Pe r f e c t i n g a. Ne va d a. Caryn S. Tijsseling. Prepared and Presented by. Lewis and Roca LLP 775-321-3426 CTijsseling@LRLaw.

Similar documents
MANAGING A BUSINESS California Mechanics Liens and Stop Notices Mechanics Liens. Stop Notices. Other Remedies. Procedure.

A GUIDE TO MECHANIC'S LIENS IN MINNESOTA

Nevada Lien Statutes

COLLECTING YOUR MONEY THROUGH MECHANIC S LIENS, STOP NOTICES & BONDS

Step One: Determining Whether Lien Rights are Available

Tip of the Month October 2007

SOUTH CAROLINA & NORTH CAROLINA, MECHANIC S LIEN AND PAYMENT BOND CLAIM MANUAL *

The 2012 Cardinal Change Order to California s Works of Improvement Statutes

Michigan Construction Lien Act Summary and Forms

SUMMARY OF MECHANICS LIEN LAW FOR RHODE ISLAND. With Revisions Through Section Contents Pre-lien Notice(s)

Marion County Board of County Commissioners

Mechanic s Liens (Reprinted with permission from NACM s Manual of Credit and Commercial Laws, 104 th edition) INTRODUCTION

SUMMARY OF MECHANICS LIEN LAW FOR CONNECTICUT. Reviewed Through 2011

SUMMARY OF MECHANICS LIEN LAW FOR MINNESOTA. As of Name of Notice Who Must Use This Notice When How to Serve Verified or notarized?

Obtaining Title Insurance on Construction Loans: Avoiding Pitfalls Regarding Title Insurance Underwriting for Construction Loans

How To Get A Construction Contract In The United States

Real Estate Finance: Arizona Clare H. Abel, Burch & Cracchiolo, P.A.

LIEN AND BOND CLAIM MANUAL

SUMMARY OF MECHANICS LIEN LAW FOR THE DISTRICT OF COLUMBIA

Texas Mineral Lien Law Update. Liens Against Mineral Property Chapter 56 - Texas Property Code '' et seq.

By Donald A. Odell, Attorney at Law

SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)

AIA Document A310 TM 2010

The Top 10 Misconceptions About Mechanic s Liens

Situation where the claim is limited (PRIVATE WORKS PROJECTS, unless otherwise noted) What the claim is limited to

OKLAHOMA MECHANICS LIEN LAW. With Changes in Section Contents Pre-lien Notice(s)

Kentucky Department of Education Version of Document A

HOME IMPROVEMENT CONTRACTS: STEPS TO TAKE WHEN HIRING A CONTRACTOR TO DO WORK ON YOUR PROPERTY (A BAD CONTRACTOR CAN BE WORSE THAN A HURRICANE)

THE NUTS AND BOLTS OF MISSISSIPPI S NEW LIEN LAW

SUMMARY OF MECHANICS LIEN LAW FOR ARIZONA. With Changes for 2013

CITY OF GIG HARBOR PRIVATE PROJECT DEVELOPMENT PERFORMANCE BOND

Document A312 TM SURETY. (Name, legal status and principal place of business)

Lien and Bond Claims in the 50 States

ARIZONA STATE = RIGHT TO REPAIR LAW HB 2620

8132. [Operative July 1, 2012] Conditional Waiver and Release in Exchange for Progress Payment; Form. If a claimant is required to execute a waiver

SUBCONTRACTOR LABOR AND MATERIAL PAYMENT BOND ("Bond") SURETY Address

THESE FORMS ARE NOT A SUBSTITUTE FOR LEGAL ADVICE.

Mechanic s Liens. Colorado Revised Statutes, Section

13 SB 61/AP A BILL TO BE ENTITLED AN ACT

SOUTH CAROLINA MECHANIC S LIEN LAW With Changes Made in Section Contents Pre-lien Notice(s)

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

Step Carefully When Crossing a Texas Minefield

Construction Defect Action Reform Act

Performance Bond. Business):

EXHIBIT A (of Request for Proposal)

CALIFORNIA NEW MANDATORY NOTICE REQUIREMENTS FOR ENFORCEMENT OF MECHANIC S LIEN RIGHTS

said subcontractor initiates his work.

MECHANIC S LIEN PRIORITIES VS. OTHER ENCUMBRANCES

FOR PROPERTY LOSS AND DAMAGE 1

NC General Statutes - Chapter 44A Article 2 1


CHAPTER FORECLOSURE OF REAL ESTATE MORTGAGES BY ACTION

ILLINOIS MECHANIC S LIEN LAW With Changes for Section Contents Pre-lien Notice(s)

PUBLIC CHAPTER NO. 353

SB 588. Employment: nonpayment of wages: Labor Commissioner: judgment enforcement.

Real Estate Finance: Missouri Mark Murray, Armstrong Teasdale LLP

Equipment Lease Agreement

GLOSSARY OF COLLECTION LAW TERMINOLOGY

CSA CONSTRUCTION, INC McAllister Road Houston, Texas SUBCONTRACTOR AGREEMENT

Real Property Levy Guide

Using a Mechanic s Lien to Get Your Money in Texas

LIEN PERFECTION SERVICES AGREEMENT

CLAUSES REQUIRED ON ALL HOME IMPROVEMENT CONTRACTS ($ on up)

NEW YORK, NEW YORK. EXCESS SIPC SURETY BOND (the "Surety Bond")

MARYLAND MECHANIC S LIEN LAW With Changes Made in Section Contents Pre-lien Notice(s)

NEW JERSEY MECHANIC S LIEN LAW With Changes Made in Section Contents Pre-lien Notice(s)

CHAPTER FORECLOSURE OF MORTGAGES OF REAL PROPERTY BY ADVERTISEMENT

NIGP Career Seminar Series II Workshop I Bonds (Bid, Performance, and Payment) Bond Excerpts from ARS Title 34

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1

State of Ohio. Abandoned and Derelict Vessel (ADV) Legislative and Administrative Review

BEFORE YOU INVEST IN A PROMISSORY NOTE SECURED BY AN INTEREST IN REAL PROPERTY, YOU SHOULD KNOW

Town of Front Royal Finance Department 102 E. Main St Front Royal VA Phone: Fax:

NC General Statutes - Chapter 44A Article 3 1

How To Pay Property Tax In Kentucky

A Guide To Understanding The Community Association Collection And Foreclosure Process

Case 2:10-cv JCM-LRL Document 1 Filed 07/22/10 Page 1 of 8

Raymond P. Pepe 1 K&L Gates LLP

Construction Bonds on Public Projects (Reprinted with permission from NACM s Manual of Credit and Commercial Laws, 104 th edition)

This agreement ( Agreement ) made by and between (owner name) hereinafter called the OWNER, and RMG REALTY, INC., hereinafter called the AGENT.

Right-of-Entry Agreement. For Providing Removal of Hurricane Debris on Private Property (Curbside and/or Streets)

CHAPTER 51. ALTERNATE PROCEDURE FOR COLLECTION OF PROPERTY TAXES

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE

MORTGAGE REF. NO. FREEHOLD LEASEHOLD (check ( ) appropriate box)

PRACTITIONER S GUIDE Superior Court Trust Fund Superior Court Clerk s Office

1. Common areas means the entire project excepting all units therein granted or reserved.

CHICAGO TITLE INSURANCE COMPANY

MORTGAGE PART 1 (This area for Land Title Office use) Page 1 of pages

MIGHTY MIKE PLUMBING, INC. PLUMBING GENERAL CONTRACTOR SERVICES PROPOSAL

CITY OF FIFE PERFORMANCE & PAYMENT BOND WITH GUARANTY

STANDARD LAND PURCHASE AND SALE AGREEMENT [#505] (With Contingencies)

CHICAGO TITLE INSURANCE COMPANY

This Agreement is made between Barnard College and

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

NC General Statutes - Chapter 44A Article 4 1

By: Pat Derdenger, Partner Steptoe & Johnson LLP 201 East Washington Street, 16 th Floor Phoenix, Arizona

SUMMARY OF MECHANICS LIEN LAW FOR NEW YORK. With Changes for Section Contents Mechanic s Lien

RESOLVING DISPUTES WITH YOUR CONTRACTOR

MINNESOTA COMMERCIAL LEASE AGREEMENT. This lease is made between, herein called Lessor, and

Title 10: COMMERCE AND TRADE

AIA Document A141 TM Standard From of Agreement Between Owner and Design- Builder

Transcription:

Pe r f e c t i n g a Mechanic s Lien in Ne va d a Prepared and Presented by Caryn S. Tijsseling Lewis and Roca LLP 775-321-3426 CTijsseling@LRLaw.com

Overview of Construction Liens The Nevada Revised Statutes set forth the scope and requirements for perfecting a Mechanic s Lien. A construction lien is a statutory lien in favor of contractors, materialmen, and others to secure payment of labor rendered and services provided. A construction lien is also known as a mechanic s lien, materialman s lien, subcontractor s lien and various other names. The Nevada statutory scheme, Chapter 108, refers to these liens as mechanic s liens. The basic premise underlying mechanic s liens is that those who have their lands improved should pay for the labor rendered and the materials delivered. All 50 states have adopted mechanic s lien laws. Contractors and others who have lien rights can either have their attorneys prepare and serve all notices and documents necessary to perfect lien rights or train in-house personnel in the necessary procedures to properly perfect a mechanic s lien. This guide is intended to provide an overview of what is necessary in order to perfect a mechanic s lien in Nevada. Who is Entitled to A Lien? Under NRS 108.2214, any person who provides work, material or equipment with a value of $500.00 or more which is used in the construction, alteration or repair of any improvement, property or work of improvement is entitled to a mechanic s lien. The statute sets forth specifically that the following individuals are entitled to mechanic s liens: Artisans Builders Contractors Laborers Lessors or renters of equipment Materialmen Miners -1-

Subcontractors Anyone who provides work, material or equipment Architects Engineers Land Surveyors Geologists Keep in mind that if a license is required to perform the work, the contractor or professional will only have the lien if he is licensed to perform the work. NRS 108.222(2). Are You A Proper Mechanic s Lien Claimant? You are entitled to assert a mechanic s lien if: You provided labor, services, equipment, and/or materials to a work of improvement; Labor was performed on the subject property; Materials were intended for and used on the project; The work of improvement is permanent; and The work was performed with the consent of the owner or the owner s agent. What Property Is Subject to A Mechanic s Lien? Mechanic s liens attach to the property, any improvements for which the work, materials and equipment were furnished... and any construction disbursement account. NRS 108.222(1). Under NRS 108.22172 property means: The land and all buildings Improvements and fixtures on the land and A convenient space around the land -2-

Improvement means: Development, enhancement or addition to property. Note: When dealing with multiple parcels or buildings it is important to understand that if labor or materials are (a) incorporated into more than one building, (b) located on separate legal parcels, but (c) owned by the same person, the provider may record a single lien against several buildings. Schultz v. King, 68 Nev. 207, 228 P.2d 401 (1951). Be careful when filing a single lien against multiple parcels because failure to allocate the lienable amount among the various buildings will result in subordination of the lien to subsequently recorded liens. NRS 108.231 (3). What is the Amount of the Lien That You Are Entitled To? If the parties entered into a contract for a specific price the lienable amount is the unpaid balance of the agreed price. NRS 108.222(1)(a). If the parties did not agree to a specific price, then the lienable amount is the fair market value of the work, material or services that were provided. NRS 108.222(1)(b). What Priority Will Your Lien Receive? The following is the statutory priority of the various types of Mechanic s Liens: 1. 2. 3. 4. Labor claims. Material suppliers and lessors or equipment. Other lien claimants who performed under a contract with the prime contractor or any subcontractor. All other lien claimants. -3-

Perfecting Your Mechanic s Lien Pre-Lien Notice The first notice required to perfect a lien is the Notice of Right to Lien. All potential lien claimants must deliver a Notice of Right to Lien. Under NRS 108.245(1), the lien claimant may provide the Notice of Right to Lien at any time after the first delivery of material or performance of work or services under his contract. The Notice of Right to Lien should be recorded promptly, despite the absence of a time frame in the statute. The purpose of the Notice of Right to Lien is to warn the owner of the property that the lien claimant may at a future date record a lien in accordance with applicable law. The Notice of Right to Lien does not create a lien or encumbrance on the property but is required nonetheless. NRS 108.245(B). The Notice of Right to Lien must be delivered in person or by certified mail to the owner of the property. NRS 108.245(1). Caution: A subcontractor has the additional requirement to notify the prime contractor in person or by certified mail. The failure to do this is grounds for disciplinary action against the subcontractor. Exceptions: Those providing labor only are not required to provide a Notice of Right to Lien. The Prime Contractor who contracts directly with the owner is not required to give the Notice of Right to Lien. The 15 Day Notice (Residential construction projects only) There is an additional notice required for residential construction projects. If the work of improvement involves the construction, alteration or repair of multi-family or single family residences, including without limitation, apartment houses, then the lien claimant must serve a 15 day Notice of Intent to Lien. The 15 day notice of lien does not have to be recorded but does have to be served by personal delivery or certified mail. NRS 108.226(6). The -4-

owner and the prime contractor must be served with the 15 day Notice of Intent to Lien. The 15 day notice of lien is a statutory prerequisite to filing the Notice of Lien. Notice of Lien A timely recorded Notice of Lien is required to perfect the lien claimant s lien. Under NRS 108.226(5) the Notice of Lien must be substantially in the form set forth in the statute. Specifically the following information is required: The amount of the original contract The total amount of all additional or charged work, materials and equipment The total amount of all payments received to date The amount of the lien, after deducting all just credits and offsets; The name of the owner of the property The name of the person by whom the lien claimant was employed or to whom the lien claimant furnished or agreed to furnish work, materials or equipment; A brief statement of the terms of payment of the lien claimant s contract; and A description of the property to be changed with the lien. A sample is provided in Appendix A. The Notice of Lien must be verified by the oath of the lien claimant. The timing of the filing of the notice of Lien is set forth in NRS 108.226(1) (a) and (b). The Notice of lien must be recorded within ninety (90) days after the date on which the latest of the following occurs: The completion of the work of improvement; -5-

The last delivery of material or furnishing of equipment by the lien claimant for the work of improvement; or The last performance of work by the lien claimant for the work of improvement. The Notice of Lien must be served upon the owner of the property within thirty (30) days after recording the Notice of Lien. The Notice must be served in the following manner 1 : By delivering a copy to the owner personally; or If the owner is absent from his residence or place of business by mailing a copy by certified mail with a return receipt to the owner at his residence, usual place of business, or to his resident agent. If the owner cannot be located and his residence of place of business cannot be ascertained, then service can be effected in the following ways 2 : By fixing a copy in a conspicuous place on the property; Delivering a copy to a person residing there; and Mailing a copy addressed to the owner at the property address. Note: All owners should be served but the failure to serve all owners will not invalidate the lien. NRS 108.227(2). Caution: The general contractor is also required to noticed of the Notice of Lien. NRS 108.246(4). The failure of the subcontractor to deliver such notice to the general contractor is a basis for disciplinary proceedings against the subcontractor. Duration of the Lien Construction Liens are effective for a period of 6 months from the date the Notice of Lien is recorded. NRS 108.233(1). 1 NRS 108.227(1) 2 NRS 108.227(3) -6-

The lien will not be effective beyond six (6) months unless: A lawsuit has been commenced to enforce the lien; or The time to commence the lawsuit has been extended by a written agreement signed by the lien claimant and a person with an interest in the subject property. Note: The agreement to extend the time to foreclose the lien will only be effective if recorded in the County Recorder s office prior to the expiration of the original 6 month period, must be notarized, and the agreement cannot exceed one year from the date the lien was recorded. Foreclosure Actions A lien claimant must wait 30 days from recordation of the Notice of Lien to initiate a foreclosure action. NRS 108.244. An action to foreclose the lien may not be brought any later than 6 months after the lien was recorded unless the time was extended by agreement. The following documents are required to foreclose the lien: The Complaint Must be filed in a court of competent jurisdiction Should include additional contract based causes of action The Notice of Pendency of the Action Must be filed with the court and recorded to provide constructive notice to the work of an alleged claim or interest in the property. The Notice of Foreclosure Published once a week for 3 consecutive weeks in newspaper published in the County where the property is located. Must be delivered in person or certified mail to all other lien claimant who had liens recorded against the subject property at the time the Complaint was filed. -7-

The Statement of Facts Constituting Lien If you receive a Notice of Foreclosure of another lien claimant s lien, you are required to file a Statement of Facts Constituting Lien. The Statement of Facts Constituting Lien must be filed with the Court within a reasonable time after publication or receipt of the Notice of Foreclosure. Out of an abundance of caution it is recommended that the Statement of facts Constituting Lien be filed within 10 days. Caution: The consequence for not filing a Statement of Facts Constituting Lien is that your lien rights will be waived. It is strongly recommended that someone in your office be charged with the duty of reviewing daily legal filings to ensure that you protect all your lien rights in the event another lien claimant seeks to foreclose before you. You are Entitled to Attorneys Fees and Costs NRS 108.237 provides that the Court shall award the prevailing lien claimant the amount of their lien, their costs for preparing and recording the Notice of Lien including attorneys fees and costs. Also, the Court shall calculate and award interest pursuant to the contract rate or, if there is no contract, the legal rate. -8-

LAW from a business point of view. las vegas 3993 howard hughes parkway suite 600 las vegas, nevada 89169 702-949-8200 reno 50 west liberty street suite 410 reno, nevada 89501 775-823-2900 phoenix 40 north central avenue suite 1900 phoenix, arizona 85004 602-262-5311 tucson one south church avenue suite 700 tucson, arizona 85701 520-622-2090 albuquerque 201 third street nw suite 1950 albuquerque, new mexico 87102 505-764-5400 www.lrlaw.com