DSR De-rating Background Information

Similar documents
Capacity Market DSR Workshop Tuesday 22 March 2016

The format this is requested in contains a. Users should provide the answer in DD/MM/YYYY. The Range for Historic Performance Data be DD/MM/YYYY

The participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change

Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market

Duncan Burt Head of Commercial Operation National Grid. The Office of Gas and Electricity Markets 9 Millbank London SW1P 3GE

National Grid EMR Electricity Capacity Report

Pricing Methodology 1. 1 July 2009 to 30 June April 2010

Power System Operation Procedure: Short Term Projected Assessment of System Adequacy (ST PASA)

Demand Response Market Overview. Glossary of Demand Response Services

EMR: Consultation on industry code and licence modifications

WP35-CM Applicant /Capacity Provider Credit Cover Process

Understanding the Capacity Market

a description of the various categories of embedded generators

EUROPEAN COMMISSION. Brussels, C (2014) 5083 final. State aid SA (2014/N-2) United Kingdom Electricity market reform Capacity market

Overview of the UK Demand Response Market

How To Register A Power Plant On The Em Delivery Body Website

Government response: EMR consultation on industry code and licence modifications

Contracts for Difference Round Guidance

EMR Capacity Market Implementation Coordination Workshop

APPROVED AMENDED PRICING METHODOLOGY FOR PRESCRIBED SHARED TRANSMISSION SERVICES FOR 1 JULY 2014 TO 30 JUNE 2019.

Government response: EMR consultation on BSC subsidiary documents

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

Energy in the Wholesale Market December 5, :30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England

UK legislative framework for renewable energy

Standard conditions of the Electricity Distribution Licence

Standard conditions of the Electricity Distribution Licence

Energy Efficient Storage - Multi- Tier Strategies For Retaining Data

Energy Networks Association. Electricity Demand Side Response Working Group. Demand Side Response Shared Services Framework Concept Paper

GB Electricity Market Summary

TRANSPOWER NEW ZEALAND LIMITED. Request for Proposals. Demand Response Programme

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd

ENHANCED FREQUENCY RESPONSE. Invitation to tender for pre-qualified parties. 15th April 2016

Power Generation. Lilian Macleod Power Supply Manager National Grid

Copyright 2013 wolfssl Inc. All rights reserved. 2

UK Electricity Market Reform:

Electricity Settlements Company Ltd Framework Document

Contract Specifications for CEGH Gas Futures Contracts for the Delivery Point Virtual Trading Point - CEGH

The UK Electricity Market Reform and the Capacity Market

EMR: Consultation on Balancing and Settlement Code subsidiary documents

VALUING FLEXIBILITY 20 May 2014 Florence Forum Stephen Woodhouse, Director, Pöyry Management Consulting

How To Manage The Ercot Grid

Standard conditions of electricity supply licence

Provide an overview of why and how BM Units are used for EMR settlement; Describe the differences between BM Units for SVA and CVA EMR Assets; and

Risk of Large Cascading Blackouts

Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014

RENEWABLE ENERGY DEVELOPMENT IN LITHUANIA ACHIEVEMENTS AND DRAWBACKS

PUBLIC. Response to consultation on EMR data flows

New Brunswick Electricity Business Rules

Electricity Balancing Services

Network Price List (excludes GST)

The Liberalized Electricity Market

Workshop B. 11:15 a.m. to 12:30 p.m.

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014

ELECTRIC SCHEDULE E-6 Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE

JAPANESE YEN SETTLEMENT REGULATIONS

ELECTRICITY DISTRIBUTION LICENCE: STANDARD CONDITIONS

Reliability Options in Ireland and Northern Ireland Obligations and Penalties

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

IRAS e-tax Guide Income Tax: Concession for

Explanatory Note settlement prices publication End-of-Day report

SMART GRIDS PLUS INITIATIVE

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS No. [XXXX]

The Teachers Life Insurance Regulations

Sage 100 ERP Intelligence. Citrix Environment Installation Guide

Demand Response FAQs

KERALA STATE ELECTRICITY REGULATORY COMMISSION

Questions raised on committee updates in EMR

Full Scale Program for Renewable Energy in Egypt

GLOSSARY. Issued by Nord Pool Spot

Customer-Led Network Revolution Commercial Arrangements Study Review of existing commercial arrangements and emerging best practice

Terms and Conditions for Stop Orders and Trailing Stop Orders. Stockbrokers

HOW EMR MAKES THE CASE FOR ENERGY EFFICIENCY MORE ATTRACTIVE. Smart businesses are seeing EMR as an opportunity, not just an overhead.

Transcription:

DSR De-rating Information 13 July 2015 National Grid Electricity Transmission Page 1

DSR De-rating Information 13 th July 2015 This information document must be used in conjunction with the Electricity Capacity Regulations 2014 and Capacity Market Rules 2014 (with 2015 amendments); failure to do so may result in unsuccessful pre-qualification or failure to gain a capacity agreement in the Capacity Auction. Copyright National Grid 2015, all rights reserved. No part of this information document may be reproduced in any material form (including photocopying and restoring in any medium or electronic means and whether or not transiently or incidentally) without the written permission of National Grid except in accordance with the provisions of the Copyright, Designs and Patents Act 1988. National Grid Electricity Transmission Page 1

De-rating Calculation Responsibility The Capacity Market Rules 2.3 sets out the requirements for the calculation of De-rating Factors. Rule 2.3.1(a) requires the Delivery Body to calculate the De-rating Factor for CMUs in each generating Technology class and 2.3.1(b) sets out the responsibility of the DB for determining the De-rating Factor for DSR CMUs. The Secretary of State, subject to Capacity Market Rule 2.3.1A(a,b), must determine a De-rating Factor for each Interconnector CMU. This document describes the process followed by the DB in fulfilling the obligations under 2.3.1 (b) for the calculation of De-rating Factors for DSR CMU s. De-rating Factor Definition 2.3.4 of the Capacity Market Rules explains what a De-rating Factor is: a. for CMUs in a Generating Technology Class, the Technology Class Weighted Average Availability ( TCWAA ) of that Generating Technology Class; (Covered in the Electricity Capacity Report 1 ) b. for DSR CMUs, the Average Availability of Non-BSC Balancing Services ( AABS ) and; (Covered in this document) c. for an Interconnector CMU, the Equivalent Firm Interconnector Capacity ( EFIC ) of that CMU. (Covered in DECC guidance 2 ) 2.3.5 of the Capacity Market Rules explains how AABS is calculated: b. for AABS, by determining the mean average of the declared availabilities of all Non-BSC Balancing Services providers at real time in High Demand Settlement Periods over the three immediately preceding Core Winter Periods, divided by their contracted volumes. Determining Average Availability of Non-BSC Balancing Services STOR availability was chosen as a basis for these calculations as this is the largest, most accurate and relevant data set available to National Grid. Availability information following settlement also includes the effect of any utilisation failure, so this provides a more accurate view than declared availability. Note there is a low volume of other applicable Balancing Services data available such as FCDM (Frequency Control Demand Management) and FFR services (Firm Frequency 1 https://www.emrdeliverybody.com/capacity%20markets%20document%20library/electricity%20capacity%20report% 202015.pdf (page 58-73) 2 https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/439232/150629_sos_ng_confirmation_ of_capacity_auction_parameters.pdf National Grid Electricity Transmission Page 2

Response) but these services are either not comparable to Capacity Market data, or the data is not sufficient to add value to the process. Within STOR there are three services: 1. Committed - a service provider must make the service available for all Availability Windows within the contracted Season. 2. Flexible - this is only open to non-bm service providers and allows greater flexibility on how many hours are made available and when that is offered; and 3. Premium Flexible - Similar to the Flexible service, although when a service provider offers availability in a premium availability window, National Grid guarantees to accept a large percentage of these. From the three STOR services only Committed STOR units were considered and used in the calculation. The availability of Flexible units is found to be low due to the nature of the load and hence the reason for the flexible service. When including Flexible STOR the De-rating Factor was shown to decrease so was not used. The committed service also more closely reflects the capacity product than the other services. Currently contracted unit data was used as this reflects the current market rather than units that may have left the market due to low performance. DSR De-rating Methodology The following explains the methodology used on the data to calculate the DSR De-rating figure (using Committed STOR availability over the most recent 3 winters at 50th percentile demand): 1. The mean average of the declared availabilities: - The mean average of the STOR available volume or 0 if not available, where the volume is as settled including any deemed unavailability following an Event of Default, for the defined STOR units in the defined settlement periods. - Units that have declared themselves unavailable will have 0 availability for the relevant period. - As per the STOR Standard Contract terms, units that have failed to deliver by the end of their defined response time following a utilisation instruction (<90% of expected volume in response time) will have 0 availability for the periods impacted. - Units that have delivered <90% expected volume for an instruction will have 0 availability for the remainder of the window. - Units that have baseline generation/load at level other than agreed i.e. if a generator metering >0MW, if a demand unit, metering < Contracted MW, will have 0 availability for the entire window. 2. Of all Non-BSC Balancing Services: Non-BM Committed STOR units that were contracted for the latest winter season (STOR season 8.5). 3. Over the High Demand Settlement Periods: Settlement Periods inside defined STOR windows between 7 am and 7pm where the GB peak demand for the day was greater than the 50th percentile of demands for that winter (November to March). The definition National Grid Electricity Transmission Page 3

of High Demand Settlement Periods is that used in the ECR (Electricity Capacity Report) 3. 4. For the three immediately preceding Core Winter Periods: on week days between December and February. 5. Divided by their contracted volumes: settlement period STOR contract volume. Calculated DSR De-rating Factors Using the above methodology the calculated De-rating Factors were: 2014 89.70% 2015 86.80% The DSR De-rating Factor for the 2015 Auction Window is 2.9% lower than that calculated for 2014. There are a number of possible reasons why a reduction is seen in the De-rating Factors compared with last year; the market is well supplied causing the prices to reduce in the market thus creating an incentive for some providers to move to evolving services such as fast reserve. 3 https://www.emrdeliverybody.com/capacity%20markets%20document%20library/electricity%20capacity%20report% 202015.pdf National Grid Electricity Transmission Page 4