SUBJECT CAN: 2-108. Temporary Systems, Utilities and Equipment. Effective: 4/09/2013. CODE SECTION 2010 California Building Code (CBC)



Similar documents
CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

city of edmonds development information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

527 CMR: BOARD OF FIRE PREVENTION REGULATIONS

R432. Health, Health Systems Improvement, Licensing. R Nursing Facility Construction. R Legal Authority. R Purpose.

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

Facilities Development Division. The Building Department for California s Hospitals

EXPRESS PERMITS (No Plan Check Required)

Construction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP

CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS

Name Of Occupancy Date. Yes No Describe

2. What building projects are exempted? (permit not required)

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

The replacement or modification of existing windows shall comply with the following requirements:

PERMITS REQUIRED & PERMIT EXEMPTIONS

Crawford Inspection Services C.C.B. #

Element D Services Plumbing

WHEN IS A PERMIT REQUIRED?

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

ELECTRICAL EMERGENCY SYSTEM PLAN REVIEW OVERVIEW OF CODE REQUIREMENTS

6 FAM 1700 SPACE ALLOCATION AND RELATED SERVICES

Development Services City of Lawrence, KS

SECTION MECHANICAL: ELECTRICAL: PLUMBING

Arapahoe County Residential Water Heater Installation and Inspection Guide

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

National Archives and Records Administration (NARA) Facility Standards for Federal Records Storage Facilities

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Solar Panel Installations

Electrical. This section applies to the design and installation of building power distribution systems.

The following definitions apply with regard to requirements specified in this document:

Gas Meter Clearances and Service Installation Requirements

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

How To Make A House Safe

City of Riverside Building & Safety Division Residential Electric Vehicle (EV) Charger Guidelines

Notes. Material 1. Appropriate Flammable Liquids

2012 NC Rehabilitation Code Effective Date: January 1, 2015

Building Permit Application

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

contractors, etc. and establish relationships with lease and rental companies.

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

General Fire Code Requirements Within Commercial Tenant Spaces

UNIVERSITY OF TOLEDO

CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY

Gramercy Place Condo Association, Inc.

Top Commercial / Residential Electrical Requirements *

LIQUEFIED PETROLEUM GASES

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

Article 10 - ADMINISTRATIVE SECTION

Spray Booth Guideline

2010 Residential Water Heater Replacement Check List

City of Fort Smith Building Permit Process Frequently Asked Questions

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Electrical Contractors. and the. New Jersey. Rehabilitation Code

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

2013 BUILDING ENERGY EFFICIENCY STANDARDS

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Questions and Answers for Heating and A/C Contractors

City of St. Charles Basement Finish or Remodel

NMSU FIRE DEPARTMENT Commercial Kitchen Fire Suppression Worksheet

TOP 10 CHANGES 2013 CALIFORNIA ELECTRICAL CODE 2013 CALIFORNIA ENERGY CODE (ELECTRICAL)

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

GUIDELINES FOR PLAN CHECK AND PERMIT REQUIREMENTS FOR SOLAR ENERGY SYSTEMS

SECTION GENERAL PROVISIONS FOR HVAC WORK

COMPREHENSIVE PROPERTY INSPECTIONS

Minimum Housing and Health Standards

Aurora Mall. Aurora (Denver), Colorado

City of Riverside Building & Safety Division Phone: (951)

GENERAL WIRING RULES FOR HOUSES

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

County of Riverside Building and Safety Department

Mechanical, Plumbing, and Fire Protection Conditions

SMOKE DETECTOR INSTALLATION PROGRAM The Burlington Ordinance Perspective

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Carbon Monoxide Detection in Commercial Buildings (

Pre-Drywall Inspection Report

Infection Control Risk Assessment : the Infection Preventionist s Role in Construction

SECTION THREE CONSTRUCTION CODES

Gas Meter Clearances and Service Installation Requirements

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Page 1 of 5 COMPLIANCE CHECKLIST. > Hospice Inpatient Facility Nursing Care Unit

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

ELECTRICAL REQUIREMENTS FOR HEALTH CARE FACILITIES

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

Transformer Deluge Systems

Transcription:

Facilities Development Division Office of Statewide Health Planning and Development 400 R Street, Suite 200 Sacramento, CA 95811 (916) 440-8300 700 N. Alameda Street, Suite 2-500 Los Angeles, CA 90012 (213) 897-0166 CODE APPLICATION NOTICE (CAN) H&S Code 129851 SUBJECT Temporary Systems, Utilities and Equipment CAN: 2-108 Effective: 4/09/2013 CODE SECTION 2010 California Building Code (CBC) SECTION 108. TEMPORARY STRUCTURES AND USES 108.1 General. The building official is authorized to issue a permit for temporary structures and temporary uses. Such permits shall be limited as to time of service, but shall not be permitted for more than 180 days. The building official is authorized to grant extensions for demonstrated cause. 108.2 Conformance. Temporary structures and uses shall conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of this code as necessary to ensure public health, safety and general welfare. 108.3 Temporary power. The building official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been fully completed and the final certificate of completion has been issued. The part covered by the temporary certificate shall comply with the requirements specified for temporary lighting, heat or power in NFPA 70 [CEC]. 108.4 Termination of approval. The building official is authorized to terminate such permit for a temporary structure or use and to order the temporary structure or use to be discontinued. REFERENCE CODE SECTIONS 2010 California Electrical Code (CEC) Article 590 Temporary Installations 590.1 Scope. The provisions of this article apply to temporary electric power and lighting installations. 590.2 All Wiring Installations. (A) Other Articles. Except as specifically modified in this article, all other requirements of this Code for permanent wiring shall apply to temporary wiring installations. (B) Approval. Temporary wiring methods shall be acceptable only if approved based on the conditions of use and any special requirements of the temporary installation. 590.3 Time Constraints (A) During the Period of Construction. Temporary electrical power and lighting installations shall be permitted during the period of construction, remodeling, maintenance, repair, or demolition of buildings, structures, equipment, or similar activities. Page 1 of 8 CAN 2-108

(C.1) Emergencies and Tests. [SFM] Temporary electrical power and lighting installations shall be permitted during emergencies and for tests, experiments, and developmental work as approved by the authority having jurisdiction. 2010 California Mechanical Code (CMC) Section 117.0 Connection Approval. 117.1 Energy Connections. No person shall make connections from a source of energy or fuel to any mechanical system or equipment regulated by this code and for which a permit is required until approved by the Authority Having Jurisdiction. 117.2 Temporary Connections. The Authority Having Jurisdiction shall be permitted to authorize temporary connection of the mechanical equipment to the source of energy or fuel for the purpose of testing the equipment or for use under a temporary certificate of occupancy. 2010 California Plumbing Code (CPC) Chapter 12 Fuel Gas Section 1208.0 Temporary Use of Gas. Where temporary use of gas is desired and the Authority Having Jurisdiction deems the use necessary, a permit shall be permitted to be issued for such use for a period of time not to exceed that designated by the Authority Having Jurisdiction, provided that such gas-piping system otherwise conforms to the requirements of this code regarding material, sizing, and safety. Chapter 13 Health Care Facilities and Medical Gas and Vacuum Systems 1327.0 Testing and Inspection. 1327.1 Inspection and testing shall be performed on new piped gas systems, additions, renovations, temporary installations, or repaired systems, to ensure the facility, by a documented procedure, that the applicable provisions of this document have been adhered to and system integrity has been achieved or maintained. [NFPA 99:5.1.12.1.1.]. 2010 California Fire Code (CFC) Section 605 Electrical Equipment, Wiring and Hazards. 605.9 Temporary Wiring. Temporary wiring for electrical power and lighting installations is allowed for a period not to exceed 90 days. Temporary wiring methods shall meet the applicable provisions of the California Electrical Code. Exception: Temporary wiring for electrical power and lighting installations is allowed during periods of construction, remodeling, repair, and demolition of buildings, structures, equipment or similar activities. 605.9.1 Attachment to structures. Temporary wiring attached to a structure shall be attached in an approved manner. Page 2 of 8 CAN 2-108

INTERPRETATION The California Building Standards Code (CBSC) provides regulations that authorize the building official to issue a permit for the provision and use of temporary systems, utilities and equipment for limited time periods during construction. The Office of Statewide Health Planning and Development (OSHPD) may issue a permit, as necessary, for the use of temporary systems, utilities and equipment during project construction, remodel, repair or demolition of buildings under its jurisdiction. Applications for temporary use are reviewed by OSHPD and permits will be issued on a case-by-case basis. Permits for temporary use are separate from, and in addition to, permits for permanent construction of the work and shall be granted solely for the period needed during construction. Under no circumstances will a permit for temporary uses be granted for more than 180 days. Temporary construction shall satisfy the requirements of this Code Application Notice (CAN) and CAN 2-102.6. Buildings, systems, components and equipment repaired or replaced under emergency conditions are subject to CBC 105.2.1 and the provisions of CAC 7-300. All temporary equipment must, at a minimum, meet the appropriate code requirements for capacity and performance. All code requirements for permanent equipment must be met except as specifically noted below. For example, temporary air handlers must meet the code requirements for filter efficiency and capacity (ability to maintain proper air balance and air flow). Outdoor air intake must be located within the required distance from exhaust outlets, plumbing vents, etc. as required by the CMC. A temporary generator and temporary Automatic Transfer Switch for the emergency power supply must be sized to provide adequate capacity to meet the demand for the operation of all functions and equipment to be served by each system and branch, be fully automatic and be identified for emergency use. Temporary power installations shall meet the requirements of Article 590 of the CEC. Temporary use of fuel gas may be issued per CMC section 1308 or CPC section 1208. The temporary use of gas is under the condition the piping system conforms to the requirements of the code regarding material, sizing, and safety. Applications for any permit for the use of temporary systems, utilities and/or equipment shall be made to the Office in advance of the anticipated use, allowing adequate time for review. Applications shall include plans clearly delineating the location of the temporary equipment; routing and sizing of utility lines to power and/or fuel the equipment and identification of the points of connection; routing and sizing of conduit, cabling, piping, and/or ducting between the temporary equipment and the existing distribution system; locations, sizes, and construction of any barriers, fencing and/or other protective measures for the equipment and/or piping, conductors, and duct work showing adequate clearances when appropriate; and detailing of any temporary anchorage and bracing when required. Applications shall also include certification from a structural engineer and supporting calculations when required. Applications shall also include a Testing, Inspection and Observation Program (TIO) indicating related structural, mechanical, plumbing, and/or electrical testing, balancing, inspections or observations that are required. Temporary uses are classified as short-term, mid-term or long-term. A short-term temporary permit has a maximum duration of 7 days, including: make ready work and installation of the temporary system(s), utilities and/or equipment; commissioning the system and/or equipment; the temporary use; de-commissioning; and removal of the temporary system(s), utilities and/or equipment. A mid-term temporary permit has a maximum duration of 30 days. A long-term temporary permit has a maximum duration of 180 days. Page 3 of 8 CAN 2-108

COMPARISON CHART Temporary Equipment Short-Term Temporary Permit 7-day maximum Short-term temporary use equipment may be mobile (truck mounted w/ blocked tires and guyed corners) or skid mounted and set on the ground or roof. Mid-Term Temporary Permit 30-day maximum Mid-term temporary use equipment may be mobile (truck mounted w/ blocked tires and guyed corners) or skid mounted and set on the ground or roof. Long-Term Temporary Permit 180-day maximum Long-term temporary use equipment may be mobile (truck mounted) or set on the ground or roof. Seismic Design Seismic design for supports, attachments and special seismic certification are not required. Seismic design for supports, attachments and special seismic certification are not required. Temporary equipment shall be anchored and braced in accordance with ASCE 7 Chapter 13; however the calculated F p may be reduced by 50%. Special Seismic Certification of temporary equipment per CBC Section 1708A.4 is not required. Prior to placing any temporary equipment on the roof, floor, or other structure, the adequacy of the structure to support the operating weight of the unit shall be confirmed and substantiated by a licensed structural engineer. Placement on existing structure Prior to placing any temporary equipment on the roof, floor, or other structure, the adequacy of the structure to support the operating weight of the unit shall be confirmed and substantiated by a licensed structural engineer. Prior to placing any temporary equipment on the roof, floor, or other structure, the adequacy of the structure to support the operating weight of the unit shall be confirmed and substantiated by a licensed structural engineer. Equipment service access and clearances No requirement Clearance and access around the equipment shall comply with code including internal access to the equipment when required and provision of a roof guard rail if the access/service area is located within 10 feet of a roof edge. Clearance and access around the equipment shall comply with code including internal access to the equipment when required and provision of a roof guard rail if the access/service area is located within 10 feet of a roof edge. Automatic shutoff Where applicable, automatic shutoff of air handling units for smoke control shall be provided. However, the unit is not required to be tied into the fire alarm system. Where applicable, automatic shutoff of air handling units for smoke control shall be provided, with connection to the fire alarm system. Where applicable, automatic shutoff of air handling units for smoke control shall be provided, with connection to the fire alarm system. Outdoor air intake Outdoor air intake for temporary air handling units must maintain required clearances from exhaust outlets, plumbing vents, etc. as required by the CMC Outdoor air intake for temporary air handling units must maintain required clearances from exhaust outlets, plumbing vents, etc. as required by the CMC. Outdoor air intake for temporary air handling units must maintain required clearances from exhaust outlets, plumbing vents, etc. as required by the CMC. Page 4 of 8 CAN 2-108

Temporary chillers Short-Term Temporary Permit 7-day maximum Temporary chillers located outdoors, the pressure relief shall be located a minimum 10 feet from windows or outside air intake locations. Mid-Term Temporary Permit 30-day maximum Temporary chillers located outdoors, the pressure relief shall be located a minimum 10 feet from windows or outside air intake locations. Long-Term Temporary Permit 180-day maximum Temporary chillers located indoors shall comply with all requirements of CMC Chapter 11. If located outdoors, the pressure relief shall be located a minimum 10 feet from windows or outside air intake locations. Flexible ductwork Flexible ductwork is permitted between the temporary unit and the hard duct system. Flexible ductwork is permitted for distances up to 25 feet in length. Flexible ductwork is permitted for distances up to 25 feet in length. Flexible piping Flexible piping, rated for the pressure and media, is permitted between the temporary unit and the rigid piping system. Flexible piping rated for the pressure and media is permitted for distances up to 25 feet maximum in length. Flexible piping rated for the pressure and media is permitted for distances up to 10 feet in length. Seismic bracing of temporary piping, conductors and ductwork Short-term temporary piping, conductors and ductwork do not require seismic bracing. Mid-term temporary piping, conductors and ductwork do not require seismic bracing. Long-term temporary piping, conductors and ductwork shall be secured/supported. Seismic design for supports and attachments of long-term temporary piping, conductors and ductwork is not required. Protective barriers Barriers shall be provided for pipes, ducts and conductors associated with temporary equipment to protect them from physical damage. Short-term temporary utilities shall not be subjected to vehicular traffic. Barriers shall be provided for pipes, ducts and conductors associated with temporary equipment to protect them from physical damage. Temporary utility lines subject to vehicular traffic shall be placed in trenches covered with traffic-rated plates. Temporary fuel gas service shall be protected against damage per CPC Section 1211.1.2. Barriers shall be provided for pipes, ducts and conductors associated with temporary equipment to protect them from physical damage. Temporary utility lines subject to vehicular traffic shall be placed in trenches with backfill and covered with traffic-rated plates. Temporary fuel gas service shall be protected against damage per CPC Section 1211.1.2. Protection of temporary electrical equipment Short-term temporary electrical equipment and cables shall be protected from physical damage and guarded with suitable fencing, barriers, or other effective means to limit access only to authorized and qualified personnel per CEC Article 590. Mid-term temporary electrical equipment and cables shall be protected from physical damage and guarded with suitable fencing, barriers, or other effective means to limit access only to authorized and qualified personnel per CEC Article 590. Long-term temporary electrical equipment and cables shall be protected from physical damage and guarded with suitable fencing, barriers, or other effective means to limit access only to authorized and qualified personnel per CEC Article 590. Page 5 of 8 CAN 2-108

Emergency generators Short-Term Temporary Permit 7-day maximum For emergency generators, 24-hour fuel supply via integral fuel tanks, mobile fuel trucks, or other approved means, shall be provided. An installation acceptance test shall be performed on the temporary emergency generator in accordance with CEC Section 700.4(A) and NFPA 110, Section 7.13. A temporary transfer switch (Non-Bypass Isolation Type) may be used as the temporary automatic transfer switch. The temporary transfer switch may be a single unit, even if code requires multiple units for the branch requirements. Temporary generators shall be located a minimum of 25 feet from outside air intakes, and 10 feet minimum from windows and doors. Mid-Term Temporary Permit 30-day maximum For emergency generators, 24-hour fuel supply via integral fuel tanks, mobile fuel trucks, or other approved means, shall be provided. An installation acceptance test shall be performed on the temporary emergency generator in accordance with CEC Section 700.4(A) and NFPA 110, Section 7.13. A temporary transfer switch (Non-Bypass Isolation Type) may be used as the temporary automatic transfer switch. The temporary transfer switch may be a single unit, even if code requires multiple units for the branch requirements. Temporary generators shall be located a minimum of 25 feet from outside air intakes, and 10 feet minimum from windows and doors. Long-Term Temporary Permit 180-day maximum For emergency generators, 24-hour fuel supply via integral fuel tanks, mobile fuel trucks, or other approved means, shall be provided. An installation acceptance test shall be performed on the temporary emergency generator in accordance with CEC Section 700.4(A) and NFPA 110, Section 7.13. The temporary emergency generator shall be exercised under load at least once a month in accordance with CEC Section 700.4(A) and NFPA 110 Section 8.4. A temporary transfer switch (Non-Bypass Isolation Type) may be used as the temporary automatic transfer switch. The temporary transfer switch may be a single unit, even if code requires multiple units for the branch requirements. Temporary generators shall be located a minimum of 25 feet from outside air intakes, and 10 feet minimum from windows and doors. Power cables Flexible power cables (conductors) conforming to CEC Section 590 may be used. Flexible power cables (conductors) conforming to CEC Section 590 may be used. Flexible power cables (conductors) conforming to CEC Section 590 may be used. Essential electrical power Short-term temporary mechanical units may be on normal power. Mid-term temporary mechanical units serving sensitive areas, as defined in CMC Table 315, shall be on the essential electrical power equipment system. Temporary mechanical units not serving sensitive areas may be on normal power. Long-term temporary mechanical units shall be on the essential electrical power equipment system, as required by CMC Section 316.0. Noise, steam, odors, hazards. No requirement Mid-term temporary equipment shall be located to minimize noise, steam, odors, hazards and unsightliness in patient-care areas and bedrooms. Equipment shall be guarded against damage by being installed behind protective fencing/barriers and located out of the normal path of vehicles. Long-term temporary equipment shall be located to minimize noise, steam, odors, hazards and unsightliness in patient-care areas and bedrooms. Equipment shall be guarded against damage by being installed behind protective fencing/barriers and located out of the normal path of vehicles. Page 6 of 8 CAN 2-108

Emergency Work Emergency work may be necessary due to equipment failure, natural disaster or other occurrences that require immediate repair or replacement to insure jobsite or building occupant health or safety. If buildings, systems, components or equipment are repaired or replaced under emergency conditions, the work must be approved and permitted as required by CAC, Chapter 7, Article 20. Short-term, mid-term or long-term temporary equipment and systems may be required to protect occupant safety and maintain services during the repairs. Original signed 4/09/13 Paul Coleman Date Page 7 of 8 CAN 2-108

CODE SECTION APPENDIX 2010 California Building Code (2010 CBC) 1615A.1.12 ASCE 7, Section 13.1.4. Replace ASCE 7 Section 13.1.4 with the following: 13.1.4 Exemptions. The following nonstructural components are exempt from the requirements of this section: 1. Furniture (except storage cabinets as noted in Table 13.5-1). 2. Temporary or moveable equipment. Exceptions: a) Equipment shall be anchored if it is permanently attached to the building utility services such as electricity, gas, or water. For the purposes of this requirement, permanently attached shall include all electrical connections except three-prong plugs for duplex receptacles. 2010 California Administrative Code (CAC) Chapter 7 7-300. Plan Review and Approval. ARTICLE 20 REPAIR OF DAMAGE AFTER AN EMERGENCY (a) All repair projects are subject to prior plan review, plan approval and construction permit by the Office except as noted in subsection (b). (b) For emergency repairs carried out without the Office plan review and permit in the aftermath of an emergency, an application for plan review must be submitted with construction documents, fees and a letter of transmittal stating the reasons for emergency repairs. Photographs, if available and reports of damage and repairs should also be submitted with the application. Additional repairs may be required if the emergency repairs do not comply with the code. For alternate fee payment methodology, see Section 129787 of the Health and Safety Code. (c) Plan reviews for emergency damage repairs will be performed on a priority basis. The application for plan review should clearly state that the scope of the project is to repair the damage from the emergency. Where possible, reviews will be made over the counter. 7-305. All Buildings. Where the repairs to damage caused by an emergency are required, facilities may reopen, after temporary repairs, for a limited period of time subject to the following: 1. Temporary repairs: The hazard resulting from damage to the facility is abated and the facility is at least restored to its pre-emergency condition or its equivalent. 2. Permanent repairs/retrofit: The Owner successfully negotiates with the Office a time bound plan for the permanent repairs/retrofit of the damaged facilities required by these regulations. Page 8 of 8 CAN 2-108