Emergency Demand Response Program Manual



Similar documents
GENERAL INFORMATION. 8. LIMITATIONS OF SERVICE CLASSIFICATIONS (Continued)

PSC No: Electricity Leaf No New York State Electric & Gas Corporation Revision: 0

NYISO Demand Response Programs: Enrollment

Overview of Reliability Demand Response Resource

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

Price Responsive Load Programs in the New York Wholesale Electricity Market. Wholesale Market and New York Independent System Operator

Outage Scheduling Manual

Energy in the Wholesale Market December 5, :30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.

Demand Response Programs: Lessons from the Northeast

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

ICAP/UCAP Overview. Aaron Westcott If possible, Please mute your phones Please do not use the hold button.

Demand Response FAQs

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

Accounting and Billing Manual

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

SEC STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products

Revenue Metering Requirements Manual

New York State of the Market System - NYISO Success Project

CONSTELLATION ENERGY TERMS AND CONDITIONS

Kiwi Energy NY LLC 144 North 7 th Street #417 Brooklyn, NY

Ancillary Services Manual

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S.

Demand Response Frequently Asked Questions (Last Updated 02/23/16)

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

The Market Guide. An introductory guide to how the Electric Reliability Council of Texas (ERCOT) facilitates the competitive power market

ISO-NE Transmission Markets and Services Tariff Cross Sound Cable Business Practices. Version 10.0 April 17, 2013

Commercial and Industrial Electric Rates

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

A Locational Analysis of Generation Benefits on Long Island, New York

SECTION B ELECTRICITY SUPPLIER COORDINATION TARIFF

PEAKLOAD THE POWER OF DEMAND: Peak Load Management Program for Governmental Customers Option Overview

THE COMED RESIDENTIAL REAL-TIME PRICING PROGRAM GUIDE TO REAL-TIME PRICING

Load Response Program Agreement Real-Time Demand Response Program 30 Minute Notice

Wind Plant Operator Data Guide

What is hourly pricing and what does it mean for you? Customer Meetings May 2006

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Chapter 9 Settlements and Billing

Chambers Bank Business Internet Banking Agreement

Schedule No. OGS-3-HOPU OPTIONAL LARGE GENERAL SERVICE - HIGH OFF-PEAK USE APPLICABLE

Market Manual Changes for Settlement of Capacity Based DR. Demand Response Working Group August 6, 2014

Worship Facility Matching Grant Program 2010 Program Manual

Schedule TOU-GS-1-RTP Sheet 1 GENERAL SERVICE - SMALL REAL TIME PRICING

Will Electric Aggregation Group. Electric Aggregation Plan of Operation and Governance. Will County Governmental League

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

Rules on Southern Companies Energy Auction Participation

ELECTRICITY SUPPLIER COORDINATION TARIFF IN THE DISTRICT OF COLUMBIA

Demand Response Programs

REAL TIME PRICING - HOUR AHEAD SCHEDULE: RTP-HA-5

Energy Efficiency and Demand Response Programs in the United States

Chapter 7 System Operations and Physical Markets

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows: CHAPTER 1 PRELIMINARY PROVISIONS

Methodology for Merit Order Dispatch. Version 1.0

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry

Schedule 6VP LARGE GENERAL SERVICE VARIABLE PRICING

Most household services provide you with a fixed monthly bill: Broadband Internet service

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

OUR ELECTRICITY AGREEMENT Constellation Energy Power Choice, Inc. P.O. Box 4911, Houston, TX 77210

IEA Workshop: Demand Response. 3 July, 2014

Employer commencement as a self-insurer

CON EDISON CALLABLE LOAD STUDY

Options for Trading of Electricity Savings in Shanghai

Automation of ROS DAM

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER

CITY OF LOCKPORT ELECTRIC AGGREGATION PROGRAM PLAN OF OPERATION AND GOVERNANCE. Background

Market Solutions to Loop Flow

ELECTRONIC SERVICES AGREEMENT

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

-1- PSEG-LI Update of LIPA SGIP Full Docw-NYISO reqmts above 10 MW

Energy Efficiency Measurement & Verification

Salary Reduction Simplified Employee Pension (SAR-SEP) Plan Employer Adoption Agreement For Use with the Traditional IRA Application

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

Application Instructions

Demand Response, Dynamic Pricing, and the Smart Grid in New York

Market Participants User s Guide

Demand Response Management System ABB Smart Grid solution for demand response programs, distributed energy management and commercial operations

SCHEDULE 1. Scheduling, System Control and Dispatch Service

SERVICE CLASSIFICATION NO. 9. TRANSPORTATION SERVICE (TS) Table of Contents. (Service Classification No. 9 - Continued on Leaf No. 255.

Online Banking - Terms and Conditions

HOUSE COMMITTEE ON APPROPRIATIONS FISCAL NOTE. HOUSE BILL NO PRINTERS NO PRIME SPONSOR: Mustio

Electricity Business Act

STREAMLINED SALES TAX GOVERNING BOARD, INC.

PROCEDURE. Part 5.9: Settlement Payment Methods and Schedule PUBLIC. Market Manual 5: Settlements. Issue 17.0 MDP_PRO_0036

urning A Bank Of California (EFCE)

THE NARRAGANSETT ELECTRIC COMPANY OPTIONAL LARGE DEMAND BACK-UP SERVICE RATE (B-62) RETAIL DELIVERY SERVICE

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Product Management Update

MERCHANT SERVICES, LEASING AND OPERATING AGREEMENT. ( Blackboard ). In this Agreement, the words; BbOne Card means a stored-value account

May 20, Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

Indiana Michigan Power Company

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

Electric Energy Storage. Opportunities and Challenges in New York

DUQUESNE LIGHT COMPANY ELECTRIC GENERATION SUPPLIER COORDINATION TARIFF. Issued By. DUQUESNE LIGHT COMPANY 411 Seventh Avenue Pittsburgh, PA 15219

2009 Product Enhancements

SPRINT SIP TRUNKING SERVICE PRODUCT ANNEX

The Benefits of Demand Response

Transcription:

MANUAL 7 Emergency Demand Response Program Manual June 2016

Version: 7.2 Effective Date: 06/03/2016 Committee Acceptance: 05/18/2016 BIC This document was prepared by: NYISO Demand Response Operations New York Independent System Operator 10 Krey Boulevard Rensselaer, NY 12144 (518) 356-6060 www.nyiso.com Disclaimer The information contained within this manual, along with the other NYISO manuals, is intended to be used for informational purposes and is subject to change. The NYISO is not responsible for the user s reliance on these publications or for any erroneous or misleading material. Copyright 2001-2016 New York Independent System Operator

Table of Contents Table of Figures... v Revision History... vii 1. Definitions and Acronyms... 1-1 1.1 Tariff Definitions... 1-1 1.2 Additional Terms Relevant to the Emergency Demand Response Program... 1-2 2. Eligibility Criteria / Qualification... 2-1 2.1 Who Can Participate?... 2-1 2.2 Minimum Qualifications for CSPs... 2-1 2.3 Restrictions... 2-2 2.4 Requirements for Curtailment Customers with a Local Generator... 2-2 2.5 Compatibility with Special Case Resources... 2-3 2.6 Compatibility with other NYISO Demand Response Programs... 2-3 2.7 Small Customer Aggregation... 2-4 2.8 EDRP Program Evaluation... 2-5 3. EDRP Enrollment Procedures... 3-1 3.1 Requirements for CSP Enrollment... 3-1 3.2 Procedures for Enrolling Demand Side Resources in EDRP... 3-1 4. Operating Mechanism / Implementation... 4-1 4.1 When Will the Program be Deployed?... 4-1 4.2 NYISO Protocol for Local Generator Participation... 4-1 4.2.1 Compliance with Federal, State and Local Laws... 4-1 4.3 Notification Procedures... 4-1 4.4 Notification Message Examples... 4-2 4.4.1 EDRP Day-Ahead Advisory... 4-2 4.4.2 EDRP Activation (2 Hour Notice)... 4-3 5. Metering, Verification, Billing, and Settlement... 5-1 5.1 Metering Requirements... 5-1 5.1.1 Metering Device Requirements... 5-1 5.1.2 Metering Configuration Requirements... 5-2 5.1.3 Historical Operating Data... 5-3 5.2 Calculation of CBL... 5-3 5.2.1 Select a CBL method... 5-3 5.2.2 CBL Calculation Method (Load Reduction or Both Local Generator and Load Reduction) Based on DRIS Metering Configuration... 5-4 5.2.3 Example CBL Calculation... 5-9 5.2.4 CBL Calculation Method when metering a Local Generator Only... 5-11 5.3 Performance Measurements for Energy Payments... 5-12 5.4 Settlement Procedures... 5-13 5.4.1 EDRP Reporting and Data Format... 5-13 5.4.2 Calculation and Payments... 5-13 5.4.3 Verification, Errors and Fraud... 5-14 5.5 Cost Allocation... 5-14 6. Targeted Demand Response Program... 6-1 6.1 Program Overview... 6-1 6.2 Conditions for Deploying TDRP... 6-1 6.2.1 Transmission and Sub-Transmission System (69kV or higher)... 6-1 NYISO Demand Response Operations iii

6.2.1.1 Day-Ahead Advisory Conditions... 6-2 6.2.1.2 In-Day Advisory/Deployment Conditions... 6-2 6.2.2 Lower Voltage Systems (33kV or Below)... 6-2 6.3 Verification, Billing and Settlement... 6-2 iv NYISO Demand Response Operations

Table of Figures Figure 5-1 Examples of acceptable Meter Configurations...5-3 Figure 5-2 Example of Determining a Resource's Peak Load Hour that Occurred During Event Hours Over the Past 30 Days and the Calculation of the Initial Seed Value...5-6 Figure 5-3 Example of CBL Window Selection - Single Weekday Event...5-7 Figure 5-4 Example of CBL Window Selection Multiple Weekday Events...5-7 Figure 5-5 Example of CBL Window Selection Weekend Event...5-8 NYISO Demand Response Operations v

This page intentionally blank. vi NYISO Demand Response Operations

Revision History Version Date Revisions 7.2 06/03/2016 Section 2.6 Renamed the section to better reflect the content Removed unnecessary and unhelpful language not related to NYISO DR programs Replaced redundant language on calculations of payments for resources with reference to Section 5.4.2 Calculation and Payments of the EDRP Manual Section 3.1 Removed reference to the retired CSP enrollment form Section 5.1.2 Described in detail the determination of a SCR s Response Type that must be identified at enrollment Section 5.4.2 Clarified CBL data reporting process for a SCR that has fewer than five CBL days 7.1 08/21/2013 Section 5.2.2 Corrected how the Average Daily Event Usage is used with the initial seed value to determine the exclusion of low usage days. Corrected language in Figure 5.2 to reflect the correction noted above. 7.0 07/17/2013 Global Updated format, punctuation, terminology and links. Capitalized defined terms. Replaced: "Load Curtailment" with "Load Reduction" "Emergency Generation" with "Emergency Generator" "On-site generator" and "Local Generation" with "Local Generator" "Subscribe" with "Enroll" "Usage" with "Load" Section 1.1 Added Tariff definition "Day-Ahead Market" Added Tariff definition "Demand Side Ancillary Service Program Resource (DSASP Resource)" Added Tariff definition "Load" Section 1.2 Clarified definition of: Curtailment Program End User Customer (EUC) Load Reduction Added term "Day Ahead Demand Side Response Program (DADRP)" Removed term "NYS DEC" Section 2. Changed title Section 2.1 Clarified description of "Who Can Participate" in the EDRP NYISO Demand Response Operations vii

Section 2.2 Clarified minimum qualification for CSPs and removed footnote Section 2.3 Further defined qualifications of Local Generators in the EDRP Section 2.4 Clarified definition for CSPs with a Local Generator to participate in the EDRP Replaced "NYCA" with "NYISO" Section 2.5 Further defined "other program eligibility" requirements for SCRs in ICAP Market Section 2.6 Added language regarding Demand Side Resources participating in both the EDRP and the DSASP Section 3.1 Clarified enrollment requirements for CSPs Section 4.2 Clarified definition of CSP customer demand reduction and added "and RIPs" Section 4.2.1 Changed title Updated language for clarification, including removal of generator examples Section 4.3 Revised description of the notification communication media Updated reference to NYISO Stakeholder Services and removed email address Updated names of notification types Section 4.4 Updated Notification message examples Section 5. Added language to clarify that the CSP Metering and Data Requirements in Section 5.1, 5.2 and 5.3 also apply to RIPs with SCRs in the ICAP SCR Program Section 5.1 Clarified the CSP metering requirements Section 5.1.2 Clarified the CSP configuration requirements Section 5.1.3 Clarified requirements for providing historical metering and operation data for CSPs and RIPs Redefined minimum requirement of hourly interval data Redefined the retention period of interval meter readings to be three (3) years Section 5.2 Changed title Section 5.2.1. Clarified that the CSP selects CBL method when enrolling a resource viii NYISO Demand Response Operations

in the EDRP Section 5.2.2 Changed the title Added clarification on what Load may be included in metered Load Added clarification on which CBL calculation is to be used when a resource is enrolled as a Response Type G Updated I. The Average Day CBL for Weekdays II. The Average Day CBL for Weekends III. Elective Weather-Sensitive CBL Formulation Section 5.2.3 Changed title and clarified Steps 1 and 2 Section 5.2.4 Changed title Section 5.3 Changed title Clarified equations and metering configurations Added DRIS Response Type for each configuration Section 5.3.2 Removed Compliance" section Section 5.4.1 Removed duplicate Data Receipt language Section 5.4.2 Renumbered Section 5.4.3 Renumbered and added explanation of Settlement procedures 5.4.4 Renumbered and clarified that all data related to EDRP participation are subject to audit by the NYISO Section 5.5 Changed title Eliminated duplicate information Updated reference to Attachment G of the NYISO Services Tariff Section 6.1 Removed reference to cost allocation methodology 6.2 12/02/2010 Global Updated tariff citations to reflect section renumbering secondary to e- Tariff implementation. Implemented various ministerial changes. Section 3.2 Specified that timing of EDRP Enrollment is per the Demand Response Information System (DRIS) event calendar. Section 5.2.2 Clarified means of calculating weekday Average Day CBLs. Replace screenshots for figures 5-2, 5-3, and 5-4. Section 5.4 Clarified means and timing of CSP reporting energy payment data, which will be accomplished in DRIS. NYISO Demand Response Operations ix

Section 5.4.1 Clarified receipt requirements for Load reduction data. Section 5.4.2 Clarified format of reporting Load reduction data as being that outlined in the NYISO Demand Response Information System User's Guide. Section 5.4.3 Clarified calculations and payments for a resource that performs in either the DADRP or DSASP concurrent with an EDRP deployment. Section 5.6 Removed in total, including Figure 5-5, Timeline for Settlement. 6.1 05/05/2010 Global Updated links/instructions for accessing external documents secondary to NYISO Web site redesign. Updated internal references to EDRP Manual sections and figures. Incorporated changes to reflect terminology used in the Demand Response Information System (DRIS), including enroll instead of register and deploy instead of activate. Removed references to Attachments A, B, C, and D. Section 1 Revised definition titles to match Market Services Tariff. Section 2 Separated classifications of CSPs and eligibility for resource participation. Removed NYISO verification of restrictions for participation. Section 3 Clarified CSP enrollment procedures. Clarified Demand Resource enrollment procedures, which will be accomplished in DRIS. Section 4 Referenced Emergency Operations Manual for conditions indicating deployment. Clarified notification procedures. Section 5 Corrected references to PRL program. Clarified examples. Removed 45-day deadline for reporting event performance. Removed payment and cost allocation details and referred to Attachment G of the NYISO Market Services Tariff for cost allocation rules. 6.0 07/20/2008 Global Reformatted per new template to standardize presentation Corrected figure and table cross-references. Updated NYISO Website references Front Matter Removed What s New page. Revision History Table Changed column headings as follows: Revision changed to Version Changes changed to Revisions x NYISO Demand Response Operations

Standardized date format to mm/dd/yyyy. Section 1 Revised definitions to align with Market Services Tariff definitions. Included reference to Market Services Tariff, where applicable. Section 2 Removed Program Summary. Section 3.1 NEW 2.1: Removed effective period of the program; program is permanent. Section 3.3 NEW 2.3: Tariff reference to permit sharing of data with Transmission Owners for planning and system operation. Added statement about compliance with DEC rules and regulations. Section 3.7 NEW 2.7: Added statement restricting resources included in small customer aggregations to one NYISO reliability program. Other minor wording changes. Section 4.1 NEW 3.1: Removed automatic registration after 30 days NYISO will notify the LSE of approved registration. Also added annual reregistration each spring. Section 4.2 NEW 3.2: Removed automatic registration after 30 days NYISO will notify the entity that takes service directly from the ISO to supply its own Load in the NYCA of approved registration. Also added annual reregistration each spring. Section 4.3 NEW 3.3: Removed automatic registration after 30 days NYISO will notify the Curtailment Customer Aggregator of approved registration. Also added annual re-registration each spring. Section 4.4 NEW 3.4: Removed automatic registration after 30 days NYISO will notify the Curtailment Program End Use Customer of approved registration. Also added annual re-registration each spring. Sections 4.3 and 4.4 Modified Notification Procedures to update messages. Section 5.2.1 NEW 4.2.1: Revised program limitation language and removed references to NYSERDA s reimbursement of expenses. Section 5.2.2 Removed references to NYSERDA s reimbursement of expenses. NEW 4.4: Added new sub-section titled Notification Message Examples Section 5.2.3 Reformatted tables in Example Customer Baseline Calculation. Section 5.4 Corrected typographical error related to the time frame by which verification of load reduction must received by the NYISO in order for compensation to be provided, from 45 days to 75 days. Section 6.1 NYISO Demand Response Operations xi

NEW 5.1: Added sentence: Transmission Owner or MDSP certification is required to read the revenue grade meter on load. Section 6.1.2 NEW 5.1.2: Added descriptions of identifiers in Metering Configuration diagrams Section 6.2 NEW 5.2: CBL Section completely revised to make it easier to follow, including better examples: Single weekday event, Multiple weekday events, Weekend event. Section 6.3.1 NEW 5.3.1: load changed to load reduction in several places. Section 6.4.3 Removed section titled: Demand Side Resource Reduction Data. Specified requirements for billing data for entire bill period surrounding an event. Section 6.4.4 NEW 5.4.3: Added statement requiring one file per day with meter and CBL data for the event period. Updated contact information and Website links. Section 6.4.5 NEW 5.4.4: Revised statement to align with tariff language (Attachment G, article 10). Section 6.5.1 NEW 5.5.1: Changes to wording of subsection: Objectives of Cost Allocation. Section 6.5.2 NEW 5.5.2: Changes to wording of subsection: Causes for EDRP Being Invoked now references section 4.4 of NYISO Emergency Operations manual. Section 6.5.3 NEW 5.5.3: Reworded reference to previous section and removed last line of table 6.5.3 regarding an external control condition. Section 6.6 NEW 5.6: Redrawing and relabeling of Timeline for Settlement. Section 7 NEW 6: Added Targeted Demand Response Program information from Technical Bulletin 164. Attachments Removed registration form attachments and file format attachments, which are available on Demand Response page of NYISO Website (http://www.nyiso.com/public/products/demand_response/edrp.jsp). 5.0 04/02/2004 Section 3.3 (2) Footnote removes host load size restriction on DG resources. Section 3.5 Removed host load size restriction on DG resources. Section 4.1.3 Remove 2-day notification requirement for LSE. Section 4.1.4 Change deemed approved time limit from 14 to 30 days. xii NYISO Demand Response Operations

Section 4.3.5 Remove 2-day notification requirement for LSE. Section 4.3.6 Change deemed approved time limit from 14 to 30 days. Section 4.4.5 Remove 2-day notification requirement for LSE. Section 4.4.6 Change deemed approved time limit from 14 to 30 days. Section 5.2.1 Clarify that CSP, not NYISO, is responsible for 200 hour per year DG operating limit. Remove requirement that DG units submit permits to NYISO. 4.0 04/29/2003 Section 2.0 Removed 25 MW cap on small customer aggregation program Section 4.3 (#2), 4.4 (#2) Revise to say that these sections of the Registration Packet should be completed: A, B, G, H, I, L, N and O. Section 5.2.1 Notes that program participants are responsible for ensuring compliance with the ultra-low sulfur fuel requirements and for the emissions testing requirements for model 1994 and older generators. Section 5.2.2 Clarifies NYSERDA s rules for program expense reimbursement. Section 6.1 Clarifies meter installation and reading language. Section 6.1.1 Clarifies that meter certification data is required only for non-revenue grade meters. Section 6.2.1 Notes that the CSP is responsible for CBL calculation. Section 6.6.4 Clarifies that the NYISO provides hourly payment information by customer to CSPs separate from the consolidated invoice. 3.0 02/28/2003 Section 2.0 Removed 25 MW cap on small customer aggregation program. Section 5.2.1 Notes that program participants are responsible for ensuring compliance with the ultra-low sulfur fuel requirements and for the emissions testing requirements for model 1994 and older generators. Section 5.2.2 Clarifies NYSERDA s rules for program expense reimbursement. Section 6.1 Clarifies meter installation and reading language. Section 6.1.1 Clarifies that meter certification data is required only for non-revenue grade meters. Section 6.2.1 NYISO Demand Response Operations xiii

Notes that the CSP is responsible for CBL calculation. Section 6.6.4 Clarifies that the NYISO provides hourly payment information by customer to CSPs separate from the consolidated invoice. 2.0 03/20/2002 Section 3.8 Alternative Performance Measures for Small Customer Aggregations can be submitted for approval to the NYISO. Section 3.9 Curtailment Service Providers must participate in NYISO sponsored EDRP program evaluations. Section 5.2 On-site generators must supply evidence that they have applied for or received from the NYS Dept. of Environmental Conservation (DEC) one of the following permits (i) Title V, (ii) State Facility, or (iii) Registration. Section 5.3 Updated EDRP Notification Procedures to reflect the procedures put in place during the summer 2001. Section 6.1 Updated Metering Requirements. Section 6.2.1.1 Alternative weather-sensitive Customer Base Line (CBL) options. Section 6.7 Updated Settlement Payment timeline. Att. A, B Att. D Added.csv event data reporting format description. 1.0 07/11/2001 Initial Release xiv NYISO Demand Response Operations

1. DEFINITIONS AND ACRONYMS 1.1 Tariff Definitions Definitions for terms used in this manual can be found in the NYISO Market Administration and Control Area Services Tariff (Services Tariff) available from the NYISO Web site at http://www.nyiso.com/public/markets_operations/documents/tariffs/index.jsp as follows: Section 2.3: Definitions C Capability Period Curtailment Customer Aggregator Curtailment Services Provider (CSP) Section 2.4: Definitions D Day-Ahead LBMP Day-Ahead Market Demand Side Ancillary Service Program Resource (DSASP Resource)Demand Side Resources Section 2.5: Definitions E EDRP Emergency State Section 2.9: Definitions I Installed Capacity (ICAP) Section 2.12: Definitions L Load Load Serving Entity (LSE) Load Zone Local Generator Locational Based Marginal Price (LBMP) Section 2.14: Definitions N New York Control Area (NYCA) NYISO Customer NYISO Limited Customer Section 2.18: Definitions R Real-Time LBMP NYISO Demand Response Operations 1-1

Section 2.19: Definitions S Special Case Resource 1.2 Additional Terms Relevant to the Emergency Demand Response Program Curtailment Program End Use Customer (EUC) A retail end-user that qualified as a CSP and can either interrupt Load or start up a Local Generator or both to reduce Load from the NYS Transmission System or the distribution system at the direction of the ISO under the EDRP. Customer Baseline Load (CBL) Average hourly energy consumption as calculated in Section 5, used to determine the level of Load Reduction provided. Day-Ahead Demand Response Program (DADRP) - The DADRP program provides Demand Side Resources with an opportunity to offer their load curtailment capability into the Day-Ahead Market ( DAM ) as an energy resource. Direct Customer An entity that takes or provides service directly from or to the NYISO, and is responsible for bidding, scheduling, and billing functions for their facilities. Also referred to as a type 2 LSE: an entity that takes service directly from the NYISO to supply its own Load in the NYCA. EDRP Loads Retail end-users that provide Load Reduction and have been enrolled through a CSP to participate in the Emergency Demand Response Program. Emergency Generator An electrical generator installed to handle emergency outages at a facility for short periods of time. In-Day Peak Hour Forecast Forecasted morning and evening peak Loads as determined by the NYISO Shift Supervisor or assignee, used to evaluate total operating capacity. Interval Meter An approved metering device that records electricity usage for each fifteen-minute period during a billing period. Load Bank An electric resistance coil or similar device that creates an electric Load which is used for testing generators under load. Load Reduction A reduction in energy usage at a retail end user s facility that is the result of the retail end user either reducing the energy consumed or operating a Local Generator to cause a Load Reduction from the NYS Transmission System and/or local distribution system at the direction of the NYISO. Meter Service Provider (MSP) An entity that provides meter services, consisting of the installation, maintenance, testing, and removal of meters and related equipment. Meter Data Service Provider (MDSP) An entity providing meter data services, consisting of meter reading, meter data translation and customer association, validation, editing, and estimation. 1-2 NYISO Demand Response Operations

NYISO Services Tariff The FERC-approved document that sets forth the provisions applicable to the services provided by the NYISO related to its administration of markets for the sale and purchase of Energy, Ancillary Services, and Capacity. Operating Reserve Shortage Failure to maintain the Minimum Operating Reserve Requirement as defined in the NYISO Emergency Operations Manual (available from the NYISO Web site at the following URL: http://www.nyiso.com/public/markets_operations/documents/manuals_guides/index.jsp) NYISO Demand Response Operations 1-3

This page intentionally blank. 1-4 NYISO Demand Response Operations

2. ELIGIBILITY CRITERIA / QUALIFICATION 2.1 Who Can Participate? The EDRP allows wholesale electricity market participants to subscribe retail end users able to provide Load Reduction (Demand Side Resources) by curtailing Load or by shifting Load onto a Local Generator when called upon by the NYISO during emergency conditions. Wholesale market participants are grouped into four broad classes of Curtailment Service Providers (CSPs): Load-Serving Entities (LSEs) as defined in the NYISO Services Tariff that currently serve retail end users capable of Load Reduction or an LSE that subscribes another LSE s Load solely for the purpose of participating in the NYISO EDRP. An individual retail customer taking service as an LSE and enrolled to take service directly from the NYISO to supply its own Load in the NYCA as defined in the NYISO Services Tariff. NYISO-approved Curtailment Customer Aggregators (Aggregators) of retail end users capable of Load Reduction. Aggregators may claim Load Reductions from Demand Side Resources with which they have a contractual arrangement. An Aggregator may join the NYISO as a NYISO Limited Customer. NYISO-approved Curtailment Program End Use Customers (EUC), end-use customers whose Load is normally served by an LSE but who wish to participate directly with the NYISO solely for purposes of the EDRP. Curtailment Program End Use Customers (EUCs) must be capable of reducing at least 100 kw of Load. An EUC is required to join the NYISO as a NYISO Limited Customer. Participation in the EDRP is voluntary. The EDRP program imposes no penalties upon CSPs or Demand Side Resources for not responding to Load Reduction requests; other Load Reduction programs to which the EDRP customer may be simultaneously enrolled, may impose penalties for failure to reduce. Demand Side Resources participating in the NYISO Energy Market or the Ancillary Services Market may also participate in EDRP. 2.2 Minimum Qualifications for CSPs To serve as a CSP, an entity must: 1. Be a NYISO Customer (in the case of LSEs and individual retail customers enrolled as LSEs that take service directly from the NYISO to supply their own Load in the NYCA) or a NYISO Limited Customer (in the case of Aggregators and EUCs) and be able to pledge Load Reduction in the NYCA. 2. Be able to cause a Load Reduction from the NYS Transmission System and/or local distribution system at the direction of the NYISO. Be capable of reducing at least 100 kw of Load per zone. Be capable of responding within two hours of notice from the NYISO. NYISO Demand Response Operations 2-1

Follow the enrollment procedures defined in Section EDRP Enrollment Procedures of this manual. Provide hourly interval metering data to validate performance. Specific metering requirements are given in Section 5 of this manual. 2.3 Restrictions An individual Demand Side Resource can subscribe to either EDRP or the SCR program, but not both. Special Case Resources (SCRs) that have enrolled with the NYISO but have not sold any of their Special Case Resource Capacity will be added to the list of EDRP resources for that period of time when all of their Special Case Resource Capacity is unsold, and will be called with EDRP resources if an EDRP event is deployed. To participate in the Program, an individual Demand Side Resource cannot subscribe the same metered Load with more than one CSP. Information provided by CSPs may be shared with their local Transmission Owner for planning or system operation. Retail end users under a contract that prevents them from curtailing energy are prohibited from participating in the program. Local Generators that are operating to fully serve their Load do not qualify for the EDRP. A Local Generator that is normally operating to partially serve its Load may participate in the program with any additional generation that is available to operate at the direction of the NYISO in order to reduce the remaining Load being supplied from the NYS Transmission System and/or distribution system. Demand Side Resources using a Local Generator to provide load relief through EDRP are subject to all environmental rules and regulations. Demand Side Resources determined not to be complying with environmental requirements will not be permitted to participate in the EDRP. 2.4 Requirements for Curtailment Customers with a Local Generator Owners of Local Generators including, but not limited to, hospitals, data centers, office buildings, warehouses, and industrial locations are eligible to participate in the EDRP. A Local Generator can serve all or part of the facility's Load being supplied from the NYS Transmission System and/or distribution system (i.e., the retail end user s specific Load delivered from their LSE), thereby reducing the total Load being supplied from the NYS Transmission System and/or distribution system during declared emergencies. The requirements for participation are as follow: 1. Be capable of responding within 2 hours of a request to cause a Load Reduction from the NYS Transmission System and/or local distribution system at the direction of the NYISO. 2. Have an integrated hourly or permanent recording meter as described in Section 5.1, Metering Requirements. 3. Be capable of receiving notification from a Curtailment Service Provider (CSP). 2-2 NYISO Demand Response Operations

4. Demand Side Resources that will use Local Generators to reduce Load and that have Load Banks for testing purposes must ensure that the Load Bank is not operating during the hours required by the EDRP. Nothing in the EDRP expands or reduces the rights, obligations, or restrictions a Local Generator may have to buy or sell energy in the NYISO s wholesale market. 2.5 Compatibility with Special Case Resources The EDRP pays for energy during times of emergency, but does not pay for capacity. The NYISO has a separate program called Special Case Resource (SCR) program within the Installed Capacity (ICAP) market that pays for capacity and energy. The SCR program is available to Local Generators and resources that curtail the facility's Load to reduce Load supplied by the NYS Transmission System and/or distribution system during a NYISO initiated performance test or event. SCRs are required to meet testing, metering and other program eligibility requirements. While there are no penalties for non-performance as an EDRP provider, the SCR program will reduce future capacity payments if the NYISO calls for operation and the SCR does not perform. There may also be penalties imposed for nonperformance by other programs in which the SCR resource is simultaneously enrolled. In the event that the NYISO deploys an SCR resource to reduce its consumption of energy in accordance with the criteria set forth in Section 4, the NYISO may deploy the EDRP. SCRs that have enrolled with the NYISO but not sold any of their Special Case Resource Capacity will be added to the list of EDRP resources for the period of time when all of their Special Case Resource Capacity is unsold and will be called with EDRP resources if an EDRP event is deployed. For more details on SCR, see the ICAP Manual, available from http://www.nyiso.com/public/markets_operations/documents/manuals_guides/index.jsp by activating the Operations option in the navigation pane and choosing the Installed Capacity Manual link in the display pane. 2.6 Compatibility with other NYISO Demand Response Programs Demand Side Resources may participate in both the EDRP and the Day-Ahead Demand Response Program (DADRP) offered by the NYISO. If an EDRP event is called and a Demand Side Resource is participating in both programs, payments will be made in accordance with Section 5.4.2 of this EDRP Manual. Demand Side Resources may participate in both the EDRP and the Demand Side Ancillary Services Program (DSASP) offered by the NYISO. If an EDRP event is called and a Demand Side Resource is participating in both programs, the Demand Side Resource's realtime dispatch schedule in the DSASP program will be terminated for the duration of the demand response event to permit the Demand Side Resource to participate as an EDRP resource. If an EDRP event is called and a Demand Side Resource is participating in both programs, payments will be made in accordance with Section 5.4.2 of this Manual. NYISO Demand Response Operations 2-3

2.7 Small Customer Aggregation 1. Aggregations must be at least 0.5 MW for EDRP. The NYISO will establish an up-front means of certifying that the aggregation has an expectation of meeting this requirement. This will be established as part of the approval of the verification methodology; the sampling plan or other measurement methodology will assign an initial (a priori deemed) estimate of the response per site in order to drive the sample size. Resources included in the aggregation may only participate in one NYISO reliability program. The NYISO may request confirmation that all resources are enrolled only for participation in the Emergency Demand Response Program. The aggregation can be comprised of two or more different sampling methods, provided that such a super aggregation was allowed by the NYISO. 2. Aggregators will be held responsible and liable for payments to and penalties levied against the members of the aggregation. 3. Proposals for measuring aggregation performance can involve one of several methods: a. The deployment of approved whole-premise kw metering devices on a sample of resources b. The deployment of approved end-use device or process kw metering devices on a sample of resources that elect to limit EDRP participation to specified end-use devices or processes c. Provision for supplying verifiable behavioral actions, equipment operating logs, or other data that is deemed to be sufficient, indicating the load level the customer otherwise would have consumed, but for the EDRP event participation d. Other measurement systems that indicate the load level the customer otherwise would have consumed, but for the EDRP event participation 4. Small Customer Aggregation: A process and procedures will be drawn to govern how applications are made, processed and ruled upon, and to set limits to aggregation projects by zone, provider, program, or any other category. The number of aggregations allowed needs to accommodate all of the utilities plus a reasonable number of CSPs and LSEs. Each initial proposal (or significant revision thereof) for small customer aggregation will be reviewed by the NYISO staff and the Price Responsive Load Working Group, and must be approved by a majority of the Chairs and Vice-Chairs of the Management Committee and Business Issues Committee and the Chairman of the Price Responsive Load Working Group. 5. The Small Customer Aggregator is responsible for all costs associated with developing and administering the alternative performance methodology. Applications for approval of alternative methodologies must include an explicit description of the methodology and how it would be tracked and administered, accompanied by the specific administration processes required. The NYISO, in approving an application, will specify the costs associated with administration that the applicant must bear. The aggregation applicant must agree to be responsible for all such costs, including costs incurred by the NYISO for developing and administrating the alternative methodology. The NYISO may, at 2-4 NYISO Demand Response Operations

its discretion, require that some or all of such costs be reimbursed by the applicant upon approval of the methodology, or deduct all costs from payments for curtailments by resources, or a combination of the two methods of cost recovery. 6. End-use electricity customers may subscribe Load at a given premise to EDRP only under a single performance methodology, either the standard method or an approved alternative methodology. 7. Failure to comply with aggregation procedures: The NYISO may, at any time, terminate its agreement with an aggregation broker if it determines that the broker is not fulfilling its obligation under the aggregation agreement. Customers belonging to such an aggregation may henceforth participate by signing up under any approved means of participation. 2.8 EDRP Program Evaluation Curtailment Service Providers shall participate in all NYISO-sponsored EDRP program evaluations for which NYISO requires their participation. NYISO Demand Response Operations 2-5

This page intentionally blank. 2-6 NYISO Demand Response Operations

3. EDRP ENROLLMENT PROCEDURES 3.1 Requirements for CSP Enrollment To qualify as a Curtailment Service Provider (CSP), an organization must be one of the following: 1. An LSE serving retail Load, 2. An individual customer taking service from an LSE and registered to take service directly from the NYISO to supply its own Load in the NYCA, 3. A Curtailment Customer Aggregator (a NYISO Limited Customer that works with owners of Demand Side Resources to make it easier to participate in the NYISO Emergency Demand Response program), or 4. A Curtailment Program End Use Customer (a NYISO Limited Customer that is a retail end user capable of interrupting Load or using a Local Generator that can reduce at least 100kW in a load zone). For information on becoming a NYISO Customer, see the NYISO web site at http://www.nyiso.com/public/markets_operations/services/nyiso_registration/index.jsp 3.2 Procedures for Enrolling Demand Side Resources in EDRP CSPs are required to obtain authorization from each EDRP resource allowing the CSP to enroll the resource in the EDRP. Upon request, the CSP shall provide such authorization to the NYISO. It is the responsibility of the CSP to ensure compatibility with other curtailment programs before enrolling resources in the EDRP. Demand Side Resources must be enrolled for participation in the EDRP through the NYISO Demand Response Information System (DRIS) according to the DRIS Event Calendar. Information on the type of data that is required in DRIS is provided in the DRIS User s Guide, posted on the NYISO web site at http://www.nyiso.com/public/markets_operations/market_data/demand_response/index.jsp Resources must be reenrolled each Capability Period for participation in the EDRP. NYISO Demand Response Operations 3-1

This page intentionally blank. 3-2 NYISO Demand Response Operations

4. OPERATING MECHANISM / IMPLEMENTATION 4.1 When Will the Program be Deployed? The NYISO will deploy the EDRP as one of its emergency procedures in conjunction with the In-day Peak Hour Forecast response to an Operating Reserve Peak Forecast Shortage, as defined in, or in response to, the Major Emergency State as defined in the NYISO Emergency Operations Manual (available from the NYISO Web site at http://www.nyiso.com/public/markets_operations/documents/manuals_guides/index.jsp by activating the Operations option in the navigation pane and choosing the Emergency Operations link in the display pane). Day-ahead notice of a potential operating reserve shortage shall be provided to CSPs when possible. The program is intended to support the New York State power system during emergency periods and the NYISO reserves the right to use its discretion in deploying EDRP resources to relieve system or zonal emergencies. The EDRP may be deployed in conjunction with Special Case Resources. 4.2 NYISO Protocol for Local Generator Participation This section describes the circumstances under which the NYISO and its market participants have agreed that CSPs and RIPs may contract with customers who agree to reduce demand on the electricity grid by offloading all or a portion of their own power needs through the operation of Local Generators to cause a Load Reduction from the NYS Transmission System and/or local distribution system at the direction of the NYISO. 4.2.1 Compliance with Federal, State and Local Laws By enrolling a resource that is a Local Generator, CSPs and RIPs, which may participate in the EDRP program in accordance with Section 2.5 of this manual when capacity associated with its SCRs is unsold, certify that the resource complies with all federal, state, and local laws and regulatory requirements with respect to operation of the Local Generator used to reduce Load on the NYCA system during a demand response event. RIPs that participate in EDRP pursuant to Section 2.5 of this manual and CSPs will provide documentation of compliance with these requirements upon request of the NYISO. 4.3 Notification Procedures When the NYISO deploys the Emergency Demand Response Program (EDRP), a specific set of messages will be sent to Curtailment Service Providers (CSPs). A CSP will be asked to take certain actions in response to the NYISO notification. This section describes the contact procedures and actions that will be requested of CSPs. NYISO Demand Response Operations 4-1

The time frame for advisory and deployment notices will be a function of the degree of warning the NYISO has in identifying and responding to operating reserve shortages / major emergencies. Notification from the NYISO will take place via two communications media: Burst e-mail messages to all CSP Event-Responder e-mail contacts specified in DRIS. Automated phone call to all CSP Event-Responder phone contacts specified in DRIS. After receiving an EDRP notification, the CSP shall take the following steps: 1. Assess whether or not the CSP has resources that can respond, and the kw level of response by zone. 2. Provide the expected kw response by load zone in accordance with the instructions in the notification. 3. If for some reason, the CSP cannot follow the response instructions, the CSP is advised to contact NYISO Stakeholder Services at 518-356-6060. If the NYISO does not receive the automated response in a reasonable amount of time, it may call additional CSP contact numbers in an attempt to make a connection. In this case, NYISO staff will identify themselves by name and indicate that the NYISO has deployed the EDRP program, followed by the specific requests below. Several types of notifications may be distributed. The notification types include, but are not limited to: Day-Ahead Advisory, In-Day Advisory, Activation (2 Hour Notice), Immediate Activation, Extension of an Event, or Early Termination of an Event. The email and phone messages specify the type of notification, hours of event or advisory, and zones called. The exact wording of the notices is subject to change and may include additional information. Listed below are examples of the type of notices that may be received for a Day-Ahead Advisory and Activation (2-Hour Notice). 4.4 Notification Message Examples 4.4.1 EDRP Day-Ahead Advisory This notice applies to Curtailment Services Providers (CSPs) participating in the NYISO Emergency Demand Response Program (EDRP). EDRP resources may be needed tomorrow starting at hh:mm and ending at hh:mm. EDRP resources located in zones A,B,C,D,E,F,G,H,I,J,K are subject to this notice. Please respond within one hour by logging into the NYISO Demand Response Information System (DRIS) and entering the Load Reduction levels (kw) expected to be achieved on the system in each zone. This data is used for reliability purposes. A confirmation and final request to perform will be distributed at least two hours prior to the specified starting time of this event. 4-2 NYISO Demand Response Operations

This constitutes an official EDRP Event Day-Ahead Advisory. If any questions arise concerning this EDRP Event Day-Ahead Advisory notice please contact NYISO Stakeholder Services at 518-356-6060. 4.4.2 EDRP Activation (2 Hour Notice) EDRP resources are needed today starting at hh:mm and ending at hh:mm. EDRP resources located in zones A,B,C,D,E,F,G,H,I,J,K are subject to this notice. Please respond within one hour by logging into the NYISO Demand Response Information System (DRIS) and entering the Load Reduction levels (kw) expected to be achieved on the system in each zone. This data is used for reliability purposes. This constitutes an official EDRP Event Activation Two Hour notice. If any questions arise concerning this EDRP Event Day-Ahead Advisory notice please contact NYISO Stakeholder Services at 518-356-6060. NYISO Demand Response Operations 4-3

This page intentionally blank. 4-4 NYISO Demand Response Operations

5. METERING, VERIFICATION, BILLING, AND SETTLEMENT As provided in ICAP Manual Section 4.12.2, the CSP Metering and Meter Data Requirements provided in Sections 5.1, 5.2 and 5.3 also apply to Responsible Interface Parties (RIPs) with SCR resources in the SCR Program. 5.1 Metering Requirements CSPs must use PSC-certified Meter Service Providers (MSP) or Transmission Owners (TOs) to install, and PSC-certified Meter Data Service Providers (MDSP) to read, revenuegrade interval meters. Installation of any devices directly connected to the revenue meter, such as totalizers, must be performed by PSC-certified MSPs or TOs. Non-revenue-grade meters meeting the 2% accuracy requirement as defined in Section 5.1.1 may be installed by CSPs as long as they are certified by a Professional Engineer as meeting ANSI C12 standards and are periodically tested and calibrated in accordance with the standards applicable to MSPs. Transmission Owner or MDSP certification is required to read the meter. CSPs must use a PSC-certified MDSP to read such meters. Acceptable interval metering for Demand Side Resources participating in the EDRP, whether with Load Reduction, a Local Generator or a combination of both, is described below in Section 5.1.1. 5.1.1 Metering Device Requirements Meters installed under the 2001 EDRP rules prior to March 20, 2002 may be used as the source of EDRP event reporting data. Hourly interval metering data is required to validate performance. Demand Side Resources may use non-revenue interval metering devices with an overall accuracy of ±2% as the source of performance data. For each non-revenue interval meter design used, the CSP will submit certification from the meter manufacturer that the model in use meets the ±2% accuracy threshold, recognizing errors in: Current measurement Voltage measurement A/D conversion Calibration Such meters shall be periodically tested and calibrated in accordance with the standards applicable to MSPs and MDSPs. Where a revenue meter exists, losses in secondary/service circuits between the revenue meter and the non-revenue interval meter may be compensated for to bring the reading within ±2% of the revenue meter. The CSP must demonstrate compliance through comparison of the revenue and non-revenue meters, or show calculation of losses between the revenue and non-revenue meters. NYISO Demand Response Operations 5-1

5.1.2 Metering Configuration Requirements A CSP must identify a "Response Type" for each EDRP resource it enrolls in DRIS based upon: (i) how the EDRP resource will reduce its Load during a NYISO initiated event; and (ii) the meter configuration of the EDRP resource's facility. Each EDRP resource must be enrolled as one of the following: Response Type C (Curtailment), Response Type G (Generation), or Response Type B (Both). An EDRP resource must enroll as Response Type C when it reduces the Load supplied by the NYS Transmission System and/or distribution system during a NYISO initiated event only by curtailing the facility's Load, and that submit the entire facility's net meter data as evidence of Load reduction. An EDRP resource must enroll as Response Type G when it reduces the Load supplied by the NYS Transmission System and/or distribution system during a NYISO initiated event only by using a Local Generator, and submits the Local Generator's meter data (not entire facility's net meter data) as evidence of Load reduction An EDRP resource must enroll as Response Type B when: (i) it uses both a Local Generator and curtailment of the facility's Load to reduce Load supplied by the NYS Transmission System and/or distribution system during a NYISO initiated event, and submits (a) the entire facility's net meter data, or (b) the net of entire facility's Load meter data and Local Generator's meter data as evidence of Load reduction; or (ii) it uses only a Local Generator to reduce the Load supplied by the NYS Transmission System and/or distribution system during a NYISO initiated event, and submits (a) the entire facility's net meter data, or (b) the net of entire facility's Load meter data and Local Generator's meter data as evidence of Load reduction. Figure 5-1 illustrates examples of acceptable EDRP resource meter configurations. The Local Generator represented in the illustrations is used to facilitate Load reduction. For use of any meter configuration not represented by one of these diagrams, please contact NYISO Stakeholder Services at 518-356-6060. 5-2 NYISO Demand Response Operations

Figure 5-1 Examples of acceptable Meter Configurations 5.1.3 Historical Operating Data Upon request of the NYISO, CSPs and RIPs shall provide historical metering and operating data for each resource enrolled that is consistent with the enrolled meter configuration. These requirements may be met by, but not limited to, the following types of data requests: 1. For a resource that is participating in the EDRP, the meter ID and MSP ID certifying meter installation; 2. For resources with existing interval meters, a minimum of 30 days of hourly interval data immediately preceding the first month of the Capability Period the resource will participate in; 3. For resources that are eligible to report totalized Loads with existing interval meters, hourly interval data for a minimum of 30 days of hourly interval data for all participating Loads at the premise. Consistent with Section 4.12.7 of the ICAP Manual, RIPs and CSPs shall retain all interval meter readings upon which it bases its certification of compliance for a period of three (3) years. 5.2 Calculation of CBL 5.2.1 Select a CBL method 1. The CSP selects the CBL formula when it enrolls a resource with the NYISO in the EDRP. The choice of CBL becomes effective when the NYISO accepts the enrollment. 2. At the initial enrollment in the EDRP, the CSP may elect either the Average Day CBL or the Adjusted CBL formula. NYISO Demand Response Operations 5-3

3. A change in the CBL formula can be made when the CSP reenrolls the resource in the EDRP in the next Capability Period. 5.2.2 CBL Calculation Method (Load Reduction or Both Local Generator and Load Reduction) Based on DRIS Metering Configuration It is the responsibility of the CSP to provide the CBL calculation to the NYISO and ensure that calculations are complete and accurate. Section 5.2.3 provides a complete example of the CBL calculation process including the weather adjustment. Any Load supported by generation produced from a Local Generator, other behind-themeter generator, or other supply source located behind the resource's meter may not be included in the metered Load used to calculate the resource's CBL when the resource is enrolled in DRIS with a Response Type B or C. Resources enrolled in DRIS with a Response Type G are required to use the CBL Calculation Method in Section 5.2.4 for calculation of the CBL of the Local Generator to calculate energy response during a demand response event. I. The Average Day CBL for Weekdays I.A. Establish the CBL Window for Weekdays. I.A.1. Determine the resource's peak load hour within, but not to exceed, the last 30 days that corresponds to the hours that cover the event for which the CBL is being developed. Multiply the peak load hour value by 25% to calculate the initial seed value. (Figure 5-2) I.A.2. Beginning with the day prior to the event for which the CBL is being calculated, exclude the following: I.A.2.a Any holidays within the last 30 days, as specified by the NYISO. I.A.2.b Any days within the last 30 days when the NYISO declared an SCR, EDRP or TDRP event for which the resource was eligible for payment for a curtailment. The day prior to any other weekday when the NYISO declared an SCR, EDRP or TDRP event within the last 30 days for which the resource was eligible for payment for a curtailment. I.A.2.c Any days within the last 30 days in which the resource s DADRP curtailment bid was accepted in the DAM, whether or not the resource actually curtailed. Any day prior to the day in which the resource's DADRP curtailment bid was accepted in the DAM, whether or not the resource actually curtailed. I.A.3. For each remaining weekday within the last 30 days, create the Average Daily Event Period Usage for that day, defined as the simple average of the resource s actual usage over the hours that define the event for which the CBL is being developed. Eliminate low usage days. For each day that has not been excluded within the last 30 days, compare the resulting Average Daily Event Period Usage to the initial seed value. If the Average Daily Event Period Usage is less than the initial seed value, exclude that day. If, after all 5-4 NYISO Demand Response Operations