HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES



Similar documents
NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Time/Date Stamp when received:

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

NEW CONSTRUCTION FINANCING PROGRAM

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

APPLICATION FOR NEW CONSTRUCTION

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

C I T Y O F P E A R S A L L

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

BUSINESS USE PERMIT APPLICATION

BUILDING APPLICATION CHECK LIST

Commercial Construction Permit Application

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

Single Family Residential Building Permit Questions & Answers

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

Bureau Veritas Contact Information

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Residential Building Permits

DEMOLITION PERMIT CHECKLIST* B.H.M.C. Section

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

CLOSURE/ABANDONMENT OF AN ON-SITE WASTEWATER TREATMENT FACILITY

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

City of Hill Country Village Residential Construction/Development Packet

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

SECTION 1 - BUILDING CODE

TOWN OF SPENCER Office of Development & Inspectional Services

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

Ferry County Out Building Application

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Residential Plan Routing Information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

INCORPORATED VILLAGE OF OYSTER BAY COVE TOWN OF OYSTER BAY, NASSAU COUNTY, N.Y. OFFICE BUILDING INSPECTOR FEE SCHEDULE

INFORMATION BULLETIN NO.

City of Douglas Commercial Building Permit Site Application

RELOCATION OF BUILDINGS

TOWN OF OHIO BUILDING PERMIT APPLICATION

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

CHARLOTTE COUNTY Community Development Department

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Frequently Asked Questions

VILLAGE OF HUDSON FALLS 220 MAIN STREET HUDSON FALLS, NY (518) /

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

WEST VIRGINIA CONTRACTOR LICENSING BOARD

Town of Surf City Community Development. General Permit Information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

City of Fort Smith Building Permit Process Frequently Asked Questions

SECTION 15 FLOODPLAIN MANAGEMENT

TOWN OF TRURO BUILDING PERMIT APPLICATION

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

Administrative Procedures Regarding the Application of Flood Damage Prevention

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

City of Mandeville. Guidelines for Construction and Development

ZONING HEARING BOARD APPLICATION CHECKLIST

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

CONTRACTOR REGISTRATION

Zoning Department DECK PERMITS. Checklist

Marion County Board of County Commissioners

Fill out all sections or mark with N/A (not applicable)

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

Building Information Packet

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

Section 801 Driveway Access Onto Public Right-of-Ways

Uncovered Decks & Porches

A Guide for the Homeowner/Builder

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

City of Elk River BASEMENT Office Use Only

Patio Covers / Carports

RESIDENTIAL WINDOW REPLACEMENT

Charter Township of Shelby Harry Reese Building Director

Check Off (Below) Information That Is Submitted With Permit

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

2-Party Shared Well Users Agreement (If Applicable)

A HOMEOWNERS GUIDE TO BUILDING IN GREY HIGHLANDS

WEST VIRGINIA CONTRACTOR LICENSING BOARD

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Notice to Property Owners

Transcription:

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES A demolition permit is required for complete demolition of residential or non-residential structures. PART I Location of Property Complete address including city, state and zip code must be provided on all applications. PARTS II thru VI Complete every section. PART VII Building & Lot Size dimensions of the property (length/width) and/or total square feet or acreage must be provided on all applications. PART IX - Plot Plan Provide scaled plan of entire property. Identify streets adjacent to property. Place all buildings, with size dimensions (length and width) indicated, within property lines and indicate whether existing or proposed. Indicate front yard, side yard, and rear yard setbacks by showing the distance from buildings to property lines on all sides. The property owner is responsible for the accuracy of this plot plan. On-lot sewage disposal systems and/or any easements/deed restrictions must be indicated. PART X Sign and Date Application. If property resident is not the owner of the property, a notarized statement indicating the owner s approval of the proposed construction must be submitted with the application. Provide phone numbers for property owner/resident and contractor. Contractors making application must be registered with the township prior to starting construction. *PLANS AND SPECIFICATIONS A plot plan showing location of structure or structures to be demolished. Letters from Utility Companies stating disconnection (electric, gas, water & sewer). Rodent inspection letter (the removal of all rodents). *All items listed must be included with initial permit application submittal.

ADDITIONAL INFORMATION FEES Permit fees must be submitted with the permit application. If paying by check, please make check payable to Hatfield Township. REVIEW The application will be reviewed by the Code Enforcement Department for compliance with the building codes of Hatfield Township. All permits must be submitted together for review. (i.e.: PLUMBING, ELECTRICAL, HVAC and FIRE PROTECTION) PERMIT GRANTED Work may not start until a permit has been approved and granted. The permit cards are to be displayed so as to be visible from the street. PLUMBING, ELECTRICAL, HVAC and FIRE PROTECTION All plumbing, electrical, heating & air conditioning and fire protection contractors and/or their personnel must be registered and provide a Certificate of Insurance verifying Worker s Compensation coverage, and Federal or State Employer Identification Number (EIN). In addition, each contractor must obtain the appropriate permits for the work to be done. All electrical work must be inspected by United Inspection Agency. INSPECTIONS Call the Township office (215-855-0900) at least 24 hours in advance to schedule each inspection. Responsibility for notification for inspections at the various stages of construction lies with the applicant and/or contractor. If the appropriate inspections are not requested, they will not be done and uninspected work will not be granted final approval. If an inspection fails twice for the same code violation, a reinspection fee will be required prior to a third inspection. NOTES: All Subdivision and Land Development approvals must be complete before submitting building permit. All PA labor & Industry approvals must be stamped on the same set of plans being submitting with the building permit. Township requires stamped plans if any structural materials (i.e.: steel, trusses, bond beams or manufactured beams) are being used in the construction of structure.

HATFIELD TOWNSHIP Demolition Permit Application I - LOCATION OF PROPERTY Address: City: State: ZIP: II - IDENTIFICATION To be completed by all applicants APPLICANT Name: Phone: Company: Address: City: State: Zip Code: Email Address: OWNER Name: Phone: Address: City: State: Zip Code: CONTRACTOR Company: Phone: Name: Address: City: State: Zip Code: State License Number Expiration Date: DESIGN Name: Phone: PROFFESSIONAL Address: City: State: Zip Code:

III - TYPE OF DEMOLITION Residential Commercial Description of Work: IV PRINCIPAL TYPE OF FRAME Masonry (bearing walls) Wood Frame Structural Steel Reinforced Concrete Other V TYPE OF SEWAGE DISPOSAL Public Private (septic tank) Pump System Holding Tank VI TYPE OF WATER SUPPLY Public Private (well) VII DIMENSIONS Total building lot size, square footage VIII COST Cost of Demolition $ IX - SITE OR PLOT PLAN - Please provide or attach plot plan details here.

X - SIGNATURE Deposit of check representing the fee for this application does not constitute approval of or granting of same by Hatfield Township. I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his agent and we agree to conform to all applicable laws of Hatfield Township. SIGNATURE OF APPLICANT (Please print & sign) DATE SCHEDULE OF FEES (from Resolution 14-26) Building Permit Fees. Demolition $160.00