CALIFORNIA CONSTRUCTION CONTRACTS, DEFECTS, AND LITIGATION (1st Edition) November 2015 TABLE OF CONTENTS



Similar documents
SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)

AIA Document A312 - Electronic Format. Performance Bond

Kentucky Department of Education Version of Document A

AIA Document A310 TM 2010

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

California Civil Code

CLAUSES REQUIRED ON ALL HOME IMPROVEMENT CONTRACTS ($ on up)

OWNER S CHECKLIST ISSUES FOR PERFORMANCE AND PAYMENT BONDS Produced by the ABA Forum on the Construction Industry Division 12: Owners and Lenders

STANDARD FORM OF AGREEMENT BETWEEN CONTRACTOR AND SUBCONTRACTOR (Where Contractor and Subcontractor Share Risk of Owner Payment)

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1

Make sure your builder is registered.

California Senate Bill 474 Impact on Owners & Contractors

INDEX. bonded contract, 289 insureds, 243. misrepresentation, 291 obtaining, 242

How To Write A Short Form Prime Prime Prime Contract Between A Contractor And Owner

Construction Management Contract This agreement is made by (Contractor) and (Owner) on the date written beside our signatures.

AIA Document A312 TM 1984

Construction Performance Bond. THIS CONSTRUCTION PERFORMANCE BOND ( Bond ) is dated, is in the penal sum of. Sample Preview CONTRACTOR: Address

COMMENTARY. California s New Subcontractor Defense Regime for Non-Residential Projects: Creating Order or Chaos?

KITCHEN CONTRACT FOR WORK OVER $5000 COMPANY NAME: ADDRESS: DATE: CONTRACT PRICE: Please read all attached information and terms.

Contract Clauses Appendix B: Contract

Bond Form Commentary and Comparison

CA Home Repair I Page 1

This AGREEMENT is made as of the day of in the year of, by and between the following parties, for the sale of materials.

Welcome to the Model Residential Construction Contract Cost Plus

Contract Language and Documentation

COMPLIANCE WITH LAWS, CODES, AND STANDARDS

Payment and Performance Surety Bonds in Construction Projects: Perspectives of Owners, Contractors and Sureties

Welcome to the Model Residential Construction Contract Lump Sum

CHAPTER 11 APPEALS AND DISPUTES

As used in sections 327A.01 to 327A.07, the terms in this section shall have the meanings assigned to them.

California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form]

Construction Defect Action Reform Act

MANAGEMENT AGREEMENT

FOR PROPERTY LOSS AND DAMAGE 1

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

D None SeePage 2. AlA Document A312

Insurance and the Construction Failure

Document A312 TM SURETY. (Name, legal status and principal place of business)

PITTSBURG UNIFIED SCHOOL DISTRICT

Flexible Circuits Inc. Purchase Order Standard Terms and Conditions

EARLY CARE & EDUCATION LAW UNIT WHAT YOU NEED TO KNOW ABOUT SMALL CLAIMS COURT

IEC Electronics Terms and Conditions

A Quick Introduction to Construction Risks and Contracting Practices

CSA CONSTRUCTION, INC McAllister Road Houston, Texas SUBCONTRACTOR AGREEMENT

THE SUSTAINABLE ENERGY AUTHORITY OF IRELAND PURCHASE ORDER TERMS AND CONDITIONS OF PURCHASE

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).

How To Build A House

QUOTATION DOCUMENTS TERMS AND CONDITIONS OF AGREEMENT

SUBCONTRACTOR LABOR AND MATERIAL PAYMENT BOND ("Bond") SURETY Address

ROADMAP TO A SUCCESSFUL TERMINATION FOR DEFAULT

8132. [Operative July 1, 2012] Conditional Waiver and Release in Exchange for Progress Payment; Form. If a claimant is required to execute a waiver

Performance Bond. Business):

TABLE OF CONTENTS Arbitration of Extended Warranty Contracts

PROJECT NO. 2733, RFP NO /02. Peralta Community College District. 333 East 8th Street, Oakland, CA Questions

CLIENT / PROJECT MANAGER AGREEMENT

AN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS

Willis & Ainsworth Ltd Terms and Conditions

CALIFORNIA DEPARTMENT OF TRANSPORTATION CONTRACTOR LIABILITY INSURANCE

Document A312 TM SURETY. (Name, legal status and principal place of business)

STANDARD SUBCONTRACT AGREEMENT FOR BUILDING CONSTRUCTION

(INDIVIDUALS ONLY) IndContPkge Version: 1.7 Updated: 18 Jul. 03

GENERAL CONDITIONS OF CONTRACT MINOR WORKS AND SERVICES

JAMS Dispute Resolution Rules for Surety Bond Disputes

THIRD PARTY ADMINISTRATOR AGREEMENT. (Hereinafter, Agreement ) Between

PURCHASE ORDER TERMS AND CONDITIONS

EXHIBIT "B" CRITERIA AND BILLING FOR EXTRA SERVICES

HOW TO FILE AN ANSWER TO A CIVIL COMPLAINT FOR BREACH OF AN AGREEMENT (CONTRACT)

JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.

WORK ORDER AND CONTRACT

INSURANCE REQUIREMENTS FOR FEDERAL CONTRACTORS

Expedited Dispute Resolution Bond (P3 Form)

THE CONDOMINIUM CRAZE: Managing the Players, the Project, and the Potential Liability

RESOLVING DISPUTES WITH YOUR CONTRACTOR

Document A312" of business) OWNER'S REPRESENTATIVE: (Architect, Engineer or other party:) 500 North Main Street Monroe, North Carolina 28112

Checklist 26: How Owners Can Avoid Litigation on Construction Projects

Performance, Payment and Contract Bonds The Fastest Bond Program up to $500,000

Home Foundation Contractor Services Agreement

Return completed applications to: APAC-Texas, Inc. P.O. Box Beaumont, TX (409) Phone (409) Fax

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM

Bonds. Brian E. Rawling, Brian E. Rawling & Associates

TECHNOLOGY AS A SERVICE (TAAS) PROGRAM MASTER LEASE AGREEMENT

ANNUAL SUBCONTRACTOR AGREEMENT. THIS AGREEMENT is made on, 200, between <>, a Minnesota corporation ( Contractor ) and ( Subcontractor ).

How To Get A Construction Contract In The United States

Document A312 TM SURETY. (Name, legal status and principal place of business)

Bid Protests Legal Issues

CLAIMS ADMINISTRATION SERVICES AGREEMENT

Performance Bonds. Putting Words to Action. Bennett Rainey, Sarah Riedl, Joseph Riegerix, and Evan Rossi

UNIVERSITY OF MINNESOTA

SUMMARY OF CHANGES COMMERCIAL ARBITRATION RULES

REQUEST FOR PROPOSAL OFFICE OF THE NEVADA ATTORNEY GENERAL GRANTEE- FORECLOSURE RELIEF PROGRAM MAY 20, 2011

Adrian G. Driscoll's Representative Experience

INSTRUCTIONS TO BIDDERS

SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SANTA CLARA

TEXAS ASSOCIATION OF REALTORS INDEPENDENT CONTRACTOR AGREEMENT FOR SALES ASSOCIATE. Robyn Jones Homes, LLC

LONG FORM PRIME CONTRACT BETWEEN OWNER AND CONTRACTOR

E.I.F.S. APPLICATOR COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION

NZIA Standard Construction Contract

Transcription:

CALIFORNIA CONSTRUCTION CONTRACTS, DEFECTS, AND LITIGATION (1st Edition) November 2015 TABLE OF CONTENTS File Name Book Section Title CH01 Chapter 1 Contractor Licensing; Remedies for Unlicensed Work 01-022 1.22 Form Provision: Allegation re Cause of Action Against Surety on License Bond CH02 Chapter 2 Drafting Construction Contracts 02-054 2.54 Contractor s License Notice 02-059 2.59 2.100 Introduction; Parties 2.60 Description of Work 2.61 Property Lines 2.62 Payment (Lump-Sum) 2.63 Time for Start and Completion 2.64 Delay Beyond Contractor s Control 2.65 Liquidated Damages for Delay 2.66 Drawings, Specifications, Permits, and Fees 2.67 Payment by Contractor for Labor and Material 2.68 Interpretation of Contract, Drawings, and Specifications 2.69 Extra Work, Changes, and Deletions 2.70 Allowances 2.71 Completion and Occupancy 2.72 Insurance 2.73 Warranty of Work and Correction Guaranty 2.74 Indemnity 2.75 Arbitration 2.76 Time of the Essence 2.77 Cleanup 2.78 Attorney Fees 2.79 Assignment 2.80 Other Documents 2.81 Contractor s License Notice 2.82 Notice 2.83 Integration 2.84 Governing Law 2.85 Signatures; Contractor s License Number 2.86 Independent Investigation 2.87 Right to Stop Work 2.88 No Right to Stop Work 2.89 Option to Terminate Time of the Essence 2.90 Right to Demand Bond 2.91 Corrective or Repair Work 2.92 Right to Approve Financial Arrangements 2.93 Contract Not Conditioned on Financing 2.94 Contract Conditioned on Financing 2.95 Repossession of Materials 2.96 Personal Liability

2.97 Building Department Requirements 2.98 Payments Not Constituting Approval 2.99 Final Payment Waives Claims 2.100 Waiver of Surety s Right to Approve Change Orders 02-103D 2.103D Mechanics Lien Warning 02-103E 2.103E Contractors State License Board (CSLB) Notice 02-103F 2.103F 3-Day Right to Cancel 02-103G 2.103G Notice of Cancellation (3-Day) 02-103H 2.103H 7-Day Right to Cancel 02-103I 2.103I Notice of Cancellation 02-110 2.110 Home Improvement Contract 02-111C 2.111C Notice to Buyer 02-114 2.114 Form Provision: Payment and Financing 02-115 2.115 Form Provision: Acknowledgment 02-117 2.117 Form Provision: Disclosure Provisions 02-119 2.119 Notice of Right of Rescission 02-124 2.124 2.155 Parties and Introductory Clause 2.125 Description of Work 2.126 Subcontractor Investigations 2.127 Incorporation of Prime Contract 2.128 Subcontract Payment 2.129 Payment Schedule 2.130 Effect of Payments 2.131 Payments in Trust 2.132 Commencement and Progress of Work; Delay 2.133 Protection of Work and Property 2.134 Extra Work, Changes, and Deletions 2.135 Subcontractor s Claims 2.136 Guaranty of Work 2.137 Bond Requirements 2.138 Superintendent 2.139 Cleanup 2.140 Job Safety 2.141 Taxes, Licenses, and Fees 2.142 Labor Matters 2.143 Arbitration 2.144 Alternative Equipment, Material, or Method 2.145 Insurance 2.146 Indemnity 2.147 Default and Termination 2.148 Releases and Proof of Payment 2.149 Attorney Fees 2.150 Assignment 2.151 Bankruptcy 2.152 Notices 2.153 Integration 2.154 Governing Law

2.155 Contractors License Notice, Signatures, and License Number CH03 Chapter 3 Design-Build 03-023 3.23 Checklist: Contract Issues to Be Considered in Design- Build 03-024 3.24 Checklist: Issues Owner Should Review in Preparing Contract Documents 03-026 3.26 3.33 Owner as Third Party Beneficiary 3.27 Design-Builder s Responsibility for Errors and Omissions 3.28 Arbitration Within Owner s Discretion 3.29 Owner s Right to Terminate 3.30 No Damage for Delay 3.31 Relationship of Trust and Confidence 3.32 Design-Builder s Obligation to Obtain Permits 3.33 Errors and Omissions Insurance CH04 Chapter 4 Green Building 04-005 4.5 Checklist: Factors Influencing the Decision to Build Green 04-026H 4.26H Checklist: Key Documents to Review for Purchase of Renewable Energy 04-026I 4.26I Checklist: Lenders Concerns for Financing Renewable Energy Projects 04-030 4.30 Checklist: Early Actions 04-038 4.38 Checklist: Advising Owners 04-040 4.40 Checklist: Advising Contractors 04-043 4.43 Checklist: Advising Design Professionals CH07 Chapter 7 Arbitration 07-024 7.24 Checklist: Drafting an Arbitration Clause 07-041 7.41 Checklist: Drafting Submission Agreement 07-143 7.143 AAA Arbitration Clause 07-144 7.144 Long Form Arbitration Clause 07-146 7.146 Petition for Order Compelling Arbitration 07-147 7.147 Notice of Hearing on Petition 07-148 7.148 Order Compelling Arbitration 07-149 7.149 Notice of Motion to Stay Action 07-150 7.150 Declaration in Support of Motion to Stay Action 07-151 7.151 Memorandum in Support of Motion to Stay Action 07-152 7.152 Petition for Order Nominating Arbitrators 07-153 7.153 Order Nominating Arbitrators 07-154 7.154 Petition for Order Appointing Arbitrator 07-155 7.155 Order Appointing Arbitrator 07-156 7.156 Arbitration Award 07-157 7.157 Petition to Confirm Arbitration Award 07-158 7.158 Response to Petition; Application for Vacation of Award CH09 Chapter 9 Handling Disputes During Construction 09-003 9.3 Checklist: Public Projects 09-004 9.4 Checklist: Public and Private Projects 09-005 9.5 Checklist: Construction Terminology 09-007 9.7 Checklist: Principal Parties

09-011 9.11 Checklist: Review Resolution Methods 09-012 9.12 Checklist: Review Contract 09-013 9.13 Checklist: Review Statutes 09-017 9.17 Checklist: Who Needs a Contractor s License 09-018 9.18 Checklist: Who Does Not Need a Contractor s License 09-019 9.19 Checklist: Licensing Qualifications 09-025 9.25 Checklist: Bidding Process in General 09-050 9.50 Checklist: Owner s Steps if Contractor Refuses to Proceed 09-060 9.60 Checklist: Proceeding With Bid Protest 09-061 9.61 Checklist: Owner s Actions 09-064 9.64 Checklist: Contract Interpretation 09-084 9.84 Checklist: Owner s Measures to Prevent a Claim of Implied Abandonment 09-094 9.94 Checklist for Owner: Evaluate Options When Defective Work Is Discovered 09-095 9.95 Checklist: Owner s Actions When Defect Discovered Before Project Completion 09-096 9.96 Checklist: Owner s Actions When Defect Discovered After Project Completion 09-098 9.98 Checklist: Action Following Receipt of Disputed Notice of Defect 09-112 9.112 Checklist: Contractor s Actions if Owner Is Responsible for Delay 09-115 9.115 Checklist: Owner s Actions if Contractor Is Responsible for Delay 09-128 9.128 Checklist: Contract Requirements 09-129 9.129 Checklist: Owner s Prompt-Payment Statutes (Progress Payments) 09-130 9.130 Checklist: Contractor s Prompt-Payment Statutes (Progress Payments) 09-131 9.131 Checklist: Retention Proceeds (Owner and Contractor Payment) CH13 Chapter 13 Construction Defects: Contribution, Equitable Indemnity, and Good Faith Settlement 13-036 13.36 Cross-Complaint for Breach of Contract, Breach of Express and Implied Warranties, Negligence, Strict Liability, Contribution, and Indemnity 13-037 13.37 Order Determining Good Faith Settlement and Dismissing Cross-Actions CH14 Chapter 14 Construction Defects: Case Management and Mediation 14-021 14.21 Checklist: Initial Preparation of Case 14-024 14.24 Checklist: Crucial Issues When Interviewing Subcontractor 14-025 14.25 Checklist: Claims and Document Analysis 14-026 14.26 Checklist: Insurance Tenders; Additional-Insured Requirements

14-027 14.27 Checklist: Evaluating Claim 14-029 14.29 Checklist: Expert Meetings 14-067 14.67 Plaintiff s Premediation Checklist 14-069 14.69 Settlement CH15 Chapter 15 Prelitigation and Litigation Requirements Unique to New Residential Construction 15-044 15.44 Notice of Claim 15-054 15.54 Acknowledgment of Notice (CC 913) 15-070 15.70 Offer to Repair (CC 917) APP Appendixes APPENDIXES APP-A APP-A Prime Contract Between Owner and Contractor: Cost Plus Percentage With Guaranteed Maximum APP-B APP-B Case Management Order