Issue Management Plan Preparation Guidelines



Similar documents
CHANGE MANAGEMENT PLAN TEMPLATE

Document Management Plan Preparation Guidelines

This is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.

1. Background and business case

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

To provide a procedure and associated guidelines to facilitate the management of project dependencies.

DIRECTIVE NUMBER: v2.0. SUBJECT: Correctional Integration Systems Change Management Plan

<Company Name> <Project Name> Software Development Plan. Version <1.0>

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

Project Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997

OE PROJECT CHARTER TEMPLATE

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)

The IT Project Management Framework

Risk/Issue Management Plan

PROJECT MANAGEMENT GUIDELINES NATIONAL TRANSPORT AUTHORITY

PROJECT PLAN FOR. Project Name Here

Process Improvement Plan

<name of project> Software Project Management Plan

Project Management Guidebook

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

Project Management Fact Sheet:

A COMPARISON OF PRINCE2 AGAINST PMBOK

Project Management Standards: A Review of Certifications/Certificates

Community Client Health Profile (CCHP) Program

Electronic Clinical Transfusion Management System

Why are PMO s are Needed on Large Projects?

BMC Software Consulting Services. Fermilab Computing Division Service Catalog & Communications: Process and Procedures

Performance Management Plan

IT Baseline Management Policy. Table of Contents

Mohawk DI-r: Privacy Breach Management Procedure Version 2.0. April 2011

<Project Name> Configuration Management Plan

Business Continuity Plan Template

Software Test Plan (STP) Template

Step by Step Project Planning

Project Management Fact Sheet:

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

APPENDIX C. The following items are included in this appendix: Project Planning (POAM) Example. Project Schedule (ET-A Sample)

Process Guide. Release Management. Service Improvement Program (SIP)

I. Creating a Project Request in TeamDynamix: Defining

CS 6361, SPRING 2010 Advanced Requirements Engineering Web Based Meeting Scheduler- Project Plan

Project Management Process

Capacity Plan. Template. Version X.x October 11, 2012

ITIL Intermediate: Service Design. Lesson Plan. Mock Exam: Duration: Language:

Standardized Technology Evaluation Process (STEP) User s Guide and Methodology for Evaluation Teams. Sarah Brown May 2007

Project Management Plan for

Project Management Fact Sheet:

Policies of the University of North Texas Health Science Center

1.20 Appendix A Generic Risk Management Process and Tasks

Central Agency for Information Technology

TYLER JUNIOR COLLEGE School of Continuing Studies 1530 SSW Loop 323 Tyler, TX

COMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>

<Company Name> ugather Event Management System Software Requirements Specification. Version 1.0

Project Lifecycle Management (PLM)

ITIL 2011 Summary of Updates

DPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010

SEVEN KEY TACTICS FOR ENSURING QUALITY

Service Level Management

Market Data Transparency Service Level Agreement

Resource Management. Determining and managing the people resources on projects can be complex as:

GAMP 4 to GAMP 5 Summary

Measurement Information Model

State of California Department of Transportation. Transportation System Data Business Plan

Project Implementation Process (PIP)

System Requirements Specification (SRS) (Subsystem and Version #)

ICT OPERATING SYSTEM SECURITY CONTROLS POLICY

Final Report. Audit of the Project Management Framework. December 2014

>

Project Charter Guide

NFSA Project Management Guidelines

COMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>

Managing Successful Programmes

MICHIGAN DEPARTMENT OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT RESOURCE CENTER

REGIONAL TRANSPORTATION SAFETY INFORMATION MANAGEMENT SYSTEM (RTSIMS) Phase II UPWP Project: Task Order SA09-1 Goal

<Project Name> Quality Assurance Plan

8.1. DEVELOPMENT OF NEW MUNICIPAL PUBLIC HEALTH AND WELLBEING PLAN (HLTH5:NM:HM) Submitting Councillor: Councillor Paul Klisaris

Academic Affairs School of Social Work Online MSW Degree with Specialization in Community and Organizational Practice

Appendix V Risk Management Plan Template

BUY ONLINE AT:

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Enterprise Risk Management Panel Discussion

Project Time Management

Python Checker. Computer Science Department

PALAU A SITUATION ANALYSIS OF CHILDREN, YOUTH & WOMEN. GOVERNMENT OF PALAU with the assistance of UNICEF

MNLARS Project Audit Checklist

Design Specification for IEEE Std 1471 Recommended Practice for Architectural Description IEEE Architecture Working Group 0 Motivation

ITIL V3 Foundation Certification - Sample Exam 1

IT Security Risk Management: A Lifecycle Approach

IT Project Management Methodology. Project Execution Support Guide. Version 0.3

Configuring budget planning for Microsoft Dynamics AX 2012 R2

Ten Steps to Comprehensive Project Portfolio Management Part 3 Projects, Programs, Portfolios and Strategic Direction By R.

Transcription:

Issue Management Plan Preparation Guidelines

TABLE OF CONTENTS 1. Purpose of Document 1 2. Definition of Issue Management 1 3. Objectives of Issue Management 1 4. Terms, Acronyms and Abbreviations 1 5. Issue Management Methods 1 5.1 Issue Identification...2 5.2 Issue Analysis...2 5.3 Issue Response...3 5.4 Issue Tracking and Reporting...3 6. Issue Management Process 3 6.1 Simple Issue Management Process Map...5 6.2 Simple Issue Management Process Narrative...6 6.3 More Complex Issue Management Process Map...7 6.4 More Complex Issue Management Process Narrative...8 7. Roles and Responsibilities 8 Issue Management Plan Preparation Guidelines Table of Contents

1. PURPOSE OF DOCUMENT This section provides the purpose of the document. Recommended text: The Issue Management Plan outlines the issue management approach for <insert name of project> It provides standard terminology, clear roles and responsibilities, a detailed description of the approved issue management process, and the standard templates used in that process. It is designed to guide the project team and stakeholders. 2. DEFINITION OF ISSUE MANAGEMENT This section provides the definition of issue management. Recommended Text: An issue is something currently happening that is having a negative impact on the project and requires resolution for the project to proceed successfully. Issue management is the process of identifying, analyzing, responding to, and tracking issues facing the project. 3. OBJECTIVES OF ISSUE MANAGEMENT This section provides the goal and objectives of issue management. Recommended Text: The overall goal of issue management is to protect the project from the negative impact of issues. The objectives of issue management are as follows: Monitor a project to identify new or changing issues. Understand and minimize the cost and other impacts of project issues. Focus management attention on higher priority issues. Make issue-related decisions at the proper level of authority. Communicate clearly about issues with the team and project stakeholders. Maintain a clear and accurate record of issues and related actions over the life of the project. 4. TERMS, ACRONYMS AND ABBREVIATIONS This section informs readers where they can access definitions for the terms, acronyms and abbreviations used in this document. Recommended Text: All terms, acronyms, and abbreviations used in this document are defined in the Project Management Glossary at www.qnpm.gov.qa. 5. ISSUE MANAGEMENT METHODS This section outlines issue management methods to be used on the project for each step of the issue management process. Recommended Text: This section outlines issue management methods to be used on the project for each step of the risk management process. Issue Management Plan Preparation Guidelines Page 1

These steps are issue identification, issue analysis, issue response, and issue tracking and reporting. Note that the first three steps happen in sequence, and the final step, issue tracking and reporting, happens throughout the process. Identify Issues Analyze Issues Respond to Issues Track and Report Issues Tips: Remember that projects are committed to undertaking the issue management process and methods described in this document once it is approved. The should be held accountable for completing activities described in this Plan by the Sponsor or Steering Committee. Avoid providing general descriptions of issue management best practice. This document describes the nature and extent of issue management activities for a specific project. The time and budget required to complete issue management activities described in this document should be included in the overall Project Schedule and Budget. Determine who should be involved in issue management activities. Options are to (i) limit activities to the and team or (ii) include stakeholders. 5.1 Issue Identification This sub-section identifies the activities the team will undertake to identify issues. Note: Good issue identification is essential because issues can only be managed if they are identified. To do a thorough job in identifying issues, it is important to do the following three things: Encourage team members to bring any issues they identify to the attention of the or Project Management Office. Orient team on the issue management process for the project. Probe for new issues at team status meetings and in discussions with stakeholders. Have a strong connection between your risk management process and issue management process. Once a risk (which is something a team thinks may happen in the future) becomes an actual problem, it should immediately move from the risk management process to the issue management process. 5.2 Issue Analysis This sub-section identifies how the team will analyze issues. Note: Issue analysis involves assessing each issue for its potential to harm a project by understanding its impact. Impact describes the loss a project will experience as a result of an issue. Below are definitions for high, medium and low impact. Note that the definitions of high, medium, and low vary by the impact type. For example, budget impact is measured in dollars, and schedule impact is measured in months. Note also that some issues can have more that one type of impact on a project. Tips: Use the same impact definitions for issues, risks, and changes. Consider a broad range of impact types relevant to a specific project.. A useful way to set budget and schedule impact definitions is to use percentages of the overall budget and timeline. For a QAR 50,000 project, a QAR 25,000 budget impact is a 50% budget impact and is likely to be considered a high impact. However, for a QAR 10,000,000 budget, a QAR 25,000 budget impact is a 0.25% budget impact and is likely to be considered low impact. Issue Management Plan Preparation Guidelines Page 2

Example Impact Table: Impact Type High Impact Medium Impact Low Impact Budget > QAR 100,000 QAR 25,000-100,000 <QAR 25,000 Schedule > 6 months 1 5 months < 1month Safety Worker fatality or serious injury Worker minor injury Worker very minor injury System Loss of system Major system damage Minor system damage 5.3 Issue Response This section specifies the activities needed to effectively respond to major issues. Note: Issue response activities are the responsibility of the. Example: The will, in consultation with others, determine activities for responding to issues. The Project Manager will also assign these activities to appropriate team members and is responsible for monitoring whether or not these activities are being completed and whether or not they are effective in reducing the impact of an issue. 5.4 Issue Tracking and Reporting This section outlines how issues will be tracked and reported. Note: When writing this section, consider the following: 1. What type of Issue Log will be used to track issues? 2. Who is responsible for maintaining the Issue Log? 3. In what format will issues be reported? 4. Who will receive issues reports? 5. What are the thresholds for reporting issues? For example, the needs to be aware of all issues, but the Steering Committee may only be interested in hearing about issues that are high impact. Example: The is responsible for tracking issues. He will maintain the Issue Log provided in Appendix E by ensuring that information is up-to-date. This requires monitoring whether or not issues are changing and whether or not response activities are effective. The is also responsible for reporting on the status of issues. High and medium impact issues are reported in the weekly status report. The thresholds for reporting issues are as follows: The Sponsor is made aware of all issues that are accepted and all high and medium impact issues. The Steering Committee is made aware of all high impact issues. 6. ISSUE MANAGEMENT PROCESS This section outlines the issue management process for the project including how an issue is identified, analyzed, logged, tracked, and reported. It includes a process map (diagram outlining steps) and a process narrative (text describing each step). Recommended text: This section outlines the issue management process for the project and includes an issue is identified, analyzed, logged, tracked, and reported. Issue Management Plan Preparation Guidelines Page 3

It clearly identifies roles, activities, the sequence of activities, inputs, outputs, and how and where information is stored. Tips: In designing an issue management process, aim to make the process as simple as possible while still achieving the process objectives listed earlier in this document. More complex projects require more complex project management processes. Factors contributing to project complexity include the following: team size, budget size, timeline length, strategic or political importance, impact on stakeholders, number of agencies and suppliers involved, number of dependencies on other projects. In designing an issue management process, consider the following: 1. Approval authority: Who are all the decision-makers in the process and what is their role and level of decision-making authority? Decision-makers can include the,, Steering Committee, Team Leads, or Project Sponsor 2. Required Documentation: Simple: issue information is recorded in the Issue Log and Status Report only. More complex: in addition to the Issue Log and Status Report, Issue Identification Forms and Issue Analysis Forms are used. Storage: where should the Issue Log, Issue Identification Forms, and other issue documentation be stored? As soft copies, hard copies, or both? 3. Automation: Will any steps of the process be automated? Use of enterprise project management applications can automate some aspects of a issue management process. Examples: Below please find two examples of an issue management process. The first is a simple process and is appropriate for a relatively small and simple project. The second is more complex and is appropriate for a relatively large and complex project. Issue Management Plan Preparation Guidelines Page 4

6.1 Simple Issue Management Process Map The following process map depicts a straight-forward, manual issue management process that primarily involves a and Project Sponsor. Documentation is limited to the Issue Log and Status Report. New issue identified or issue previously identified requires update 1. Analyze Issues 2. Plan Response to Issues 3. Respond to Issues 1.1 Review issue and effectiveness of response activities to date Status Report Issue Log Project Server 2.1 Determine issue response activities and update Issue Log and Status Report 3.1 Update work breakdown structure with issue response activities 1.2 Determine issue impact 2.2 Stream issue based on medium or low impact (high, medium, low) 3.2 Communicate required action to team high Status Report 2.3 Inform Sponsor of issue response 3.3 Monitor completion of activities and effectiveness in minimizing impact of issue Issue Log Project Server 1.3 Update Issue Log and Status Report 2.4 Approve or revise issue response Sponsor revise approve 3.4 Update Issue Log and Status Report Status Report Issue Log Project Server Go to 2.1 Issue Management Plan Preparation Guidelines Page 5

6.2 Simple Issue Management Process Narrative The following table describes the steps in the issue management process. Note that an activity assigned to the can be completed by the or a designate. Step Responsible Action 1. Analyze Issue 1.1 The reviews issue and effectiveness of response activities to date. 1.2 The determines the issue impact based on established impact definitions. 1.3 The updates the Issue Log and that period s Status Report. These documents are stored on the project server. 2. Plan Response to Issue 2.1 The outlines what activities must be done to address an issue; this activity is often done in consultation with others. The then updates the Issue Log and Status Report. These documents are stored on the project server. 2.2 The streams the issue according to issue impact (high, medium, low) for further action and communication. If the impact is medium or low, go to step 3.1. If it is high, go to step 2.3. 2.3 The informs the Sponsor of the planned issue response for high impact issues. 2.4 Project Sponsor The Sponsor approves or revises the issue response. If it is approved, the next step is 3.1. If it is revised, the next step is 2.1. 3. Respond to Issue 3.1 The updates the project work breakdown structure with issue response activities. 3.2 The communicates the required action to the team. 3.3 The monitors completion of activities and their effectiveness in minimizing issue. 3.4 The updates the Issue Log and Status Report. These documents are stored on the project server. Issue Management Plan Preparation Guidelines Page 6

6.3 More Complex Issue Management Process Map The following process map depicts a more complex manual issue management process with a, and Steering Committee. Documentation includes an issue Log, Status Report, Issue Identification Form, and Issue Assessment Form. New issue identified 1. Process New Issues 2. Analyze Issues 3. Plan Responses to Issues 4. Respond to Issues Issue Identification Form Status Report Issue Log Project Server 1.1 Orient Identifier in completing Issue Identification Form if required 1.2 Complete Issue Identification Form and submit to Identifier 1.3 File form and update Issue Log and Status Report 1.4 Submit Issue Identification Form to Issue Identifier 1.5 Identify and assign Issue Evaluator Go to 2.4 Status Report 2.1 Review issues in Issue Log and effectiveness of response activities to date not new 2.2 Determine if issue is new new 2.3 Review Issue Assessment Form 2.4 Determine impact of issue Status Report Issue Log Project Server 3.1 Determine issue response activities and update Issue Log and Status Report 3.2 Medium or low Stream issue based on impact (high, medium, low)) high 3.3 Consult Advisory Committee on planned actions 3.4 Provide Plans to Steering Committee for approval 4.1 Update work breakdown structure with issue response activities 4.2 Communicate required action to team 4.3 Monitor completion of activities and effectiveness in minimizing impact of issue 4.4 Update Issue Log and Status Report Status Report Issue Log Project Server Issue Assessment Form 1.6 Complete Issue Assessment Form Evaluator Issue Log Project Server 2.5 Update Issue Log and Status Report 3.5 Approve or revise issue response Steering Committee approve Go to 4.1 Go to 3.1 revise Go to 2.1 Go to 3.1 Issue Management Plan Preparation Guidelines Page 7

6.4 More Complex Issue Management Process Narrative The following table describes the steps in the issue management process above. Note that an activity assigned to the can be completed by the or a designate. Step Responsible Action 1. Process New Issues 1.1 When a new issue is identified, the orients the identifier on how to complete an Issue Identification Form if Required. 1.2 Identifier The Identifier completes Issue Identification Form and submits it to. 1.3 The files the Issue Identification Form and updates the issue Log and Status Report. These documents are stored on the project server. 1.4 Identifier The Identifier submits the Issue Identification Form to. 1.5 The identifies and assigns an Issue Evaluator. 1.6 Evaluator The Evaluator completes Issue Assessment Form and submits it to. 2. Analyze Issues 2.1 The reviews Issue Log and the effectiveness of response activities to date for each issue 2.2 The determines if the issue is new. If it not new, the next step is 2.4. 2.3 The reviews the Issue Assessment Form. 2.4 The determines the impact of the issue based on established impact definitions 2.5 The Issue Manager updates Issue Log and Status Report. These documents are stored on the project server. 3. Plan Response to Issues 3.1 The determines issue response activities and updates the Issue Log and Status Report. These documents are stored on the project server. 3.2 The streams the issue according to issue impact (high, medium, low) for further action and communication. 3.3 The consults the Advisory Committee on planned actions for high impact issues. 3.4 The provides the planned actions to the Steering Committee for approval 3.5 Steering Committee The Steering Committee approves or revises the Issue response. 4. Respond to Issues 4.1 The updates the project work breakdown structure with issue response activities. 4.2 The communicates the required action to the team. 4.3 The monitors completion of activities and their effectiveness in minimizing the impact of the issue. 4.4 The updates the issue Log and Status Report. These documents are stored on the project server. 7. ROLES AND RESPONSIBILITIES This section outlines roles and responsibilities for those involved in issue management. Note: This section should only include issue management-related responsibilities. It should also provide more detail on issue management responsibilities than provided in the Project Plan. Example: The table below describes roles and responsibilities related to the issue management process. Issue Management Plan Preparation Guidelines Page 8

Role Responsibilities Issue Management Plan Preparation Guidelines Page 9

APPENDIX A: ISSUE IDENTIFICATION FORM Insert the Issue Identification Form template if one is required in the issue management process documented in this Plan. A sample template is available at www.qnpm.gov.qa Issue Management Plan Preparation Guidelines Page 10

APPENDIX B: ISSUE ANALYSIS FORM Insert the Issue Analysis Form template if one is required in the issue management process documented in this Plan. A sample template is available at www.qnpm.gov.qa. Issue Management Plan Preparation Guidelines Page 11

APPENDIX C: ISSUE LOG Insert the Issue Log to be used in the issue management process documented in this Plan. A sample template is available at www.qnpm.gov.qa. Issue Management Plan Preparation Guidelines Page 12