Residential Foundations and Basements



Similar documents
COMMONLY USED RESIDENTIAL BUILDING CODES

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

State of Connecticut Department of Public Health RADON PROGRAM

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Chapter 3 Pre-Installation, Foundations and Piers

Additions and Alterations

R E S I D E N T I A L H O U S I N G

Basement Moisture Problems

Engineered Wood Foundations

Lighthouse Engineering, L.L.C.

MUNICODE SERVICES LTD.

Comment Form on Proposed Gut Rehabilitation Alternatives

Foundation. Foundation

The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A

Best Basement Water Management Practices

Residential Deck Safety, Construction, and Repair

Oil Spill Clean-up by Homeowner in Ohio *

Residential Decks. Planning and Development Services Department

Renovating Your Basement

Proposed Minimum Subterranean Termite Treatment Standards

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

Elevating Your House. Introduction CHAPTER 5

The minimum reinforcement for the stem wall is the placement of:

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

RESIDENTIAL/COMMERCIAL

Page & Turnbull imagining change in historic environments through design, research, and technology

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

LAYING BLOCK AND BRICK

Top 10+ Mistakes of DWV plumbing design

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

6 RETROFITTING POST & PIER HOUSES

POST AND FRAME STRUCTURES (Pole Barns)

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Chapter 3 FOUNDATIONS AND FOUNDATION WALLS

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Waterproofing and interior insulation for basements takes new twist in technology.

Table 4.9 Storm Drain Inlet Protetion Applicable for

Basic Requirements for Residential Plan Review _

Chapter 2: Foundations

Lighthouse Engineering, L.L.C.

BUILDING SAFETY UNIT

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

Uniform Construction Code (UCC) Building Permit Application Package

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

symptoms of a faulty foundation

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Common Problems with Walls

Residential Building Permits Information

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

AMERICAN GOTHIC PLAYHOUSE

Basement Window Installation Guide Hopper and Sliding

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

Foundation Code compliance and Best Practices By Michael Coello

HV AC CODE CHECKLISTS

Georgia Association of Home Inspectors

Pre-Drywall Inspection Report

For the purposes of this Part, the following words shall have the following meanings:

Crawlspaces. Bowling Green, KY Stormwater Best Management Practices July No Symbol. Symbol. Immediate and Long Term Problems

Cedar Cottage Doghouse Plans

Designed and Engineered to Perform

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Termites: How to Reduce Your Home's Risk of Infestation

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

2015 UCC Residential Code Update

BUILDING PERMIT SPECIFICATIONS

How To Repair A Boat Landing Deck With A Boat Bed

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Owner's Manual & Assembly Instructions

Prestige Home Inspection LLC

Superform Products Ltd.

HOW TO INSULATE A CRAWLSPACE

Lighthouse Engineering, L.L.C.

What Home Builders Need To Know About Termites: Termite-deterring Construction Practices:

GOOD NEWS BUT NOT ALWAYS

October 30, Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

EAST LYME HIGH SCHOOL

Basement & Foundation Damage

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

Applications for building permits will not be reviewed until all of the required information has been submitted.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

Preventing Ice Dams on Roofs

Single Family Residential Building Permit Questions & Answers

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

DELTA Premium Moisture Management Systems for Foundations.

March 14, Installation of Bay, Bow and Garden Windows

PANELIZED HOME INSTALLATION GUIDELINE

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

How To Repair A House

APPENDIX C MOISTURE GUIDELINES & MOISTURE TESTING

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

Transcription:

Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article numbers are listed for reference to the actual code article. The visual aids used are taken from the above referenced code or the 2003 IRC study companion. They are not created by OMPC. This information is presented to answer or clarify common code questions and is not intended to be a complete review of all code requirements. A permit holder is required to comply with all building codes pertinent to the construction undertaken. General Foundation Information Treated Wood R319.1 (2) All wood framing members that rest on concrete or are within eight inches (8 ) of the exposed ground shall be treated or resistant to decay. This means sill plates, girder beams and wood siding. Drainage R401.3 Lots shall be graded to drain surface water away from the foundation wall. The grade shall fall at least six inches (6 ) in the first ten feet (10 ) away from the structure. Anchor Bolts R403.1.6 The sill plate shall be anchored to the foundation with anchor bolts. The bolts shall be spaced a maximum of six feet (6 ) on center. There shall be a minimum of two bolts per plate section. They shall be located between three and one half inches (3.5 ) and twelve inches (12 ) from each end of the plate. The bolts shall be at least one half inch (1/2 ) in diameter and extend into the masonry or concrete at least seven inches (7 ). A nut and washer shall be tightened on every bolt.

Foundation Elevation R403.1.7.3 The top of the foundation shall be a minimum of twelve inches (12 ) above the street gutter or inlet of an approved drainage, plus 2% of the distance from the foundation to said gutter or inlet. For example, if the foundation s front wall is thirty feet (30 ) from the street gutter it must be at least nineteen and one quarter inches (19 1/4 ) above that gutter ((30 *.02)+12 )=19.25. Height Above Finished Grade R404.1.6 The Concrete or Masonry foundation wall shall be at least four inches (4 ) above the finished grade when applying brick to the exterior. In all other situations, the foundation wall must be six inches (6 ) above the adjacent ground. Removal of Debris R408.5 The ground under the floor shall be cleaned of all vegetation and organic material. Grass, roots, and sticks left under the house will decay causing bad odors that may permeate the home and be difficult to remove. On a slab floor, when the material decays voids are created under the slab allowing the floor to crack or settle. Slab Foundation Fill Material R506.2 Fill may be any type of stone available at the local rock yard. No. 8 limestone works very well as it is easy to move around, settles out well and does not track up much under foot traffic. Pea gravel is even easier to move and use, but shifts underfoot causing pits under the concrete if care is not taken to work them out. The smaller the rock used, the more tonnage it will take to fill the slab. No. 8 limestone and pea gravel cost more per ton than river rock fill gravel. River rock fill gravel is economical and less dense than other fill, which equates to a higher volume. Some pieces in this are as large as No. 3 limestone. Regardless of the type of fill used, it should be free from vegetation, dirt and

Vapor Retarder R506.2.3 Insulation N1102.2.7 construction debris. Special care should be taken when filling around plumbing and HVAC in the slab. The weight of the rock can collapse or shift these if not done correctly. The best practice is to spill the rock lightly over the pipe like pouring water over it to rinse. The rock will flow in under the pipe and create a bed first and then anchor the pipe in place as it covers. There shall be a six mil polyethylene film placed over the fill material and beneath the concrete floor for slab construction. This vapor barrier will keep moisture from seeping up through the concrete. Where pieces of the vapor barrier overlap, the lapped seam should be at least six inches (6 ) wide. The vapor barrier may extend out over the foundation wall and lap up on the inside of the sill plate. This will keep the concrete from flowing down in the block cores if they have not previously been filled with rock. The inner walls of the foundation shall be lined with at least one and one half inch (1 ½ ) thick polystyrene insulation from the bottom of the concrete slab to the grade level. This is usually at least sixteen inches (16 ) high. Conveniently, a sheet of polystyrene is perforated every sixteen inches (16 ) length ways and is easily broken by hand along these perforations. Concrete Slab R506.1 The slab shall be at least three and one half (3.5 ) inches thick. Crawl Space Foundation Ventilation R408.1 There shall be vents in the foundation walls to allow the removal of moisture. There shall be one square foot of vent opening for every one hundred and fifty (150) square feet of under floor area. The average block shaped vent has an area of only eight tenths (0.80) of a square foot. Additionally, there shall be a vent within three feet (3 ) of each corner in the foundation. If no vents are desired in the crawl space, refer to R408.3 to review the appropriate code regulations to construct an unventilated crawl space.

Vapor Barrier Just as in the slab foundation, the bare ground below the floor shall be covered with a six mil polyethylene film from foundation wall to foundation wall with joints lapped at least six inches (6 ). Insulation Polystyrene insulation shall be attached to the inside of the foundation walls to insulate the under-floor area during winter. This should be at least one and one half inch (1 ½ ) thick polystyrene. Ground Clearance to Floor Joists R319.1 (1) Untreated floor joists must be held at least eighteen inches (18 ) above the under-floor grade. Untreated wood girders that hold the floor joists must be at least twelve inches (12 ) above the under-floor grade. Access R408.4 Access shall be provided to all under-floor spaces. Openings in the floor itself shall be a minimum of eighteen inches (18 ) by twenty-four inches (24 ). Openings through the perimeter foundation wall shall be sixteen inches (16 ) by twenty-four inches (24 ). If any part of this access door is below grade a hole shall be placed in front of the door twenty four inches (24 ) wide and extending sixteen inches (16 ) back from the door. The bottom of the hole shall be level with the bottom of the access door. Appropriate drainage measures shall be installed to keep this place from collecting water. Finished Grade R408.6 The finished grade under the floor may typically be cut down as low as the bottom of the footer. However, if the lot has drainage and water problems the dirt under the foundation shall be at least as high as the ground outside the foundation. Also if there is a trench left on the inside of the block wall from the footer, it shall be filled in level with the rest of the ground under the foundation. This is most easily done before the floor is installed.

Drilling and Notching Floor Joist R502.8 Notches shall not exceed one-sixth the depth of the member, shall be no longer than one-third the depth of the member, and shall not be located in the middle third of the span. Notches at the ends shall not exceed onefourth the depth of the member. The diameter of holes bored in the member shall not exceed one-third the depth and shall not be closer than two inches from the top or bottom of the member or to any other holes or notches. The tension side of a member four inches or greater in thickness shall not be notched. Please observe the following illustration from the 06 IRC.

Framing of Openings R502.10 Openings in floor framing shall be framed with a header and trimmer joist. When the header span does not exceed four feet (4 ) it may be a single member the same size as the floor joists. A single trimmer joist may be used to carry a single header that is within three feet (3 ) of the trimmer s bearing point. When the header span exceeds four feet (4 ), it shall be doubled. If the header span exceeds six feet (6 ), an approved hanger shall be used to support the header. Tail joists over twelve feet (12 ) long shall be supported at the header by framing anchors or a ledger strip not less than two inches (2 ) by two inches (2 ).

Basements Foundation Drainage R405.1 Drains shall be provided around all concrete and masonry foundations that retain earth and enclose habitable or usable spaces located below grade. Drains shall discharge by gravity or mechanical means. They shall be installed at or below grade of the area that is to be protected. Base R 405.2.1 A four inch (4 ) thick layer of gravel or sand is required under the basement floor and it shall be automatically drained by gravity or mechanical means. Moisture Barrier R405.2.2 A six mil polyethylene moisture barrier shall be applied over the porous layer under the basement floor.