The Enterprise Project Management Office



Similar documents
Project Governance Concepts Issues and Constraints. Dick Patterson

TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.

COMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>

Enterprise Data Governance

EVOLVING THE PROJECT MANAGEMENT OFFICE: A COMPETENCY CONTINUUM

MNLARS Project Audit Checklist

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:

Role and Skill Descriptions. For An ITIL Implementation Project

Essential Elements for Any Successful Project

Business Analysis Capability Assessment

Assessing the Appropriate Level of Project, Program, and PMO Structure

Project Management Best Practice Benchmarks

Project Management Office (PMO) Charter

WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Information Technology Governance Overview and Charter

Project Team Roles Adapted for PAAMCO

The Manager s Guide to Avoiding 7 Project Portfolio Pitfalls

Integrated Risk Management:

White Paper. PPP Governance

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

Business Analysis Standardization & Maturity

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.

FIXING PROJECT MANAGEMENT: A MUST-HAVE

What you need to know about PMOs

building and sustaining productive working relationships p u b l i c r e l a t i o n s a n d p r o c u r e m e n t

The PMO as a Project Management Integrator, Innovator and Interventionist

The Integration of Strategic Planning and Portfolio Management

D6.1: Service management tools implementation and maturity baseline assessment framework

ITRM Guideline CPM Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE

Project Management Office (PMO)

IT Risk & Security Specialist Position Description

DISCIPLINE DATA GOVERNANCE GOVERN PLAN IMPLEMENT

Creating HR Service Delivery Success

EIM Strategy & Data Governance

Project Management Office Best Practices

Enterprise Architecture: A Governance Framework

JOURNAL OF OBJECT TECHNOLOGY

Change Management Office Benefits and Structure

TenStep Project Management Process Summary

Project Management Office: Seeing the Whole Picture

Best practices in project and portfolio management

P U T Y O U R L O G O H E R E. Revision Date Description of Changes Author / Editor. Name Title Organization Tel. 1

How To Be An Architect

Section 6. Governance & Investment Roadmap. Executive Governance

Project Management Change Management Procedure

PHASE 1: INITIATION PHASE

Business Continuity Position Description

The following is intended to outline our general product direction. It is intended for informational purposes only, and may not be incorporated into

Business Logistics Specialist Position Description

Contract Management Part One Making the Business Case for Investment

Making A Case For Project Management

AP1000 European 18. Human Factors Engineering Design Control Document

Solutions Master Data Governance Model and Mechanism

Establishing an Enterprise-Wide PMO-Striking Out Once Doesn't Mean Game Over! Bennetta B. Raby MS, PMP, LSSBB

DATA QUALITY MATURITY

HRO Provider Management: Success Requires a Disciplined Approach

PROJECT MANAGEMENT SURVEY

Governing Boards: Middle States Commission on Higher Education

Project, Program & Portfolio Management Help Leading Firms Deliver Value

Enterprise Asset Management Customer Utility Board Charter

10 Keys to Successful Software Projects: An Executive Guide

Software Engineering Governance:! a briefing!

Setting up and operationalisation of Enterprise PMOs

Ten Steps to Comprehensive Project Portfolio Management Part 1 An Introduction By R. Max Wideman Introduction Project

Project Management Issues in the Finance Transformation Arena

Portfolio Management Professional (PfMP)SM. Examination Content Outline

Agile Master Data Management A Better Approach than Trial and Error

IT Financial Management and Cost Recovery

EXECUTIVE SUMMARY...5

State of Minnesota IT Governance Framework

Building a Data Quality Scorecard for Operational Data Governance

Understand why, when and how-to to formally close a project

INCREASING THE STRATEGIC VALUE OF PPM THE KEY TO BUSINESS-DRIVEN PPM SUCCESS BUSINESS-DRIVEN WHITE PAPER SERIES

Project Management and Scrum A Side by Side Comparison by Anne Loeser, October 2006

Building an effective stay back team to gain maximum value from an outsourcing agreement

Systematic and Holistic IT Project Management Approach for Commercial Software. Theresa Kraft Lawrence Technological University

ASAE s Job Task Analysis Strategic Level Competencies

Principles of IT Governance

Central Project Office: Charter

Portfolio Management 101:

The Project/Program Management Office (PMO)

Vendor Management. Minimizing Value Leakage. Deloitte Consulting LLP. November 19, 2013

OPTIMUS SBR. Optimizing Results with Business Intelligence Governance CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.

Solutions. Master Data Governance Model and the Mechanism

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Data Quality for BASEL II

IT Cost Reduction. Doing More with Less. Anita Ballaney, Vishwanath Shenoy, Michael Gavigan. Strategic IT cost reduction - Doing More with Less

PM Services. Portfolio Strategy, Design and Build

Financial and Cash Management Task Force. Strategic Business Plan

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

Enterprise Architecture (Re)Charter Template

Chapter 4. The IM/IT Portfolio Management Office

Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners

Transcription:

The Enterprise Project Management Office A Conceptual Review Dick Patterson dpatterson@intelcheck.ca 1

Report Overview Almost all enterprises are confronted by accelerating change. An effective, Enterprise Project Management Office is an essential response element. The Enterprise Project Management Office EPMO must be carefully structured and properly resourced to effectively discharge its responsibilities. 2

Change in the Enterprise Marketplace (Biome) Regulatory Globalization Technology The Enterprise New Products Delivery Processes Governance New Channels Resource Management Strategic Planning Projects 3

4 Change in the Enterprise/2 What are projects? Vehicles to execute change. Building blocks in strategy execution. Resource allocation. Direct means to create value. Projects are critical to enterprise success

Change in the Enterprise/3 Aggregate Project View Addresses the entire project portfolio -distribution -subject domain -cost The Enterprise Perspective Individual Project View n Projects -Owner -Project Manager -Project Resources -Processes 5

The Enterprise Perspective The Project Portfolio What is the resource allocation to projects (change) vs. ongoing operations? How is the portfolio distributed by subject (IT, HR, organizational, new initiatives, etc.)? What is the risk distribution (high, medium, low)? What is the current status (actual to plan) of key projects? How is the portfolio changing over time? 6

The Enterprise Perspective/2 The Project Portfolio Risk Distribution 120 100 80 60 40 Lo Risk Medium Hi Risk - % 20 0 Q1 Q2 Q3 Q4 7

Concept Delineation The Project Management Office concept is not a new idea Generally: -It is found in almost all North American enterprises -Usually originated within IT -Three primary functions: -Project tracking (systematic information gathering) -Status reporting (uniformity) -Resource/ tools sharing templates, standards, d methodologies Functional PMO 8

Concept Delineation/2 Executive Group Project Owner Enterprise PMO Functional PMO Project & PM 9

Concept Delineation/3 PMO Construct Functional Enterprise Elaboration Primarily data gathering, providing status information and dtools to project managers. Active project participant, promoting good governance and management, reporting to the enterprise at large While the functional PMO is now a common organizational feature, especially in the IT unit, the Enterprise PMO is rarely to be found. 10

Concept Delineation/4 Service To: Functional Enterprise -Executive Group None directly Project status overview Portfolio analysis -Project Owners None directly Governance assistance Status reports -Project Managers Reporting Focus Information & tools repository Data for project managers Same General project and portfolio reporting 11

Governance Governance is the function wherein various project stakeholders exert power and influence on the direction of the project. Governance Function The Project Owner Project Manager Project 12

Governance/2 Project Failure Analysis Domain Governance Project Management Technology Problem Illustration Indifferent users Conflicting motivators Inadequate testing Unstable software The prevailing conventional wisdom is that most failures arise from management or technology problems; the facts indicate otherwise. 13

Governance/3 Project Failure Analysis cont d In my personal experience, most project reversals arise form governance failure The Chaos Report (Standish Group) reviewed 8,380 projects; the reported problems are largely governance issues An effective governance function can and will correct project management problems; the converse is almost always impossible. 14

Conclusion One All large organizations require an Enterprise Project Management Office -To provide the enterprise with portfolio project management. -To promote good project governance at the project owner level. -To optimize project processes beyond the possibilities of a functional unit. 15

EPMO Consequences It changes information flows. Before: Project PM Owner Executive Group With an EPMO PMO Project PM Owner Executive Group 16

Consequences/2 The Project Owner (usually, the responsible line executive) perceives pluses and minuses Better -Source of governance assistance -More consistent project information Concern Loss of control over information flows to the executive group The EPMO concept requires careful relationship management 17

Consequences/3 Project Managers also develop concerns. Methodologies Before PMO As dictated by my experience/belief After PMO Pay attention to prescribed methods Information Exclusive Shared Control Imposed None Could be significant, Overhead depending on design 18

The Cumulative Effect The PM Lobby Line Executives Executive Group Expectations Feverish Project Activity PMO 19

Nevertheless An effective Enterprise PMO is vitally important to most organizations; it is the foundation for: Project Portfolio Management Enhanced Project Processes Before EPMO Project Success = f(heroic Effort) After EPMO Project Success = f(systemic Process) 20

Conclusion Two The EPMO requires careful planning, demonstrable expertise and prudent execution to achieve success -Receptivity within the enterprise must be considered and nurtured. -Credible (i.e. seasoned ) resources are essential to sustain acceptance. -An incremental approach is usually superior to allow organizational learning. 21

Success Factors - Some 1. The organizational placement must be corporate. 2. It must be seen as a vital resource to the Executive Group. 3. The organizational tension between the PMO and its interfaces must be understood, acknowledged and managed. 4. The founding vision/mandate must be clearly articulated. 22

Success Factors cont d 5. The operational and implementation plan needs to be reasonably charted. 6. Communicate, communicate, communicate: organizational learning is essential. 7. Like with most functions, sound metrics are essential. 8. Focus on steady incremental improvement, especially in sensitive areas like governance. An effective EPMO is a corporate achievement, not simply a new function within the enterprise. 23

Success Factors - Conclusion The initial launch lays the foundation EPMO Repository Enterprise Review Adapted EPMO Plan 24

The Strategic Option regarding the Project Management Office A Summary Review Dick Patterson dpatterson@intelcheck.caca 25

Report Overview The Start Point: Almost all enterprises have established Project Management Offices PMO as an integral part of the project management process However Most PMO s are Functional in their role and orientation This Report Will explore the concept of a Strategic PMO, the resultant advantages and consequences 26

Report Overview cont d Assumes that the management rationale for a PMO is fully understood and does not require further review. Addresses the following topics: 1. Delineation of the Strategic PMO concept. 2. Comparisons between the Functional and Strategic 3. Consequential advantages 4. Implementation notes 27

Concept Delineation Executive Group Strategic Project Owner PMO Functional PMO Project & PM 28

Delineation cont d Construct Functional Elaboration Primarily, data gathering, providing status information and tools to project managers. Strategic Active project participant, p promoting good governance and management, reporting to the enterprise at large Yes, there is a continuum in the constructs with intermediate positions possible. In practice most implementations fall clearly in one mode or the other. 29

Service Comparisons Service To: Functional Strategic Executive Group Project Owners Project Managers None directly None directly -PM tools -Project status overview -Portfolio analysis -Governance assistance -Status reports -Data repository Reporting Reach Data for project managers General project and portfolio reporting 30

Some Comparisons Functional Strategic Primary Client Project Managers Executive Group Governance None Assess, support Role and report Project Passive repository Advocate for Methodologies standard, good practices Reporting Reach Data for project managers General project and portfolio reporting 31

More Comparisons Functional Strategic Staffing Junior analysts Seasoned PM veterans Cost Relatively low Appreciably greater Project Impact Organizational Placement Positive but limited Usually, within IT Positive and appreciable, subject to good politics. Must be corporate Enterprise Impact Basically, none To be addressed 32

Turning to the Strategic PMO, several effects need to be understood One: It changes information flows. Before: Project PM Owner With a PMO Executive Group PMO Project PM Owner Executive Group 33

Effects cont d One: Consequences of changed information flows The Project Owner (usually, the responsible line executive) perceives pluses and minuses Better Worse More reliable, consistent Lose of control on info project information to senior executives Bottom Line: I d better be careful about this. 34

Effects cont d Two: Project Managers also develop concerns. Methodologies Before PMO As dictated by my experience/belief After PMO Pay attention to prescribed methods Information Exclusive Shared Control Imposed None Could be significant, Overhead depending on design 35

Effects cont d Two: The PMO PM interface cannot ignore organizational realities. The PM s came first. The need/justification for PM s is beyond debate. The PMO is usually charged with proving itself. The PMO mandate is often ambiguous strategic, functional or in between? Consequently, PMO s often find themselves compelled to appease a powerful PM group within the enterprise, compromising the strategic orientation that would make it successful. 36

Effects cont d Three: The essence of project delivery changes. Before PMO: PMO Foundation: Project Success = f (Heroic Effort) Project Success = f (Systemic Process) 37

The Cumulative Effect The PM Lobby Line Executives Executive Group Expectations Feverish Project Activity PMO 38

Nevertheless An effective strategic PMO is vitally Important to most enterprises. Basis for enterprise change/adaptation. Basis for portfolio project management. Arguably, most project failure originate from governance failure; only strategic PMO s can address. 39

Success Factors 1. The organizational placement must be corporate. 2. It must be seen as a vital resource to the Executive Group. 3. The organizational tension between the PMO and its interfaces must be understood, acknowledged and managed. 4. The founding vision/mandate must be clearly articulated. 40

Success Factors cont d 5. The operational and implementation plan needs to be fully charted. 6. Communicate, communicate, communicate. 7. Like with most functions, sound metrics are essential. 8. Focus on steady incremental improvement, especially in sensitive areas like governance. 41

The Project Management Office -Challenges and Consequences- Intuitive Reflections Dick Patterson dpatterson@intelcheck.ca 42

Background The Project Management Office concept is a reasonably mature construct. Nevertheless, its adoption in any enterprise should be subject to careful planning and informed decision making. It is also possible that a viable commercially supplied system may be available to provide the required functionality. Advantages Reduced time to completion Usually, lower cost More reliable system Lower risk Disadvantages Generalized solution; limits to customization Vendor dependency 43

Background /2 In either case, an effective management framework is required for the project. Input Interested Stakeholders Options & Requirements (Project) Review & Assess Governance Plan This Report Project Plan 44

Background /3 Under the best of circumstances, most large information system projects fail. 8,380 Projects (private & public) Cancelled: 31% Marginal: 37% (Average: 189% of budget, 42% of functionality) As Planned: 9% Other: 23% Source: The Standish Group, 1994 45

Background /4 The Integrated Information Systems for large organizations are usually very large, complex projects large numbers of distinct units Corporate oversight User Requirements Business scope annual operating budget - say: $150 million Project funding - say $30 million 46

Management Requirements From the management perspective, what is required to ensure a successful project? Audit Organizations define: 7 Pillars 4 Principles 1. Governance 1. Support the business 2. Review (monitor / assess) 2. Ensure accountability 3. Change Management 3. Comprehensive project management 4. Best practices 5. Professional development 6. Pathfinder projects 7. Communications 4. Risk management 47

Project Governance /1 What? Why? How? Any large information systems project, usually encompasses several stakeholders besides the system owner. These diverse interests must be reconciled into a coherent strategic direction and effective management oversight. An Enterprise A Project Governance Board of Directors Project Council Management CEO Project Manager 48

Project Governance /2 In a large project context, governance can be depicted as follows: Group 1 Group 2. Group 3 Group 4 External $ Funding GOVERNANCE Direction & Oversight Project 49

Project Governance /3 The governance function is usually delivered through a Project Council (sometimes called Steering Committee ) which provides: 1. A visible forum for governance who is running the show 2. Strategic direction e.g. objectives and priorities resolution of major issues organizational change management 3. Reconciliation of diverse interests and pressures 4. Project oversight / monitoring 5. A mechanism to ensure project benefits 50

Project Governance /4 Project governance is distinct from but must effectively interface with project management. Governance Decisions Regular Contract Reporting or Charter Management Processes Resource Management Requirements Management Quality Management Risk Management Project Management 51

Project Governance /5 What is required for an effective Council? 1. Leadership from recognized, accepted system owner. 2. Each member is accountable for his / her stewardship of the project. Thus, each member must know for what and to whom he / she is accountable. 3. All legitimate stakeholders are included with an appropriate balance of influence. 4. Reflects legitimacy and credibility. 5. Established modus operandi by consensus, preferable owner decision, when necessary 52

Project Governance /6 What is desirable for an effective Council? 1. Congruence between ownership, funding and Council leadership. 2. Presence of an independent member. 3. Appropriate p training. 4. Availability of independent reviews, if required. 53

Project Management /1 Project Governance provides the foundation for effective project management which must begin with a comprehensive project plan. Start Planning Business Process Delineation, System Requirements, Business Case Design Architecture, Release Specifications Construction Programs, Procedures, Testing Implementation Conversion, Training, Support 54

Project Management /2 The first two phases (Planning and Design) are especially important with ample opportunities for going astray. Why? 1. Business processes inadequately defined. 2. The planning / design outputs are quite abstract difficult to grasp 3. Their absence can be ignored start construction before planning / design formalized 4. Validation / acceptance must be independent of preparation 5. Change management must be applied 55

Project Management /3 Mapping the existing project to the established constructs of good project management raises several serious concerns. Phase Expectation Available Planning Design Construction Implementation Business Case System Requirements No No Architecture Data No Technology No Release Specifications No Underway N/A 56

Project Management /4 Several consequences may flow from the project conditions previously cited. Condition Consequence Business Case Missing No Requirements No Data Architecture No Technology Architecture No Security Architecture Cost to complete, benefits to be realized are unknown No basis for resource trade-offs User needs may not be satisfied Required information not available Unknown configuration requirements, unknown cost Sensitive system; major exposure No Release Specifications Implementation ti may be counter-productive ti No Stress Test No Conversion Plan Performance may be unacceptable Essential 57

Project Management /5 A comprehensive project plan must be prepared to chart the many inter-related activities required for project completion. Project Deliverables Activities to deliver (how) Schedule (when) Resources ($, labour, etc.) Project organizational structure 58

Governance Illustrated /1 What issues or problems should the Project Council anticipate? 1. Visible Forum communication / representations from stakeholders 2. Strategic direction SMS or commercial package? Which standard assessment tool? Trade-offs between central project responsibility and individual CCAC s e.g. conversion 3. Reconciliation Balancing system and user perspectives Differences on functionality, interfaces, etc. 59

Governance Illustrated /2 Continuing with anticipated issues. 4. Project oversight Review / accept project plan (business perspective) Review / resolve changes to plan e.g. delays due to user requests Resolve disputed deliverables 5. Ensuring project benefits Are benefits being realized? (e.g. projected cost reductions, service level l improvements, etc.) 60

Your Input Specifically, how should the Project Council be structured? Chair: Who Accountability Members: Who Accountability Owner: Who Mechanisms 61

Conclusion In summary, program management is envisaged as: Your Input Governance Plan System Owner, Project Council, Resources SMS or Alternative Project Plan Retrofit Planning and Design Components Disciplined Action 62