By Geoff Vorley MSc. MCQI



Similar documents
Root cause analysis. Chartered Institute of Internal Auditors

Effective Root Cause Analysis For Corrective and Preventive Action

Training Pack. Kaizen PDCA ( Plan / Do / Check / Act )

Lean Six Sigma Training The DMAIC Story. Unit 6: Glossary Page 6-1

CAPA Essentials Root Cause Analysis Tools and Techniques

Root Cause Analysis Dealing with problems not just symptoms 1

Supplier Training 8D Problem Solving Approach Brooks Automation, Inc.

Six Sigma aims to maximise customer satisfaction and minimise defects.

Problem Solving Tools and Techniques

The Importance of Project Quality Management. What Is Project Quality? The International Organization for Standardization (ISO)

Root Cause Analysis 1

Figure 1: Fishbone Diagram - Structure. Cause-and-Effect Diagram, Ishikawa diagram, Fishbone diagram, Root Cause Analysis.

Certified Six Sigma Yellow Belt

Training As a Root Cause

Health and Safety Executive Accident Investigations in Practice

8D :: Problem Solving Worksheet

Certified Quality Improvement Associate

BODY OF KNOWLEDGE CERTIFIED SIX SIGMA YELLOW BELT

Tools & Techniques for Process Improvement

FAILURE INVESTIGATION AND ROOT CAUSE ANALYSIS

E-Learning Courses. Course Category

LeadingAge Maryland. QAPI: Quality Assurance Performance Improvement

THE SIX SIGMA YELLOW BELT SOLUTIONS TEXT

Body of Knowledge for Six Sigma Green Belt

White paper. Corrective action: The closed-loop system

Root Cause Analysis for IT Incidents Investigation

Hoshin Training. Supplier Workshop Presented by Mark Underwood 5/1/2014

Module 15: Nonconformance And Corrective And Preventive Action

Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) elindsay@blueyonder.co.

Part 1 Overview of clinical governance Clinical governance the concept 1-3

Reliability Analysis A Tool Set for. Aron Brall

Procedure for Corrective and Preventative Action. Procedure No. 304

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Common Tools for Displaying and Communicating Data for Process Improvement

Hazard Identification, Risk Assessment And Control Procedure

Using Performance Excellence Models - Part 1:

Achieve. Performance objectives

Leader s Guide: New Manager Orientation

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

Managing Project Quality

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

CONTINUOUS IMPROVEMENT EXERCISE L. Leslie Gardner, Ph.D., Assistant Professor School of Business University of Indianapolis

The Seven Basic Tools. QUALITY CONTROL TOOLS (The Seven Basic Tools) What are check sheets? CHECK SHEET. Illustration (Painting defects)

MULTIMEDIA COLLEGE JALAN GURNEY KIRI KUALA LUMPUR

FINAL DOCUMENT. Global Harmonization Task Force

Lean Six Sigma Black Belt-EngineRoom

Table of Contents. Chapter 3: ESTABLISH A COMMUNICATION PLAN Discussion Questions Documenting the Communication Element...

An Introduction to. Metrics. used during. Software Development

ICH guideline Q10 on pharmaceutical quality system

A GUIDE TO PROCESS MAPPING AND IMPROVEMENT

ISO 9001 Quality Management Systems Professional

Failure Analysis Methods What, Why and How. MEEG 466 Special Topics in Design Jim Glancey Spring, 2006

Section 15 Revision Techniques

EQF CODE EQF. European Competence Profiles in e-content Professions.

A STRUCTURED APPROACH TO ORGANIZATIONAL IMPROVEMENT

PROJECT QUALITY MANAGEMENT

The Seven Management & Planning Tools

Process/Workflow Analysis Quiz

Root Cause Analysis and Problem Solving

Business Information Management I

Introducing the. Tools for. Continuous Improvement

Workflow and Process Analysis for CCC

A Sales Strategy to Increase Function Bookings

Risk Analysis Guide. How to Evaluate It How to Manage It

Case study: Improving performance in HR London Camden

An Introduction to Risk Management. For Event Holders in Western Australia. May 2014

Project Management Guidebook

How to Forecast Sales

Social Studies Fair

HOW TO IMPROVE QUALITY AND EFFICIENCY USING TEST DATA ANALYTICS

Key Resources for Project Managers. Critical Thinking. Guide 3

TRAINING TITLE: CAPA System Expert Certification (CERT-003)

Unit 1: Introduction to Quality Management

SAMPLE EXAMINATION. If you have any questions regarding this sample examination, please

Service Improvement. Part 1 The Frontline. Robert.Gormley@ed.ac.uk

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

A C T I V I T Y : U S I N G T H E F I S H B O N E D I A G R A M TO

Six Sigma DMAIC Model and its Synergy with ITIL and CMMI

Mind Mapping to Gantt Charts

Learning Objectives Lean Six Sigma Black Belt Course

pm4dev, 2008 management for development series Project Quality Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

The ITIL v.3 Foundation Examination

The Two Key Criteria for Successful Six Sigma Project Selection Advantage Series White Paper By Jeff Gotro, Ph.D., CMC

Quality Risk Management Tools Quality Risk Management Tool Selection When to Select FMEA: QRM Tool Selection Matrix

Six Sigma Continuous Improvement

How to Forecast Sales

Corrective and Preventive Action Background & Examples Presented by:

Course Overview Lean Six Sigma Green Belt

Problem-Solving and Decision-Making

Problem Management Why and how? Author : George Ritchie, Serio Ltd george dot- ritchie at- seriosoft.com

Title. Learning from Incidents, Complaints and Claims. Description of Document

Wealth Management.

Contents. Before you begin. Learning outcomes Competency standard How to use this book

Application of Quality Tools to Improve Quality: A Case Study of a Building Remediation Contractor

Market Research Methodology

Transcription:

MINI GUIDE TO ROOT CAUSE ANALYSIS By Geoff Vorley MSc. MCQI Published by Quality Management & Training (Publications) Ltd PO Box 172 Guildford Surrey United Kingdom GU2 7FN W: www.qmt.co.uk E: help@qmt.co.uk T: 00 44 1483 453511 F: 00 44 1483 453512 Quality Management & Training Limited 2008 Quality Management & Training Limited All rights reserved 2008 1

MINI GUIDE TO ROOT CAUSE ANALYSIS Contents: 1) Introduction... 3 2) Why complete Root Cause Analysis?... 4 3) QM&T approach to RCA... 5 4) Practical guide to carrying out an RCA.... 6 5) RCA Tools & Techniques... 7 6) Look up table for completing an RCA... 13 7) Examples RCA s... 14 8) Hints and Tips... 14 9) 12 Pitfalls of RCA... 14 Quality Management & Training Limited All rights reserved 2008 2

1) Introduction Root Cause Analysis (RCA) is a method that is used to address a problem or non-conformance, in order to get to the root cause of the problem. It is used so we can correct or eliminate the cause, and prevent the problem from recurring. It is not rocket science anyone can do it. You probably do it on a day to day basis without thinking about it. RCA is simply the application of a series of well known, common sense techniques which can produce a systematic, quantified and documented approach to the identification, understanding and resolution of underlying causes. Below are a number of definitions which encapsulates the main points of this technique: Identify the Problem Monitor the system Define the Problem Corrective action Understand the problem Identify the root cause An objective, thorough and disciplined methodology employed to determine the most probable underlying causes of problems, complaints and undesired events within an organization, with the aim of formulating and agreeing corrective actions to at least mitigate, if not eliminate, those causes and so produce significant long term performance improvement. - Vorley & Tickle, QM&T, 2002 A powerful tool used to identify, record and visually represent the possible causes of a problem Instead of problems and their effects appearing vast and insoluble, root cause analysis breaks down the problem into smaller, more easily handled chunks represented by a fishbone diagram. - Paul Wilson RCA (ASQC) The investigation and reporting the causes of occurrences to enable the identification of corrective actions adequate to prevent recurrence and thereby protect the health and safety of the public, the workers, and the environment. - RCA Guidance document DOE Guidelines, Feb 92 Quality Management & Training Limited All rights reserved 2008 3

2) Why complete Root Cause Analysis? Organizations often respond to problems with short-term solutions. However, constantly relying on quick fixes requires staff to repeat the same tasks over and over again, all while maintaining the status quo. Focusing on short-term solutions is not a recipe for increased profitability and organizational growth. When people spend a lot of time putting out fires in the workplace, there is an illusion of industry; lots of busy people completing lots of tasks. Working harder and faster, we allow the environment s energy and rhythm to seduce us into believing we re doing our best to increase productivity and efficiency. But the law of diminishing returns applies here. However, you can improve efficiency by taking time to think through problems from first principles, and then tackling the causes rather than the effects. To improve efficiency and profitability, we need to look beneath the surface to the root of a problem or issue. By observing the effect (which is really just the symptom) of a problem and deducing what has caused it to occur, you can create a preventative solution that should put an end to the problem. In order to understand the source of a problem, you will need to undertake a root cause analysis. RCA gives the confidence that the problem can be solved by taking a structured approach - making sure that the problem never happens again. By the way, RCA is not a chore it can be fun! By eliminating the root cause, you can save time and money Quality Management & Training Limited All rights reserved 2008 4

3) QM&T approach to RCA. The first step in any RCA is to identify the problem. QM&T monitor many aspects of the organisation, and can spot potential problem areas. This process is known as Pareto Analysis, which we will cover later. However, potential RCA s can be derived from many areas, ranging from Customer Complaints, Escalations, and Incidents through to recurring EARS/QA s, Customer Surveys and Credit Notes. The Corrective Action Request (CAR) system can be used to document the immediate and longer term corrective action. There is no one person identified to chase and progress these CAR. This pocket guide is not intended to be a guide to the CAR system, but to provide a Road Map or approach that can be adopted in tackling a specific RCA project. The table below may help in determining the RCA projects importance. RCA Significance Likelihood of Occurrence Almost certain Likely Possible Unlikely Rare Consequences or Severity of Incident Critical High Medium Low Very high risk Very high risk High Moderate Moderate Very high risk High Moderate Low Low High Moderate Moderate Low Very Low Low Low Low Very Low Very Low Consequences (of incident): Critical: Health & Safety issue, High: Customer s Business Process (CBP) unavailable, Medium: Customer s Business Process (CBP) degraded, Low: Non urgent Likelihood (of occurrence): Almost certain, Likely, Possible, Unlikely, Rare Priority: Very High, High, Moderate, Low, Very Low Quality Management & Training Limited All rights reserved 2008 5

4) Practical guide to carrying out an RCA. To assist with the process, QM&T have devised a Worksheet which can be found at on the website, along with many if the tools that can be used to complete a RCA project. Once the problem has been discovered there are 5 basic steps to completing an RCA. 5. Confirm the Solution 1. Define the Problem 4. Corrective Action 2. Understand the Problem 3. Immediate Action I. Define the Problem: Try and use SMART principles, i.e. Specific; Measurable, Actions oriented; Realistic; Time constrained. Unless the problem is defined accurately, the RCA whole process maybe prone to failure. This phase will usually also define how the RCA will be run as a Project. II. Understand the Problem: Check the information, obtaining real data regarding the problem, gaining a clear understanding of the issues. This is when the various tools and techniques, such as Cause and Effect, brainstorming, etc, can be used. III. Immediate Action: Implement temporary countermeasures at the place of the problem. The further away from the problem source the solution is determined, the less likely that the solution will be effective. IV. Corrective Action: Determine and prioritise the most probable underlying causes of the problem, as the temporary counter-measure may not resolve the root cause. Taking corrective actions to at least mitigate or preferably eliminate the causes. V. Confirm the Solution:. After the measures have been determined and implemented the success of the adopted approach needs to be established. Having confirmed the success of the suggested solution then rules or control methods need to be established that will avoid the problem ever happening again.. This is probably the most important phase in the RCA, but the one most often missed. Quality Management & Training Limited All rights reserved 2008 6

5) RCA Tools & Techniques. 5 Why s (or Gemba Gembutsu) 5 Why s can sometimes be referred to as Gemba Gembutsu (which literally means Place and Information in Japanese, from who s car industry much of today s RCA methods are taken). 5 Why's typically refers to the practice of asking, five times, why the failure has occurred in order to get to the root cause/causes of the problem. No special technique is required or form is required, but the results should be captured in the Worksheet (see an example of 5 Why s in Sect.6). 5 Why s are best used when tackling a simple RCA. Pareto Analysis Pareto analysis is an easy to use technique that helps you to choose the most effective changes to make. It uses the Pareto principle, i.e. the idea that by doing 20% of the work you can generate 80% of the advantage of doing the entire job. Pareto analysis is a formal technique for finding the changes that will give the biggest benefits. It is useful where many possible courses of action are competing for your attention. For example, you might want to establish why customers no longer deal with us as a supplier. Number of Customers 80 70 60 50 40 30 20 10 0 Study of Customer Satisfaction ' 20% of the Problem 80% of the Quantity or Cost The graph reveals approx. 20% of reasons for leaving are responsible for 80% of the customers who left Attitude of Indiffence Dissatisfaction Competition Other Suppliers Price Reason for Leaving No Reason # of Customers Quality Management & Training Limited All rights reserved 2008 7

Cause & Effect diagrams Also known as Fishbone diagrams (for their appearance) and Ishikawa diagrams(names after their developer Kaoru Ishikawa), this useful technique is used for more complex RCAs. This type of diagram identifies ALL the potential processes and factors that could contribute to a problem. A basic diagram is shown below. A basic Cause and Effect template can be found in Microsoft Visio, or just use PowerPoint. Cause 2 Cause 3 Cause 1 Materials Cause 1 Men Equipment Cause 1 Cause 2 Cause 3 Cause 2 Cause 3 Cause 1 Effect Measurement Cause 1 Environment Cause 1 Cause 1 Cause 1 Cause 2 Process or Method Once you have captures all the desired information, try and prioritise those areas that you have a control over, and concentrate on finding resolutions for these. Brainstorming/Interviewing Most people are familiar with Brainstorming and Interviewing techniques. However, here are a few reminders: Collect as many ideas as possible from all participants with no criticisms or judgments made while ideas are being generated. All ideas are welcome no matter how silly or far out they seem. Be creative. The more ideas the better because at this point you don't know what might work. No secondary discussions should take place during the brainstorming activity. Talking about the ideas will take place after brainstorming is complete. Do not criticize or judge. Don't even groan, frown, or laugh. All ideas are equally valid at this point. Do build on others' ideas. Do write all ideas on a flipchart or board so the whole group can easily see them. Use Cause and Effect Diagrams and Fault Trees to help capture the information. Set a time limit for the brainstorming. 30 minutes is often enough. Quality Management & Training Limited All rights reserved 2008 8

Process Analysis, Mapping and flowcharts Most processes we follow today are mapped out by a flowchart. Flowcharts organize information about a process in a graphical manner thus making it clear what is impacted. Whether your problem has a documented process or not, this can be a really useful tool to understand what is going on. You don t have to be an expert to in flowcharting either. Although there are good templates in Microsoft PowerPoint and Visio, you can just as easily use a wipe board or pen and paper. Customer Order Generated Process Payment Sales Order Completed Credit Problem Addressed No OK? Yes Order Stopped Invoice Product Credit & Invoicing Order Received Check Credit No Yes Credit OK? OK Invoice Prepared Shipped Order? Invoice Sent Production Control Order Entered No In Stock? Yes Copying Production Scheduled Diskettes Copied Assembly & Shipping Packages Assembled Order Picked Order Shipped Quality Management & Training Limited All rights reserved 2008 9

Fault Tree This is a graphical technique that provides a systematic description of the combinations of possible occurrences in a system, which can result in an undesirable outcome. This method can combine system and human failures A good example is shown below. Fault trees can either be presented left to right or top to bottom. There are many specialist software products that allow Fault Tree analysis, but both Microsoft PowerPoint and Visio can be used to complete these diagrams. Quality Management & Training Limited All rights reserved 2008 10

Check Sheets Check Sheets (or Tally Charts) are simply used to gather and record data. The data is usually numerical, but can also be used for other purposes, e.g. listing audit questions to be asked and recording the responses. You may use a Check Sheet on a day-to-day basis to check for software defects or the numbers and types of Customer incidents. Example 1 Study of projects completed late # Checked Project Number Number % 1 2 3 4 5 correct Failure 1 Correct File Structure/Contents 0 100 2 Specification correct 1 80 3 Cost estimate available 3 40 4 Customer Order available 3 40 5 Order Acknowledged 3 40 6 Contract reviewed 2 60 Total correct 5 3 4 0 0 Example 2 Study of customers reasons for leaving Customer Week Number per month Relationship Total M J J A S No reason 11 1111 1111 1 111 17 Other suppliers Competitive Reasons 11 1111 1 1111 1 11 15 1 1 1 1111 11 10 Attitude of staff 1111 1 1111 1 0 1111 1111 111 24 Total 9 10 15 12 20 66 Quality Management & Training Limited All rights reserved 2008 11

Sampling Used to collect data for the above check sheets Control Charts The control chart is a graph used to study how a process changes over time. Data is plotted in time order. A control chart has a central line for the average, an upper line for the upper control limit and a lower line for the lower control limit. These lines are determined from historical data. By comparing current data to these lines, you can draw conclusions about whether the process variation is consistent (in control) or is unpredictable (out of control, affected by special causes of variation). We quite often use Control Charts to look at where areas of the Business are falling outside defined limits. For example, when the number of reported incidents exceeds a certain figure. Example of Help Desk Calls Quality Planning Every stage of a process or project is a possible source of poor quality. The objective of a Quality Plan is to anticipate possible sources of poor quality and to arrange for means of identifying such failure and preventing them from occurring. Where a Quality Manual is company specific a Quality Plan is project or process specific. Quality Management & Training Limited All rights reserved 2008 12

6) Look up table for completing an RCA Section (See Quality Management - Tools & Techniques ) 1. Define the Problem (Identify Improvement Area) 2. Understand the Problem (Evaluate Improvement Area) 2. Understand the Problem (Collect Data) 2. Understand the Problem (Data Analysis) 3. Immediate Action (Develop Action Plan) 4. Corrective Action (Implement Action Plan) 5. Confirm the Solution (Monitor Action Plan) Activity Sampling Brain Storming (NGT) Cause and Effect Dgrms Check Sheets Gemba Gembutsu - 5whys Histograms Pareto Analysis Performance Measurem t Process Mapping Quality Planning Assessment (FMEA) Root Cause Analysis Sampling Scatter Diagrams Six Sigma SMART Statistical Quality Control Quality Management & Training Limited All rights reserved 2008 13

7) Examples RCA s Examples of RCA projects will be shown on the RCA course. 8) Hints and Tips It is important to select the right team for carrying out an RCA; members should have knowledge of the process and be able to help explore the why, what and how Don't jump in with solutions: the problem and solution may not be obvious Make sure you are aware of the causal relationships Suggest improvements that you can implement and that are owned and signed up to by your team Having a facilitator with experience in the process will make things easier; this includes someone who knows about process, tools and facilitation Practising the techniques of RCA will ensure that your maintain the skills Only take responsibility for actions over which you have control: you should not agree an action plan for something you can't implement 9) 12 Pitfalls of RCA i. Not understanding the problem and therefore not defining it correctly ii. Not asking for help iii. Not considering all possible failure modes/causes iv. Not identifying all root causes v. Not understanding how the system should operate vi. Runaway tests and analysis vii. Adopting a 'remove & replace' mentality viii. Silver Bullet Theory ix. Returning the part/product without analysis x. Failing to follow-through xi. Jumping to conclusions (satisficing) xii. Tearing a system apart without a plan Authors: Geoff Vorley Quality Management & Training Limited Mary-Clare Bushell- Quality Management & Training Limited Quality Management & Training Limited All rights reserved 2008 14

Quality Management & Training Limited PO Box 172 Guildford Surrey United Kingdom GU2 7FN T: +44 (0) 1483 453511 F: +44 (0) 1483 453512 E: help@qmt.co.uk W: www.qmt.co.uk First Published by Quality Management & Training Limited 2008 All rights reserved. No part of this publication may be reproduced in any material form including photocopying, or storing in any medium by electronic means and whether or not transiently or incidentally to some other use of this publication without the written permission of the Copyright holder except in accordance with the provision of the Copyright, Designs and Patents Act 1988 or under the terms of a licence issued by the Copyright Licensing Agency Limited, 90 Tottenham Court Road, London, W1P 9HE, England. Applications for copyright holder s permission to reproduce any part of this publication should be addressed to the publishers. Quality Management & Training Limited All rights reserved 2008 15