N00164.AR.002425 NSA CRANE 5090.3a



Similar documents
LETTER REGARDING THE TRANSMITTAL OF THE QUARTERLY REPORT FOR REPORTING PERIOD OCTOBER THROUGH DECEMBER 2007 NWS EARLE NJ 1/24/2008 TETRA TECH NUS

LETTER REGARDING THE SUBMITTAL OF THE QUARTERLY REPORT FOR REPORTING PERIOD APRIL THROUGH JUNE 2007 NWS EARLE NJ 7/25/2007 TETRA TECH NUS

FINAL RESOURCE CONSERVATION AND RECOVERY ACT PARTIAL CLOSURE REPORT FOR BUILDING 111 WITH TRANSMITTAL LETTER NAS BRUNSWICK ME 11/5/2010 NAS BRUNSWICK

N60201.AR NS MAYPORT a

FLORIDA BROWNFIELDS CONFERENCE

Fact sheet: Writing a complaint letter. General guidelines

Oil Spill Clean-up by Homeowner in Ohio *

I. PURPOSE This SOP describes policies, procedures, and record keeping requirements for all documents subject to change control.

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Writing a complaint letter

AHERA 3-Year Asbestos Re-Inspection

Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 &#6, MO , Construction Permit No. CP , Callaway County

MEN'S FASHION UK Items are ranked in order of popularity.

State of Michigan DEPARTMENT OF HUMAN SERVICES

FDEP Soil Cleanup Target Level Residential soil = 400 ppm Industrial soil = 920 ppm. Arsenic is a known human carcinogen EPA regulation

South East of Process Main Building / 1F. North East of Process Main Building / 1F. At 14:05 April 16, Sample not collected

Visual Sample Plan (VSP): A Tool for Balancing Sampling Requirements Against Decision Error Risk

Table of Contents. This file contains the following documents in the order Fsted:

Subject: No-Rise Certification for River Restoration Activities on a section of the West Fork White River near the Fayetteville Executive Airport

EPA Comments on Assessment of Dam Safety of Coal Combustion Surface Impoundments: Prairie Power Inc Pearl Power Plant, Pearl, IL

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program.

February 26, Enclosed for your records is an approved copy of the following State Plan Amendment: --Effective Date: July 1, 2013

Contingency Plan. Facility Name

Technical Cleaning Ó

Pierre VOC Ground Water Investigation and MTBE Remediation Pilot Study

The Biggest Environmental Design Project of All Time

Note: This article appeared in the November-December 2013 Issue of FBI NAA s The Associate Magazine.

Photographs: Acceptable, Unacceptable, and Unacceptably Repaired Precast Concrete Products

CHAPTER 4 IDENTIFYING LEAD-BASED PAINT HAZARDS

OFFICE OF INSURANCE AND SAFETY FIRE COMMISSIONER

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009

New Cumberland Army Depot Formerly Used Defense Site (FUDS) Marsh Run Park Site Restoration Community Meeting

a GAO GAO DEFENSE WORKING CAPITAL FUND Military Services Did Not Calculate and Report Carryover Amounts Correctly

Letter Health Consultation

REFINANCE INFORMATION FORM. In order to ensure a smooth closing, we would like to make you aware of the following information:

Termiticide Use Restrictions in Delaware

Florida Department of Environmental Protection Central District 3319 Maguire Boulevard, Suite 232 Orlando, Florida

Range Equipment HVAC Design & Supply Modular Ranges

Letter to United States Attorney Re: Filing of Abstract of Judgment, Abstract of Judgment Form, and Instructions

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

Sara Brock Counsel for NRC Staff

QUALITY CONTROL REVIEW REPORT

FDIC ENVIRONMENTAL CHECKLIST OF. FDIC Asset Number Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois

City of Riverside Building & Safety Division Phone: (951)

ORDER OF THE SUPREME COURT OF TEXAS. MiSC Docket N m J^- A 1

Sandoz Private Limited 10/22/15

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

1 March Al Dussinger Embrace Home Loans 25 Enterprise Center Middletown, RI Dear Mr. Dussinger,

Transcription:

N00164.AR.002425 NSA CRANE 5090.3a TRANSMITTAL LETTER REGARDING FINAL TECHNICAL MEMORANDUM SUPPLEMENTAL SOIL SAMPLING RESULTS AND PROPOSED ADDITIONAL SAMPLING PLAN ROUND 2 UNEXPLODED ORDNANCE 7 (UXO 7) NSA CRANE IN 8/20/2012 TETRA TECH

['11::) TETRA TECH PITT-08-12-041 August20,2012 Project No. 112G01621 I Mr. Tom Brent NSA Crane Code 09510 Building 3245 300 Highway 361 Crane, Indiana 47522-5009 Reference: CLEAN Contract No. N62472-03-D-0057 Contract Task Order No. F272 Subject: Final Technical Memorandum - UXO 7 Supplemental Soil Sampling Results and Proposed Additional Sampling Plan (Round 2), Naval Support Activity Crane, Crane, Indiana Dear Mr. Brent: Please find enclosed four printed copies of the revised pages and covers and four CDs with the files for the Final UXO 7 Supplemental Soil Sampling Results and Proposed Additional Sampling Plan, Naval Support Activity Crane, Crane, Indian The subject technical memorandum has been modified to address technical review comments provided by Peter Ramanauskas, EPA Region V, dated August 10, 2012. Those comments and Tetra Tech's responses to those comments are attached to this letter. The enclosed materials include an updated cover, binder spine cover, and Technical Memorandum text indicating August 2012 as the date for the Final version of this Technical Memorandum. Please remove July 2012 covers and the July 2012 text and reference portion of the Technical Memorandum in your bound copies with the enclosed replacement files. Table 3-2 was revised to address an EPA comment, so please remove the previous version of Table 3-2 from the binder and replace it with the enclosed revised copy of Table 3-2. An updated CD (dated August 2012) is also enclosed and should replace the previous CD dated July 2012. Please forward copies of these materials to the other recipients of the July 2012 version, so they may update their UXO 7 Technical Memorandum in a similar fashion. Please contact me at (412) 921-8524 (email: Richard Rick.Barringer@tetratech.com) or Jim Goerdt at (412) 921-8425 (email: James.Goerdt@tetratech.com) regarding any questions or comments. Sincerely, ~ai<t2~ Richard A. Barringer Project Manager RAB/mlg Enclosures cc: Mr. Howard Hickey, NAVFAC MW (letter, attachment, enclosures, CD) Mr. Ralph Basinski, Tetra Tech (letter, attachment, enclosures, CD) Mr. Jim Goerdt, Tetra Tech (letter, attachment, enclosures, CD) Project File - CTO F272 (letter, attachment, enclosures, CD) Tetra Tech 661 Andersen Drive, Pittsburgh, PA 15220-2700 Tel 412.921.7090 Fax 412.921.4040 www.tetratech.com

Responses to EPA Comments Dated August 10, 2012: Technical Memorandum for Supplemental Sampling {Round 2) at UXO 7-Small Arms Range, NSA Crane, July 2012 1) Referring to Section 3.2.1., why is no deeper sample proposed for location X7-SB417 which had a detection of 715 mg/kg at 5 to 6 feet? Response to Comment #1: Deeper samples are proposed for location X7S8417 during the proposed Round 2 sampling. Table 1-1 only includes the samples collected during Round 1. The deepest soil lead sample collected from location X7-S8417 during Round 1 was from a depth of 5 to 6 feet below the ground surface (X7-S8417-0506} and is indicated on page 9 of Table 1-1. As presented in the third paragraph of Section 3.2.1, that sample contained a lead concentration of 715 mg/kg lead. The proposed soil lead samples for Round 2 are presented in Table 3-2. Deeper samples are proposed for location X7-S8417 during Round 2 and include X7-S8417-0607 (6 to 7 feet below ground surface [bgs]) and X7-S8417-0708 (7 to 8 feet bgs) as presented on pag~ 2 of Table 3-2. No changes were made in response to this comment. 2) For XRF lead analysis, perhaps screen the top two intervals at each proposed locations so you have better confidence that they are clean locations. Some of the previous sampling revealed lead in excess of screening at the interval below the topmost interval. Response to Comment #2: Agreed. There have been instances when soil lead contamination at depth was not expressed within the top sampled interval at a specific sampling point. To better evaluate soil-lead concentrations at a location, the technical sampling approach will be revised to now include XRF lead screening of the two uppermost soil samples at a location. If neither of the two uppermost soil samples evaluated by XRF indicates soil-lead concentrations greater than the field screening level of 125 ppm, then the deeper collected samples will not require analysis by XRF. This is now clearly stated in multiple locations in the text including: Section 3.2.lc, Section 3.2.2c, and 3.2.3c, and explained in footnote 4 of Table 3-2. The following changes were made in response to this comment: Section 3.2.1 bullet c now reads as follows: Proposed Sampling at the 400-yard Firing Berm (Figure 3-3): 1

Section 3.2.2 bullet c now reads as follows: Proposed Sampling at the Drainageway between 400-yard and 500-yard Berms (Figure 3-4): Section 3.2.3 bullet c now reads as follows: Proposed Sampling at the Dirt Mound (Figure 3-5): Footnote 4 of Table 3-2 has been modified to state: 4 All proposed samples will be collected and processed for XRF field analysis for lead; however, if the two uppermost sample intervals at a specific location exhibit XRF lead concentrations Jess than 125 ppm, then the collected lower sample intervals at that specific location will not undergo XRF analysis. Additionally, should an interior sample exhibit an XRF lead concentration less than 125 ppm, then any proposed associated exterior sample wi/i not be analyzed. Should a proposed exterior sample location exhibit an XRF lead concentration greater than 125 ppm, additional step-out samples will be collected. 2

, 3) Confirm that these additional samples will be collected utilizing the SOPs and QA procedures outlined in the Supplemental Sampling Activities at UXO 7 Ranges work plan approved October 21, 2011. Response to Comment #3: The additional Round 2 soil samples will be collected utilizing the SOPs and QA procedures outlined in the Supplemental Sampling Activities at UXO 7 Ranges approved October 21, 2011. This statement has been added as new text in Section 3.0. 3