MinuteManPlus Project Management Software



Similar documents
FastTrack Schedule 10. Tutorials Manual. Copyright 2010, AEC Software, Inc. All rights reserved.

Managing Projects. With. MinuteMan Project Management Software

ELECTRO-MECHANICAL PROJECT MANAGEMENT

Creating a New Project

OVERVIEW. Microsoft Project terms and definitions

MS Project Tutorial for Senior Design Using Microsoft Project to manage projects

Aras Corporation Aras Corporation. All rights reserved. Notice of Rights. Notice of Liability

Appointment Scheduler

Ohio University Computer Services Center August, 2002 Crystal Reports Introduction Quick Reference Guide

Word 2007: Basics Learning Guide

Microsoft Project 2013 Guide to Task and Resource Planning

Open Workbench. User Guide. v2.0.00

Utilities ComCash

Project Management within ManagePro

-lead Grabber Business 2010 User Guide

TimeValue Software Due Date Tracking and Task Management Software

Microsoft Project 2007 Level 2: Working with Resources and Managing a Project

Microsoft Project Server 2010 Project Manager s Guide for Project Web App

User Guide. Customer Appointment Manager. Standard & Pro Versions. Overview. New in this Version

Microsoft Project 2007 Level 1: Creating Project Tasks

Integrated Accounting System for Mac OS X and Windows

Section 4. Mastering Folders

Administration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT 2010 AND PMBOK GUIDE FOURTH EDITION training course presented by

Microsoft Access 2010 handout

Introduction to Microsoft Access 2003

Creating and Using Forms in SharePoint

1.5 MONITOR FOR FMS 6 USER GUIDE

Project planning with MindGenius

1.5 MONITOR. Schools Accountancy Team INTRODUCTION

IT Training. Microsoft Project. Vicky Samways, IT Training Information System Services Version 2.1

Computer Training Centre University College Cork

Microsoft Access 2010 Part 1: Introduction to Access

Time & Expense Entry WalkThrough

Abstract. For notes detailing the changes in each release, see the MySQL for Excel Release Notes. For legal information, see the Legal Notices.

Create task relationships by linking tasks. Switch task scheduling from manual to automatic. Set nonworking days for the project plan.

USER GUIDE. Unit 2: Synergy. Chapter 2: Using Schoolwires Synergy

I N FO RM A T I O N T EC H N O L O G Y S ERV I C ES M I C ROSOFT PROJ EC T T A S K M A N A GEM EN T LEARNING GUIDE

QUICK START GUIDE RESOURCE MANAGERS. Last Updated: 04/27/2012

Results CRM 2012 User Manual

USER CONVERSION P3, SURETRAK AND MICROSOFT PROJECT ASTA POWERPROJECT PAUL E HARRIS EASTWOOD HARRIS

Scheduling Document Creation

Event Record Monitoring and Analysis Software. Software Rev. 3.0 and Up. User s Guide

Guidelines for Accessing and Using the VDOT Scheduling Application (Primavera P6)

WBS Schedule Pro. User's Guide

BIGPOND ONLINE STORAGE USER GUIDE Issue August 2005

EMS User Manual. EMS Workplace EMS Campus EMS Enterprise EMS Legal Dean Evans & Associates, Inc.

Object-Oriented Analysis. with the Unified Process. John W. Satzinger Southwest Missouri State University. Robert B. Jackson Brigham Young University

Introduction to Microsoft Project 2010

Outlook 2010 Essentials

Integrated Accounting System for Mac OS X

SYSTEMS ANALYSIS AND DESIGN DO NOT COPY

Lab 1 Introduction to Microsoft Project

NDSU Technology Learning & Media Center. Introduction to Google Sites

Using Microsoft Office to Manage Projects

Using Microsoft Project 2000

MICROSOFT OFFICE ACCESS NEW FEATURES

Web Intelligence User Guide

Module One: Getting Started Opening Outlook Setting Up Outlook for the First Time Understanding the Interface...

PowerPoint 2007: Basics Learning Guide

NETWORK PRINT MONITOR User Guide

Module A2 Item Activities, Gantt Chart and Utilization Sheet

PERCEPTION PERT-PAC Using Microsoft Project 2000

Project 2010 Introduction

Lotus Notes Client Version 8.5 Reference Guide

Password Memory 6 User s Guide

Google Docs Basics Website:

Intellect Platform - The Workflow Engine Basic HelpDesk Troubleticket System - A102

NorthClark Computing, Inc. Bill of Material and Parts Master Maintenance. Administrator s Guide

Qualtrics Survey Tool

Planning and Managing Projects with Microsoft Project Professional 2013

Beginning Microsoft Project

Revealing the Secrets of Microsoft Project

Create a New Database in Access 2010

APPLYING BENFORD'S LAW This PDF contains step-by-step instructions on how to apply Benford's law using Microsoft Excel, which is commonly used by

Accounts Receivable WalkThrough

O UTLOOK 2003 HELP SHEET MAIL. Opening the program. Mail

SonicWALL GMS Custom Reports

Release Notes DAISY 4.0

MS Access Lab 2. Topic: Tables

Scheduling Software User s Guide

Retain Planner Quick Start Guide

Titanium Schedule Center Management Software USER MANUAL. Sales and Customer Service Technical Support

Enterprise Interface User Guide

WEB TRADER USER MANUAL

Microsoft PowerPoint 2010

MICROSOFT ACCESS 2007 BOOK 2

User Guide QAD Field Service Scheduler

Training Guide. Customizing Your Food/Service Items in Menu Manager

Introduction To Microsoft Office PowerPoint Bob Booth July 2008 AP-PPT5

Utility Billing Software Manual

Using Webmail. Technical Manual: User Guide. Document Updated: 1/07. The Webmail Window. Displaying and Hiding the Full Header.

University of Sunderland. Microsoft Project. Basic Guide

Catholic Archdiocese of Atlanta Outlook 2003 Training

Creating tables in Microsoft Access 2007

WINDOWS LIVE MAIL FEATURES

Integrated Invoicing and Debt Management System for Mac OS X

Livescribe Desktop for Windows User Guide VERSION 2.3.3

Microsoft Project 2010

INTRODUCTION TO MICROSOFT PROJECT 2007 CONTENTS

Transcription:

MinuteManPlus Project Management Software Copyright 2011 MinuteMan Systems PO Box 152, Belmont, MA 02478 www.minuteman-systems.com email info@minuteman-systems.com

Contents 1.0 INTRODUCTION... 3 1.1 REGISTRATION... 4 1.2 SUPPORT... 5 1.3 INSTALLATION NOTE... 5 2.0 OVERVIEW OF BASIC OPERATION... 6 3.0 LOOKING AT THE LIST OF PROJECTS... 7 3.1 WORKING ON THE LIST OF PROJECTS... 9 3.2 THE TOP-LEVEL TIMELINE OF ALL PROJECTS... 13 3.3 TOP-LEVEL REPORTS... 14 4.0 LOOKING AT INDIVIDUAL PROJECTS IN DETAIL... 15 4.1 THE TIMELINE VIEW... 16 4.2 THE PLANNING VIEW... 17 4.3 THE PERT CHART... 18 5.0 USING THE TIMELINE VIEW... 19 5.1 NAVIGATION... 19 5.2 CREATING AND MANAGING TASKS... 20 5.3 RECORDING PROGRESS WITH THE %COMPLETE FEATURE... 22 6.0 THE PROJECT PLANNING VIEW... 23 6.1 THE TASK-DATA AREA AND TOOL BAR... 23 6.2 BASIC NAVIGATION... 25 6.3 TASK ENTRY AND EDITING... 26 6.4 PARALLEL TASKS... 27 6.5 TASK NUMBERING... 28 7.0 USING THE PERT CHART... 31 7.1 NAVIGATION... 31 7.2 CREATING AND MANAGING TASKS... 31 7.3 PRINTING THE PERT CHART... 31 8.0 TRACKING PEOPLE, RESOURCES, AND EXPENDITURES... 32 8.1 BACKGROUND: HOW RESOURCES ARE STORED... 32 8.2 TRACKING PROJECT HEADCOUNT RESOURCES... 33 8.3 VIEWING RESOURCE USAGE ON THE TIMELINE... 35 8.4 RESOURCE LEVELING... 37 9.0 USING THE REPORT GENERATOR... 38 10.0 THE PROJECT CALENDAR... 40 11.0 THE CRITICAL PATH TASKS AND IMPORTANT TASKS... 42 12.0 EARLIEST/LATEST DATE CALCULATIONS... 43 13.0 WORKING WITH SPREADSHEET FILES AND MICROSOFT PROJECT... 44 13.1 INPUT OF SCHEDULES USING SPREADSHEET FORMAT... 45 1

13.2 IMPORTING SCHEDULES FROM MICROSOFT PROJECT... 46 14.0 SENDING INFORMATION TO OTHERS... 47 15.0 USING TEMPLATES FOR SIMILAR OR REPEATED PROJECTS... 48 16.0 USE ON A NETWORK... 49 17.0 ABOUT FILENAMES... 50 18.0 DATA BACKUP AND RECOVERY... 51 19.0 FREQUENTLY ASKED QUESTIONS... 52 20.0 COPYRIGHT & OTHER INFORMATION... 56 LICENSE AGREEMENT... 56 2

1.0 Introduction MinuteMan-Plus is an easy-to-use program to track multiple projects. You can mange a list of projects at a high level; - Track start and end dates and durations - Identify resources; headcount and expenditures - View a Timeline for your projects (also called a Gantt Chart ). - Generate numerous text and graphics reports for individual projects and do roll-ups across all projects. Each project can then be managed in detail; - Create a detail plan consisting of up to 200 tasks or milestones within each project - Link tasks, identify a Critical Path, create a Work Outline, and apply other standard Project Management techniques. - View a PERT Chart ; a map of the relation of all tasks. - Perform As Soon As Possible and As Late As Possible scheduling This makes managing a project as simple as or as detailed as you need it to be. You can quickly create numerous projects using the basic features, capturing the key information. Projects needing more detailed tracking can be expanded using the advanced features. Relationship to Standard MinuteMan Project Management Software If you are familiar with standard MinuteMan, you will find that MinuteMan-Plus extends MinuteMan s single-project capabilities across 100 projects, providing an extensive yet easy-to-use high-level view of your projects. The Basic features described in this Help File allow you to do a high-level planning of multiple projects. The Advanced features are the same ones that standard MinuteMan provides for the detail planning and tracking of a single project. Standard MinuteMan costs $49.95 US. If your demands are for a single project, you can obtain at no charge a fully-featured evaluation copy at www.minuteman-systems.com. 3

1.1 Registration If you have already purchased MinuteMan-Plus, you may skip this section. Terms This is an evaluation copy of MinuteMan-Plus Management Software. If you find it useful, please register as indicated below. To purchase online by any major credit card or by wire transfer, please go to http://www.minutemansystems.com/howtobuy.htm#minutemanplus. There are several ways to purchase including; Individual copies at $99.95US each Individual Copies On CD at $109.95US each 5 pack of licenses with 1 CD at $399.95US Unlimited site license with 1 CD at $1699.95US You will receive by email a permanently enabling password(s) for the program. If you order a CD you will also be sent that separately. To order by FAX, run MinuteManPlus and use the menu entries for HELP and ORDER FORM and FAX. Fill in the indicated fields, including your credit card information, print out the form, and FAX your order to one of the indicated telephone numbers. You can also send a check or money order for $99.95 (US), with your return address and contact information (telephone, email, etc.) to; MinuteMan Systems P.O. Box 152 Belmont, MA 02478 USA From the main menu use HELP + ORDER FORM and LAND MAIL to access an easy order form. Discounts for Educational and Non-Profit Users Additional discounts are available for use in an educational or non-profit environment. Please send email to info@minuteman-systems.com describing your organization, and we will provide ordering information by return email. Updates The program is periodically updated about 3 or 4 times a year. Please check back periodically to our website. You can download the latest version at no cost. If you install it in the same location as your original registered copy, it should come up in a registered state. If not, just send an email to info@minuteman-systems.com and a new password will be supplied, again at no charge. You can also order an update on CD for $9.95on the order page listed above 4

1.2 Support If you have any questions about using the program or regarding an order, please contact us via email to info@minuteman-systems.com 1.3 Installation Note When you install MinuteMan-Plus, you may wish to configure your system so that double-clicking MinuteMan-Plus data files in a folder or on the Windows desktop will cause MinuteMan-Plus to be launched and that data file to be opened. To do this it will be necessary to associate the MinuteMan-Plus data file extension.prm with the MinuteMan-Plus Application MINMANP.EXE Following are instructions for doing this on Windows ME; instructions for other platforms are similar; - Launch My Computer and select View and select Tools and select Folder Options - Click the Tab for File Types and select New (See Note below if.prm is already in use) - Enter PRM and click OK - Under Details click Change - A list of programs on your computer will appear. If MinuteMan-Plus is not already in the list, Click Other and browse to the directory where MinuteMan-Plus is installed and select MINMANP.EXE. Typically this is installed in C:\ProgramFile\MinuteManPlus - Click OK as needed to exit NOTE: It is possible that there may already be a program on your machine associated with the.prm file extension. Print Shop is one program that uses that extension. If another program is associated with the PRM extension, the only way to associate MinuteMan-Plus with MinuteMan-Plus data files is to identify the other program in the above procedure and use EDIT to associate PRM with MinuteMan-Plus 5

2.0 Overview of Basic Operation MinuteManPlus can manage multiple projects at both a high-level for overview purposes, and at a lowlevel for day-to-day management. Please see the diagram below. When MinuteManPlus is started you are presented with a MainScreen which lists all the projects, as well as notes and comments on each. By double-clicking any project on the projects list, you then open up that project and can manage it in detail. The default is to work with a timeline, but there are also other views for seeing a flow chart of the project. In the detail view you can also assign people and fixed costs to tasks, and run a variety of reports. At any point you can always pop back up to the top level and manage the overall list of projects. 6

3.0 Looking At The List of Projects MinuteManPlus works on lists of projects. You open or create one list at a time. A list can have up to 100 projects in it. There is no limit on the number of project list files you can store on your computer. For the following sections it is recommended that you first launch MinuteManPlus and then use the menu for File and Open to load the sample project projlst1 that is supplied with the program. When you first load the sample project, you should see the following Project Summary view; The Project summary contains a list of projects, with fields for text comments, and schedule information. Active Help At the bottom of the screen, a Hint or Help bar is provided which describes the function of whatever field is below the mouse/cursor; As you become familiar with the program, you will have less need for the Active Help. It can be removed or restored at any time using the Menus for Options and Overall and Show Hint Bar. 7

The Toolbar A Toolbar is available across the top of the Project Summary View; The individual button features are as follows; File/Open Call up a windows-standard dialogue to load a project list. Save File present project list to disk (CTRL-S on the keyboard also activates this.) Print Reports Activates the Report Generator to print or file text reports about the projects. Costs Assign people and expenditures to a project Resources Define a list of workers available for all projects Calendar Define working days, shifts, holidays, special days, and more Detail Project View Click this to start a detailed schedule on any one project - Timeline View a Timeline or Gantt Chart of all projects. - Help View this Help File. The File/Open and Save are windows standard features for opening and saving your work. The Print feature has some advanced capabilities and will be discussed in detail in Section 5 about the Timeline MinuteManPlus also has many features for defining the times during which work can be done. Normal Workdays, Holidays, and repeating non-work days (i.e weekends) can be defined. Also, working days can have multiple shifts defined. The Calendar feature for using the features is also described in Section 6. MinuteManPlus has very capable features for defining resources and assigning them to projects. The Costs and Resources buttons will be described in detail in Section 7. 8

3.1 Working on the List of Projects There are 3 major areas of display in the main Screen; - The List of Projects - The Schedule for each project - The Information for each project In the List of Projects you enter (obviously) your list of projects or tasks. Whenever you highlight an indivisual project by clicking it, the schedule for that project is listed in the Schedule area, and text comments are entered in the Information Section The List of Projects This field acts like a small, two column, spreadsheet. You can edit any entry. The ADD Button inserts a new blank entry, and the DELETE button deletes the currently selected entry. The UP and DN (Down) buttons are used to change the position of the highlighted task in the list. If you click EXPORT it will export the currently selected project to a single file. The IMPORT button can be used to insert one or more projects from an existing list of projects. Please see later section 17 Working With Spreadsheet Files and Microsoft Project for further information using the IMPORT function to accept schedules created with spreadsheet files. 9

The Schedule Information The Schedule Information box allows you to specify and or calculate the start, end, and duration of a project. There is also a way to record progress on a given task via a percent complete field. If you click the START or END data field, (The Date itself, not the label Start: or End: ) a date-picker box will appear ; Click the desired Start (or End) date and then the SELECT button. The date will be entered for the project. If you enter an End Date, the duration field will automatically be calculated and updated to agree with the selected end time. Note that days that have been specified as Non-Working will not be accepted as Start or End dates. See Section 6, for information about setting Working and Non-Working days.. 10

In a similar fashion, clicking the Start or End Hours fields will activate a Time-Picker box; You can use the fields to select a Start or End time as appropriate. If you enter an End Time, the duration field will automatically be calculated and updated to agree with the selected end time. Again, please refer to Section 6, for instructions on specifying valid working and non-working hours. NOTE No task can be specified as ending at the start time of a valid work day or work shift. For example, with the default workday consisting of an 8-hour day with the hours of 8:00AM to 12:00 PM and 1:00PM to 5:00PM, you cannot specify a task as ending at 8:00AM nor 1:00 PM. The task should end at 5PM of the previous day or 12:00 AM. Similarly, a project cannot start at the end of a working period. While this may seem obvious, it is a common and easy mistake to make. You can also specify the Duration of Tasks in the indicated field. When you can enter any valid duration the End Date/Time will automatically be calculated and updated to agree with it. Enter 1.0 to indicate 1 working day (typically 8 hours). You can also enter fractional days ; 1.5 and 0.25 are acceptable ways of entering 12 and 4 hours respectively, assuming an 8-hour day is in use. The default units are working days. You can also make entries in hours instead of days; just type in 4h and it will switch to a default of hours. Enter 1d to return to a default of days. Note that MinuteManPlus has a resolution of 15 minutes and any duration entries will be rounded off to the nearest 15 minutes. 11

Adding Notes on Each Project The Project Information box allows you to record important information about each project. In the example project list there are 4 data fields labeled Account Name, Account Number, Budget, and Contact. You can edit these labels as appropriate for your projects. Just click any one of the existing labels (i.e. Account Name ) and the fields will be put into an editing mode; Edit the label, and when done use the Enter key or Tab key on your keyboard, or click something else on the screen, to leave the editing mode. Note that one set of labels is used for all Projects in a Project list, although each project can have different entries in the data field next to each label. The Comments: box allows you to enter free-form text comments or other information about the selected project. You can enter up to 1000 characters for each project. 12

3.2 The Top-Level Timeline of All Projects You can view a high-level timeline of all projects. Click the Timeline button, or use the menu for View and Timeline to switch to it. By using the Zoom Out button you should be able to view the Timeline for the list of projects as follows; You can edit project data in either the Project Summary or Timeline view, although you can only add or remove projects in the Project Summary View. To switch back to the Project Summary View, either press the TOP button View and Project Summary. or use the menu for There are also detail timelines available for each project, as will be seen later. 13

3.3 Top-Level Reports Activate the Report Generator by using the Menu for Reports and Report Generator. The following screen will be displayed; Click DONE to return to the original View. There are also more detailed reports that can be run on individual projects this will be shown later. 14

4.0 Looking at Individual Projects in Detail MinuteManPlus allows you to work on a schedule from 3 different views ; The Timeline or Gantt Chart is a method to show when tasks happen. The left hand side of the Gantt Chart is a column listing tasks individually. To the right of each task in the Gantt Chart, a box is overlaid on a calendar showing when the task occurs. Access from the toolbar with The Timeline is the view most often used for entering and editing tasks. The Planning View provides an additional ability to graphically layout the flow of your project. Access from the toolbar with A Pert Chart is an expanded way of showing the flow of work. Each box represents a task, and a line (or Link) from one to another means the second will take place after the first is completed. The Critical Path is the line of tasks through the PERT Chart, which directly affect the completion in a project. Access from the toolbar with All functions related to creating or editing tasks can be done from any of the 3 views. Each has its strength's; MinuteManPlus also provides 3 ways of numbering tasks, if that is needed. For the majority of projects where numbering is not needed, the default is a simple sequential numbering of tasks as they are entered.. Two outlining methods are also available for those projects that require budgetary tracking by task number. For simplicity, the majority of examples in this manual are given using the default Timeline view, and the simplest numbering system, All 3 views are described in a bit more detail further on in this section. 15

4.1 The TimeLine View The TimeLine presents the schedule against a calendar. It is very similar to the industry-standard Gantt Chart, but with a few improvements. In the above example, the tasks for one quarter (3 months) are shown. By using the In and years. Zoom Zoom Out buttons, you can select the range of time diplayed, from 1 day up to two The diagram above shows task durations. In the VIEWS menu entry, you can select two other important ways to display the TimeLine; Resource Usage and Resource Usage by task. These are described in more detail in a later section. 16

4.2 The Planning View The Planning View allows you to quickly enter tasks and establish relationships between them. The view below shows the Planning View used with the file project SAMPLE1 supplied with MinuteMan. The red and blue boxes in the grid on the right are individual tasks. (Red is Critical, blue is Normal, explained later.) Lines between tasks are links indicating that the task to the right can t start until tasks to its left have completed. A milestone (task with duration of zero) is indicated by a diamond within a box. Tasks with non-zero duration are indicated by a plain box. It is common to place similar, sequential, related tasks in the same row. The fields under Task Group Summary to the left of the grid may be edited to enter a general comment or description about the tasks in that row. Any task can be deleted by highlighting (clicking ) the task and clicking the -T button at the top of the screen. A task can be inserted at any vacant location in the grid by highlighting or clicking the location, and then clicking the +T button at the top of the screen. A task can be deleted 17

4.3 The PERT Chart This is a fairly standard way of representing a project. The focus is on identifying starting and ending relationships between tasks. Each box represents a task. The box contains information on the description of the task, its outline number, and start/end information. Lines from one task to another indicate a dependency - each rightmost task starts when all the predecessors to its left have completed. A task with zero duration is considered to be a milestone and is drawn with rounded corners. The critical path traces the sequence of events that are directly responsible for the completion of the project. By definition; a task is on the critical path if extending that tasks duration adds to the end date of the latest task in the project. Tasks or milestones on the critical path are drawn in red. Note: Pert Charts with a large number of tasks can take up a lot of space when printing! See section 13 for hints on compactly printing Pert Charts. 18

5.0 Using the Timeline View From the Timeline view you can create and manage tasks with almost all the same capabilities as in the Planning View. If you run the program and use FILE and OPEN to load the supplied SAMPLE1 you will see; When you initially launch the Timeline view, only the data columns for Task Number, Description, and Duration are displayed. Right-click the gray bar with Duration, Description etc at the top to show more columns or to select columns to hide. By dragging the Separator bar between this area and the actual timeline, you can also show the start/end dates and times. 5.1 Navigation By using the Zoom In and Zoom Out buttons, you can select the timeframe shown as being a Day, Week, Month, Quarter, Year, or 2 Years. 19

5.2 Creating and Managing Tasks When you launch the program, or use FILE and NEW, you see a default project with a single task named First Task with duration 1Day; To add more tasks, - click any empty box below First Task and type a task name, and use the Enter button on your keyboard - or, Use the mouse and left mouse button to drag a box anywhere in the calendar (right) area from the approximate desired Start to End date - or right-click anywhere in the column under Item Number and select Insert Task To edit the description, duration or start or end date or time - Click the appropriate box in the row of the task - or, Right-Click the task Description and select the desired item. Dates and Times are edited with a mini-calendar or menu. Note that if you edit the End Date or time for a Task, the duration field (further below) will be automatically re-calculated. Duration: Enter duration for a task in the indicated field. The d or h next to the field indicates the units in use; days or hours. To change units just include an H or D at the end of the field. I.E. if the Units are (d)ays, enter 3h to enter a 3-hour duration. For days or hours fractions may be entered; the program operates with a resolution of 15-minute intervals. I.E. 2.5 H is an acceptable entry. When the duration of a task is edited, the End Date and Time are automatically recalculated. 20

To create a link between tasks; - Use the left mouse button to drag a line between task task boxes in the calendar (right) area - Or Click the Links button on the toolbar Link Editor - A menu will be provided where you can select existing links and delete them, or select any tasks to add as predecessor or successor links. To delete a task, right-click in the Task ID column for the row of the Task, and then select Delete Task You can hide many of the columns in the display by right-clicking the title at the head of the column (i.e. End Date ) and then selecting Hide Column from the drop-down menu. There is also a Show All Columns choice. Other features on the toolbar, described later, are; - Add a text note to a task - Resources Define a list of globally available resources - Calendar: Define Working and Non-Working days - Costs: Assign (defined) resources to tasks. 21

5.3 Recording Progress with the %Complete Feature The %Complete feature may be used if you wish to record progress on your schedule. In each of the Planning, Timeline, and PERT Charts the data for the currently selected task contains a %Complete field that you fill out. The Timeline view provides a graphical indication of the %Complete as well as an indication of tasks running late. In the default Timeline diagram tasks on the Critical Path are displayed in Red, while those not on the Critical Path are Blue. The timeline can also show the %Complete for each task, and whether it is on time or running late. The %Complete for a task can be set using the menu in the data area; from the drop-down menu, or type a value in.. You can select a value To display %Complete on the Timeline, use the menu entries for Options and Timeline and Mark Completion. The above partial timeline for a single task illustrates how %Complete and Lateness are displayed. The task has duration of 4 days and starts on 12-May. The %Complete has been entered as being 25%. The green bar shows that 25% of the work has been done. This report was run on 14-May. If the task were following its schedule, it should have been 50% complete by the end of 13-May. The yellow bar shows the difference between the amount of work completed, and how much work should have been completed by now; i.e. how late the task is running. 22

6.0 The Project Planning View With the Timeline view it is easy to define a series of tasks and establish basic links between tasks. The Planning View provides a way to both create tasks then graphically manage their relationships; this is useful for more complicated things like individual or groups of tasks going on in parallel, at the same time. Section 4.1 will describe the layout of the planning view, and then the following sections will describe how to use it. 6.1 The Task-Data Area and Tool Bar For the Planning view, a Task Data Area is provided across the top of the screen. This is where data about the currently selected task can be entered, changed, or just displayed. There is also a toolbar across the very top of the screen. The Task-Data Area The data area presents information about the task that has been selected in the current View. The items in the data area are; Task #: This box lists the identifying number of the currently selected task. Numbers can be automatically assigned or you can create a structured outline. Duration: The duration of the task. Calculations may be done using days or hours, Start: The Start date and time of the selected task. End: The End date and time of the selected task Description: A brief description or "name" you can assign to identify the task. Longer text information can be supplied using the Note function on the toolbar. Cost: A rollup of the total costs associated with the task. Clicking the Cost button calls up a menu where you can assign People or Expenditures to the task. Links: A list of predecessors of the task. Clicking the Links button calls up a menu where you can add or remove predecessors to the Task. : Important selector/indicator ; Used to select individual Tasks as being Important. The button will be Red for those tasks that have been designated as Important. You can edit the Description, Duration, and Start Date/Time for a task. (If the Task is assigned predecessors The Start Date/Time will be recalculated and updated by the program.) The End date and Outline Number are calculated. 23

The Toolbar The toolbar provides quick access to frequently used functions, which are also present in the overall menubar. The toolbar buttons are described below; - Open An Existing Project - Save Project away - Print - Links: Create/delete predecessor or successor links for a Task - Notes: Append a text note to a task. - Resources Define a list of globally available resources - Costs: Assign (Defined) resources to tasks. - Calendar: Define Working and Non- Working days - PERT View or Project View - Add or Remove a Task in the current - Insert One Task between two others - Set Percent Complete for task - Insert or Remove a Row in the current Project View - Insert or Remove a Column in the current Project View - Help ; Activate the help file. - TimeLine View - Planning View Each of these functions will be described in more detail further on. Active Help At the bottom of the screen, a Hint bar is provided which describes the function of whatever field is below the mouse/cursor; As you become familiar with the program, you will have less need for the Active Help. It can be removed or re-activated by using the menu entries for Options and Overall and Show Hint Bar. 24

6.2 Basic Navigation When you first launch MinuteMan, and go to the Planning View, a default project with just one task is displayed as follows Because of the mechanics of the program, you must always have that one task in that position. It cannot be deleted or moved. You can however edit its properties to make it useful; you can edit the description, or duration, and add resources or notes just like any other task. You can select any box in the Tasks grid or the Task Group Summary column by clicking it, and then move around with the keyboard Right/Left arrows or Page Up/Down keys. 25

6.3 Task Entry and Editing Task Entry - A task can be inserted at any vacant location in the grid by highlighting or clicking the location, and then clicking the +T button at the top of the screen. A task can be deleted by highlighting (clicking ) the task and clicking the -T button at the top of the screen. Dates - Clicking the Start Date or Start Time Field will pull up a mini-calendar or menu from which you can set the Start Date and Time for a Task. Similarly the End Date and Time set those values for the task. Note that if you edit the End Date or time for a Task, the duration field (further below) will be automatically recalculated. Duration: Enter duration for a task in the indicated field. The d or h next to the field indicates the units in use; days or hours. To change units just include an H or D at the end of the field. I.E. if the Units are (d)ays, enter 3h to enter a 3-hour duration. For days or hours fractions may be entered; the program operates with a resolution of 15-minute intervals. I.E. 2.5 H is an acceptable entry. When the duration of a task is edited, the End Date and Time are automatically recalculated. Moving Tasks - You can move a task from one location to another by placing the cursor above the task, pushing down the right mouse button, dragging to another location, and releasing the right mouse button Creating a Task and a Link at the Same Time - You can create new task an link after any task by by placing the cursor above the task, pushing down the left mouse button, dragging to another location, and releasing the left mouse button Links; To manage the links for a Task, click the task and then click either the [ LINK ] directly above the grid, or LINK button on the Toolbar. A menu will be provided where you can select existing links and delete them, or select any tasks to add as predecessor or successor links. Managing Rows and Columns - As with a Spreadsheet, rows and columns may be added or removed using the +/- Row and Column buttons at the top of the screen. 26

6.4 Parallel Tasks The ability to graphically layout tasks makes it easy to define activities that are going on at the same time. Following is a simple illustration ; In the Planning View As Appearing In the Timeline View 27

6.5 Task Numbering The default operation is to number tasks sequentially, running from the upper left hand corner to the lower right-hand corner of the Planning View The program provides two additional methods for numbering tasks, for projects where it is desired to organize groups of tasks using an outline. To switch between the numbering modes, use the menu entries for Options and Overall and Task Numbering Style. The three methods are - Numbers (the default) - Outline - Outline with indenting In the Outline method, each row is assigned a number. The text in the Project Outline column serves as a name for the activities in the row. The first row in the Example below is 1., it s name is Row 1 and individual tasks in the row are then numbered 1.1, 1.2, etc See the example below. Row 2 is 2. tasks in Row 2 are 2.1, 2.2, 2.3 etc. In Planning View; As it appears in the Timeline View; 28

The Outline with Indenting method provides a means to indent whole rows below each other. When first enabled, note that the rows are now numbered 1.0, 2.0 etc. tasks within the row are numbered 1.0.1, 1.0.2, 1.0.3 etc Also note the appearance of the indent/outdent arrows at the head of the column. Click Row 2 and then click the indent arrow In the Planning View and the second row becomes indented below the first. As it appears in the Timeline View Rows may be indented up to 4 levels below the top level. 29

In the Planning View you can always insert additional Rows as needed. In the Timeline View, note that the same Indent/Outdent buttons appear at the head of the numbering column. In the timeline view you can insert outline row items by right clicking the Items column, but it must be at the point of an existing outline number (i.e. not on row representing a task; Here are a couple important points - The numbering system is purely for numbering purposes only; there is no rolling up of task durations or costs across indented rows - Switching backwards from Outline-with-indenting to one of the other views can introduce unexpected or surprising numbering results. 30

7.0 Using The PERT Chart The PERT Chart is an industry-standard way of displaying the sequence of tasks and their interdependencies. This view provides the majority of the same task management capabilities as are available in the Planning and Timeline views. 7.1 Navigation Navigation in this view is very similar to that of the Planning view. Click any task to highlight it. The data for the highlighted task will be displayed at the top of the screen. Right/Left arrow and Page Up/Down keyboard keys behave as in the Planning view. Lines from one task to another indicate a dependency - each rightmost task starts when all the predecessors to its left have completed. A task with zero duration is considered to be a milestone and is drawn with rounded corners. Tasks or milestones on the critical path are drawn in red. 7.2 Creating and Managing Tasks As in the planning view, - A task can be created or deleted at any location using the +T button (at a vacant location) or the T button (for a highlighted task). - A task can be moved from one location to another by dragging with the right mouse button. - A new linked task can be created by dragging from an existing task to a vacant location using the left mouse button. 7.3 Printing the PERT Chart PERT Charts can take up a lot of space. There are several things that can be done to minimize taping together multiple sheets of paper. The PERT Chart can be printed on larger size paper (if available on your printer) or a number of pages can be compressed into one graphics file and printed on a single page. Se Section 14 for details. 31

8.0 Tracking People, Resources, and Expenditures MinuteManPlus provides several features that allow you to track people, costs, purchases, and equipment. This can be used to prepare a budget, to track costs, or to help you keep track of how much equipment needs to be ordered and when. MinuteManPlus breaks all resources into two general areas; Head-Count Resources, and Expenditures, but each can be used in different ways; Headcount; 1) Track individuals by name (J. Williams, E. Martin, etc) 2) Track people by job category (Hardware Engineer, Accountant) 3) Calculate labor costs on an hourly basis Expenditures; 1) Individual Purchases (Rental Fee $55, Tooling Charges $3000, etc) 2) Piece Parts (5 Integrated Circuits @ $2.00 Each= 10$, 10 Boxes Paper @ $7.00 Each =$70, etc) In general, Headcount Resources have costs that increase with the duration of a task, while expenditures reflect fixed costs. 8.1 Background: How Resources are Stored MinuteManPlus creates two files to store all the information for any one project; FILENAME.PRM stores the information on individual tasks, durations, links, etc and other general project information for project FILENAME. This information is unique to that one project. FILENAME.RSC stores a list of resources that have been defined by project FILENAME. That same list can be imported and used by any other project, to save having to redefine a commonly used resource list. 32

8.2 Tracking Project Headcount Resources You define resources and assign them to tasks using the Costs button on the toolbar. When you click it, on the left you will see a list of tasks in the project (as from the Timeline View) and on the right you will see 4 tabbed windows for managing costs and resources. You first define resources and expenditures, using the Available Resources and Common Expenditures tabs, and then assign them to tasks using the Resources and Common Expenditures tabs. The tabs are each used as follows; Available Resources; To create a Resource, type it s name in a blank line under the Description column, then use the Enter or Tab key on your keyboard. Then enter the Hourly rate under Cost/Hr. The Max field is used to specify how many of that particular resource may be in use at any time; if you have 3 carpenters available, enter a Max of 3. When the program is calculating schedules and costs, it will flag any resource that is over0-used at any point in time To delete a resource, right-click anywhere in the line or just delete it s Description field. 33

Common Expenditures - Create, delete, or edit a commonly available Expenditure the same as a resource. Resources; This tab applies to the Task currently selected on the left hand side of the screen. To add a resource to a task, make a selection from the dropdown menu in the Description column. To delete a task just right-click somewhere in the row. The Qty field defines how many of the resource are applied to the task. There is a drop-down menu under Usage where you specify some options for using the resource; Full Time, or Hours/Day, Days/Week, etc. Two special entries are Days and Hours. These mean a fixed number of Days or Hours regardless of the duration of the task. All the other settings apply the resource based on how long the task takes. The Cost/Hr cannot be edited; it just displays the amount that was defined in the Available Resources tab. Expenditures ; This applies Expenditures from the Common Expenditures list to the selected task. Add, or delete an Expenditure the same was as adding resources. 34

8.3 Viewing Resource Usage on the TimeLine The VIEW menu enables you to call up two views of the TimeLine, which display resource utilization; Resources-Summary and Resources - By Task. Resources Summary (above) lists the utilization of each resource over time. Tasks that are at or under their specified maximum usage are indicated in Green, while those being consumed above their specified usage are shown in Yellow. 35

Resources-By-Task provides additional detail on which task is calling for each resource. Critical-Path tasks are indicated in Red, and Non-Critical Tasks are shown in Blue. 36

8.4 Resource Leveling Resource Leveling is the ability to adjust a schedule to reflect the availability of resources; if two tasks both require the same worker, one task must be delayed until the other is complete. MinuteManPlus provides an option to automatically perform resource leveling on the entire schedule. This feature is normally turned OFF. To turn it ON use the menu entries for Options and Overall and then toggle Resource Leveling Here are a couple things to note about planning a project with Resource Leveling About ALAP Timing As Late As Possible timing has been described elsewhere in this manual. ALAP timing should not be employed on any tasks when Resource Leveling is enabled; the two features can lead to contradictory results. The program will provide a warning of attempts to have both features on. Task With No Predecessors; If you have a task with a given Start Date, and then turn Resource Leveling ON, and the Task s Start is delayed due to a resource conflict, the Task s Start date will not be returned to its original value if you turn Resource Leveling back OFF. The program has no way of knowing what the original Start Date was. However, there is a way to make a Task s Start return to an original value if needed; create a Milestone (zero duration task) with no predecessors at the desired Start Date, and make that Milestone a predecessor to the Task in question. Resource Leveling will not move the Milestone s dates. If Resource Leveling is later turned OFF the linked task s Start Date will return to that of the Milestone. Critical Path and Critical Chain; the concept of the Critical Path has been described elsewhere. When Resource Leveling is turned ON, the Critical Path takes on a new meaning. Rather than reflect a timedriven completion of the project, it is reflecting a resource-driven completion of the project. A Critical Path calculated for a Resource-driven schedule is commonly called a Critical Chain. 37

9.0 Using the Report Generator The Report Generator may be used to develop a number of reports. The reports displayed on the screen may be sent to a text file or printed using the buttons in the upper left hand corner. A Header and Footer can be specified using the fields shown. The Report Generator has 3 Tabs labeled data, Filters, and Layout. On the data screen, the reports may be selected from the REPORT: Pull Down Menu as follows; Project Data - This report presents the schedule information for all tasks in sequential order. The Headcount, Expenditures, Notes and Predecessors (Links) may each be optionally included or excluded in the report. Cost Summary - This report lists the people and expenditures used across all tasks. 38

Cost Summary by Task - This report lists the people and expenditures used on a task-by-task basis. Expenditures - This lists discrete purchases, by task and totalized, across the project. It may be used to track one-time purchases, general cash usage, and also key components that must be bought. Staffing Assignments This list for each person the teasks they are assigned to and the date/time for those tasks. Staffing - Costs: This lists for each person the tasks they are assigned to, the resulting labor cost for the task, and the total cost per person and per-project. Earned Value - This provides a way to view overall project progress by tracking the financial "worth" against budget of tasks as their completion is recorded. Reminders Identifies tasks that fall within a specified range of days or on a specific day. Useful for identifying What s due this day, week, month, etc On the Filters tab you can further customize the reports using the following options; Summary Line - Include the Summary Description of a group of related tasks (I.E. the label from the lefthand column of the Planning View.) Predecessors - List all predecessors of each task. Headcount - Include Headcount name/qty/cost information for each task. Expenditures - Include individual expenditures by name/qty/cost for each task. Notes - Include the next note for each task. Show Hours - When reporting dates, include hours A Special Feature of Reminders When you select the Reminders report, in the Filters tab you select tasks that start or end within a certain date range or on a specific date. Also, one checkbox specifies that the Reminders report be run and displayed every time you start the program. There is also an ability to run reports on only those tasks meeting certain selection criteria. Under the Tasks To Report On the default is to Select All Tasks. If you click Select from list at right: you can narrow down the tasks reported on. The report will cover only those tasks selected under Only if all of meeting all the choices which have been checked (Has Headcount, Has Expenditures, Is On Critical Path, is Important, is a Milestone with Duration = 0.) The list of task reported on is further narrowed to only include those listed under And Is which covers tasks that are Not Started (%Complete=0), In Progress (%Complete >0 and <100, and Complete (%Complete =100). Tasks can also be filtered by Late. For example, to report on only those task which are on the critical path and completed, check only the box that says Critical and the box that says complete. NOTE You must select at least one of Not Started, In Progress, or Complete, or you will effectively rule all tasks out of the report. 39

10.0 The Project Calendar It is important to be able to define regular working and non-working days, and events such as holidays, vacation days, or days with a different working schedule. Click the toolbar button for the Calendar. A calendar view will be presented. Standard working days are drawn in white. Days with non-standard schedules are drawn in yellow. Non-Working Days are indicated in shaded/gray. You can advance or back up by a month- or year at a time by clicking the buttons to either side of the current month. Units of Time The program uses standard 12-Hour AM/PM nomenclature. The smallest resolution of time is the 15- minute interval. Entries can be made in terms of Days or Hours. You can change the default using the button at the lower left of the Calendar Screen. Alternatively, when typing in duration, if you follow it with an "h" or "d" (for "Hours" or "days"), the system default will be changed to reflect that. Working Shifts You can specify up to 3 working shifts. A Standard (default) shift can be scheduled, and Custom shift schedules can be specified for individual days or groups of days. Shift hours are specified using the scheduling boxes at the bottom of the dialog box for this. The three buttons at the lower right of the screen allow you to Reset the standard work day to an 8-hour default, copy the Standard Workday schedule to a Custom Day, or to clear the Custom Day entry to start over. 40

Setting Work Days When you click any one day, its status as Standard Working Day, Custom Working Day, or Non-Working Day is displayed in the box to the right. The day's status can be changed, by clicking the adjacent button for "Standard Work Day", "Custom Work Day or "Non-Working". When you select an individual day as "Custom Work Day", you can the set the shift schedule for that day using the scheduling boxes at the bottom of the screen. You can also select a day and click "Non-Working Day" to indicate that there are no working hours on that day - such as for a Holiday. Note: The program allows the specification of a maximum of 100 Custom Days and a maximum of 100 Non-Working Days. You can set periodic days off, typically weekend-days, by clicking that day name at the head of a column ("Sun") and then clicking the "Working" or "Non-Working" button. Similarly, you can set periodic Custom-Day schedules by clicking that day name at the head of a column ("Wed") and then clicking the "Custom" button. Example - On Wednesdays we only work for a half-day. All calendar settings are saved when you exit the program. A simple "Working Day Calculator" is provided to the lower right of the calendar screen. Enter, or click, a starting date followed by duration, and an end-date will be displayed. This is the end date based on working days as opposed to just elapsed days 41

11.0 The Critical Path Tasks and Important Tasks MinuteMan supports Critical Path project tracking. The Critical Path is commonly defined as the sequence of tasks which directly affect the completion date of a project. Tasks on the Critical Path are the ones to focus on shortening in order to make a project finish sooner. As a simple example, paying for Overnight Delivery vs. Standard Delivery, for a shipment that is on the critical path, can directly shorten a project. MinuteMan recalculates the Critical Path every time an edit is made to the schedule. By default, the Tasks that are on the Critical Task are indicated in red in the Planning, Timeline, and PERT views. This can be changed using the menu entries for Options and Overall and Critical Path; you can elect to mark all tasks as Critical (all red) or no tasks as critical (all are blue or black) A related feature is the ability to designate certain tasks as Important whether they are on the Critical Path or not. There is an Exclamation Point button immediately to the right of the task Description: Field at the top of the screen. Clicking this button toggles whether a task is marked as Important or not. If the task has been marked as Important, the Button will turn red. Additionally, the menus for Options and Overall and Critical Path include a choice indicate important tasks - this means that red will be used to indicate Important tasks instead of Critical Path tasks in each of the Planning, Timeline, and PERT views. 42

12.0 Earliest/Latest Date Calculations Normally MinuteManPlus calculates all dates on a "do it as soon as possible" basis. Each tasks' start date is set to the finish date of its last-completed predecessor. This is called the "As Soon As Possible" or "ASAP" method. However, in some cases you may want to have one or more tasks actually occur As late As Possible or "ALAP", to defer expenses or labor. MinutemanPlus supports ASAP and ALAP methodologies, selectable on a per-task basis. By selecting the menu entries for Options and Overall and Select ASAP/ALAP the Data area of the screen will be changed to look as follows; Note that the area formerly used to display Links and Costs has been replaced with a drop-down-list and the EXECUTE, Help ("?"), and Close ("X") buttons. The Links and Costs can still be accessed via the related Toolbar buttons. Operation of these new features is as follows; "X" reverts to the mode of displaying the Links and Costs. "?" Displays a very brief summary of this operation "Execute" is used to activate choices selected in the drop-down-list The drop-down-list choices are; "New Tasks are ASAP" means whenever you enter a new task it will be treated as an ASAP task "New Tasks are ALAP" means whenever you enter a new task it will be treated as an ALAP task "Set All Tasks to ASAP" will convert all existing ALAP tasks to ASAP when Execute is clicked. "Make Selected Task ASAP" - Highlight an ALAP task, click "Execute", and the task will be converted to ALAP. "Make Selected Task ALAP" - Highlight an ASAP task, click "Execute", and the task will be converted to ASAP. Note that the label "Start" for any ALAP task is modified to "Late Start", to allow it to be distinguished from ASAP tasks. Here are a couple notes on how ASAP/ALAP timings are calculated; All calculations are done in a two-pass mode; The entire project is first calculated with each task as ASAP (including the Critical Path identification). Then any tasks identified as "ALAP" are delayed as much as possible without delaying any ASAP tasks, and without changing the Critical Path. This dual calculation is transparent to you - all you see is the end result. Note this means that if there is a conflict between tasks such as an ALAP task being the only predecessor to an ASAP task, the ASAP task "wins" and stays where it is, whether on the critical path originally or not. 43

13.0 Working With Spreadsheet Files and Microsoft Project MinuteManPlus can exchange data with Microsoft project using the MPX file format. MinuteManPlus has the ability to accept project schedules that were generated in spreadsheet format. 44

13.1 Input of Schedules Using Spreadsheet Format MinuteManPlus can accept schedule data from a spreadsheet-format file. This is useful if you have created basic task information using a spreadsheet. Also, this allows you to port schedules to MinuteManPlus from other programs that support spreadsheet-format outputs (See Microsoft Project further in this section.) MinuteManPlus accepts schedules in comma-delimited text file format, which as an industry standard has.csv as a file extension. In order to input a spreadsheet file, use the usual IMPORT button in the main Project Summary view. When the dialog box appears, in the field for File of Type select Comma Delimited Spreadsheet files and then browse and select the desired file. MinuteManPlus requires that some minimal information be present in the file in order to create a meaningful schedule. Following is a description of the format expected. Summary; The file must be comma-delimited text. The first line must have Titles ( Fields ) corresponding to the data in each column. The expected fields are described below. MinuteManPlus will ignore fields and columns beyond the ones described below. (i.e extra columns won t prevent the file from being read.) Each line after the first line will correspond to the data for a single task. There may be up to 200 tasks entered. Following is a detail description of the file requirements; The following verification rules are applied to any imported spreadsheet file. If any of these conditions are not met the whole file will be rejected. Overall - Only comma-delimited files are accepted - The first line must include Field Names. - The program will use Field Names from the following list; Description, Start Date, Start Time, End Date, End Time, Duration, Predecessors - Spelling of Field names must be exactly as above. Field names are not case-sensitive. - The listed Field names may appear in any order or position in the first line. - Some of the Field Names are Mandatory. Others are Optional; the program will attempt to compute missing optional Field Names. See the description "For Each record" - Other field names may be present but they will be ignored. For Each Task Record - Each Task shall be on one line with comma-delimited data Fields corresponding to the Field Names in the file's First Line - There must be at least one Record in a file. - There can be no more than 200 Records in a file. - Each Record must have a Description and Start Date - If a Start Time is not specified, the Start Time is set to the first working hour of the specified Start Date - If an End Date is Specified but not an End Time, the End Time is set to last working hour of the specified End Date - If an End Date is specified, the Duration (in days) will be calculated from the Start Date/Time and End Date/Time - If a Duration is specified but no End Date is specified, the End Date/Time will be calculated from the Duration and the Start Date/Time - The Description shall be any text. Descriptions longer than 50 characters will be truncated. - Start Date and (if present) End Date shall be a date only (not including time) and shall be compliant with Windows usage. - The Start Time and (if present) End Time shall be 12-HR AM/PM format i.e. "8:00 AM", "11:00PM" 45

13.2 Importing Schedules from Microsoft Project Background; Versions of Microsoft Project prior to 2003 support input and output using the publicly defined "MPX" file format. - To Read an MPX format file into MS-Project, just use File and Open and select 'files of type' and 'MPX' - To Save an MS-Project file as MPX format, just use 'Save' and select 'files of type' and 'MPX' For versions of Microsoft Project 2003 or later, the program, will read in MPX files but will no longer write out MPX files. MS-Project 2003 and later can write 'CSV' format spreadsheet files. To Save a Microsoft Project file in CSV format, use File and Save As and select "CSV" You will be walked through an export wizard. If/When prompted, select; - Use existing Map - Default Task Data - Select the comma separator (caution - that is not the default) MinuteManPlus can read and write MPX Files and CSV Files - To Write a MinuteManPlus file to MPX format, use File and Export and select "To Microsoft Project MPX" - To Read an MPX File into MinuteManPlus, just use File and Open and for "Files of Type" select MPX - To Read a spreadsheet file from MS-Project 2003 into MinuteManPlus, just use File and Open and for "Files of Type" select "CSV" Comments There is not an exact translation of files between MinuteManPlus and Microsoft Project. Here is a partial list of differences known at this time; First, MinuteManPlus will only read-in a subset of all the features that may exist in a Microsoft project file. Task names, dates and durations, resources and links are read in. Other data is not. Here are some other differences that have been identified so far - The two programs may have different workday schedules and calendars. There is not a means to automatically synchronize them. Consequently dates and times may be moved around a bit in going from one program to the other. Example; If one program uses Sunday as a workday and the other doesn't, a task on a Sunday will get moved to a working day on the other program. If important, you can manually set the calendars of the two programs to be similar. MinuteManPlus has limits on the number of tasks-per-project (200) and links-per-task (5) and will delete any incoming entries, which exceed this or reject the file outright. 46

14.0 Sending Information to Others You may have a need to share your schedule with other people who may or may not have a copy of MinuteManPlus. The next section discusses sharing data files with people who have their own copy of the program. To help share your schedule with people who don t have a copy of the program using, the program provides text and graphics file outputs which can be shared with others using conventional office tools such as email, word processor files, or posting on a website. As discussed in the section on the Report Generator, all reports can be output as text files that can then be emailed, included in a word processor document, or posted on a website. All Screen Views such as the Timeline and PERT Chart can be sent to graphics files. These graphics files can be inserted directly into word processor documents, sent via email, or posted on a website. A word processor can also be used to re-size, combine, or otherwise modify the graphics files For any View, when you select "Print" a conventional Print dialog box will come up. Under the list of Printer choices, the last says "Graphics File.BMP". Selecting this device will choose sending the output to a graphics file. The graphics file(s) will be sent to a subdirectory /GRAPHICS off the directory in which MinuteMan is installed. There will be one file for each page of output. For the Pert chart they will be named PERT1.BMP, PERT2.BMP etc for each page. Files for the Timeline view will start with TIME and for the Planning view will start with OUTL Please note that any time you do a graphics output of one view, all previously existing files of (only) that same type in the directory will be erased. Pert Charts in particular can become quite large, and if printed on standard pages such as US 8.5 x11 can require taping a large number of pages together. The Pert Chart Print Dialog Box supports paper sizes up to 17 x22 ( US Size C ). This will fit more of the output on each physical page. They can be resized even further as graphics files within a word processor document. Legible results have been obtained with a 'C' formatted output reduced to 'A' on a single page within a Word processor. It is recommended that you experiment with various page/orientation settings and your Word Processor to determine the optimal printed output. 47

15.0 Using Templates for Similar or Repeated Projects Very often you may find that different projects have the same basic format; similar tasks and durations, but perhaps starting at a different point in time. One project can be used as a template and repeated, thus saving the work of having to re-enter the same information multiple times. Let s say that you have 5 projects defined as below, and that Project #3 is of a format that you wish to use over and over. You can save project #3 as a Template by clicking the Template button the top of the list at In the Templates menu that appears, Select Export and Click the EXPORT CURRENT PROJECT button You will be prompted to save that one project in a file by itself. When you wish to add multiple copies of that project to the overall collection of projects, use the Templates button again and this time 1.) Select Import A Project Template ; you will be prompted to select the project file to import 2.) Set the Start or End date for the imported project 3.) Click Done With Import and the template project will be added to the end of the project list with the new Start or End date. You can then open and edit that newproject as needed. 48

16.0 Use On A Network MinuteManPlus is a desktop application. It is not a networked or client server application. Still, it is possible to share information with others who have the program. Sharing Files On A Network If your computer is on a network, and you have a common file storage area, you can save your files (the actual working files or a copy for distribution) on the common storage area where others can access them. A common question is; What if two people are working on the same file at the same time? The problem; When the program opens a schedule, it creates a local copy where the changes are made, and when you do a save it writes the local copy over the original. So, if two people were working on a file at the same time, they would actually be working on separate copies and whomever did Save last would overwrite the others changes. The Solution; While the program cannot prevent mulytiple people from opening the same file, it can provide a warning that a file is already being worked on by someone else. To enable this feature, on the main screen select the menu entries for Options and Overall and then click/select Indicate File In Use. Use In A Citrix or Terminal Server Environment Some office networks provide an ability to host a single copy of a program on a central location which can then be run by multiple people at the same time. Citrix and Windows t\terminal Server or Remote File Share are a couple methods use to do this. Note1: MinuteMan Systems does not provide technical support for doing this it is up to your own IT people to implement it. Also, MinuteMan Sysytems products have not been technically verified as working in such environments you may or may not be able to use it as such. Note 2: In the event a single copy is hosted for multiple users, your company should still acquire a multiuser license. Direct File Transfer Lastly, you always have the option of copying the project files to a storage device such as a flash drive and moving it between computers. When doing so please note that each project consists of two files projectname.prm and projectname.rsc. Both must be copied to deliver all the project information. Also, any modifications you make to the working calendar, and any view preferences, are only stored locally and you may wish to also copy those from one computer to another. The calendar is stored in file CALENDAR.DAT in the same directory where the program is installed. Viewing preferences are stored in file MINMAN.PRF in the same directory where the program is installed. 49

17.0 About Filenames This is a description of several files used by MinuteMan. It is intended to be of assistance when making any backups of your data Per-Project Files MinuteManPlus stores 2 files for each project list you that create as follows; filename.prm stores schedule and miscellaneous information for the project filename.rsc stores resource information for the project filename.txt when you save a report from the report generator to disk, this filename format is used. Common Files The following files are used by MinuteManPlus in common across all project lists; Minman.prf stores preferences you may have elected Calvb4.dat - stores the working calendar information 50

18.0 Data Backup and Recovery MinuteManPlus provides a data-archive feature to aid in recovery of data should a mis-operation occur, such as a power failure. Whenever you save a file, a duplicate copy is made to a directory \BACKUP located off the directory in which the program is installed. Typically that becomes c:\programfiles\minuteman\backup The 10 most recent files are saved here. They are named mm_archive_1 through mm_archive_10. As each save is performed, the previously stored copies are renumbered and pushed down. Therefore mm_archive_1 is always the most recently saved file, and mm_archive_10 is the oldest. If you do lose data somehow, run the program and use the Open function to open these files; typically starting with mm_archive_1 and proceeding to mm_archive_10 as needed. Apart from the backup provided by the program, its always advisable when using any software to periodically backup your data to diskette, CD, or a file-server. When backing up MinuteManPlus files, make sure to backup both of the files associated with each project; filename.prm and filename.rsc. 51

19.0 Frequently Asked Questions General Questions and The Summary View These questions cover the primary viewing screen, the Summary view, and some features that apply across projects overall. 1.) How Can I Print to a PDF Document? The best way to do this is to use a PDF Print Driver on your computer. Many computers come with one already installed. Otherwise there are many available on the internet. There is a good one, with a free version, available at www.pdf995.com. To print anything to a PDF file, start to print as you normally would, and when offered a Printer to select, scroll down to and select thye PDF Driver. Then just proceed with the printing. You will be prompted for a filename and location to print to. 2.) What are the Labels for? Question What are those fields that just say Labels used for? Answer Those are the titles of 4 customizable, general-purpose fields you can use for recording key data about your projects. Take a look at the example projects supplied with the program. For example, they could be setup to have an Account Name/Number, Contact, Telephone Number, etc. You set the labels once for all projects, and then for each project you can enter its relevant information in the field to the right of the Label. You can edit any of the labels by clicking it, typing in a new label, and then hitting the Enter or Tab keys on your keyboard, or clicking something else. The Fields themselves can be just clicked and edited. 3.) How Do I Specify Working And Non-Working Days/Weekends? Question - Our Company works on Saturdays, but the Calendar always shows Saturday as a non-working day. Can I change that? Answer Yes. Any day-of-the-week can be designated as working or non-working. To do this, use the menu for Options and Overall and Set Calendar (or click the Calendar symbol on the Toolbar.) Now click the name of the workday, at the top of the column, for the day you want to change. In this case click Sat at the head of that column. In the box at the right-hand side click Set Standard Working Day. Note; if all occurrences of a workday (i.e. all Saturdays) are set as non-working, you cannot then change individual days (i.e. just Saturday November 18 th ) back to working. 4.) How Do I Schedule Part-Time Workers? Question - When assigning people to a task, I have some people who only work part-time on a given task. How do I handle that? Answer If the person is going to work part-time on the task for the duration of the task, you can assign them to that task on a fractional basis. Click the task, and then click the Costs button on the Toolbar (it looks like a US Dollar Sign - $). Select a resource from the pull-down-menu and then under Quantity type the fraction as a decimal;.5 for 50%,.33 for 33%, etc If the person is going to work full-time for part of the task, and not at all for the rest of the task, you should break the task into two separate tasks and assign the person at 100% to one, and 0% to the other. 5.) How Do I Specify Currency Symbols? 52

Question - Speaking of US Dollar Signs, we re not in the US. How can we use a different Currency Symbol? Answer Use the menu entries for Options and Overall and Currency Symbol. You can select from the US Dollar Sign, the UK Pound symbol, or a single alphabetic character. You can also select No Currency Symbol. 6.) How To Send Reports To People Who Don t Have MinuteMan-Plus? Question - I need to send status reports with the Timeline (or Charts) to people in my department. Do they each have to have a copy of MinuteMan-Plus? Answer Not at all! This is a very important feature of MinuteMan-Plus. You can send the Timeline, Outline and PERT Charts to a graphics file.bmp output instead of a hardcopy printer. (Also, the output of the Report Generator can be sent to a.txt text file on your system) You can then just insert the graphics files or text files into a word processor document or email, format them as you wish, and distribute them to anyone. To obtain a graphics output of the click Print as you normally would. In the Print Dialog, under the list of available Printers, select Graphics File. The just print it. One file will be created for each page and sent to a sub-directory /GRAPHICS off the directory where MinuteMan-Plus is installed. They will have names like TIME01.BMP, TIME02.BMP, etc. Questions on The Detail Scheduling Views These Questions apply to the detailed project views of Outline, PERT, and Timeline. 7.) How do I maneuver between different views? Question I m confused about maneuvering between the Summary View and the detail project views. And why does the timeline sometimes show different things? Answer In the Summary View you can either enter data at the Summary level, or view the Timeline of all your projects at once. To create a detail schedule for any project, click the project in the list of projects, and then click the Detail Project Schedule button on the toolbar. This will initially go to the Outline View. When generating a detail schedule you can use buttons on the toolbar to alternate between the Outline View, the PERT Chart, and the project s own Timeline. To return to the Summary view use the BACK button. Depending on if you are using the Summary view or the Detail view, you will get two different Timelines displayed. In the Summary view you are seeing each project, whether detailed or not, represented as a single line with a Start and End. If you are in the Detail view, the Timeline will show all the tasks for only that current project. 8.) Why Can t I Edit a Task s Start Date? Question - I can t edit the Start Date for a task. Why not? Answer This is most likely because the task in question has a predecessor. That is, it is linked to another task or task. The Start Date is always calculated as equal to the End Date of the last-to-complete of 53

all the Predecessors of a Task. If you want a task to start on a Specific Date, it shouldn t have any predecessors. To remove a task s predecessors, click the Task to highlight it, the click the button labeled Links in the upper display area (or click the button that looks like a chain link in the Toolbar). Select each predecessor and click DELETE for each, and then DONE when finished. 9.) Why Do Entries Move Unexpectedly? Question - In the Outline View, or the PERT Chart, I get all the tasks arranged just where I want them, and then the program moves them around! How do I stop that? Answer By default, the program left-justifies all tasks. (Usually this happens when recalculating dates) Each task goes to the left as far as it can without passing its predecessors. This results in a more compact view that tends to show the flow of work better. You can shut off this automatic left justification. Use the menu entries for Options and Overall and click/toggle Automatic Reposition Tasks. 10.) What Do Red And Blue Signify? Question - Why is it that in the Outline View some of the boxes are Red and some are Blue? Can I change it? Answer Red is used to indicate tasks that are on the Critical Path. Blue tasks are those that aren t on the Critical Path. The Critical Path is a standard term in Project Management defined as the sequence of tasks for which changing the duration of any one task, on the path, changes the completion of the last task in the project. This is important if you are trying to shorten a project the best way to do it is to focus on shortening those tasks on the Critical Path. You can use the menus for Options and Overall and Critical Path to make all tasks Red (mark as Critical) or Blue (mark as Non-Critical) or back to the Standard Practice of indicating both Critical and Non-Critical Note: MinuteMan-Plus does not support, at present, a means to selectively highlight some tasks as being more important than others. Sometimes people seeing the term Critical Path take it to mean Selected as Important but that is not what the Critical Path is about. 11.) Can I Delete The Start Task? Question - Why can t I delete the Task labeled Start in the upper left corner of the Outline View? Answer This task serves as a starting point for all Critical Path and Date calculations in the present task. You can just leave it in and ignore it, or you can edit it to be part of something in the beginning of your project. 12.) How Do I Link To Tasks Off-Screen? Question - I need to create a link from one task to another that is not on the presently viewable screen. How do I do that? Answer Click the latter task, the Successor to highlight it. Then click the Links button. A Predecessors window will come up. Use the drop-down menu to select an eligible predecessor. Then click Add and then Done when finished. 13.) What Is A Circular Dependency? Question - I tried creating a link, but it got rejected with a message This would create a circular dependency. What s that? Answer A circular dependency is when you ve got a circle of tasks all dependent on each other, where it is impossible to determine the start and the end. As a very simple example, consider just two tasks A and B 54

where A is to start after B is complete, and B is to start after A completes. Obviously this is an impossible situation, and a schedule could not be calculated. When you get a larger project, with a lot of tasks already linked, it becomes easy to inadvertently attempt to create such a loop. The program automatically detects this and prevents it. 14.) Can The PERT Chart Be Made To Use Fewer Pages? Question - My PERT Chart, when printed, takes up too many pages! I don t like taping them together. What can I do? Answer PERT Charts inherently use a lot of space, and paper, but there are a few things you can do to minimize this. You can print on bigger sizes of paper, up to US size C (17 x22 ) if you have a printer or plotter that supports it. That will cut down the number of pages to be taped together. Another, maybe better, way is to send the PERT chart as size C to a graphics file as above. Then, read each page into a word processor and re-size it so it fits onto a single A size page. This results in a 4:1 compression of the PERT Chart, and a corresponding reduction in the number of pages. 15.) Why Do Some Tasks Appear Twice?? Question - In the detail Timeline, why does each task get repeated? It shows up on two rows. How can I stop wasting all that space? Answer First some background; In the Outline View, you can have one or more related tasks in the same row. The text in the Work Outline on the left is intended to serve as a general description for the activities in that row. If you only enter one task per row, by typing the text in the Work Outline area, then that one task will by default have the same Description as the Work Outline Text. (Y can easily edit it to be something else. Just highlight the task, and edit the Description Field.) Proceeding to the Timeline, it is set up by default to display the Work Outline text on one row, and then on succeeding rows the descriptions of all the tasks in the same row in the Outline View. So, if you only have one Task per row in the Outline View, and each task has the same Description as its associated Work Outline text, then it is going to look like each Description is printed twice. There are two things that can make this look better; One is to enter multiple tasks on the same row in the Outline view. The other is, just shut off the Display of the Work Outline Text in the TimeLine View. Do this using the menu entries for Options and Timeline and then click/toggle Display Summary Information. 55

20.0 Copyright & Other Information Copyright This software and documentation are copyrighted 1997-2011 by MinuteMan Systems. License Agreement This software is licensed to you, for your own use. This is copyrighted software. You are not obtaining title to the software or any copyright rights. You may not sublicense, rent, lease, convey, modify, translate, convert to any other programming package, decompile, or disassemble the software for any purpose. You may make as many copies of this software as you need for backup purposes. You may use this software on more than one computer, provided there is no chance it will be used simultaneously on more than one computer. This software is supplied as-is. There are no warranties, expressed or implied. This software is not to be installed on Windows 95 or Windows 98 systems. Minuteman Systems disclaims all warranties relating to this software, whether expressed or implied, including but not limited to any implied warranties of merchantability and fitness for a particular purpose, and all such warranties are expressly and specifically disclaimed. Neither Minuteman Systems nor anyone else who has been involved in the creation, production, or delivery of this software shall be liable for any indirect, consequential, or incidental damages arising out of the use or inability to use such software even if Minuteman Systems has been advised of the possibility of such damages or claims. In no event shall Minuteman Systems' liability for any damage ever exceed the price paid for the license to use the software, regardless of the form of claim. The person using the software bears all risk as to the quality and performance of the software. Some states do not allow the exclusion of the limit of liability for consequential or incidental damages, so the above limitation may not apply to you. This agreement shall be governed by the laws of the Commonwealth of Massachusetts and shall inure to the benefit of Minuteman Systems and any successors, administrators, heirs and assigns. Any action or proceeding brought by either party against the other shall be brought only in a STATE or FEDERAL COURT of competent jurisdiction located in Middlesex County, Massachusetts. The parties hereby consent to in person am jurisdiction of said courts. 56