HEAVY-DUTY ENGINE PROGRAM OFF-ROAD VEHICLE COMPONENT

Similar documents
HEAVY-DUTY TRUCK VOUCHER PROGRAM

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

CALIFORNIA PRODUCER APPOINTMENT PACKAGE

CHECKLIST. SIS Insurance Services 3250 Grey Hawk Ct. Carlsbad, CA 92010

Federated National Underwriters Phone: (800) (option 4) N.W. 14 th Street, Suite 180 Fax: (954)

STREET ADDRESS: 3250 GREY HAWK CT., CARLSBAD, CA PHONE: *FAX:

GREEN OPERATOR GO Program: Replacement Funding Assistance Program Application

CONTRACTOR PACKET Vendor Invoice and Payment Processing Instructions

Request for Taxpayer Identification Number and Certification

W-9: Please fill out. The IRS requires that we keep a W-9 form on file for whomever we do business with.

LME, INC appreciates the opportunity to serve you. We will make every effort to provide you with the finest transportation services.

How To Get A Bond In The United States

National Clean Diesel Rebate Program 2015 School Bus Replacement and Retrofit Funding Opportunity. Program Guide

Vendor Registration 6103 W. Montrose Avenue, Chicago, IL p: f:

60 Doughboy Road, Gillett, AR Phone: Fax:

DATA CENTER INCENTIVES

CITY OF KYLE, TEXAS INVITATION FOR BID (IFB) NO: PM

NEW JERSEY PROVIDER AGREEMENT

UNPAID CHECK FUND INSTRUCTIONS

Bay Area Air Quality Management District Strategic Incentives Division Attention: Mara Weibley 939 Ellis Stret San Francisco, CA 94109

2010 MARINE ENGINE GRANT PROGRAM

PROOF OF CLAIM AND RELEASE YOU MUST COMPLETE THIS CLAIM FORM AND SUBMIT IT BY NOVEMBER 23, 2013 TO BE ELIGIBLE TO SHARE IN THE SETTLEMENT.

CONTRACTOR PACKET Vendor Invoice and Payment Processing Instructions

Nursing Educational Loan Checklist (for individuals not currently employed by Wellmont)

CONTRACTING INSTRUCTIONS

Dear Valued Policyholder,

Revenue Chapter ALABAMA DEPARTMENT OF REVENUE ADMINISTRATIVE CODE CHAPTER DEALER LICENSE TABLE OF CONTENTS

RADLEY ACURA RED FLAG IDENTITY THEFT PROTECTION PROGRAM and ADDRESS DISCREPANCY PROGRAM

Financial Forms for U.S. Based Institutions

Seneca Mortgage Servicing LLC Attn: Loss Draft Department P.O. Box Phoenix, AZ Re: Repair Process. Dear Borrower(s),

INSURANCE CLAIM PACKAGE

RESIDENTIAL REWARDS PROGRAM APPLICATION THIS APPLICATION IS FOR EXISTING SITES ONLY.

Energy Management Solutions Incentives Application for Business Customers

The Pima County Attorney s Office Bad Check Program Guidebook

Kentucky Motor Vehicle Commission SALESPERSON LICENSE APPLICATION IMPORTANT NOTICE REGARDING ALL SALES PERSONNEL

San Joaquin General Hospital School of Radiologic Technology 2009 Prerequisite Verification

CITADEL BUSI ESS ACCOU T / BUSI ESS LOA APPLICATIO

APPLICATION CONTINUES ON THE NEXT PAGE

CLAIM FORM THE FOLLOWING DOCUMENTS ARE REQUIRED TO BE FILED WITH THIS CLAIM FORM:

INSTRUCTIONS FOR COMPLETING A DEALER LICENSE APPLICATION

Owners Profile Sheet. Rental Property Address:

When complete, the reimbursement application should be mailed to: ACCP DATCP PO BOX 8911 MADISON WI

IRS FORM 1099 REPORTING REQUIREMENTS

Request For Proposal. Locum Tenens Psychiatric Coverage

SPECIALTY INSURANCE MANAGERS OF OKLAHOMA, INC PRODUCER QUESTIONNAIRE

Application for General Contractor License

Subcontractor Insurance & Licensing Requirements Please provide the items below

New Account Application Advisor Class and Service Class

Business Account Application

In re Weatherford International Securities Litigation c/o GCG P.O. Box Dublin, OH PROOF OF CLAIM FORM

University of South Florida Request for Taxpayer Identification Number and Certification Substitute IRS Form W-9

Mailing address: City: State: Zip: Individual or Sole Proprietor LLC, LLP or Partnership C Corporation S Corporation Trust/Estate Exempt Payee

CLAIM FORM INSTRUCTIONS

Pedicab and Neighborhood Electric Vehicle (NEV) Certificate of Operation Application Guide

APPLICANT PROPOSAL For Non-Emergency Medical Transportation (NEMT) Coordination Services

MASSACHUSETTS STATE LOTTERY COMMISSION LICENSE APPLICATION BOOKLET

MASSACHUSETTS STATE LOTTERY COMMISSION

2014 INSTALLERS PACKET

Application Checklist

Hartford Standard Flood Program

**Incomplete vendor registration submissions will be discarded after 30 days.**

Application for Customer Status

SAI. DEFINED BENEFIT - 401(k) COMBO PLANS INSTALLATION KIT. Security Administrators, Inc.

Rules and Regulations and Establishment Self Inspection Worksheet:

STATE OF WYOMING WOLFS-109(a)

Request for Taxpayer Identification Number and Certification

Blue Chip Group, Inc. Partner Application

PHYSICIAN ASSISTANT NOTIFICATION OF CHANGE

Terms & Conditions. Continued on next page BUSINESS NAME AVISTA ACCOUNT # BUSINESS PHONE CONTACT NAME INSTALLATION DATE

$ Quick Pay: Guaranteed payment 20 days following the receipt of the POD and associated paperwork. There is a 2% discount taken for this service.

DCU Membership Application Checklist

PRODUCER QUESTIONNAIRE

Year 2015 Contractor License Packet

Type of Business. Trade Specialty. President or Owner. Address

How To Get A Transporter Tag In Martha Michael

My Simple Auction. Payment Processing Forms Final Step. Please check off the following items as you complete them:

Prescriptive, Custom, New Construction and Data Center

VILLAGE REHAB PROGRAM

Shasta County Department of Resource Management Air Quality Management District Carl Moyer Heavy-Duty Low Emission Vehicle Incentive Program

Missouri Lottery Winner Claim Form Official Missouri Lottery Claim Form

IRA Distribution Request Form

CONTACT ACCOUNTS PAYABLE FOR QUESTIONS (541)

Health Savings Account Packet

Merchant Reseller Application

OCCUPATIONAL TAX CERTIFICATE

1 Customer and Contact Information

General Contractor License - Application

VFD and Pump Incentive Application for Business Customers

JPM FAIR FUND CLAIM FORM

CITY OF ALTON S CDBG COMMERCIAL FAÇADE REHABILITATION PROGRAM PROGRAM DESCRIPTION

CONTRACTOR APPLICATION HOUSING REHABILITATION PROGRAM

Contract Checklist for Mutual of Omaha Insurance Company

SMALL BUSINESS INNOVATION RESEARCH AND TECHNOLOGY TRANSFER (SBIR/STTR) OUTREACH PROGRAM FY2016 APPLICATION. Administered by:

Small Business Enterprises (SBE) Certification Application

MISSISSIPPI RETAILER SETTLEMENT AUTHORIZATION FORM. (Full Legal Business Name)

VISION Vendor Set up, W-9 Forms and Reportable Payment Processing FAQs

Business Membership Application

AHIA. Affordable Health Insurance Agency, LLC. Dear Referring Agent,

CARL ROCHET SCHOLARSHIP For Students Pursuing a Degree in Communications and/or Journalism

Commercial Energy Initiative Rebate Program

Transcription:

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM OFF-ROAD VEHICLE COMPONENT AGRICULTURAL OFF-ROAD EQUIPMENT REPLACEMENT OPTION PAYMENT PROCEDURES This document is designed to provide participants in the Heavy-Duty Engine Program Off-Road Vehicle Component, with the required instructions and guidance for the successful completion of a Claim for Payment Packet for their project. The participant has sixty (60) days following the expiration of the agreement completion phase to submit a complete Claim for Payment Packet. Claim for Payment Packets must be received during this timeframe to be eligible for reimbursement. San Joaquin Valley Air Pollution Control District (SJVAPCD) staff is available to answer questions and to provide assistance to participants regarding these procedures. It is advisable that you read the entire document and your executed agreement in order to fully understand the grant requirements. All questions regarding payment procedures should be directed to: Jeff Riding or Kira Taylor San Joaquin Valley Air Pollution Control District Strategies and Incentives Department 1990 East Gettysburg Avenue Fresno, CA 93726-0244 Telephone: (559) 230-5800 Fax: (559) 230-6112 Email: Jeff.Riding@valleyair.org Kira.Taylor@valleyair.org

CLAIM FOR PAYMENT: STEP-BY-STEP FLOW CHART The following is a step-by-step diagram of the entire claim for payment process for reimbursement. If you have any questions about the process, please feel free to contact program staff at (559) 230-5800. Participant purchases new equipment and transfers old equipment and its engine to an approved dismantler for destruction. Participant has 30 days from the invoice date of the new equipment to transfer the old equipment and engine. Participant submits Claim for Payment Packet to the SJVAPCD: Signed Claim Form Invoice(s) New Equipment Information Form New Equipment Specification Sheet Warranty Documentation Insurance Documentation Certificate of Destruction Existing (Old) Equipment Status Form Proof of Payment SJVAPCD determines packet is complete or incomplete. SJVAPCD schedules postmonitoring site visit at the location of the new equipment to verify the eligibility of the new equipment and engine, and their information. SJVAPCD notifies applicant. Complete Incomplete Complete Dismantler destroys old equipment and its engine. Dismantler must destroy the old equipment and its engine within 30 days of receiving them. SJVAPCD schedules postmonitoring site visit at the dismantling facility to visually verify the proper destruction of the old equipment and its engine. Dismantler notifies the SJVAPCD within 10 days of receiving the old equipment and its engine. SJVAPCD reviews postmonitoring reports. SJVAPCD finalizes claim. SJVAPCD mails reimbursement check to participant within sixty (60) working days of the most recent postmonitoring site visit. Page 2 of 8

EXISTING (OLD) EQUIPMENT DISPOSAL PROCEDURES & REQUIREMENTS As part of the program provisions, the participant is required to have the existing (old) equipment and its engine properly destroyed according to SJVAPCD requirements and rendered permanently inoperable. The participant is required to submit the existing (old) equipment and its engine to a SJVAPCD approved dismantling facility for destruction. The following section outlines the procedures and requirements for disposing the existing (old) equipment and its engine replaced through the SJVAPCD Heavy-Duty Engine Program. The disposal of the old equipment and its engine will be physically inspected and verified by SJVAPCD staff prior to the disbursement of any incentive funds. Procedures and Requirements Participant Responsibilities: 1. The old equipment must be destroyed within 60 days of being replaced as determined by the invoice date of the new equipment. Within 30 days of the invoice date of the new equipment, the participant must transfer the old equipment and its engine to an approved dismantler for destruction. 2. Destruction of the existing (old) equipment and its engine by the participant will render the project ineligible for funding. A comprehensive list of approved dismantlers is included with your executed agreement, or participants may contact staff in the Incentives Department at (559) 230-5800, or by email at weberip@valleyair.org, to obtain a list of program approved dismantlers. 3. It is the participant s responsibility to ensure the old equipment and its engine are submitted to the dismantling facility in a timely manner which would allow the dismantler ample time to properly destroy both parts within the 60 day time frame. Participant is responsible for contacting his/her selected dismantler to coordinate the destruction efforts. 4. Upon transfer of the old equipment and its engine, the participant must obtain a SJVAPCD Certificate of Destruction Form from the dismantling facility. The form must be filled out completely and signed by an employee of the dismantling facility. The participant must submit the SJVAPCD Certificate of Destruction Form with the Claim for Payment Packet. 5. Participant must certify on the Existing (Old) Equipment Status Form (page 8) that the old equipment was in similar operational condition as in pre-inspection, with no parts stripped, prior to transferring it to an approved dismantler. Participant may extract equipment fluids or remove parts, such as tires, off of the old equipment prior to transferring it to the dismantler if the dismantler s standard process of receiving the equipment for destruction requires it. Dismantler Responsibilities: 1. The dismantler must destroy the old equipment and its engine according to the terms and conditions of its agreement with the SJVAPCD within 30 days receipt of both parts. 2. The dismantler must provide the participant with a completed, signed SJVAPCD Certificate of Destruction form indicating the date the dismantling facility received the old equipment and its engine. The SJVAPCD Certificate of Destruction form must include all necessary information as required by the dismantler s agreement with the SJVAPCD. 3. The old equipment and its engine shall be physically destroyed by the dismantler in such a manner to eliminate the possibility of future use. The old equipment must be rendered permanently inoperable with the equipment s structure compromised. At a minimum, the transmission casing AND axle housing must be permanently destroyed. Both pieces may be Page 3 of 8

destroyed by puncturing significantly sized holes with serrated and uneven edges, as deemed appropriate by SJVAPCD staff, in each. The old equipment and its engine may be sheared or crushed only after SJVAPCD has visually verified the proper destruction of the engine, transmission casing, and axle housing. The old equipment s engine block must be punctured with a minimum six inch diameter serrated, uneven hole which should include a portion of the oil pan rail (sealing surface). The old equipment and its engine must have a complete, visible, and legible serial number, or the SJVAPCD project number that was stamped or marked on the equipment and/or engine at the time of pre-inspection by a SJVAPCD inspector. If the serial number or the project number cannot be located, the equipment and/or its engine cannot be scrapped or destroyed until notification is made to SJVAPCD staff for assessment. Dismantler must avoid destroying any identifying numbers when performing the destruction of the equipment and engine to ensure SJVAPCD staff can verify the information during the site visit. 4. The dismantling facility must notify SJVAPCD staff within 10 days of the destruction of the old equipment and its engine. A SJVAPCD inspector will then schedule a site inspection and verify the proper destruction of the equipment and its engine. It is both the participant s and dismantler s responsibility to ensure the disabled equipment and engine are permanently removed from service. If either the disabled equipment and/or engine are found to be operational at any time after inspection, the participant and/or dismantler will be subject to enforcement action by the SJVAPCD, including repayment of incentive funds, civil penalties, and any other legal action deemed appropriate. After taking possession of their new equipment, participants should transfer their old equipment and engines to their selected approved dismantler for destruction prior to submitting a complete Claim for Payment Packet to the SJVAPCD for reimbursement. Participants are allowed to pay for, take possession of, and utilize the new equipment as long as they have received an executed agreement from the SJVAPCD; participants do not have to wait until the old equipment and its engine have been destroyed to utilize the new equipment. However, the disbursement of any incentive funds will not be made to the participant until SJVAPCD staff has deemed that the new equipment purchased is program eligible and the destruction of the old equipment and engine have met program requirements. Site Visits (Post-Inspection) All participants will undergo two post-monitoring site visits by SJVAPCD staff prior to any reimbursement. The purposes of the site visits are: 1) to verify the new replacement equipment has been placed into service and is eligible as a replacement, and 2) to ensure the existing (old) equipment and its engine were properly destroyed in accordance with the terms of the agreement. Furthermore, SJVAPCD staff will take photographs during the site visits and complete a monitoring report for each visit. The submission of a complete Claim for Payment Packet by the participant and the notification by the dismantler triggers the site visits. Both site visits must be completed and deemed by staff to meet program requirements before incentive funds can be released. The SJVAPCD retains the right to hold additional site visits at any time during the life of the project. Page 4 of 8

CLAIM FOR PAYMENT PACKET CHECKLIST To initiate the reimbursement process, the participant must submit a properly supported Claim for Payment Packet to the SJVAPCD. Reimbursement takes place after the Claim for Payment Packet has been deemed complete and acceptable, the new replacement equipment is purchased and inspected by SJVAPCD staff, and the existing (old) equipment and its engine are verified to be properly destroyed by an approved program dismantler. SJVAPCD mails the reimbursement check to the participant within sixty (60) working days of the most recent post-monitoring site visit. Submitting an incomplete Claim for Payment Packet will delay the inspection and reimbursement. A COMPLETE Claim for Payment Packet will include all the following: Claim for Payment Form Only the SJVAPCD Heavy-Duty Engine Program Claim for Payment Form will be accepted. A Claim for Payment Form is included at the end of this document for your use. This form must be signed and dated by the project contract signing authority or it will be returned to the participant. The contract signing authority is the same individual who signed the Agreement with the SJVAPCD. Invoice(s) for the cost of the new replacement equipment. New Equipment Information Form A copy of the New Equipment Information Form is included on page 7 of this document. Please have your dealer complete and sign the Form. Warranty Documentation Please submit all warranty documents pertaining to the new equipment. Participant must purchase, at their own expense, power and driver train warranty on the new replacement equipment. Please refer to your Agreement with the SJVAPCD for minimum warranty requirements. Equipment Specification Sheet for the new replacement equipment. Participants may obtain equipment specification sheets from their dealers. Proof of Payment such as finance documentation or copy of check. Insurance Documentation (ACORD Form 25) A Certificate of Insurance must be submitted and must indicate a current policy period which covers the new replacement equipment. Certificate of Destruction Form Provided to the participant by an approved program dismantler certifying the existing (old) equipment has been permanently destroyed. Existing (Old) Equipment Status Form A copy of the Existing (Old) Equipment Status Form is included on page 8 of this document for your use. This form must be signed and dated by the project contract signing authority or it will be returned to the participant. The contract signing authority is the same individual who signed the Agreement with the SJVAPCD. As a matter of policy, the SJVAPCD does not provide advance payments to participants or third parties. Approximately one year after incentive funds have been issued, the participant will receive an Internal Revenue Service (IRS) Form 1099. For information about the tax implications related to receiving incentive funds, please consult your tax advisor, as the SJVAPCD does not provide tax advice. Please retain a full copy of the completed Claim for Payment Packet for your own records. Page 5 of 8

STEP-BY-STEP CLAIM FOR PAYMENT FORM GUIDANCE This section outlines the information required for each field of the Heavy-Duty Engine Program Claim for Payment Form. Once the fields listed below have been completely filled out, the contract signing authority must sign and date the Form. This will complete the Claim for Payment Form. If you need additional assistance to complete the form, please contact program staff. Project Number The number the SJVAPCD assigned to your project; this information can be found in your agreement. Payee The organization, company, or proprietor s legal name that entered into agreement with the SJVAPCD. This information was entered into Section 1 of the Application and must be identical to the information on the Form W-9. Address The mailing address used by the organization, including the city, state, and zip code. Reimbursement checks from the District will be mailed to the address provided here. Check Box Check the classification of the organization that is listed under payee. Federal Tax I.D. # or Social Security # The Taxpayer Identification Number (TIN) entered in Section 1 of the Application, in the form of an employer identification number, or a social security number. The organization s name and TIN or SSN will be used to report incentive funding to the IRS. The SJVAPCD cannot give tax advice; please contact a tax professional or the IRS to determine the tax consequences associated with receiving incentive funding. Telephone # The main phone number, including area code, for the primary contact. Fax # The fax number, including area code, for the primary contact. New Equipment Information: Date List the date the new equipment was purchased as indicated on the invoice. New Equipment Make and Model List the make and model of the new equipment purchased through this project. Serial Number List the serial number of the new equipment purchased through this project. Amount Paid List the final amount paid for the new equipment as indicated on the invoice. Grant Amount Please leave this field blank as it is intended for SJVAPCD use only. Page 6 of 8

NEW EQUIPMENT INFORMATION FORM The following information pertaining to the new equipment and its associated invoice are required to process your reimbursement request. Please have your dealer complete and sign this form. Project Number: Dealership Name: Dealership Address: Contact Number: ( ) Email: Please provide the following information for the new equipment: Equipment Make: Vehicle ID # (VIN or PIN): Engine Make: Engine Serial Number: US EPA Engine Family Name: Engine Tier: Equipment Model: Equipment Model Year: Engine Model: Engine Model Year: Manufacture Rated Horsepower: Engine Hour Meter Reading (hours): Was the above equipment rented to the customer (program applicant) prior to contract execution? Yes No Please provide the following information pertaining to the invoice of the new equipment. The information provided here must accurately reflect invoiced costs. New Equipment Base Cost: $ Freight Cost(s): $ Setup Fee(s): $ Document Fee(s): $ Tire Tax Fee(s): $ Sales Tax: Rate (%): Total: $ Warranty Coverage: Year(s): Hours: Warranty Cost: $ Please list any additional invoiced cost(s) below (i.e., equipment options, license fees, etc.): Item: Cost: $ Item: Cost: $ Payment Type: Cash Check Financed Other explain: As the authorized dealer of the new equipment in this project, I hereby certify that all the information provided on this form accurately reflects the cost of the new equipment purchased through this project. Authorized Dealer (Print Name): Title: Authorized Dealer Signature: Date: Page 7 of 8

EXISTING (OLD) EQUIPMENT STATUS FORM Please submit this form along with your Claim for Payment Packet. Supporting documentation related to the disposal of the existing (old) equipment and its engine must also be submitted. The contract signing authority for the project must sign the Form. Please fill out a separate Form for each piece of equipment. For additional forms, please photocopy the Existing (Old) Equipment Status Form, or you may request an additional copy by contacting program staff. All subsequent copies of the Existing (Old) Equipment Status Form must also be signed and dated. If you need additional assistance to complete the form, please contact program staff. Project Number: Project Contact Name (Print): Phone Number: ( ) Fax Number: ( ) By signing this Form, participant certifies that the replaced existing (old) equipment and its engine, identified by the EIN and ESN below, have been permanently removed from operation by transferring the equipment and its engine to an approved SJVAPCD dismantling facility for destruction. Existing (Old) Equipment Identification Number (VIN or PIN): Engine Serial Number (ESN): Additionally, participant certifies that the existing (old) equipment was in operational condition similarly to its condition during the SJVAPCD s pre-monitoring of the equipment, with no parts stripped, prior to transferring it to the dismantling facility. Only fluids and/or parts required by the dismantler to be removed before transfer of the equipment were performed. Documentation in the form of a receipt from the dismantling facility has been submitted which indicates the date the existing (old) equipment and its engine were transferred. Dismantling Facility Name: Address (including street number and name, state, and zip code): Contact Name: Phone Number: ( ) Fax Number: ( ) Email: I hereby certify under penalty of perjury that all the information provided on this form and any attachments are true and correct to the best of my knowledge. Contract Signing Authority Name (Print): Title: Contract Signing Authority Signature: Date: Page 8 of 8

San Joaquin Valley Air Pollution Control District Heavy-Duty Engine Program - Claim for Payment Form Agricultural Off-Road Equipment Replacement Payee/Grantee : Address : City: State: Project Number: Zip: Individual/Sole Proprietor Trust/Estate Federal Tax I.D. # : Please check one of the following : C Corporation (C Corp) S Corporation (S Corp) Partnership Other Limited Liability Company (C=C Corp, S= S Corp, P=Partnership) Social Security # : Telephone # : Fax # : Date of New Equipment Make & Model Serial Amount Grant Invoice (List each separately) Number Paid Amount Total Claim Signature of Signing Authority Date For District Use Only For District Use Only Object Fund Year Dept Sub-Dept Type Program Phase Entity Amount 1099 Code SJVUAPCD Approval Date Administrative Services Use Only 1 90 92 - - - Stipend - Audited By Date Expense - Table - Reviewed By Date Vendor Number: $