1 Section 6 Governance & Investment Roadmap Executive Governance Strong governance is critical to the success of a long-term, complex transformative initiative. The following section provides a high-level overview of the governance model and strategy that has been designed and is in the process of being implemented to support NRPP and the NRS Transformation. The governance model includes a Deputy Minister level Project Board to provide delivery oversight and to ensure benefits are delivered for the investment. This high-level description of the governance model that is being implemented to support NRPP and the overall NRS Transformation is supported by a detailed governance and program management model that is described in the document titled BC NRS NRPP Governance Model / PMO Design. This document describes the key groups, roles, responsibilities, and decision making authority in the proposed governance structure, as well as the key program/project management and change/communications management functions (processes and tools) which will be implemented and will operate for the duration of the transformation. This model can be shared and explained in detail upon request. Figure 20 - NRPP Executive Governance Structure 72 Natural Resource Permitting Project
2 Due to the complexity and scope of the change proposed for the sector, establishing an effective governance model will be a critical first step that will enable NRS executive leadership and broader government to effectively deliver a challenging transformation with confidence, momentum, and a clear path ahead. The NRS transformation governance model will be the foundation upon which activities, decisions and costs are managed during the transformation program. The model will ensure that: Clear roles, responsibilities, and accountabilities are established across the sector and at the appropriate levels, including executive DM-level leadership provided by the NRS Board and cross-government DM-level leadership provided through the Project Board Owners and impacted parties of key decisions are identified and supported by clear decision making processes which will be established and monitored by a centralized PMO Risks and issues related to transformation activities are actively managed with escalation mechanisms which support timely resolution Changes to scope, schedule, and cost are controlled at appropriate levels Projects are effectively delivered and targeted benefits are realized A number of leading practices and lessons learned from transformations of similar scope and complexity were referenced in the development of the model, and existing sector governance bodies were considered when developing the recommended structure. The proposed executive governance structure presented in Figure 20 will provide effective oversight of program and project delivery and ensure alignment across NRS Transformation activities. Project Board Given the significant investment and strategic importance of NRPP to the NRS and broader government, a new Project Board will be formed to provide delivery oversight of NRPP. This group will include DMs from the NRS, the DM of Finance, and other DM-level participants as appropriate. This group will provide strategic direction and guidance for NRPP, as well as executive input and endorsement of NRPP priorities, scope, and high-impact decision or issues. This group will also be involved in financial matters such as annual funding requests, financial impact of any scope change, etc. The Project Board will act as executive champions for all NRPP activities, facilitating internal and external alignment, engagement, and commitment to the vision and objectives of NRPP. It will also provide appropriate oversight over program delivery, ensuring that expected benefits and outcomes are delivered. Oversight efforts will be supported by annual quality assurance review conducted by an independent and objective third party, the Risk Advisor, throughout the duration of the NRPP implementation. NRS Board The existing NRS Board will continue as the highest level of governance for the sector. This group will provide strategic direction and guidance for sector operations and non-nrpp sector transformation activities. In particular, this will include executive direction on broader NRS priorities, goals, decisions, risks, and issues. A key role of this group will be to address impacts and implications of NRPP on sector operations. Ministry of Energy and Mines Deputy Minister, Dave Nikolejsin, will be the overall Executive Sponsor for NRS Transformation. He will provide guidance and direction to program leadership, support leadership 73 Natural Resource Permitting Project
3 alignment across the sector and government and be overall accountable for the successful delivery of all transformation activities, including both NRPP and non-nrpp projects. DMCTT DMCTT will perform a critical governance role, providing strategic oversight of NRPP. As part of this role, DMCTT will continue to provide strategic guidance to NRPP leadership, ensure alignment with crossgovernment priorities, and approve major investment decisions. Regular reporting will be provided to DMCTT on NRPP progress. NRS Transformation Steering Committee A group of representative cross-nr sector ADMs, representative(s) from the OCIO, and other crossgovernment decision-makers will be formed to oversee portfolio delivery against the business case and to provide strategic guidance. The responsibilities of this group will include reviewing and approving major transformation decisions (e.g. vision, scope, timelines, and budget) and resolving escalated issues and risks affecting the health of the Transformation. An ADM will be dedicated full-time to the transformation as the Transformation Sponsor, cultivating government and external commitment to NRPP and providing strategic guidance to leadership teams. NRS Transformation Leadership Team and NRS Transformation Office The NRS Board and Project Board will be supported by the NRS Transformation Leadership Team responsible for leading the day-to-day delivery activities of NRPP. They will also be supported by an NRS Transformation Office, consisting of a Portfolio Management Office (PMO) and a Change Management Office (CMO). The PMO team will establish and execute the program/project management capability, including key methodologies, processes, and tools/templates for use by each of the programs and projects. The CMO team will establish and deliver the change management and communication strategy, goals, thought leadership, governance, and quality assurance. NRS Architecture Review Board Additional governance will be provided by an NRS Architecture Review Board, which will be established in order to serve as custodians of NRS domain architectures (e.g. business architecture, solutions architecture, information architecture, security architecture, etc.). This will include reviewing project architectures for quality and alignment, providing oversight of any refinements to architectures, and providing a forum for the resolution of escalated architectural issues. NRS ARB membership will include NRS domain architects, cross-government architecture representatives (OCIO), key NRS Transformation Leadership Team members, and other appropriate non-architecture members as needed. Additional Engagement In addition to the individuals and groups described above, regular engagement with relevant crossgovernment and external stakeholders will be instituted through formal and informal channels; this will ensure stakeholder and subject matter expert input is regularly solicited and incorporated into transformation decisions. This will include proponents, First Nations and the general public at appropriate times. 74 Natural Resource Permitting Project
4 Decision Making A core principle of NRS Transformation governance is that decisions should be made at the appropriate level. As part of the implementation of the governance model that will take place in 2013/2014, governance controls and mechanisms will be established for each aspect of the model, including: Escalation criteria and guidelines to support key processes, e.g. risk management, issue management that identify when an issue needs to be escalated to the NRS Transformation Leadership Team, NRS Transformation Steering Committee, or the Project Board A decision making framework (RACI matrix) which outlines the decision making process, defines the boundaries (thresholds) and scope of decision making by role, and establishes the owners and impacted parties of key decisions Determining these decision-making thresholds in advance of the program is critical, and resources will be dedicated in the short-term to determine the right approach. Clarity around decision rights is vital to establishing an effective governance structure and to successfully supporting a complex initiative such as NRPP. Implementation and Ongoing Operation As part of transformation readiness activities occurring in 2013/2014, a subset of the governance bodies, processes, and tools envisioned in the governance model will be established in order to support other readiness activities and project preparation. Over the first year, the model will be scaled up incrementally based on the demands of the transformation. It is estimated that the model will be fully implemented and operating by the end of year 1 ( 2014/2015) in order to support peak transformation activity in years 2-4. As transformation activity decreases over years 5-7, the model s costs and FTE requirements will decrease correspondingly. The estimated cost to set-up and operate the model over the duration of the transformation has been reflected in the total costs outlined in this business case. In addition to the executive governance described above, program- and project-level governance will be established (please see Section 8 for further details). 75 Natural Resource Permitting Project
5 NRPP Investment Roadmap Detailed planning over a number of months has culminated in the development of a detailed NRPP implementation roadmap to depict the set of projects necessary to deliver the benefits and outcomes described in this document. This section presents the timing and sequence of NRPP projects as well as the timing of expenditures over the duration of the implementation. The NRPP implementation roadmap spans 7 years, beginning in Year 1 ( 2014/2015) and completing at the end of Year 7 ( 2020/2021). Interrelated projects which have common objectives and interdependencies have been grouped into programs (e.g. Legislation, Regulation, & Policy program, Resource Stewardship program). At peak, as many as 41 different projects will be executed concurrently as part of the transformation. NRPP will be implemented using a phased approach whereby projects are delivered in waves, with core functionality built early and added to over time. Government priorities will inform implementation; for example, process improvements and system capabilities to support LNG will be prioritized to ensure this industry can be advanced in the near term. In total, there are 70 projects depicted on the roadmap: 56 projects which contribute costs to the business case: o o 49 projects within 7 programs 7 projects which provide the set-up and ongoing operation of cross-portfolio functions which support all other programs 14 projects which do not contribute costs to the business case, but are highly integrated into NRPP delivery: o o 4 legislative projects which are included to depict key dependencies 10 projects which already have approved OCIO funding Figure 21 below depicts a high-level summary view of the roadmap. 76 Natural Resource Permitting Project
6 Figure 21 - NRPP Implementation Roadmap Summary View Throughout the duration of the roadmap, NRPP will deliver a number of key capabilities benefiting the public, First Nations, clients and proponents, decision makers, and government as a whole. Capabilities will support the overall business of the NRS, including advancing LNG. The approximate timing of these capabilities is depicted in Figure 22 below. Figure 22 - Capabilities Delivered by NRPP 77 Natural Resource Permitting Project
7 Project Alignment Chart The alignment of projects to each implementation program in the near-term and mid-term is presented in Figure 23. Figure 23 - Project Alignment Chart 78 Natural Resource Permitting Project
8 Timing of Expenditures Chart The timing of NRPP expenditures by program over the duration of the roadmap is depicted below in Figure 24. Figure 24 - Timing of NRPP Expenditures Programs 2014/ / / / / / /2021 Legislation, Regulation & Policy Resource Stewardship Authorizations Compliance & Enforcement First Nations Engagement & Consultation Support Functions Common IM/IT Infrastructure Portfolio Total Capital and Operating by Year Grand Total Staffing Requirements At different stages of the roadmap, the number of NRS staff required to support the transformation will vary. Each implementation program (as shown in Figure 21) will be led by program directors and program management resources, supported by seconded staff and external parties for project delivery. The degree of involvement of sector staff will be based on requirements and availability. A key goal will be to minimize impact to operational / business-as-usual activities. As shown in Figure 25, an estimated 71 internal staff will be needed full-time to support the implementation of NRPP in year 1, with a peak of 130 staff needed in year 4. The cost of these employees has been included in this business case. Additional NRS staff will be consulted and engaged throughout the transformation to ensure business expertise is informing the implementation of NRPP; 79 Natural Resource Permitting Project
9 however, these employees needed on an ad-hoc basis have not been included in the costs for this business case. Discussions to determine how to best leverage cross-government capabilities will continue over the coming months. Funding will be required to hire or backfill the positions required to support implementation of NRPP; approval of this business case therefore constitutes approval to hire for internal positions as required. Figure 25 - Internal and External Resource Requirements to Deliver NRPP To highlight the range of NRS staff that will be required to support implementation of NRPP, Table 8 below lists the types of positions and the number of internal FTEs that will be required in Year 1. Table 8 Approximate Internal Staffing Requirements in Year 1 Position Type Internal FTEs NRS Business Resources 5 Program and Project Management Resources 8 Change Management Resources 15 Training Material Developers (for 3-6 months) 25 Portfolio Sponsor (ADM Level) 1 Portfolio Director 1 Portfolio Management Office 4 Program Directors 4 Policy Analysts 2 Managers for Legislative Pilots and Regulation 2 Legislative Support Resources 2 External Legislative Engagement 2 Total Natural Resource Permitting Project
10 Year 0 Readiness Activities and Year 1 Plan A significant amount of planning has been done to identify activities that can take place within the current fiscal year, as well as to define the key activities to take place in Year 1. A summary of key activities for Year 0 and Year 1 are presented in Table 9 below. Table 9 - Year 0 and Year 1 Key Activities Category Year 0 Year 1 Business Enablement Legislative & Regulatory Harmonization Technology Prepare detailed business requirements, use cases, and business rules for key Year 1 & 2 projects Gather existing process documentation and prepare it for process review/reengineering activities Continue work on key projects already in progress related to NRPP projects (e.g. authorization framework, records management); project alignment with NRPP roadmap and governance structure finalized Prepare NRPP Act Phase 1 legislation for submission in spring 2014 Continue foundational work for the NRPP Act Phase 2 legislation Scope, timing, and resourcing plans developed for any interim business / technology solutions required for Phase 1 NRPP legislation Complete requirements gathering for existing business cases Validate the NRPP technical approach via ISSS technology pilot project Continue foundational work related to web services and the integrated spatialtemporal operational database Complete strategy work related to security and authentication, business process management, business rules, and enterprise search Develop implementation plan for stewardship processes and framework Complete Lean prioritization and preparation for authorization and ongoing management processes and begin re-engineering of priority processes Implement a standard set of tools and procedures as well as process refinements for First Nations consultation and engagement, to improve sector usage as well as support business requirements for the First Nations system Improve operating model and Lean processes for CSNR to support business, technology, and legislative changes resulting from the transformation Complete Lean prioritization and preparation for Finance processes and begin re-engineering priority processes Complete NRPP Act Phase 1 legislation and develop initial regulations, policies, and procedures and implemented with appropriate change management and training in the regions Complete specifications for priority authorization systems Complete specifications for First Nations consultation system Purchase integrated database hardware and software and prepare it for use Implement a foundational set of common services and infrastructure (e.g. common client, common financial management) 81 Natural Resource Permitting Project
11 Category Year 0 Year 1 Change Management & Training Governance & Portfolio Management Develop key strategies, including longterm communication strategy and leadership and sector alignment strategies, and implement them across the sector Complete detailed project planning (e.g. charters, scope, individual project plans) for individual Year 1 projects Develop staffing plan for transformation, with a focus on Year 1 & 2 and identification of SMEs in critical business areas Document key linkages between initiatives planned and underway Develop NRPP procurement strategy to guide near-term (Year 1 and 2) and longterm procurement activities Initiate year 1 procurement activities and key RFPs ready for release Design and set up select aspects of the Transformation governance and PMO model and make initial portfolio functions available to support and guide Year 1 Transformation Activities Identify and confirm specific individuals for key governance and portfolio management functions and roles Determine Baselines for key OCIO outcome model KPIs Develop NRPP user experience design and standards to guide system development Deploy, verify, and test common technology infrastructure Define and finalize document and record management strategy Implement consistent cross-sector standards for operational reporting Develop standards and architecture framework for NRPP Implement NRPP communication strategy and leadership and sector alignment strategies across the sector Develop stakeholder analysis, change readiness assessment, and leadership action plans Conduct ongoing change management and training activities related to individual projects Ensure the sector is aligned throughout the execution of Year 1 projects Complete detailed project planning (e.g. charters, scope, individual project plans) for individual Year 2 projects Initiate year 2 procurement activities and key RFPs ready for release Conduct ongoing project management activities related to ensuring successful delivery of individual projects and the overall portfolio (e.g. reporting, risk and issue management, etc.) A detailed roadmap showing the specific projects to be undertaken in Year 1 is presented in Figure 26 below. 82 Natural Resource Permitting Project
12 Figure 26 - Year 1 Detailed Roadmap 83 Natural Resource Permitting Project
13 Year 1 Key Capabilities At the end of Year 1, the following capabilities will be in place: New legislative framework in place to enable a more efficient, project-focused approval process for proponents by creating administrative efficiencies and reducing red tape High-priority business processes re-engineered to be more efficient, leverage technology and improve workforce productivity Many new ISSS (Integrated System and Services Strategy) infrastructure components implemented or in progress, creating the foundation for improved business processes, a faster, more maintainable, systems development model, and enhanced online self-service options for proponents and clients Initial foundational integrated spatial-temporal operational database available, which integrates authorization and resource data to allow statutory decision makers to make more timely and durable decisions IM/IT and priority finance operating model and processes re-engineered to support updated technologies and improve workforce productivity New Common Client architecture available to enable more effective business processes by reducing duplicate data entry, improving data quality and supporting a holistic view of clients Transformation governance model in place that allows the sector to move forward with multiple projects in parallel with the right level of ownership, accountability, and oversight across the NRS and government 84 Natural Resource Permitting Project
Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015
Office of the Auditor General AUDIT OF IT GOVERNANCE Tabled at Audit Committee March 12, 2015 This page has intentionally been left blank Table of Contents Executive Summary... 1 Introduction... 1 Background...
PMO Starter Kit. White Paper
PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE
Information Technology Governance Overview and Charter
Information Technology Governance Overview and Charter Prepared by: Project #: Date submitted Document version: IT Governance Charter v03.05.2012 1.0 48.0 - Page 1 of 34 Document History Version Date Author
OCIO Strategy 2014. Page 1 CTZ-2014-00129
OCIO Strategy 2014 Page 1 Table of contents 03 Message from the GCIO & Strategy Steering Committee 05 Introduction and context 07 Our Vision and Mission 08 Our stakeholders 09 Our Roles 11 Our Values 12
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,
Final. North Carolina Procurement Transformation. Governance Model March 11, 2011
North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes
Project Governance Plan Next Generation 9-1-1 Project Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1)
Oregon Military Department, Office of Emergency Management, 9-1-1 Program (The OEM 9-1-1) Date: October 1, 2014 Version: 3.1 DOCUMENT REVISION HISTORY Version Date Changes Updated By 0.1 02/13/014 Initial
Chapter 4. The IM/IT Portfolio Management Office
Chapter 4 The IM/IT Portfolio Management Office Learning Objectives Identify some of the primary causes of IM/IT project failures. Describe the main differences between IM/IT project management, IM/IT
Manag. Roles. Novemb. ber 20122
Information Technology Manag gement Framework Roles and Respo onsibilities Version 1.2 Novemb ber 20122 ITM Roles and Version History Version ed By Revision Date Approved By Approval Date Description of
An Oracle White Paper March 2013. Project Management Office Starter Kit
An Oracle White Paper March 2013 Project Management Office Starter Kit Executive Overview... 1 Introduction... 1 Plan Phase... 2 Create Statement of Purpose and Goals... 2 Define Scope and Target Maturity...
Enterprise Data Governance
DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:
State of California Department of Transportation. Transportation System Data Business Plan
DRAFT Page i State of California Department of Transportation Transportation System Data Business Plan RFO# TSI DPA-0003 September 29, 2011 DRAFT Page ii Table of Contents Executive Summary... 4 Chapter
Change Management Office Benefits and Structure
Change Management Office Benefits and Structure Author Melanie Franklin Director Agile Change Management Limited Contents Introduction 3 The Purpose of a Change Management Office 3 The Authority of a Change
Information Technology Integration Putting IT to work in driving deal success
February 2013 A publication from PwC's Deals M&A Integration practice Information Technology Integration Putting IT to work in driving deal success At a glance Research consistently shows that integrating
Financial and Cash Management Task Force. Strategic Business Plan
Financial and Cash Management Task Force January 30, 2009 Table Of Contents 1 Executive Summary... 4 2 Introduction... 6 2.1 External Reports on Project Aspire... 7 2.1.1 Council on Efficient Government
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books offer an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews cannot be printed. TDWI strives to provide
State of Minnesota IT Governance Framework
State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the
Explore the Possibilities
Explore the Possibilities 2013 HR Service Delivery Forum Best Practices in Data Management: Creating a Sustainable and Robust Repository for Reporting and Insights 2013 Towers Watson. All rights reserved.
Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
Enterprise Planning and Governance Government of Canada
Enterprise Planning and Governance Government of Canada 27 th International Colloquium on Financial Management for National Governments September 2015 Patricia Sauvé-McCuan Assistant Comptroller General,
Enhance State IT Contract Expertise
Enhance State IT Contract Expertise Chris Estes State Chief Information Officer Office of Information Technology Services March 2015 1 P a g e Table of Contents 1. Legislative Request... 3 2. Introduction...
PM Services. Transition Program Management
PM Services Transition Program Management Transition Program Management The PM Services team brings strong PM knowledge, years of program management experience, and a proven PM tool set to assure successful
Role Profile. Ministry of Technology, Innovation and Citizens Services. Assistant Deputy Minister Integrated Workplace Solutions.
Ministry of Technology, Innovation and Citizens Services Assistant Deputy Minister Integrated Workplace Solutions Victoria Ministry Overview The Ministry of Technology, Innovation and Citizens Services
One Washington. Project Charter
One Washington Summary The State of Washington is creating a strategy and action plan, refining the business case, and assessing state agency readiness to replace the state s core financial systems with
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
EXPLORING THE CAVERN OF DATA GOVERNANCE
EXPLORING THE CAVERN OF DATA GOVERNANCE AUGUST 2013 Darren Dadley Business Intelligence, Program Director Planning and Information Office SIBI Overview SIBI Program Methodology 2 Definitions: & Governance
Project Management Office (PMO)
Contents I. Overview of Project Management...4 1. Project Management Guide (PMG)...4 1.1 Introduction...4 1.2 Scope...6 1.3 Project Types...6 2. Document Overview, Tailoring, and Guidance...7 3. The Project
Implementing a Data Governance Initiative
Implementing a Data Governance Initiative Presented by: Linda A. Montemayor, Technical Director AT&T Agenda AT&T Business Alliance Data Governance Framework Data Governance Solutions: o Metadata Management
U.S. Department of Education. Office of the Chief Information Officer
U.S. Department of Education Office of the Chief Information Officer Investment Review Board (IRB) CHARTER January 23, 2013 I. ESTABLISHMENT The Investment Review Board (IRB) is the highest level IT investment
SLDS Workshop Summary: Data Use
SLDS Workshop Summary: Data Use Developing a Data Use Strategy This publication aims to help states detail the current status of their State Longitudinal Data System (SLDS) data use strategy and identify
Introduction to SOA governance and service lifecycle management.
-oriented architecture White paper March 2009 Introduction to SOA governance and Best practices for development and deployment Bill Brown, executive IT architect, worldwide SOA governance SGMM lead, SOA
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
Governance of Evaluation, Proof of Concept and Pilot Projects
Governance of Evaluation, Proof of Concept and Pilot Projects (OCIO) Government of Newfoundland & Labrador Prepared By: (PMO) Table of Contents 1.... 2 2. Definition of an Evaluation... 2 2.1 Example...
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION The Customer Account Data Engine 2 Systems Development Guidelines; However, Process Improvements Are Needed to Address Inconsistencies September 30, Year
Defining a Governance Model for Portals
Defining a Governance Model for Portals Tushar Sachdev The need for governance While implementing portals, the focus is often only on technology. The implicit assumption being that the portal is yet another
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt. Programme, Project & Service Management Analysis
Skatteudvalget 2014-15 (2. samling) SAU Alm.del Bilag 48 Offentligt Programme, Project & Service Management Analysis Table of Content 1 Executive Summary... 3 1.1 Scope of Work... 3 1.2 Methodology for
California Enterprise Architecture Framework
Version 2.0 August 01, 2013 This Page is Intentionally Left Blank Version 2.0 ii August 01, 2013 TABLE OF CONTENTS 1 Executive Summary... 1 1.1 What is Enterprise Architecture?... 1 1.2 Why do we need
Facilities Portfolio Management Tool
2016 Facilities Portfolio Management Tool Project Charter Budget- Facilities Oversight Office of Financial Management 4/10/2016 CONTENTS Overview... 2 Purpose Statement... 2 Background... 2 Goals & Objectives...
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
Value to the Mission. FEA Practice Guidance. Federal Enterprise Architecture Program Management Office, OMB
Value to the Mission FEA Practice Guidance Federal Enterprise Program Management Office, OMB November 2007 FEA Practice Guidance Table of Contents Section 1: Overview...1-1 About the FEA Practice Guidance...
Solutions. Master Data Governance Model and the Mechanism
Solutions Master Data Governance Model and the Mechanism Executive summary Organizations worldwide are rapidly adopting various Master Data Management (MDM) solutions to address and overcome business issues
ITS Project Management
ITS Project Management Policy Contents I. POLICY STATEMENT II. REASON FOR POLICY III. SCOPE IV. AUDIENCE V. POLICY TEXT VI. PROCEDURES VII. RELATED INFORMATION VIII. DEFINITIONS IX. FREQUENTLY ASKED QUESTIONS
Analytics Strategy Information Architecture Data Management Analytics Value and Governance Realization
1/22 As a part of Qlik Consulting, works with Customers to assist in shaping strategic elements related to analytics to ensure adoption and success throughout their analytics journey. Qlik Advisory 2/22
ITS Project Management Methodology
ITS Project Management Methodology Information Technology Services Project Management Group 11/17/2014 Version 2.1 Author: ITS Project Management Group Document Control Change Record Date Author Version
STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840
MARYLAND STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840 Bobbie S. Mack, Chairman David J. McManus, Jr., Vice Chairman Rachel T. McGuckian Patrick H. Murray Charles
Blueprint for Selecting Improvement Approach
Kenan-Flagler Business School State of North Carolina Business Systems Infrastructure Study Phase II Blueprint for Selecting Improvement Approach Executive Summary January 5, 2004 Business Case www.osc.state.nc.us
Montgomery County Government Enterprise Architecture Performance Architecture
Montgomery County Government Enterprise Architecture Performance Architecture Department of Technology Services Montgomery County Government, MD 2013 by Montgomery County Government, MD all rights reserved
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
Project Management Office (PMO) Charter
Project Management Office (PMO) Charter Information & Communication Technologies 10 January 2008 Information & Communication Technologies Enterprise Application DISCLAIMER Services Project Management Office
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
Contents. Evolving Trends in Core Banking Transformation (CBT) Challenges Faced in Core Banking Transformation (CBT)
Contents Preface From the Editor s Desk Evolving Trends in Core Banking Transformation (CBT) 01. Customer Expectations and Next Generation Banking 05 02. Survival Driving Core Banking Transformation (CBT)
Dallas IIA Chapter / ISACA N. Texas Chapter. January 7, 2010
Dallas IIA Chapter / ISACA N. Texas Chapter Auditing Tuesday, October Project 20, 2009 Management Controls January 7, 2010 Table of Contents Contents Page # Project Management Office Overview 3 Aligning
UC Berkeley Campus Data Warehouse Governance and Delivery Organization Proposal Campus Data Warehouse / Business Intelligence Competency Center
Patrick McGrath, David A. Greenbaum IST Data Services In 2005, the UC Berkeley Data Stewardship Council sponsored a project to assess the feasibility, challenges and potential benefits of developing a
Positive Train Control (PTC) Program Management Plan
Positive Train Control (PTC) Program Management Plan Proposed Framework This document is considered an uncontrolled copy unless it is viewed online in the organization s Program Management Information
PMO Director. PMO Director
PMO Director It s about you Are you curious about how individual projects further a company s strategy? Can you think at the macro level across broad groups of people and services? Do you have an eye for
Health Facilities Capital Program Manual. Version 1.0
Health Facilities Capital Program Manual Version 1.0 TABLE OF CONTENTS TABLE OF CONTENTS... 2 1.0 INTRODUCTION... 9 1.1 Health Facilities Capital Program... 9 1.1.1 Major Capital Projects Total Project
U.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Stage Gate Review Process Description Version 1.3 06/30/2015 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Lifecycle
Agile Master Data Management TM : Data Governance in Action. A whitepaper by First San Francisco Partners
Agile Master Data Management TM : Data Governance in Action A whitepaper by First San Francisco Partners First San Francisco Partners Whitepaper Executive Summary What do data management, master data management,
Section 4 MANAGEMENT CONTROLS AND PROCESSES. Section 4
Section 4 MANAGEMENT CONTROLS AND PROCESSES Section 4 MANAGEMENT CONTROLS AND PROCESSES MANAGEMENT CONTROLS AND PROCESSES FEATURED IN THIS SECTION 4.1 Information Management Framework... 1 4.2 Strategic
State of Minnesota. Enterprise Security Strategic Plan. Fiscal Years 2009 2013
State of Minnesota Enterprise Security Strategic Plan Fiscal Years 2009 2013 Jointly Prepared By: Office of Enterprise Technology - Enterprise Security Office Members of the Information Security Council
PHASE 1: INITIATION PHASE
PHASE 1: INITIATION PHASE The Initiation Phase begins when agency management determines that a business function requires enhancement through an agency information technology (IT) project and investment
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development
PPM V2.0 Frequently Asked Questions (FAQs) U.S. Department of Housing and Urban Development December 2015 1. Getting Started with PPM Life Cycle 2. PPM Life Cycle Process 3. PPM V2.0 and Project Types
Deliver the information business users need
White paper Deliver the information business users need Building the Intelligence Competency Center Table of Contents 1 Overview 1 Components of the BICC 3 Typical scenarios 5 Approach to building the
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.
Introductory Certificate The APM Project Fundamentals Qualification. Examination paper Candidate Number Date Location Examination Paper Sample Paper v1.4 General Notes Time allowed 1 hour. Answer all 60
Guidelines for Best Practices in Data Management Roles and Responsibilities
Guidelines for Best Practices in Data Management Roles and Responsibilities September 2010 Data Architecture Advisory Committee A subcommittee of Information Architecture & Standards Branch Table of Contents
Data Governance Baseline Deployment
Service Offering Data Governance Baseline Deployment Overview Benefits Increase the value of data by enabling top business imperatives. Reduce IT costs of maintaining data. Transform Informatica Platform
Project Management Institute IMPLEMENTING ORGANIZATIONAL PROJECT MANAGEMENT: A PRACTICE GUIDE
Project Management Institute IMPLEMENTING ORGANIZATIONAL PROJECT MANAGEMENT: A PRACTICE GUIDE Library of Congress Cataloging-in-Publication Data Implementing organizational project management: a practice
Enterprise Architecture (Re)Charter Template
Enterprise Architecture (Re)Charter Template To learn more about this full research or to inquire about membership, contact us: +1-866-913-8101 IT.Support@ executiveboard.com www.cebglobal.com/it CEB Enterprise
BC First Nations Data Governance Initiative Strategic Framework
1 BC First Nations Data Governance Initiative Strategic Framework Prepared by: Tripartite Project Coordination Team Creation Date: February 15, 2013 Last Updated: July 22, 2014 Document Number: Version:
U.S. Department of Education Federal Student Aid
U.S. Department of Education Federal Student Aid Lifecycle Management Methodology Version 1.3 06/30/15 Final DOCUMENT NUMBER: FSA_TOQA_PROC_STGRW.NA_001 Update History Lifecycle Management Methodology
Project Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute
Portfolio Management Professional (PfMP)SM. Examination Content Outline
Portfolio Management Professional (PfMP)SM Examination Content Outline Project Management Institute Portfolio Management Professional (PfMP) SM Examination Content Outline Published by: Project Management
Qlik UKI Consulting Services Catalogue
Qlik UKI Consulting Services Catalogue The key to a successful Qlik project lies in the right people, the right skills, and the right activities in the right order www.qlik.co.uk Table of Contents Introduction
Recommended Roadmap for Shared Inspection Management Solutions
Recommended Roadmap for Shared Inspection Management Solutions This roadmap outlines the phases of activities required in order to plan, design and implement a shared inspection management solution. While
Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director
Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project
How To Be An Architect
February 9, 2015 February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 3 Typical Common Responsibilities for the ure Role... 4 Typical Responsibilities for Enterprise ure...
SYSTEM DEVELOPMENT LIFE CYCLE ROLES AND RESPONSIBILITIES. Corporate Services for the Natural Resource Sector. Information Management Branch
Corporate Services for the Natural Resource Sector Information Management Branch SYSTEM DEVELOPMENT LIFE CYCLE ROLES AND RESPONSIBILITIES Last Updated: January 18, 2013 Version: 1.0.0 Document: SDLC Roles
Solutions Master Data Governance Model and Mechanism
www.pwc.com Solutions Master Data Governance Model and Mechanism Executive summary Organizations worldwide are rapidly adopting various Master Data Management (MDM) solutions to address and overcome business
Enterprise Project and Portfolio Management Implementation Project. Update to the ETS Customer Utility Board Julie Pearson May 27, 2015
Enterprise Project and Portfolio Management Implementation Project Update to the ETS Customer Utility Board Julie Pearson May 27, 2015 Why do we need PPM? Office of the State CIO Key Initiatives (from
IT Strategic Plan and Roadmap Governance and PMO Recommendations
Appendix M IT Strategic Plan and Roadmap Governance and PMO Recommendations City of Virginia Beach ComIT Master Technology Plan (Appendix M) 1 IT Strategic Plan and Roadmap IT Governance and PMO Recommendations
A Final Report for City of Chandler Strategic IT Plan Executive Summary
A Final Report for City of Chandler 6 January 2004 Table of Contents 1. Executive Summary... 1 1.1 Background... 2 1.2 Chandler Business and IT Context... 3 1.3 Chandler s IT Strategic Direction... 5 1.4
TOGAF TOGAF & Major IT Frameworks, Architecting the Family
Fall 08 TOGAF TOGAF & Major IT Frameworks, Architecting the Family Date: February 2013 Prepared by: Danny Greefhorst, MSc., Director of ArchiXL TOGAF is a registered trademark of The Open Group. TOGAF
ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting
ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting Date November 2011 Company UXC Consulting Version Version 1.5 Contact [email protected] http://www.uxcconsulting.com.au This summary
Data Governance 8 Steps to Success
Data Governance 8 Steps to Success Anne Marie Smith, Ph.D. Principal Consultant Asmith @ alabamayankeesystems.com http://www.alabamayankeesystems.com 1 Instructor Background Internationally recognized