DRAFT ENVIRONMENTAL ASSESSMENT TEMPLATE



Similar documents
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

A Developer s Guide: Watershed-Wise Development

Pamela Birak, Jordan Lake State Park, Chatham County, NC

Summary: Introduction

Sec. 22a-1a page 1 (4-97)

Sustainability Brief: Water Quality and Watershed Integrity

Water Quality and Water Usage Surveys

Part B Integrated Monitoring Design for Comprehensive Assessment and Identification of Impaired Waters Contents

COMMUNITY CERTIFICATIONS

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

MASSACHUSETTS COASTAL NONPOINT PROGRAM NOAA/EPA DECISIONS ON CONDITIONS OF APPROVAL

How To Amend A Stormwater Ordinance

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

CHAPTER 4 ALTERNATIVES COMPARISON

PUBLIC NOTICE Application for Permit

Proposed Terms of Reference for EIA studies

ALTERNATIVE SOURCES OF FUNDING FOR

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

RE: Docket # COE ; ZRIN 0710 ZA05 Submitted via to NWP2012@usace.army.mil and Rulemaking Portal at

AIR TRAFFIC INITIAL ENVIRONMENTAL REVIEW

4. Environmental Impacts Assessment and Remediation Targets

Section 4 General Strategies and Tools

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Proposed General Plan Update Goals, Policies, and Implementation Actions

5.14 Floodplains and Drainage/Hydrology

REQUEST FOR PROPOSALS

CWSRF Project Descriptions and Examples for Green Project Reserve

How To Plan A Buffer Zone

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

NAPA COUNTY WATERSHED SYMPOSIUM

Natural Resource-Based Planning*

13. ENVIRONMENTAL PROTECTION/ RESOURCE MANAGEMENT

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Oklahoma Governor s Water Conference

ENVIRONMENT ACT PROPOSED TERMS OF REFERENCE FOR PUBLIC REVIEW AND COMMENT NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS

Michigan Wetlands. Department of Environmental Quality

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

APPLICATION FOR STATE REVOLVING FUND LOAN

Flood Damage Prevention in Delaware County, NY

~Pennsylvania Campaign for Clean Water~ Stormwater Workgroup

DEQ Response to Comments regarding the Public Notice for a Coal Mining Project in the Panther Creek watershed In Craig and Nowata Counties.

North Branch Chicago River Watershed-Based Plan

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,

How To Decide If A Dam Removal Is Safe For Water Quality

Gold Ray Dam Interagency Technical Team Meeting

1.7.0 Floodplain Modification Criteria

Environmental Guidance for

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

case study 7: south east queensland healthy waterways partnership

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

How To Manage Water Resources In The Yakima Basin

Using Green Infrastructure to Manage Combined Sewer Overflows and Flooding

Restoration Planning and Development of a Restoration Bank

SITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Environmental guidelines for preparation of an Environment Management Plan

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Low Impact Development Checklist

PROPOSAL FOR HOUSTON COUNTY BAN ON SILICA SAND MINING / PROCESSING ACTIVITY. Introduction and Assumptions

Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE

TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN

Chapter 8. List of Preparers

NASA Stennis Space Center Environmental Resources Document

Public Opinions, Attitudes and Awareness Regarding Water in Colorado

The answers to some of the following questions are separated into two major categories:

Rockdale County Storm Drain Stenciling Program Volunteer Information and Safety Briefing

Environmental Review Process

NOTICE OF PREPARATION

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Ch. 15-Restoration Ecology

Living on the Fox River

Addendum D. Nomination of Moody Wash ACEC

10/4/ slide sample of Presentation. Key Principles to Current Stormwater Management

Flood Risk Management

Flood Risk Management

CHAPTER I: INTRODUCTION. Background

Revision of Land and Resource Management Plan for the Santa Fe National Forest;

4.2 Buena Vista Creek Watershed

Transcription:

DRAFT ENVIRONMENTAL ASSESSMENT TEMPLATE I. SUMMARY A. PROJECT IDENTIFICATION Applicant: Address: Project No. B. CONTACT PERSON Mr.\Ms. City or County Manager P.O. Box, Colorado 80 C. ABSTRACT Briefly summarize the proposed project in one paragraph if possible, two paragraphs at the most. Include the following information: Proposed alternative and major components Need for the project Old vs. new capacity Increases in user rates if applicable Total project cost and loan amount D. COMMENT PERIOD In conformance with the requirements of the National Environmental Policy Act and the Colorado Environmental Review Process, a Finding of No Significant Impact (FNSI) will be subject to a 30-day public review period. The FNSI will be distributed to interested persons and agencies for their review. The FNSI will be available for public review at the Colorado Department of Public Health and Environment. Any comments received will be given due consideration. Comments should be addressed to:, Project Manager Water Quality Control Division Colorado Department of Public Health and Environment WQCD-OA-B2 4300 Cherry Creek Drive South Denver, Colorado 80246-1530 II. PURPOSE AND NEED FOR ACTION Describe why the facility planning process was started. Address applicable issues related to: Compliance Additional capacity for population growth Replacement of aged infrastructure

III. PROJECT SUMMARY Briefly summarize the technical features and costs of the project. Reference the analysis of design alternatives in the utility or facility plans if available. If there has not been an evaluation of different design alternatives including the proposed alternative, include an evaluation in this section. A summary of each alternative should include an overview of the technical and financial features, including net present value, as well as their advantages and disadvantages. IV. AFFECTED ENVIRONMENT A. DESCRIPTION OF THE PLANNING AREA The entire planning area defines the scope of the environmental assessment. In most cases the planning area encompasses the current and future service area and facility site. The future service area would include the urban growth area of the municipality (ies) and any other likely areas for extension over the 20-year planning period. A description of the planning area should include: The general location in Colorado. A reproducible map of the planning area to include major roads and land uses if possible. Show urban growth boundaries if applicable. Reproducible map(s) of the environmentally sensitive areas within the planning area including: major streams and other waterbodies, 100-year floodplains (FEMA), wetlands (National Wetlands Inventory), and any identified wildlife habitat. Describe the current conditions of these resources if possible. A listing of sites on the national and state register of historic places. B. POPULATION AND FLOW PROJECTIONS Describe the current and projected population figures and drinking water needs over the 20-year planning period and estimate the population growth rate. Evaluate conformance of population and flow forecasts with the local planning agencies if applicable. V. ENVIRONMENTAL IMPACTS OF THE PROPOSED PROJECT A. DIRECT AND SECONDARY IMPACTS Lead off this section with the following language Construction of may have direct impacts from facility construction and secondary and cumulative impacts from future development within the service area. Secondary impacts are those induced or stimulated by, or as a result of, the proposed action. These can include cumulative, social and land use impacts, among others. Cumulative impacts are the collective incremental impacts of the proposed action regardless of the entity undertaking the action. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time. From the characteristics of the proposed project, and descriptive elements of the environmental setting, probable impacts are direct and/or secondary.

Potential secondary and cumulative impacts to the environment from new development, such as increased quantity and decreased quality of urban runoff, degradation of wetland and wildlife habitat and increased air pollution and noise are likely to affect the planning area. Some of the more specific impacts are as follows: Surface Water and Groundwater Quality and Quantity Discuss the potential impacts that the proposed alternative and development within the service area may have on surface water and groundwater. Review point and nonpoint sources of pollution and focus on area- specific water quality concerns if possible. Potential secondary impacts may include changes in nonpoint source pollution as a result of the cumulative impact of changing land uses, from rural to suburban, and accompanying increases in population. Urban and suburban runoff typically contains higher concentrations of nutrients, (e.g., nitrogen and phosphorous) oxygen consuming wastes, pathogens, pesticides, heavy metals, and oil compared with runoff from rural areas. As areas develop, local waterbodies are likely to receive higher levels of nonpoint source pollution. Wetlands Discuss the potential impacts to wetlands found within the planning area and identify those most at risk based on encroaching development. If there are documented wetland losses in the area please specify. Secondary and cumulative impacts to wetlands may be similar to those for water quality. Increased delivery of non-point source pollution including temporary increases in sediment loads from construction sites can impact wetlands. Changes in hydrological regimes may alter the structure and function of wetlands. Recreational use of stream areas may also degrade wetland habitat. Floodplains Discuss the development patterns in and historical changes to the 100-year floodplain(s) found within the planning area. Impacts to the 100-year floodplain can occur in two forms: (1) directly through changes to the volumetric capacity of the floodplain; or (2) indirectly through an increase in the total volume of water arriving at and being conveyed by the floodplain. Indirect impacts are especially important when considering cumulative impacts to floodplains from all the previous, current, and planned projects in an area. Terrestrial and Aquatic Plants and Wildlife Focus on federal and state threatened and endangered species that may be found in the planning area. Summarize findings of any past surveys. Potential secondary and cumulative impacts include road kill, loss, degradation or fragmentation of wildlife habitat and temporary or permanent reductions in biodiversity. Cultural, Historical and Archeological Resources Discuss any likely impacts to resources. State that direct impacts could occur to undiscovered resources during construction activities.

Air Quality Discuss whether or not the planning area is an attainment or non-attainment area for air quality standards. State that the non-conformance rule applies for the project. Mention potential secondary impacts as follows: Secondary air quality impacts may result from increased emissions from vehicle usage, heating systems, lawn care and cooking appliances, commercial and industrial facilities, and electric generating systems. Environmental Justice Discuss the racial make-up of the planning area as a whole and in the vicinity of the project site. State whether or not the direct impacts of the project are likely to affect minority populations disproportionately. Include any other impacts identified on the Environmental Assessment Checklist. B. UNAVOIDABLE ADVERSE IMPACTS Unavoidable adverse impacts of all construction and development related projects that may not be fully mitigated include: Short-term increases in noise and ambient air particulate levels and increased traffic in the immediate vicinity of construction activities. Increased pollution in stormwater runoff from construction sites and impervious surfaces throughout the planning area. Commitment of resources including capital, manpower, and materials. Loss of potential wildlife habitat due to development. Increased traffic associated with residential and commercial development served by the project. Modify and add others as applicable. C. MITIGATION OF ADVERSE IMPACTS Summarize local and regional measures that may mitigate the environmental impacts. Address the following applicable measures and if there are none state as such: Regional watershed plan Comprehensive or master plan Urban growth boundary or other growth management tools Stormwater management plan Habitat and/or open space preservation and protection Wetland polices/ordinances Floodplain policies/ordinances

Erosion control and re-vegetation requirements Development review/approval processes that relate to wetlands, open space, wildlife, and stormwater Local or regional air quality monitoring Mitigation measures requested by contact agencies Include any additional measures not listed that may mitigate impacts. VI. PUBLIC PARTICIPATION An overview of the project and any changes in rates should be discussed at a public meeting. This meeting can be part of a regular council or board meeting although the public notice must be published 30 days in advance of the meeting. State the time, date and location of the public meeting, summarize any discussion, and submit a copy of the public notice. VII. REFERENCE DOCUMENTS Reference the utility plan, master plan, wildlife surveys, and other documents as appropriate. VIII. AGENCIES CONTACTED Send a letter with a brief description of the proposed project and planning area along with a map of the planning area to the agencies listed below and on the attached mailing list. Allow 30 days for a response and attach copies of responses to the environmental assessment. Modify contact names as necessary. A. U.S. Fish & Wildlife, Susan Linner B. Historical Society, Jim Green C. Corps of Engineers, Terry McKee D. Natural Resources Conservation Service, John E. Andrews E. Colorado Division of Wildlife, Regional Contact F. Colorado State Engineer s Office, Bill McIntyre G. Colorado Air Pollution Office, Mark McMillan H. National Park Service, Gary Weiner

ENVIRONMENTAL ASSESSMENT AGENCY CONTACT LIST A. Fish & Wildlife (Wild & Scenic Rivers/Endangered Species) Mail: U.S. Fish & Wildlife Service Delivery ONLY: U.S. Fish and Wildlife Service Ecological Services Ecological Services Colorado Field Office Colorado Field Office P.O. Box 25486, DFC 134 Union Blvd., Ste. 670 Denver, Colorado 80225-0486 Lakewood, CO 80228-1807 Susan Linner (effective 7/28/03) (303) 275-2370 Main Office Phone: (303) 236-4773 Main Office Fax: 303-236-4005 Staff: Susan Linner, Colorado Field Supervisor; Adam Misztal; Peter Plage; Sandy Vana- Miller; Laura Archuleta; Susan Kennedy; Leslie Ellwood, Alison Michael; Donna Lakamp. Western Slope: U.S. Fish & Wildlife Service Western Colorado Field Office 764 Horizon Drive, Building B Grand Junction, Colorado 81506-3946 Main Office Phone: (970) 243-2778 Staff: Al Pfister, Patty Gelatt, Rick Krueger (Colorado Depletions), Terry Ireland B. Colorado Historical Society Colorado Historical Society 1300 Broadway Denver, CO 80203-2137 Dan Corson (303) 866-2673 or Jim Green (303) 866-4674 C. Corps of Engineers (Floodplains & Wetlands) Denver Regulatory Office (1) (Omaha District) 9307 South Wadsworth Blvd. Littleton, CO 80128-6901 Phone: (303) 979-4120 Fax: (303) 979-0602 Durango Regulatory Office (2) (Albuquerque District) Attention: Hildreth Cooper 799 E. 3rd Street, Unit #2 Durango, CO 81303 Phone: (970) 375-6235 Fax (970) 375-9531 Source: https://www.nwo.usace.army.mil/html/od-tl/coloreg-home.htm Updated 09/28/2010

Durango Regulatory Office (3) (Sacramento District) Attention: Kara Hellige 799 E. 3rd Street, Unit #2 Durango, CO 81303 Phone: (970) 375-9506 Fax: (970) 375-9531 Colorado/Gunnison Basin Regulatory Office (4) (Sacramento District): Attention: Sue Nall 400 Rood Ave, Room 142 Grand Junction, CO 81501-2563 Phone: (970) 243-1199 Fax: (970) 241-2358 Southern Colorado Regulatory Office (5) (Albuquerque District) Attention: Van Truan 200 South Santa Fe Avenue, Suite 301 Pueblo, CO 81003 Phone: (719) 543-9459 Fax: (719) 543-9475 Colorado Regulatory Offices web site: https://www.nwo.usace.army.mil/html/od-tl/coloreg-home.htm D. The Natural Resources Conservation Service (NRCS) (Agricultural Lands) Natural Resources Conservation Service Attention: Allen Green Denver Federal Center Building 56, Room 2604 PO Box 25426 Denver, CO 80225-0426 Phone: (720) 544-2810 FAX: (720) 544-2962 Natural Resources Conservation Service web site: http://www.co.nrcs.usda.gov/contact/index.html E. Division of Wildlife (Wildlife Protection, Endangered Species). --Please submit two copies: One copy to CDOW Headquarters, and one copy to the respective region. CDOW Headquarters 6060 Broadway Denver, CO 80216 Division of Wildlife - Southeast Region 4255 Sinton Road Colorado Springs, CO 80907 Updated 09/28/2010

Division of Wildlife - Southwest Region 151 East 16 th Street Durango, CO 81301 Division of Wildlife - Northwest Region 711 W. Independent Avenue Grand Junction, CO 81503 Division of Wildlife - Northeast Regional Service Center 6060 Broadway Denver, CO 80216 F. State Engineers Office (Water Rights) Department of Natural Resources Dick Wolfe, State Engineer Colorado Division of Water Resources 1313 Sherman St., Rm. 818 Denver, CO 80203 Main Phone Number: (303) 866-3581 Fax number: (303) 866-3589 Colorado Division of Water Resources web site: http://water.state.co.us/org/contacts.asp G. Air Pollution Office Colorado Department of Public Health and Environment Attention: Jim DiLeo 4300 Cherry Creek Drive South Denver, CO 80246-1530 Phone: (303) 692-3127 H. National Park Service Wild and Scenic Rivers National Park Service Intermountain Regional Office Attn: Environmental Quality 12795 West Alameda Parkway Lakewood, CO 80228 Updated 04/21/2011