SECTION 16 ASBESTOS MANAGEMENT



Similar documents
ASBESTOS MANAGEMENT PROGRAM

ASBESTOS in DEPARTMENT OF ADMINISTRATION FACILITIES Frequently Asked Questions

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

University of Pittsburgh Safety Manual. EH&S Guideline Number: ASBESTOS

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

ASBESTOS AWARENESS TRAINING. Title 8, GISO Section 5208

ASBESTOS AWARENESS. Slide #1

BLR s Safety Training Presentations

TRU Asbestos Management

ASBESTOS MANAGEMENT INTRODUCTION

NDSU TABLE OF CONTENTS

ASBESTOS in state and local government

Building Owners Responsibilities for Asbestos

ENVIRONMENTAL OPERATIONS & MAINTENANCE GUIDANCE MANUAL BACKGROUND INFORMATION ON ASBESTOS AND LEAD BASED PAINT

Asbestos Awareness at the University of Toronto

UI Procedures for Asbestos Management

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS AWARENESS TRAINING. For workers and building occupants

ASBESTOS AWARENESS. For workers and building occupants

University of the Sciences Environmental Health and Radiation Safety (EHRS) Department Q&A ON ASBESTOS

Characteristics/Applications

IDENTIFICATION OF ASBESTOS You can t identify asbestos-containing materials with the naked eye. Experienced employees can identify suspected

Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR ).

Asbestos in the Home MISAWA AB, JAPAN

Asbestos in Your Home

The Richard Stockton University ASBESTOS MANAGEMENT PLAN

Fact Sheet on Asbestos

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

Primary reason asbestos is used, is its special resistance to heat. Asbestos fibers are also virtually indestructible.

Asbestos Containing Material MANAGEMENT PLAN

The Management of Asbestos at the University of Manitoba

EVERYONE'S RESPONSIBILITY

Asbestos 2 hr. Awareness

Asbestos Awareness. What is Asbestos?

This presentation is for information purposes ONLY.

Asbestos Management POLICY

EXHIBIT A SCOPE OF SERVICES

ASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

Miami University s Asbestos Operations & Maintenance Program Administered by

University of Michigan Dearborn The Department of Environmental Health and Safety & Emergency Management Asbestos Management Program General

Asbestos Management Plan EC 45 Page 1

Wellesley College Asbestos Management Program

Asbestos Inspection Project Procedure

Washington University Asbestos Operations and Maintenance Plan

ASBESTOS AWARENESS. Environmental Health And Safety. MAINTENANCE CONTRACTORS

North Carolina State University. Asbestos Management Plan

Asbestos frequently asked questions

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Mount Sinai Pediatric Environmental Health Specialty Unit WTC Asbestos Fact Sheet

ASBESTOS CONTROL PLAN

Understanding Asbestos: Implications for the Individual and the Community Development Practitioner

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan

UNVERSITY HIGH SCHOOL U W. Gregory St. Normal, IL School Asbestos Management Plan. Supplemental.

ASBESTOS MANAGEMENT PLAN

Asbestos in Your Home

Asbestos: Guidelines for Managing Asbestos in Buildings

Asbestos Hazards and Controls

ASBESTOS. Presented by: Samar Khalil Environmental & Chemical Safety Officer

Asbestos Management Program and Procedures. Northern Illinois University

Why was asbestos used?

Administrative Procedure. Asbestos

Policy on Asbestos Management

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

ASBESTOS IN THE HOME

Asbestos Management. 2. Introduction. Contents

Loss Control TIPS Technical Information Paper Series

The Truth About Asbestos In Your Home

Asbestos Management Program

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BACKGROUND INFORMATION

If you think your home might have asbestos, read this pamphlet to learn some simple steps to protect your family.

ASBESTOS MANAGEMENT PROGRAM University of New Brunswick Fredericton Campus. Project No Jacques Whitford 2008

ASBESTOS OPERATIONS AND MAINTENANCE PLAN

ASBESTOS / LEAD PAINT MANAGEMENT PLAN

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

the risks of removing asbestos containing drywall October 29, 2011

Asbestos: Common Questions and Answers

Transcription:

SECTION 16 ASBESTOS MANAGEMENT 16.1 Asbestos Management Procedure 16.2 Asbestos O&M Procedure Reviewed: October 2008 Revised: February 2003 Date Accepted: April 2002 Draft Date: December 2001

16.1 ASBESTOS MANAGEMENT PROCEDURE A. Objective To ensure that asbestos exposures of all Harper College personnel, students, guests, visitors, and contract personnel are minimized by assuring that all activities that may impact, disturb or dislodge asbestos containing materials are managed and all building conditions that could allow exposure to asbestos fibers are abated, in a manner consistent with established safety practices. B. Scope This procedure is established to address the health concerns posed by exposure to asbestos in College owned buildings. C. References Department of Labor, Occupational Health and Safety Administration (OSHA) 29 Code of Federal Regulations 1910.1001, Illinois Department of Labor 820 ILCS 225 Health and Safety Act., Illinois Department of Public Health, and IL Environmental Protection Agency (IEPA) 40 CFR Part 61. D. Responsibilities Harper employees shall not perform any type of asbestos work that includes to disturb, dislodge, remove or repair any asbestos containing materials. All work of this type will be conducted under controlled conditions by asbestos abatement workers appropriately trained and licensed by the Illinois Department of Public Health. The Asbestos Program Manger (APM) is the Manager, Environmental Health & Safety (Mgr. EH&S). The Mgr. EH&S or a designated representative, will oversee and manage all work impacting Asbestos Containing Materials (ACM). The Manager, Environmental Health & Safety, or designated training representative, will provide training to inform, provide knowledge and basic awareness to Harper College employees on asbestos issues. E. General Information Asbestos is a common, naturally occurring group of fibrous minerals. It was widely used in building materials prior to 1980 because it is heat resistant, strong and not easily degraded. Common products that contain asbestos include, but are not limited to: pipe insulation, tank insulation, floor tile and fireproofing. These material are classified as friable, which is material that can be reduced to powder by hand, and nonfriable, which is material that cannot be reduced to powder by hand. Materials such as these in buildings built prior to 1980 shall be Presumed Asbestos Containing Material (PACM), until tested and proven otherwise. Asbestos is a concern when fibers become airborne such as when Asbestos Containing Materials (ACM) are crumbled or reduced to powder. Intact, sealed, and undisturbed materials do not present an opportunity for exposure. When asbestos fibers become airborne, exposure may occur by the fibers being inhaled and deposited into the lungs. Studies have shown that some individuals exposed to certain amounts of asbestos have developed lung cancer, asbestosis (scarring of the lungs), and mesothelioma (cancer of the lining of the lung or abdomen). These diseases have generally been observed after long-term exposures from activities that directly disturb asbestos containing materials. Typically, the diseases do not develop until 10 to 40 years after exposure.

F. Procedure In the campus buildings built before 1980 all building materials will be Presumed Asbestos Containing Materials (PACM), unless tested to prove otherwise. The Manager of Environmental Health & Safety has an Asbestos Inventory of locations that have been sample to determine if asbestos is present. Most of the samples have identified asbestos in the floor tile, floor tile mastic and pipe joint compound. Campus buildings that were built before 1980 include the following: A Building (1969) Student Administration Center (& K wing addition) B Building (1969) Harper Police Center C Building (1969) New Student Services and Art Center D Building (1969) Science, Math and Health Careers Center E Building (1969) Instructional Delivery Center F Building (1969) Academic Resources Center G/H Buildings (1977) Engineering and Applied Technology Center I/J Buildings (1980) Business and Social Science Center M Building (1980) Wellness and Sports Center P Building (1974) Music Instruction Center T Building (1973) Park Management Shop U Building (1974) Roads and Grounds Shop V Building (1975) Plant Science Center Northeast Center (1973) The College adheres to the Environmental Protection Agency s (EPA) recommendation to manage asbestos in place. This strategy involves maintaining existing ACM in good condition, and removing it only during demolition, renovation or maintenance activities. Prior to the start of any renovation or demolition project, the Manager, EH&S., must determine if any PACM may be disturbed during the project. If there is any PACM identified in the project areas that may be impacted or disturbed, it must be tested to determine its asbestos content following established protocols or assume the material contains asbestos and is managed as ACM. PACM that have the possibility of containing asbestos and should be sampled before being disturbed include, but are not limited to the following: Floor Tile Floor tile mastic Ceiling Tile Wall Plaster Pipe Insulation Pipe Joint Compound Lab Hoods Lab Tops Ceiling Plaster Duct Insulation Cementitious Ridged Panels (Transite Panels) Examples of activities which may result in the disturbance of PACM include: Removing or repairing floor tile, by breaking tiles; Removing pipe insulation or pipe joint compound to access pipes and/or; Carpet removal, which has floor tile underneath it. If these activities, renovation and/or demolition disturb PACM, then further investigation by a consultant shall be done in which, the consultant will take samples of the suspect ACM for laboratory analysis to determine the asbestos content of the material. If the laboratory analysis shows that the PACM is greater than 1% asbestos containing then the material must be handled as asbestos. A licensed asbestos contractor must be called to abate the ACM prior to any activities, renovation and/or demolition. Building occupants shall be notified prior to the abatement activities. The notification occurs through correspondence and/or signage at the job site. The information shall include the type of asbestos (i.e.; floor tile), amount of asbestos, and the location. Occupants should contact the Mgr. EH&S (x6923) and/or Physical Plant (x6350) if there are any questions.

16.2 ASBESTOS O&M PROCEDURE A. Objective To outline Operations & Maintenance (O&M) work practices to (1) maintain ACM in good condition, (2) ensure proper cleanup of asbestos fibers that may have released by accidental disturbance and (3) to monitor the condition of ACM. B. Scope In areas of the College where PACM has been tested and has been identified as asbestos containing (mostly floor tile, floor tile mastic and pipe joint compounds) the following procedures shall be implemented. C. Procedure 1) Maintain ACM in good condition: Work practices should discourage disturbing Asbestos Containing Materials (ACM). This includes avoiding the action of drilling, cutting, abrading, sanding, chipping, breaking, or sawing ACM. These actions are likely to create asbestos fiber release. Certain other activities that occur in the vicinity of ACM can also cause damage, which may result in asbestos fiber release. For example, maintenance and custodial staff may damage ACM accidentally with broom handles, ladders, and forklifts while performing other tasks. Activities performed in the vicinity of ACM should always be performed cautiously to prevent fiber release. 2) Notify the Asbestos Program Manger (APM)/ Mgr. Environmental Health & Safety (Mgr. EH&S) if there has been an accidental release. The Mgr. EH&S will conduct or oversee the proper O&M cleaning will involve the use of wet cleaning or wet-wiping practices to pick up asbestos fibers. Dry sweeping or dusting can result in asbestos fibers being re-suspended into the building s air and therefore should not be used. Once wet clothes, rags, or mops have been used to pick up asbestos fibers, they should be properly discarded as asbestos waste while still wet. They should not be allowed to dry out, since the collected fibers might be released at some later time when disturbed. 3) The Mgr. EH&S will Monitor the condition of ACM. The condition of ACM shall be monitored to ensure that any ACM damage or deterioration will be detected and corrective action taken. D. Training Awareness training shall be conducted for custodians, maintenance and utilities personnel involved in cleaning and simple maintenance tasks where ACM may be accidentally disturbed. The APM/Manager EH&S or a designated training representative will conduct training. Awareness training shall include the following topics: Background information on asbestos; Health effects of asbestos;

Worker protection programs; Locations of ACM and PACM in the buildings; Recognition of PACM damage and deterioration; The Harper College Asbestos O&M Program; and Proper response to accidental fiber release episodes.