Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes



Similar documents
Measurement Requirements for Oil and Gas Operations. The Alberta Energy Regulator has approved this directive on May 28, 2015.

Measurement Requirements for Oil and Gas Operations. The Alberta Energy Regulator has approved this directive on March 31, 2016.

Allocation of Costs, and Non Arm s Length Valuation of Shared Goods, on Oil Sands Projects

Bulletin AER Administration Fees (Industry Levy)

OIL SANDS CONSERVATION RULES

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY

Incident Reporting Requirements

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DDS Basic User Manual v 1.1 (May 2013) DDS USER GUIDE

Trottier Energy Futures Project Greenhouse Gas Emissions from the Canadian Oil and Gas Sector. R.L. Evans & T. Bryant

Information on the New Royalty Framework

Setting the Record Straight: Lifecycle Emissions of Tar Sands

OFFSHORE FIELD DEVELOPMENT

Wasser Berlin International GWP Forum: Challenges in North America. Alberta s Water Challenges and Opportunities

KELT INCREASES PLANNED 2015 CAPITAL EXPENDITURES IN BRITISH COLUMBIA, PROVIDES OPERATIONS UPDATE AND ANNOUNCES $78.8 MILLION EQUITY FINANCINGS

Imperial Oil Limited 237 Fourth Avenue S.W. Calgary, Alberta T2P 3M9 imperialoil.ca

The Engineering Science of Oil Pipelines

How To Calculate 2007 Administration Fees In Alberta Energy And Utilities Board

Directive 055: Storage Requirements for the Upstream Petroleum Industry

Trilogy completed the sale of its Dunvegan oil assets in the Kaybob area for net proceeds of $45 million.

A STUDY OF ENVIRONMENTAL BENEFITS OF INDUSTRIAL INTEGRATION

Operating Criteria: Resource Recovery Requirements for Oil Sands Mine and Processing Plant Operations

RAILROAD COMMISSION OF TEXAS APPENDIX C LIST OF E&P WASTES: EXEMPT AND NONEXEMPT

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

CSA Group Safety Standards for Oil and Gas Pipeline Systems: A Life-Cycle Approach

Methodological tool Upstream leakage emissions associated with fossil fuel use

Waterflooding. A Tried and True Technique for Secondary Oil Recovery. Houston Bar Association Oil, Gas and Mineral Law Section March 26, 2013

OIL & GAS PRODUCTION AUDITING

Adjusted Estimates of Texas Natural Gas Production

Province of Alberta PIPELINE ACT PIPELINE RULES. Alberta Regulation 91/2005. With amendments up to and including Alberta Regulation 4/2015

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results

Alberta oil-sands and climate: Warming from well-to-wheel emissions

Frequently Asked Questions

Forecasting the impacts of oilsands expansion

BC-23 APPLICATION FOR GAS COST ALLOWANCE

An Introduction to Development in Alberta s Oil Sands

SUBDIVISION AND DEVELOPMENT REGULATION

Energy, Ecology, and the Environment Series ISSN (Print) ISSN (Online)

<Insert Picture Here> JD Edwards EnterpriseOne Bulk Stock Industry & Overview

TRANS MOUNTAIN PIPELINE ULC

Thermal Heavy Oil Phase 1b Potential Vent/Efficiency Options One Page Options List

Petroleum Tanks at Municipal Facilities

PSAC/SAIT Well Testing Training Program Learning Outcomes/Objectives Level B

Production Measurement & Allocation CPMA Robbie Lansangan, Ph.D. Measurement Eng. Technical Authority BP Upstream Global Projects

Comparison of North American and Imported Crude Oil Lifecycle GHG Emissions. Final Report. Prepared for: Prepared by:

AESTHETIC AND NOISE CONTROL REGULATIONS

Report 2013-B: Pipeline Performance in Alberta,

Maximizing Boiler Plant Efficiency. Presenter: Dan Watkins, LEED BD+C Sales Engineer Bornquist, Inc.

BQ-9000 Quality Management System. Marketer Requirements

Oil Sands, Greenhouse Gases, and US Oil Supply. Getting the Numbers Right 2012 Update SPECIAL REPORT CERA. Created on 08 Nov 2012 for Jackie Forrest

Owner-User Pressure Equipment Integrity Management Requirements

HYDROCARBON REMOVAL FROM AMINES DEMONSTRATED EXPERIENCE ABSTRACT

Energy BUSINESS PLAN ACCOUNTABILITY STATEMENT THE MINISTRY LINK TO GOVERNMENT OF ALBERTA STRATEGIC DIRECTION

Response from EMR to outstanding questions from the Select Committee Regarding the Risks and Benefits of Hydraulic Fracturing January 2014

BQ-9000 Quality Management System. Certified Marketer Requirements

OIL AND GAS CONSERVATION ACT

Appendix G. Allowable and Non- Allowable Capital Costs

APPROVED. PXP 2009 Tank Leak Detection and Containment at Inglewood Oil Field. Baldwin Hills CSD Conditions L.18. and E.29.e.

DIN 2403 Identification of pipelines according to the fluid conveyed. Marking of pipes according to fluid transported

Global Gas Flaring Reduction Partnership & Measurement of Flare/Vent Volumes. World Bank Francisco J. Sucre

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -

Car and commercial cial air conditioning service solutions

GAS ROYALTY CALCULATION SUPPLEMENT - INFORMATION BULLETIN February 2010

Carbon Capture & Storage. Summary Report of the Regulatory Framework Assessment

Waste Oil Collection / Storage

Instrument Gas to Instrument Air Conversion Protocol October 2009 SPECIFIED GAS EMITTERS REGULATION OCTOBER Version 1.0.

Revision to the approved baseline methodology AM0011

LOGISTICS SOLUTION FOR NUSTAR ENERGY

Dover SAGD Progress Review Thermal Heavy Oil

Understanding the Oil & Gas Exploration & Production Hazardous Waste Definition Exemption. Jeff Bowman, TEEX

Good afternoon. It's a pleasure for me to be here today, and I want to thank Raymond James for this opportunity.

Alabama Air and Waste Regulatory Update

Nitrogen Blanketing for Methanol Storage and Transportation

Annual Surmont SAGD Performance Review Approvals 9426 and Surface Operations. April 11, 2013 Calgary, Alberta, Canada

The Pipelines Regulations, 2000

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

A Job Safety Execution Plan is required. mixtures of the above called, natural gas liquids (NGL's) refined products and their components

Liquids Pipeline Leak Detection and Simulation Training

Feasibility Study Proposal & Report Guide. Industrial Optimization Program

FOURTH QUARTER 2015 Report to Shareholders for the period ended December 31, 2015

CHAPTER PETROLEUM CONTACT WATER

Directive 071: Emergency Preparedness and Response Requirements for the Petroleum Industry

Forgotten savings: Heat recovery from surface blowdown

AUG Mr. Max Jameson Environmental/Regulatory Manager Sabco Oil and Gas Corporation 34 S. Wynden Drive Houston, TX Dear Mr.

AUC Electronic Filing Services

Capturing Methane to Fuel Drilling Operations

Refinery Equipment of Texas. Mini - Refinery Feasibility Overview

TABLE OF CONTENT

SECURITY MANAGEMENT FOR CRITICAL UPSTREAM PETROLEUM AND COAL INFRASTRUCTURE REGULATION

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

Estimated emissions and CO2 savings deriving from adoption of in-place recycling techniques for road pavements

Supporting technology development: The role of the public sector in Mexico

April 24, Dear Mr. Fraser: Ontario Energy Board Energy East consultations

Environmental Guidelines for Preparation of an Environmental Management Plan

Comparison of State Severance Taxes on Oil and Gas Utah and Selected Oil and Gas Producing States

7. Chemical Waste Disposal Procedures

Goliat Produced Water Management

MINISTRY OF FINANCE July 2014

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

Transcription:

Directive 042 Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes September 6, 2006 Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta Energy Regulator (AER). As part of this succession, the title pages of all existing ERCB directives now carry the new AER logo. However, no other changes have been made to the directives, and they continue to have references to the ERCB. As new editions of the directives are issued, these references will be changed. Some phone numbers in the directives may no longer be valid. Contact AER Inquiries at 1-855-297-8311 or inquiries@aer.ca.

Directive 042 Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes September 6, 2006 Effective January 1, 2008, the Alberta Energy and Utilities Board (EUB) has been realigned into two separate regulatory bodies, the Energy Resources Conservation Board (ERCB), which regulates the energy industry, and the Alberta Utilities Commission (AUC), which regulates the utilities industry. As part of this realignment, the title pages of all existing EUB directives now carry the new ERCB logo. However, no other changes have been made to the directives, and they continue to have references to EUB. As new editions of the directives are issued, these references will be changed.

ENERGY RESOURCES CONSERVATION BOARD Directive 042: Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes September 6, 2006 Published by Energy Resources Conservation Board 640 5 Avenue SW Calgary, Alberta T2P 3G4 Telephone: 403-297-8311 Fax: 403-297-7040 Publications@ercb.ca Web site: www.ercb.ca

Directive 042 September 6, 2006 Measurement, Accounting, and Reporting Plan (MARP) Requirement for Thermal Bitumen Schemes The Alberta Energy and Utilities Board (EUB/Board) has approved this directive on September 5, 2006. [Original signed by] M. N. McCrank, Q.C., P.Eng. Chairman The Alberta Energy and Utilities Board (EUB) has modified the submission requirements for thermal bitumen schemes as required under the Oil Sands Conservation Act (OSCA). From this time forward, and in addition to the current EUB application requirements, a measurement, accounting, and reporting plan (MARP) must be submitted for these types of schemes (see attached figure). This directive explains what the MARP must contain. While a conceptual measurement plan is required as part of the scheme application, a MARP must be submitted and approved by the EUB Production Operations Section prior to Directive 056 licensing application submission of the associated surface facilities. If the licensee of an existing thermal bitumen scheme does not have an approved MARP and an OSCA scheme expansion approval has been obtained, the licensee is required to submit a MARP for approval including the entire scheme prior to Directive 056 licensing application of surface facilities. If the thermal bitumen scheme with an approved MARP is to be changed to include new or additional wells and surface facilities within an existing scheme, a new MARP submission will not be required when the licensee incorporates the same production, operating, measurement, and accounting processes approved under the original MARP. For existing schemes without an approved MARP, the EUB s Production Operations Section has initiated a process whereby each existing scheme will be audited. Priority will be given to recently approved schemes where production has not commenced. This change has been made to clarify existing EUB requirements and improve compliance. It is also expected to better allow the EUB to work collaboratively with applicants and licensees to identify potential problems and develop appropriate solutions during the development phase of a scheme and throughout the scheme s life. MARP Submission Licensees are now required to submit the following information regarding EUB measurement, accounting, and reporting that includes water balancing. For some items, a statement that the licensee will meet the requirements of related EUB documents may be sufficient. 1 General Scheme Information 1) Full company name EUB Directive 042: MARP Requirement for Thermal Bitumen Schemes (September 6, 2006) 1

2) Scheme name and number 3) Application number 4) Company contact(s) 5) General scheme/process description and location 2 Process and Measurement Diagram A simplified process flow or block and accounting measurement diagram(s) for the proposed scheme showing the following information: 1) all surface facilities associated with the scheme, including process equipment for bitumen treating and upgrading, proration testing, water treatment, steam generation, cogeneration, waste handling, and disposal; 2) all wells associated with the scheme, indicating how each well will tie into the surface facilities; include and identify crude bitumen wells, steam/solvent/noncondensable gases/water injection and disposal wells, and water source wells; 3) all applicable receipt points, whether by truck or pipeline; indicate what fluids will be received (e.g., diluent), the source of the fluids if known (e.g., reporting facility code); 4) all applicable disposition points, whether by truck or pipeline; indicate what fluids will be disposed (e.g., dilbit) and the destination of the fluids (e.g., reporting facility code); 5) all applicable flow lines, fuel lines, flare lines, recycle lines, skim lines, gas-lift lines, solvent injection lines, and utility lines; 6) all applicable bitumen, emulsion, condensate/diluent and water tanks/storage ponds/vessels, with the dimensions and capacity of each; and 7) all applicable measurement devices (e.g., meters, gauges, product analyzers), measurement points, and sample points: label and indicate the type of measurement device(s), provide documentation showing maximum uncertainty of measurement devices when requested by the EUB after the initial MARP submission, if electronic flow measurement (EFM) is used, indicate where measurement devices are configured with EFM; and 8) boundaries of applicable production facilities, such as batteries and injection facilities, that report to the Petroleum Registry of Alberta (Registry), with the appropriate Registry subtype codes. 3 Description of Proposed Operating Procedures 1) Calibration and Proving For each measurement device used for accounting and EUB reporting purposes, outline the frequency and method of calibration, checking, or proving. 2) Gauging Outline the method of gauging tanks/storage ponds/vessels and the frequency of calibrating applicable gauging devices. 3) Trucking Outline the method(s) of measuring, sampling, and recording production moved by truck to or from the facilities associated with the scheme. 2 EUB Directive 042: MARP Requirement for Thermal Bitumen Schemes (September 6, 2006)

4) Sediments and Water (S&W) Procedures Outline the frequency and method of determining the water cut of proration test production. 5) Valid Test Criteria Provide the criteria for accepting or rejecting proration tests. 6) Load Fluid Recovery Outline the method used to determine well production rates during load fluid recovery. 7) Common Flow Lines Outline the proration test procedure and purge time for wells on common flow lines. 8) Field Headers Outline the proration test procedure and purge time for wells producing to field headers. Provide test line capacity and test and group operating line pressures. 9) Casing Head Gas List wells using casing head gas and/or produced gas for lease fuel. 10) Gas Lift List the wells using gas lift. 4 Accounting Calculations and Reporting 1) Estimated Production Worksheet For proration batteries that make up the thermal bitumen schemes, provide a sample worksheet for determining the estimated bitumen, gas, and water production for each well. 2) Accounting Formulas For each production facility reporting to the Registry, provide the calculations and cite the applicable measurement points used to determine the following: bitumen production, disposition(s), and inventories gas production, disposition(s), and receipts water production, disposition(s), receipts, and inventories water source production, disposition, receipts, and inventories; include copies of the most recent water analysis for fresh and brackish water wells and sources condensate, solvent, and noncondensable gases receipts, injection, disposition, and inventories total lease fuel, flare, and vented gas 3) Outline the methods used to calculate/estimate the volume of water vapour in the metered gas streams and procedures used to adjust metered gas volumes for gas streams operating at a temperature greater than 100 degrees Celsius (corrected to 101.325 kilopascals absolute) determine shrinkage when blending hydrocarbon liquids with densities differing more than 40.0 kilograms per cubic metre determine shrinkage when condensate (diluent) is flashed through bitumen treating and other process equipment estimate unmetered flare, fuel, vented, and other gas streams; include sample calculations showing all particulars estimate gas in solution with oil dumped to stock tanks and with oil at proration test conditions determine production of injected solvent and noncondensable gases distinct from bitumen and solution gas production EUB Directive 042: MARP Requirement for Thermal Bitumen Schemes (September 6, 2006) 3

4) Other Describe any other estimate, correction, or adjustment procedures used to calculate volumes. 4 EUB Directive 042: MARP Requirement for Thermal Bitumen Schemes (September 6, 2006)

Bitumen Scheme Approval Process Operating company submits Oil Sands Conservation Act (OSCA) application Processed by Resources Applications (includes conceptual measurement plan) OSCA Approval Operating company submits Measurement, Accounting, and Reporting Plan (MARP) MARP reviewed by Production Operations Operating company submits Directive 056 application No Plan accepted? Processed by Facilities Applications Yes MARP approval issued Directive 056 licence(s) issued Existing process Addition to existing process Start construction EUB Directive 042: MARP Requirement for Thermal Bitumen Schemes (September 6, 2006) 5