Swedbank Mining Seminar. 28 November 2013

Similar documents
The Engebøfjellet Rutile project, a new high grade source in Europe

Investor presentation January 2011

A forward-looking resource company with integrated operations in exploration, extraction and production of high-end minerals and metals.

Pathway to Production

A forward-looking resource company with integrated operations in exploration, extraction and production of high-end minerals and metals.

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

For personal use only

Corporate Presentation October 2015

PROSPECTUS. A Norwegian public limited company organised under the laws of Norway

Change of Company Name to Neometals Ltd (ASX: NMT)

Case No COMP/M ANGLO AMERICAN / KUMBA RESOURCES. REGULATION (EEC) No 4064/89 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date: 03/12/2003

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

SOTKAMO SILVER. A mining Investment Opportunity

(NYSE-MKT:XRA, TSX:XRC,

3Q 2015 OPERATIONS REVIEW

Savannah North Scoping Study Looking into the future 3 February 2016

Silver Mine Project Investment Opportunity in Scandinavia

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Feasibility Study shows low cost battery grade lithium hydroxide production possible using ELi Technology

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb TORONTO

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies

Challenges of Investing in Junior Mining Companies and. Sotkamo Silver

CNSX: TV

Interim results for the six months ended 31 December 2009

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

PACIFIC ENERGY LIMITED POWER GENERATION

The company is listed on the Australian Securities Exchange (ASX code: ILU) and employs approximately 850 people, the majority in Australia.

Focusing on Near Term Production and Exploration in Quebec

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

Fourth Quarter 2010 CEO Sverre Hurum CFO Erik Stubø

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

ANNUAL GENERAL MEETING November 2015

Endeavour Management Presentation

FIJI GOLD LION ONE METALS

Grieg Seafood ASA Q Morten Vike CEO. Atle Harald Sandtorv CFO. 15 May griegseafood.com

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

DRX : Cyclone DFS soon

Nemaska Lithium A near term lithium hydroxide supplier

For personal use only

2 Badger Explorer ASA - 2Q 2007

AGNICO-EAGLE MINES LIMITED

H Results. 12 August 2015

FORWARD LOOKING STATEMENTS

Forward-Looking Statements

Ironbark Zinc Limited

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Biomass Pellet Prices Drivers and Outlook What is the worst that can happen?

Grieg Seafood ASA Q Andreas Kvame CEO. Atle Harald Sandtorv CFO. 6 November griegseafood.com

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Mako Project, Eastern Senegal Completion of Scoping Study

For personal use only

Interview with Paul Atherley, Managing Director of Berkeley Energia (911733, ASX: BKY, London: BKY)

Mineral Deposits and their Global Strategic Supply. Group Executive and Chief Executive Non-Ferrous 14 December 2011

Developing solar in emerging markets

Technical considerations and viability of higher titania slag feedstock for the chloride process

Interim Report. 4th quarter 2008

Report for the Quarter Ended 30 September 2015

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

Auriant Mining AB (publ)

4Q 11. Deep Sea Supply Plc Presentation 29 Feb 2012

For personal use only

Klöckner & Co SE. Q Results

Investor & Analyst Presentation Acquisition of Centor US Holding Inc. Uwe Röhrhoff, CEO Rainer Beaujean, CFO Duesseldorf, July 28, 2015

Kenmare Resources Plc.

Mining in Finland 2012

Sabina Gold & Silver Corp.

Gjensidige Pensjonsforsikring AS (GPF) Investor presentation. June 2016

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Third quarter results 2012

BA-CA International Investor s Conference 2006

Converting vision into value

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

Group Financial Outlook and Strategy. Mark Langer, CFO Paris, November 19, 2014

CODELCO UPDATE April Copyrights 2014 CODELCO-CHILE. Todos los Derechos Reservados. Copyrights 2014 by CODELCO-CHILE. All Rights Reserved.

OCEAN YIELD AS Pareto Offshore Conference. 13 September 2012

For personal use only

Cannon Big Pit Given the Green Light

Transcription:

Swedbank Mining Seminar 28 November 2013 Exploration and production of high-end minerals and metals Nordic Mining ASA N-0250 Oslo Norway Tel +47 22 94 77 90 Fax +47 22 94 77 01 Org. no 989 796 739 post@nordicmining.com

Disclaimer This document has been used by Nordic Mining during an oral presentation. Therefore, this document is incomplete without the oral explanations, comments and supporting instruments that were submitted during the referred presentation. To the extent permitted by law, no representation or warranty is given, express or implied, as to the accuracy of the information contained in this document. Some of the statements made in this document contain forward-looking statements. To the extent permitted by law, no representation or warranty is given, and nothing in this document or any other information made available during the oral presentation should be relied upon as a promise or representation as to the future condition of Nordic Mining s business. 2

Value potential in strategic minerals Nickel, Copper, Platinum, Palladium Reinfjord Nordic Ocean Resources AS (85%) Lithium Titanium Nordic Rutile AS Quartz Nordic Quartz AS Keliber Oy (38%) Responding to the increasing mineral deficit in Europe 3

Solid shareholder structure Largest shareholders * Share overview and share price development ** Top 20 shareholders Shares Percent 1 NORDNET BANK AB 21 982 672 7,8 % 2 SKAGEN VEKST 21 764 408 7,8 % 3 MP PENSJON PK 14 319 952 5,1 % 4 NORDEA BANK PLC FINLAND 9 341 322 3,3 % 5 FINNISH INDUSTRY INVESTMENT LTD. 8 358 949 3,0 % 6 DYBVAD CONSULTING AS 7 906 148 2,8 % 7 VPF NORDEA SMB 6 384 929 2,3 % 8 DANSKE BANK A/S 5 606 057 2,0 % 9 MAGIL AS 4 700 000 1,7 % 10 VERDIPAPIRFONDET DNB 4 263 307 1,5 % 11 VICAMA AS 4 200 000 1,5 % 12 SNATI AS 4 001 219 1,4 % 13 NORDNET PENSJONSFORSIKRING 3 719 387 1,3 % 14 OVE KLUNGLAND HOLDING AS NIL 3 414 281 1,2 % 15 CITIBANK NA S/H POHJOLA BANK 3 221 786 1,1 % 16 OLE KRISTIAN GUNDERSEN STOKKEN 2 620 000 0,9 % 17 AUDSTEIN DYBVAD 2 424 412 0,9 % 18 FEMCON AS 2 089 280 0,7 % 19 DIMA AS 2 000 000 0,7 % 20 LITHINON AS 2 000 000 0,7 % Total top 20 134 318 109 47,9 % Other 146 186 696 52,1 % Total 280 504 805 100,0% Share overview Stock symbol NOM Stock exchange Oslo Axess Number of issued shares 280 504 805 Owned by Norwegian shareholders 79% Owned by international shareholders 21% Owned by management 2,5% Options 4 850 000 - of which owned by management 2 400 000 Fully diluted number of shares 285 354 805 Current share price (NOK) 1,10 Market capitalisation (NOKm) 309 12 month trading range (NOK) 0,30-1,32 Share price development last 12 months NOK Increasing institutional shareholding Note *: Shareholder overview as of 26 November 2013 Note **: Share price as of 26 November 2013 4

Engebø Engebø rutile deposit: JORC resource of 154M tonnes One of the world s largest titanium deposits @ 3.77% TiO 2 Historical estimate of 383M tonnes @ 3.96% TiO 2

Rutile (%) Engebø is among the largest rutile deposits in the world Rutile projects grade and target production 4,50% 4,00% 3,50% 3,00% 2,50% Engebø Cerro Blanco Murray Basin 2,00% 1,50% 1,00% 0,50% 0,00% -0,50% -1,00% Sierra Rutile Coburn Donald Ranobe Kwale Planning Moma Construction Grande Cote Production 0 50 100 150 200 250 Production (Ktpa) Size of bubble indicates resource size Source: Company websites 6

Engebø has the highest rutile grade Rutile grade for current TiO 2 producers and planned projects Engebø 3.77% Murray Basin - Iluka 2.32% Cerro Blanco 2.10% Akonolinga (Years 1-6) Sierra Rutile 1.42% 1.66% Project Producer Akonolinga 1.15% Kwale Snapper 0.65% 0.59% Donald Gingko Cyclone Perth Basin - Iluka Fairbreeze Jacinth - Ambrosia Namakwa Mindarie Zircon Stradbroke 0.37% 0.35% 0.29% 0.27% 0.22% 0.20% 0.20% 0.16% 0.13% High grade ore with low impurities brings processing benefits and premium pricing Source: Company websites 7

Engebø has low impurities and implies reduction of climate gases S Africa Norway Source: Production of titanium dioxide (2007) by Fahli and Martin-Matarranza 8

The rutile process from mine to consumer Mining Processing End use Rutile is mined from ore or mineral sands producing a rutile concentrate Key rutile producing countries are Sierra Leone, South Africa and Australia Rutile is processed through chlorination in reactors which produces TiO 2 pigment Optional metallurgical process to produce titanium metal and high performance alloys Majority of TiO 2 feedstocks are used in production of pigment in paints, plastics and paper Approximately 5% is used for titanium metal Rutile is also used in welding rods Hard rock Mineral sand Rutile is more efficient than other feedstocks: TiO 2 value chain Rutile Less waste 94-96% TiO 2 Ilmenite/slag Rutile ~80% Less consumption of process chemicals Ilmenite 35-65% ~15% TiO 2 Leucoxene ~5% Less consumption of coke Leucoxene > 65% TiO 2 Processing Paint, plastics Less use of ore and paper ~90% Aircraft & Medical ~5% Welding ~6% TiO 2 ; small part of total cost for end-use manufacturers with few viable substitutes 9

Rutile and garnet, environmentally friendly products with growing markets 10

Strong correlation between global GDP growth and TiO 2 demand TZMI s recent global forecast is 3.8% CAGR (compound annual growth rate) Source: IHS Global Insights, TZMI 11

TiO 2 demand follows an S-shaped industrialisation/wealth curve China, India and other fast-growing economies are still in an emerging phase Source: Rio Tinto, TZMI 12

Favourable long-term market outlook for titanium feedstock Tight short-term market balance; demand surplus forecasted from 2016 and onwards Source: TZMI (November 2013) 13

Market balance is tightening; rutile price on the rebound Historic prices RBC short/medium term forecast NM LT price assumption USD 1,000/t RBC long-term price forecast is USD 1,200 per tonne Source: Industrial Minerals, RBC Capital Markets (November 2013) 14

25 % 25 % Long 20 % sea freights underpin 25 attractiveness % of new European supply 22% 15 % 20 % 25 % 20 % 10 % 15 % 8% 20 % 15 % 10 % 5 % 0 % 5 % 0 % 25 % 20 % 5% 15 % US 10 % 5 % 0 % Canada 25 % 20 % 15 % 10 % 5 % 0 % 3% Sierra Leone 25 % 15 % 5% 20 % 10 % Norway 15 % Ukraine 5 % 10 % 0 % 5 % 0 % 20% 25 % 20 % 15 % 10 % 5% 5 % India 0 % 8% China 5% 25 % 20 % Vietnam 15 % 19% 25 % 10 % 10 % 20 % 5 % 5 % 15 % 10 % 0 % South Africa 0 % Australia Rutile producer 5 % Ilmenite producer Ilmenite & rutile producer 0 % Cylinder indicates % of world TiO Zimbabwe 2 feedstock production European feedstock consumption is 30% of world total Source: TZMI 15

European pigment majors will be future customers Regional, stable supply brings customer benefits Substantial freight reduction compared to existing supply Plant-to-plant shipment operation Simple logistics improves working capital, storage and planning Several European customers can each take Engebø s annual production Long term commercial interest confirmed by pigment, metal and welding rod producers Large pigment plants for high grade feedstock Company Plant location Country Huntsman Tioxide Greatham UK Cristal Global Stallinborough UK Kronos Gent / Leverkusen Belgium / Germany Tronox Rotterdam Netherlands Significant supply deficit in Europe makes Norwegian rutile attractive 16

Long-term international value chains and customer potential Pigment and paint industries Titanium metal / Welding rods Global industries and players with strong European foothold Source: Company reports, webpages and presentations 17

18

Favourable project logistics and configuration Efficient and area-tight concept, low transportation costs 19

First results from measuring program recorded Moderate current velocities at depth; favorable settling conditions in fjord deposit Source: Picture and newspaper clipping from Firda 20

Political discussions and permitting process advancing From the new government platform: The mineral industry represent significant value and the government will seek to improve predictability in the planning processes towards permitting. Use of sea disposal may still be an option, in combination with best practise procedures and comprehensive environmental monitoring Source: Firda Political decisions ahead: - Resolution regarding the industrial area plan - Criteria and guidelines for waste disposal permit 21

22

Final permits will trigger accelerated progress 2013 2014 2015 2016 Permits Resource classification Process tests & pilot production Water/power supply Pre. study Offtake agreements Basic eng. Feas. study(dfs) Financing Investment decision Pre-investment expenditure of approximately USD 20 million 23

Nordic Rutile strategic business scenarios Pre-investment phase Investment/Production phase NM maintain 100% shareholding in NR Ti-focused shareholding in NR Industrial shareholding in NR Institutional shareholding in NR NM >50% shareholding in NR Ti-focused shareholding in NR Industrial shareholding in NR Customer based shareholding in NR Separate listing of NR Feasibility study (DFS) basis for debt financing 24

Preliminary project financial estimates * Main assumptions CAPEX: USD 300m Rutile recovery rate: 55% Ore production: 4 million tonnes p.a. Rutile production: 87,000 tonnes p.a. Rutile price: USD 1,000/t Garnet price: USD 300/t Mine life: 50 years OPEX (open pit): USD 550/t ex. by-product credit USD 185/t incl. by-product credit Key figures NPV @ 8% WACC: USD 466m (after tax) IRR 20.7% Payback time: 4.5 years EBITDA % open pit: 55-60% EBITDA % underground: 30-35% Break even price, rutile: USD 370/t (IRR = 0) Project ROI : 10 (undiscounted) Cashflow projection NPV sensitivity to key input factors USDm 700 600 500 400 300 200 100 0-20% -10% Base case +10% +20% Rutile price Garnet prod. Capex Opex Rutile recovery Long project life-time - short payback time Note (*): Assumptions and estimates are based on preliminary internal assessment. Product prices and OPEX are inflation adjusted with 2.5% p.a. 25

Thank you for your attention! www.nordicmining.com 26

Engebø, a unique titanium rutile project (100%) Project highlights JORC resource of 154M tonnes @ 3.8% TiO 2 * Historical estimate of 383M tonnes @ 3.96% TiO 2 50 years expected mine life NPV of USD 466M @ 8% WACC after tax (company estimate) Planned production of 80-100K tonnes rutile @ 95% TiO 2 per year Key features Large, high grade resource Low on radioactive elements Main infrastructure in place Deposit located next to deep sea port Strategically located near European markets Potential to be Europe s largest producer of natural rutile (TiO 2 ) Note (*): Refer to the November 2008 scoping Study by Wheeler and Dowdell for resource statements 27

Fast track development project in High Purity Quartz Nordic Quartz HPQ project Project highlights Key features Estimate of 3.45 million tonnes of quartz, under exploration* Mine life up to 60 years (30 years in base case) NPV of USD 60 million @ 8% WACC after tax Estimated production of 5,000 tonnes of HPQ pa Demonstrated superior product quality for advanced applications/markets Outcropping hydrothermal quartz deposit Low in critical elements as Ti, Al, Fe, P, Na, K, Li, B Ideally situated, close to infrastructure and port Small-scale mining operation; 20 30,000 tonnes ore pa Limited environmental impact Bringing a new long term supplier to the HPQ play Note *): Refer to the December 2012 Scoping Study by Dorfner Anzaplan for resource statements 28

Keliber Development project in high-grade lithium Project highlights Estimated 3.14m tonnes mineral resource; 2.65m tonnes is classified as ore reserve (JORC compliant) Cost efficient and environmentally friendly processing method Planned production of 4,000 tonnes per year of high-purity lithium carbonate Robust shareholder base: - Nordic Mining ASA 38.0 % - Finnish Industry Investment Ltd. 15.6 % - Ilmarinen Mutual Pension Insurance Company 13.0 % Key features Mining permit (Länttä deposit) and environmental permits in place Ideally located; close to processing industry cluster, competent personnel, infrastructure and port +99.9% Li-product suitable for advanced battery applications Region with promising exploration potential Keliber(38%) targets to be the first European producer of Lithium carbonate 29

Nordic Ocean Nordic Ocean Resources AS (85%) NORA wants to be a long term pioneer on the Norwegian shelf NORA has submitted an application to Norwegian authorities for licenses in Norwegian exclusive economic zone (EEZ) NORA wants to expand internationally by submitting an application to the International Seabed Authority NORA, Statoil and The Norwegian University of Science and Technology (NTNU) have entered into a cooperation regarding potential resources within the Norwegian EEZ 30

Board of Directors and Management Company background and overview Board of Directors Management Tarmo Tuominen, Chairman Chief Technology Officer in Nordkalk, Finland mmmmm Kjell Roland, Deputy chairman CEO of Norfund, Norway Ivar S. Fossum, CEO 20 years experience from management positions in Hydro, Yara and FMC Technologies Lars K. Grøndahl, CFO More than 20 years experience from industrial management positions in i.a. Aker, Scancem Group and Heidelberg Cement Mari Thjømøe, Board member Extensive executive and board experience from oil and gas, finance and investment management (e.g. Statoil, Hydro and KLP) Mona Schanche, Exploration Manager Resource geologist from the University of Science and Technology in Trondheim, former project geologist in Titania (Kronos Group) Hilde Myrberg, Board member Extensive executive and board experience from oil and gas, power and consumer industries (e.g. Hydro and Orkla) Tore Viana-Rønningen, Board member VP in Dag Dvergsten AS, Norway. Previous experience from Barclays Natural Resource Investments ($2.2 bn PE fund) mmm Differentiated mining and industrial experience combined with extensive network 31

Well defined deposit and efficient mining scenario JORC Resource* 3D block model of the Engebø ore body Resource class JORC Mill tonnes TiO 2 % @ 3% cut-off Indicated 31.7 3.77 Inferred 122.6 3.75 Total 154.3 3.77 Total JORC resource of 154 M tonnes @ 3.77% TiO 2 Historical estimate of 383 M tonnes @ 3.96% TiO 2 50 drill holes totaling 15,000 meters have been drilled, and the company aims to build the resource through further drilling Open pit mining for 10-15 years, 35-40 years underground mining Open pit strip ratio of 70 % Rutile is main product, while Garnet and Aggregates are by-products Considerable JORC compliant resource with upside potential from additional drilling Note *): Refer to the November 2008 scoping Study by Wheeler and Dowdell for resource statements 32

Preliminary capital cost estimate Capex estimate (USDm) Outline of Engebø industrial plant Royalties & land acquisition 13 Infrastructure & civil 83 Mine 17 Crushing facility 22 Wet process package 107 Dry process package 55 Laboratory and others 4 --------------------------------------------------- Total 300 The preliminary capital cost estimate was prepared internally by the company in 2011, and includes 20% contingency Capex review will be part of the continued project planning process Total construction time of 24 months Deep sea key already in place, ready to use Ideal location and simple ore and product logistics reduce capex and overrun risk 33

Engebø titanium project Efficient mine plan; first open pit, then underground Standard open pit/glory hole design Underground mining by Longwall stoping 34