 $ 3,281 $ 1.09 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,349 $ 0.82 $ 1,125 $ 0.69 $ 900 $ 0.55 5,000 per project $ 5,055 $ 0.76 $ 4,212 $ 0.63 $ 3,370 $ 0.51 10,000 per project $ 8,846 $ 0.09 $ 7,371 $ 0.08 $ 5,897 $ 50,000 per project $ 12,637 $ 0.10 $ 10,531 $ 0.08 $ 8,424 $ 100,000 per project $ 17,691 $ 0.18 $ 14,743 $ 0.15 $ 11,794 $ 0.12 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,001 $ 0.71 $ 834 $ 0.59 $ 668 $ 0.48 5,000 per project $ 4,212 $ 0.63 $ 3,510 $ 0.53 $ 2,808 $ 0.42 10,000 per project $ 7,371 $ 0.08 $ 6,143 $ 0.07 $ 4,914 $ 0.05 50,000 per project $ 10,531 $ 0.08 $ 8,775 $ 0.07 $ 7,020 $ 100,000 per project $ 14,743 $ 0.15 $ 12,286 $ 0.12 $ 9,829 $ 0.09 Inspect 15 16, 2 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.023 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,011 $ 0.68 $ 843 $ 0.56 $ 674 $ 0.45 5,000 per project $ 4,043 $ 0.60 $ 3,369 $ 0.51 $ 2,696 $ 0.41 10,000 per project $ 7,076 $ 0.07 $ 5,896 $ $ 4,717 $ 0.05 50,000 per project $ 10,107 $ 0.08 $ 8,423 $ $ 6,739 $ 0.05 100,000 per project $ 14,150 $ 0.15 $ 11,792 $ 0.11 $ 9,433 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,159 $ 2.10 $ 2,632 $ 1.76 $ 2,106 $ 1.40 2,500 per project $ 6,316 $ 1.05 $ 5,264 $ 0.87 $ 4,212 $ 0.70 4,000 per project $ 7,896 $ 2.37 $ 6,579 $ 1.98 $ 5,264 $ 1.58 6,000 per project $ 12,633 $ 3.16 $ 10,528 $ 2.63 $ 8,422 $ 2.10 8,000 per project $ 18,950 $ 2.37 $ 15,792 $ 1.98 $ 12,633 $ 1.58 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,159 $ 2.10 $ 2,632 $ 1.76 $ 2,106 $ 1.40 2,500 per project $ 6,316 $ 1.05 $ 5,264 $ 0.87 $ 4,212 $ 0.70 4,000 per project $ 7,896 $ 2.37 $ 6,579 $ 1.98 $ 5,264 $ 1.58 6,000 per project $ 12,633 $ 3.16 $ 10,528 $ 2.63 $ 8,422 $ 2.10 8,000 per project $ 18,950 $ 2.37 $ 15,792 $ 1.98 $ 12,633 $ 1.58 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,508 $ 0.62 $ 1,256 $ 0.52 $ 1,005 $ 0.42 400 per project $ 1,632 $ 4.14 $ 1,360 $ 3.45 $ 1,088 $ 2.77 600 per project $ 2,462 $ 1.23 $ 2,051 $ 1.03 $ 1,641 $ 0.82 1,000 per project $ 2,954 $ 0.99 $ 2,462 $ 0.82 $ 1,968 $ 0.66 3,000 per project $ 4,922 $ 1.64 $ 4,102 $ 1.36 $ 3,281 $ 1.09 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,250 $ 2.85 $ 1,041 $ 2.38 $ 833 $ 1.90 500 per project $ 2,391 $ 2.39 $ 1,992 $ 2.00 $ 1,594 $ 1.59 1,000 per project $ 3,586 $ 2.39 $ 2,989 $ 2.00 $ 2,391 $ 1.59 1,500 per project $ 4,782 $ 2.39 $ 3,985 $ 2.00 $ 3,188 $ 1.59 2,000 per project $ 5,978 $ 2.99 $ 4,981 $ 2.49 $ 3,985 $ 2.00 Inspect 15 16, 3 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.023 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,137 $ 2.84 $ 948 $ 2.37 $ 758 $ 1.89 500 per project $ 2,274 $ 2.28 $ 1,895 $ 1.89 $ 1,516 $ 1.52 1,000 per project $ 3,411 $ 2.28 $ 2,842 $ 1.89 $ 2,274 $ 1.52 1,500 per project $ 4,548 $ 2.28 $ 3,790 $ 1.89 $ 3,032 $ 1.52 2,000 per project $ 5,685 $ 2.84 $ 4,738 $ 2.37 $ 3,790 $ 1.89 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 698 $ 0.47 $ 582 $ 0.38 $ 465 $ 0.31 5,000 per project $ 2,790 $ 0.42 $ 2,325 $ 0.35 $ 1,860 $ 0.28 10,000 per project $ 4,884 $ 0.05 $ 4,070 $ 0.04 $ 3,255 $ 0.03 50,000 per project $ 6,977 $ 0.05 $ 5,814 $ 0.04 $ 4,652 $ 0.04 100,000 per project $ 9,767 $ 0.09 $ 8,139 $ 0.08 $ 6,512 $ Inspect 15 16, 4 of 4

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 113 $ 112 Electric car charging system each $ 113 $ 112 Firepalce Insert/upgrade each $ 301 $ 299 Furnace/heater replacement each $ 113 $ 112 Graywater/Rainwater Harvesting System each $ 69 $ 69 Insulation/energy upgrade per project $ 109 $ 108 Re-roof with added ventilation per project $ 109 $ 108 Solar photovoltaic system per project $ 156 $ 155 Water heater replacement each $ 113 $ 112 Window retrofits (non-structural only) per project $ 182 $ 181 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 1,027 $ 1,020 ea add'l 100 s.f per project $ 105 $ 104 Canopy / Awning per project $ 356 $ 354 Cellular Tower / Antenna First Antenna / Tower each $ 844 $ 839 each add'l antenna/ tower each $ 92 $ 92 Antenna/Tower w/ Equipment Shelter each $ 615 $ 611 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,102 $ 1,094 Upgrades such as reception counter, registers, signage, etc. each $ 882 $ 876 Commercial Coach Installation each $ 1,464 $ 1,453 Demolition Interior or garage - utlity building per project $ 417 $ 414 Entire Building, residence or commercial per project $ 730 $ 725 Dry rot/termite Repair per project $ 217 $ 215 Fence or Non-Engineered Wall per project $ 628 $ 623 Fireplace Retrofit / Chimney Repair per project $ 600 $ 596 Flag, Light, or Sign Pole - Install / Replace per project $ 747 $ 742 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,252 $ 1,243 Misc Page 1 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 625 $ 621 Garage Conversion First 500 s.f. per project $ 834 $ 828 Ea add'l 100 s.f. per project $ 105 $ 104 Grading 1,000 CY or less per project $ 730 $ 725 1,001-10,000 CY per project $ 939 $ 932 >10,001 CY per project $ 1,147 $ 1,139 Paint Booth per project $ 939 $ 932 Partition per project $ 698 $ 693 Patio Cover Open per project $ 628 $ 623 Enclosed per project $ 1,095 $ 1,087 Pool / Spa - Commercial per project $ 1,042 $ 1,035 Pool / Spa - Residential per project $ 834 $ 828 Re-Roof - Residential per project $ 217 $ 215 Re-Roof - Commercial First 300 s.f. per project $ 417 $ 414 Ea add'l 100 s.f. per project $ 105 $ 104 Roof Structure Replacement First 300 s.f. per project $ 939 $ 932 Ea add'l 100 s.f. per project $ 126 $ 125 Retaining Wall Engineered per project First 100 l.f. per project $ 1,147 $ 1,139 Ea add'l 100 l.f. per project $ 105 $ 104 Non-Engineered per project $ 732 $ 727 Stair Repair / Replace per project $ 939 $ 932 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 834 $ 828 Siding / Stucco per project $ 396 $ 393 Misc Page 2 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Sign Wall per project $ 313 $ 311 Monument per project $ 557 $ 553 Solar / PV System - Commercial / Multi-family per project $ 730 $ 725 Store Front/Façade Alterations: Minor per project $ 939 $ 932 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 625 $ 621 Trash Enclosure per project $ 1,042 $ 1,035 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 522 $ 518 Window / Door - Non-Structural First 10 windows / doors per project $ 365 $ 362 each add'l 10 windows/doors per project $ 18 $ 18 Window / Door - Structural First 10 windows / doors per project $ 539 $ 535 each add'l 10 windows/doors per project $ 70 $ 70 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 286 $ 284 Minor Code Corrections per project $ 217 $ 215 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,252 $ 1,243 MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 225 $ 224 Appeal of Building Official Decision per project $ 1,042 $ 1,035 Handicap Board of Appeals per project $ 1,042 $ 1,035 Fire Permit Handling Fee per project $ 417 $ 414 Supplemental Plan Check per project $ 208 $ 207 Supplemental Inspection per project $ 208 $ 207 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 417 $ 414 Preliminary Project Consultation / Code Analysis (per hour) per project $ 208 $ 207 Misc Page 3 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 105 $ 104 UNIT FEES: A/C (Residential) - each $ 69 $ 69 Furnaces (F.A.U., Floor) $ 69 $ 69 Heater (Wall) $ 69 $ 69 Refrigeration Compressor/Condenser $ 87 $ 86 Boiler $ 87 $ 86 Chiller $ 87 $ 86 Heat Pump (Package unit) $ 52 $ 52 Heater (Unit, Radiant, etc.) $ 52 $ 52 Air Handler $ 52 $ 52 Duct Work only $ 52 $ 52 Evaporative Cooler $ 52 $ 52 Make-up Air System $ 52 $ 52 Vent Fan (Single Duct) - each $ 52 $ 52 Exhaust Hood and Duct (Residential) $ 52 $ 52 Exhaust Hood - Type I (Commercial Grease Hood) $ 105 $ 104 Exhaust Hood - Type II (Commercial Steam Hood) $ 69 $ 69 Walk-in Box/Refrigerator Coil $ 69 $ 69 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 69 $ 69 Other Mechanical Inspections (per hour) $ 208 $ 207 Mechanical Volume and Current Fee Analysis $ 64 $ 63 Misc Page 4 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 208 $ 207 UNIT FEES: Fixtures (each) $ 52 $ 52 Gas System Replace/Repair/Extend (First Outlet) $ 52 $ 52 Gas Outlets (Each Additional) $ 7 $ 7 Building Sewer $ 69 $ 69 Grease Trap $ 52 $ 52 Water Heater (First Heater) $ 69 $ 69 Water Heater (Each Additional Heater) $ 18 $ 18 Water Pipe Repair/Replacement $ 52 $ 52 Drain-Vent Repair/Alterations $ 52 $ 52 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 69 $ 69 Graywater Systems (each) $ 139 $ 138 Miscellaneous Plumbing Items NOS $ 69 $ 69 Other Plumbing and Gas Inspections (per hour) $ 208 $ 207 Plumbing Volume and Current Fee Analysis $ 63 $ 62 ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 105 $ 104 Add/Replace Service (not over 200 amps) $ 69 $ 69 Add/Replace Service (over 200 amps) $ 105 $ 104 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ 52 $ 52 25 or 40 amp circuits (each) $ 35 $ 34 50 to 175 amp circuits (each) $ 42 $ 42 200 amp and larger circuits (each) $ 52 $ 52 Temporary Service (each) $ 52 $ 52 Misc Page 5 of 6

MINOR & MISCELLANEOUS PERMITS 2015-16 The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity 1.007 1.023 Fee Description Proposed Fee Current Fee ELECTRICAL PERMIT FEES, continued Generator Installation (each) $ 80 $ 79 Miscellaneous Electrical Items NOS $ 69 $ 69 Other Electrical Inspections (per hour) $ 208 $ 207 Electrical Volume and Current Fee Analysis $ 64 $ 63 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 $ 40 Code Enforcement Fee $ 338 $ 336 Construction Tax **This fee does not increase by CPI $ 151 $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 273 $ 272 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,721 $ 1,709 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,650 $ 3,625 Misc Page 6 of 6

New Construction Fee Schedule - Plan Check Fees 1.007 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,634 $ 1.75 $ 2,195 $ 1.46 $ 1,756 $ 1.13 5,000 per project $ 10,538 $ 0.52 $ 8,782 $ 0.43 $ 7,025 $ 0.34 10,000 per project $ 13,172 $ 0.19 $ 10,976 $ 0.16 $ 8,782 $ 0.13 50,000 per project $ 21,076 $ 0.10 $ 17,563 $ 0.08 $ 14,050 $ 100,000 per project $ 26,345 $ 0.26 $ 21,954 $ 0.21 $ 17,563 $ 0.17 Commercial Residential and Multifamily Residential Uses - (All newly constructed added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,898 $ 1.93 $ 2,415 $ 1.60 $ 1,932 $ 1.25 5,000 per project $ 11,591 $ 0.58 $ 9,660 $ 0.48 $ 7,728 $ 0.37 10,000 per project $ 14,489 $ 0.21 $ 12,074 $ 0.18 $ 9,660 $ 0.14 50,000 per project $ 23,183 $ 0.12 $ 19,319 $ 0.09 $ 15,455 $ 0.07 100,000 per project $ 28,980 $ 0.28 $ 24,150 $ 0.24 $ 19,319 $ 0.18 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residentia Uses 500 per project $ 1,912 $ 0.42 $ 1,594 $ 0.35 $ 1,275 $ 0.27 5,000 per project $ 3,825 $ 0.15 $ 3,187 $ 0.13 $ 2,550 $ 0.09 10,000 per project $ 4,590 $ 0.02 $ 3,825 $ 0.02 $ 3,060 $ 0.01 50,000 per project $ 5,737 $ 0.03 $ 4,782 $ 0.03 $ 3,825 $ 0.02 100,000 per project $ 7,650 $ 0.07 $ 6,375 $ $ 5,100 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,634 $ 1.75 $ 2,195 $ 1.46 $ 1,756 $ 1.13 5,000 per project $ 10,538 $ 0.52 $ 8,782 $ 0.43 $ 7,025 $ 0.34 10,000 per project $ 13,172 $ 0.19 $ 10,976 $ 0.16 $ 8,782 $ 0.13 50,000 per project $ 21,076 $ 0.10 $ 17,563 $ 0.08 $ 14,050 $ 100,000 per project $ 26,345 $ 0.26 $ 21,954 $ 0.21 $ 17,563 $ 0.17 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 671 $ 1.52 $ 559 $ 1.27 $ 447 $ 0.98 400 per project $ 975 $ 1.41 $ 813 $ 1.17 $ 651 $ 0.91 600 per project $ 1,260 $ 0.31 $ 1,050 $ 0.26 $ 840 $ 0.20 1,000 per project $ 1,386 $ 0.25 $ 1,155 $ 0.21 $ 924 $ 0.16 3,000 per project $ 1,890 $ 0.63 $ 1,575 $ 0.52 $ 1,260 $ 0.40 PlanCheck 16 17, 1 of 3

New Construction Fee Schedule - Plan Check Fees 1.007 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 671 $ 1.52 $ 559 $ 1.27 $ 447 $ 0.98 400 per project $ 975 $ 1.41 $ 813 $ 1.17 $ 651 $ 0.91 600 per project $ 1,260 $ 0.31 $ 1,050 $ 0.26 $ 840 $ 0.20 1,000 per project $ 1,386 $ 0.25 $ 1,155 $ 0.21 $ 924 $ 0.16 3,000 per project $ 1,890 $ 0.63 $ 1,575 $ 0.52 $ 1,260 $ 0.40 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,580 $ 1.05 $ 1,317 $ 0.87 $ 1,053 $ 0.68 5,000 per project $ 6,323 $ 0.31 $ 5,269 $ 0.26 $ 4,215 $ 0.20 10,000 per project $ 7,903 $ 0.12 $ 6,586 $ 0.09 $ 5,269 $ 0.07 50,000 per project $ 12,645 $ $ 10,538 $ 0.05 $ 8,430 $ 0.03 100,000 per project $ 15,806 $ 0.16 $ 13,172 $ 0.13 $ 10,538 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,317 $ 0.87 $ 1,097 $ 0.72 $ 878 $ 0.57 5,000 per project $ 5,269 $ 0.26 $ 4,391 $ 0.21 $ 3,512 $ 0.17 10,000 per project $ 6,586 $ 0.09 $ 5,488 $ 0.07 $ 4,391 $ 50,000 per project $ 10,538 $ 0.05 $ 8,782 $ 0.04 $ 7,025 $ 0.03 100,000 per project $ 13,172 $ 0.13 $ 10,976 $ 0.10 $ 8,782 $ 0.08 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,370 $ 0.91 $ 1,142 $ 0.75 $ 914 $ 0.61 5,000 per project $ 5,485 $ 0.27 $ 4,570 $ 0.22 $ 3,656 $ 0.18 10,000 per project $ 6,856 $ 0.09 $ 5,713 $ 0.08 $ 4,570 $ 50,000 per project $ 10,969 $ 0.05 $ 9,141 $ 0.04 $ 7,313 $ 0.03 100,000 per project $ 13,712 $ 0.14 $ 11,426 $ 0.10 $ 9,141 $ 0.08 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,140 $ 2.08 $ 2,617 $ 1.74 $ 2,093 $ 1.39 2,500 per project $ 6,281 $ 0.41 $ 5,234 $ 0.35 $ 4,188 $ 0.27 4,000 per project $ 6,909 $ 0.46 $ 5,758 $ 0.39 $ 4,606 $ 0.30 6,000 per project $ 7,851 $ 0.78 $ 6,543 $ 0.65 $ 5,234 $ 0.51 8,000 per project $ 9,422 $ 1.17 $ 7,851 $ 0.97 $ 6,281 $ 0.78 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 1,014 $ 0.67 $ 845 $ 0.56 $ 676 $ 0.45 2,500 per project $ 2,029 $ 0.13 $ 1,691 $ 0.10 $ 1,353 $ 0.08 4,000 per project $ 2,233 $ 0.15 $ 1,861 $ 0.13 $ 1,488 $ 0.09 6,000 per project $ 2,536 $ 0.25 $ 2,114 $ 0.21 $ 1,691 $ 0.17 8,000 per project $ 3,045 $ 0.38 $ 2,536 $ 0.31 $ 2,029 $ 0.25 PlanCheck 16 17, 2 of 3

New Construction Fee Schedule - Plan Check Fees 1.007 Effective 7/1/15 (proposed) Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 201 $ 0.45 $ 168 $ 0.38 $ 134 $ 0.30 400 per project $ 292 $ 0.42 $ 243 $ 0.35 $ 195 $ 0.28 600 per project $ 377 $ 0.09 $ 314 $ 0.07 $ 251 $ 1,000 per project $ 416 $ 0.07 $ 346 $ $ 277 $ 0.04 3,000 per project $ 567 $ 0.19 $ 473 $ 0.16 $ 377 $ 0.13 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 863 $ 2.07 $ 720 $ 1.73 $ 575 $ 1.38 500 per project $ 1,695 $ 3.38 $ 1,412 $ 2.82 $ 1,130 $ 2.25 1,000 per project $ 3,391 $ 0.67 $ 2,826 $ 0.56 $ 2,261 $ 0.45 1,500 per project $ 3,730 $ 0.67 $ 3,108 $ 0.56 $ 2,486 $ 0.45 2,000 per project $ 4,069 $ 2.03 $ 3,391 $ 1.69 $ 2,712 $ 1.35 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 619 $ 0.43 $ 517 $ 0.36 $ 413 $ 0.28 500 per project $ 795 $ 1.38 $ 662 $ 1.15 $ 530 $ 0.92 1,000 per project $ 1,488 $ 0.29 $ 1,239 $ 0.24 $ 991 $ 0.19 1,500 per project $ 1,636 $ 0.29 $ 1,363 $ 0.24 $ 1,091 $ 0.19 2,000 per project $ 1,785 $ 0.89 $ 1,488 $ 0.74 $ 1,190 $ 0.59 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 888 $ 0.59 $ 740 $ 0.49 $ 592 $ 0.39 5,000 per project $ 3,554 $ 0.17 $ 2,961 $ 0.15 $ 2,369 $ 0.12 10,000 per project $ 4,442 $ $ 3,701 $ 0.05 $ 2,961 $ 0.04 50,000 per project $ 7,107 $ 0.03 $ 5,922 $ 0.02 $ 4,739 $ 0.02 100,000 per project $ 8,884 $ 0.08 $ 7,404 $ 0.07 $ 5,922 $ 0.05 PlanCheck 16 17, 3 of 3

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.007 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,120 $ 1.41 $ 1,767 $ 1.17 $ 1,414 $ 0.91 5,000 per project $ 8,483 $ 1.27 $ 7,070 $ 1.06 $ 5,655 $ 0.83 10,000 per project $ 14,846 $ 0.16 $ 12,372 $ 0.14 $ 9,897 $ 0.10 50,000 per project $ 21,208 $ 0.17 $ 17,674 $ 0.14 $ 14,139 $ 0.10 100,000 per project $ 29,692 $ 0.29 $ 24,743 $ 0.25 $ 19,795 $ 0.19 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,182 $ 2.12 $ 2,651 $ 1.77 $ 2,120 $ 1.37 5,000 per project $ 12,725 $ 1.91 $ 10,605 $ 1.59 $ 8,483 $ 1.24 10,000 per project $ 22,269 $ 0.24 $ 18,557 $ 0.20 $ 14,846 $ 0.16 50,000 per project $ 31,813 $ 0.25 $ 26,510 $ 0.21 $ 21,208 $ 0.17 100,000 per project $ 44,538 $ 0.45 $ 37,115 $ 0.37 $ 29,692 $ 0.29 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,913 $ 0.43 $ 1,594 $ 0.36 $ 1,275 $ 1.37 5,000 per project $ 3,825 $ 0.16 $ 3,188 $ 0.13 $ 2,550 $ 1.24 10,000 per project $ 4,591 $ 0.03 $ 3,825 $ 0.02 $ 3,060 $ 0.16 50,000 per project $ 5,738 $ 0.04 $ 4,782 $ 0.03 $ 3,825 $ 0.17 100,000 per project $ 7,651 $ 0.07 $ 6,375 $ $ 5,100 $ 0.29 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,121 $ 1.41 $ 1,767 $ 1.18 $ 1,414 $ 0.92 5,000 per project $ 8,483 $ 1.27 $ 7,070 $ 1.06 $ 5,656 $ 0.82 10,000 per project $ 14,846 $ 0.16 $ 12,372 $ 0.13 $ 9,897 $ 0.10 50,000 per project $ 21,209 $ 0.17 $ 17,674 $ 0.14 $ 14,139 $ 0.11 100,000 per project $ 29,692 $ 0.30 $ 24,743 $ 0.25 $ 19,795 $ 0.19 Inspect 16 17, 1 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.007 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,656 $ 0.80 $ 1,380 $ 0.67 $ 1,104 $ 0.54 400 per project $ 1,817 $ 4.44 $ 1,514 $ 3.70 $ 1,212 $ 2.96 600 per project $ 2,706 $ 1.33 $ 2,255 $ 1.11 $ 1,804 $ 0.89 1,000 per project $ 3,238 $ 1.08 $ 2,699 $ 0.90 $ 2,159 $ 0.71 3,000 per project $ 5,391 $ 1.80 $ 4,492 $ 1.50 $ 3,594 $ 1.20 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,518 $ 0.63 $ 1,265 $ 0.52 $ 1,012 $ 0.42 400 per project $ 1,644 $ 4.17 $ 1,369 $ 3.48 $ 1,096 $ 2.79 600 per project $ 2,478 $ 1.24 $ 2,065 $ 1.04 $ 1,652 $ 0.83 1,000 per project $ 2,974 $ 1.00 $ 2,478 $ 0.83 $ 1,982 $ 0.66 3,000 per project $ 4,957 $ 1.68 $ 4,131 $ 1.37 $ 3,304 $ 1.10 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,359 $ 0.83 $ 1,133 $ 0.69 $ 906 $ 0.55 5,000 per project $ 5,090 $ 0.76 $ 4,242 $ 0.64 $ 3,393 $ 0.51 10,000 per project $ 8,908 $ 0.10 $ 7,423 $ 0.08 $ 5,938 $ 50,000 per project $ 12,725 $ 0.10 $ 10,604 $ 0.08 $ 8,483 $ 100,000 per project $ 17,815 $ 0.18 $ 14,846 $ 0.15 $ 11,877 $ 0.13 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,008 $ 0.72 $ 840 $ 0.60 $ 672 $ 0.48 5,000 per project $ 4,242 $ 0.64 $ 3,535 $ 0.53 $ 2,828 $ 0.42 10,000 per project $ 7,423 $ 0.08 $ 6,186 $ 0.07 $ 4,948 $ 0.05 50,000 per project $ 10,604 $ 0.08 $ 8,837 $ 0.07 $ 7,070 $ 100,000 per project $ 14,846 $ 0.15 $ 12,372 $ 0.12 $ 9,897 $ 0.09 Inspect 16 17, 2 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.007 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,018 $ 0.68 $ 849 $ 0.57 $ 679 $ 0.45 5,000 per project $ 4,071 $ 0.61 $ 3,392 $ 0.51 $ 2,715 $ 0.41 10,000 per project $ 7,125 $ 0.07 $ 5,937 $ $ 4,750 $ 0.05 50,000 per project $ 10,178 $ 0.08 $ 8,482 $ $ 6,786 $ 0.05 100,000 per project $ 14,249 $ 0.15 $ 11,874 $ 0.12 $ 9,499 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,181 $ 2.12 $ 2,651 $ 1.77 $ 2,120 $ 1.41 2,500 per project $ 6,360 $ 1.06 $ 5,301 $ 0.88 $ 4,241 $ 0.70 4,000 per project $ 7,951 $ 2.39 $ 6,625 $ 1.99 $ 5,301 $ 1.59 6,000 per project $ 12,722 $ 3.18 $ 10,601 $ 2.65 $ 8,481 $ 2.12 8,000 per project $ 19,082 $ 2.39 $ 15,903 $ 1.99 $ 12,722 $ 1.59 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,181 $ 2.12 $ 2,651 $ 1.77 $ 2,120 $ 1.41 2,500 per project $ 6,360 $ 1.06 $ 5,301 $ 0.88 $ 4,241 $ 0.70 4,000 per project $ 7,951 $ 2.39 $ 6,625 $ 1.99 $ 5,301 $ 1.59 6,000 per project $ 12,722 $ 3.18 $ 10,601 $ 2.65 $ 8,481 $ 2.12 8,000 per project $ 19,082 $ 2.39 $ 15,903 $ 1.99 $ 12,722 $ 1.59 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,518 $ 0.63 $ 1,265 $ 0.52 $ 1,012 $ 0.42 400 per project $ 1,644 $ 4.17 $ 1,369 $ 3.48 $ 1,096 $ 2.79 600 per project $ 2,479 $ 1.24 $ 2,065 $ 1.04 $ 1,652 $ 0.83 1,000 per project $ 2,974 $ 1.00 $ 2,479 $ 0.83 $ 1,982 $ 0.66 3,000 per project $ 4,957 $ 1.66 $ 4,131 $ 1.37 $ 3,304 $ 1.10 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,258 $ 2.87 $ 1,049 $ 2.40 $ 839 $ 1.92 500 per project $ 2,408 $ 2.41 $ 2,006 $ 2.01 $ 1,605 $ 1.60 1,000 per project $ 3,611 $ 2.41 $ 3,010 $ 2.01 $ 2,408 $ 1.60 1,500 per project $ 4,815 $ 2.41 $ 4,013 $ 2.01 $ 3,210 $ 1.60 2,000 per project $ 6,020 $ 3.01 $ 5,016 $ 2.50 $ 4,013 $ 2.01 Inspect 16 17, 3 of 4

New Construction Fee Schedule - Inspection Fees Effective 7/1/15 (proposed) 1.007 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,145 $ 2.86 $ 954 $ 2.39 $ 764 $ 1.91 500 per project $ 2,290 $ 2.29 $ 1,908 $ 1.91 $ 1,526 $ 1.53 1,000 per project $ 3,435 $ 2.29 $ 2,862 $ 1.91 $ 2,290 $ 1.53 1,500 per project $ 4,579 $ 2.29 $ 3,817 $ 1.91 $ 3,053 $ 1.53 2,000 per project $ 5,724 $ 2.86 $ 4,771 $ 2.39 $ 3,817 $ 1.91 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 703 $ 0.47 $ 586 $ 0.39 $ 468 $ 0.31 5,000 per project $ 2,810 $ 0.42 $ 2,342 $ 0.36 $ 1,873 $ 0.28 10,000 per project $ 4,918 $ 0.05 $ 4,098 $ 0.04 $ 3,278 $ 0.03 50,000 per project $ 7,026 $ 0.05 $ 5,854 $ 0.04 $ 4,684 $ 0.04 100,000 per project $ 9,836 $ 0.09 $ 8,196 $ 0.08 $ 6,557 $ Inspect 16 17, 4 of 4