Supporting Notes for the Provider Independent (PI) Assignment Request Form



Similar documents
Supporting Notes for the Provider Aggregatable (PA) Assignment Request Form

How To Get An Ipv6 Allocation On Ipv4 (Ipv4) From Ipv5) From The Ipvripe Ncc (Ip6) From A Ipvv6 Ipv2 (Ip4) To Ip

Routing Security Training Course

RIPE Network Coordination Centre RIPE NCC LIR Tutorial

IPv6 and IPv4 Update from the RIPE NCC. Sandra Brás, Ferenc Csorba

Mirroring the RIPE Database

Telematics. 14th Tutorial - Proxies, Firewalls, P2P

RIPE Whois Database Query Reference Manual

For extra services running behind your router. What to do after IP change

LIR Handbook. January 2012 RIPE NETWORK COORDINATION CENTRE

12. Firewalls Content

We Recommend: Click here to increase PC Speed! URL Decode Lookup. Express. DNS Records (Advanced Tool) URL Encode Trace.

Advanced Higher Computing. Computer Networks. Homework Sheets

Setting the Management IP Address

Step-by-Step Configuration

LAN TCP/IP and DHCP Setup

Multi-Homing Security Gateway

Detecting BGP hijacks in 2014

Networking Basics for Automation Engineers

Fireware Essentials Exam Study Guide

INTERNET For noncommercial. Organisations

nexvortex Setup Template

TCP/IP works on 3 types of services (cont.): TCP/IP protocols are divided into three categories:

Apache CloudStack 4.x (incubating) Network Setup: excerpt from Installation Guide. Revised February 28, :32 pm Pacific

Address Scheme Planning for an ISP backbone Network

Configuring Network Address Translation (NAT)

How To Implement A Cisco Vip From Scratch

Introduction to The Internet

Application Note Configuring the Synapse SB67070 SIP Gateway for Broadvox GO! SIP Trunking

Top-Down Network Design

How To Guide. SIP Trunking Configuration Using the SIP Trunk Page

Lab Configuring the PIX Firewall as a DHCP Server

NAC Guest. Lab Exercises

Basic Network Configuration

CompTIA Exam N CompTIA Network+ certification Version: 5.1 [ Total Questions: 1146 ]

Proxy Server, Network Address Translator, Firewall. Proxy Server

Protecting the Home Network (Firewall)

Secure Web Appliance. Reverse Proxy

Chapter 6 Configuring the SSL VPN Tunnel Client and Port Forwarding

How to Configure an Initial Installation of the VMware ESXi Hypervisor

It should be noted that the installer will delete any existing partitions on your disk in order to install the software required to use BLËSK.

Spam Marshall SpamWall Step-by-Step Installation Guide for Exchange 5.5

Deploying ACLs to Manage Network Security

This is a guide on how to create an IPsec VPN tunnel from a local client running Shrew Soft VPN Client to an Opengear device.

CREATING AN IKE IPSEC TUNNEL BETWEEN AN INTERNET SECURITY ROUTER AND A WINDOWS 2000/XP PC

Introduction to The Internet. ISP/IXP Workshops

Networking Topology For Your System

Aerohive Networks Inc. Free Bonjour Gateway FAQ

A Guide to New Features in Propalms OneGate 4.0

Configuring a customer owned router to function as a switch with Ultra TV

Multi-Homing Dual WAN Firewall Router

Internet Operations and the RIRs

Workflow Templates Library

Configuring a Domain to work with your Server

Lab Developing ACLs to Implement Firewall Rule Sets

Palo Alto Networks AAC Lab Creation Guidelines v1.0

VPN Solution Guide Peplink Balance Series. Peplink Balance. VPN Solution Guide Copyright 2015 Peplink

Lab Diagramming External Traffic Flows

APNIC IPv6 Deployment

Break Internet Bandwidth Limits Higher Speed. Extreme Reliability. Reduced Cost.

IP Configuration Manual

Configuration Guide for connecting the Eircom Advantage 4800/1500/1200 PBXs to the Eircom SIP Voice platform.

GPRS / 3G Services: VPN solutions supported

Configuring an IPSec Tunnel between a Firebox & a Check Point FireWall-1

Architecture. The DMZ is a portion of a network that separates a purely internal network from an external network.

SIP Trunk Configuration Guide. using

White Paper Copyright 2011 Nomadix, Inc. All Rights Reserved. Thursday, January 05, 2012

Chapter 9 Monitoring System Performance

> Technical Configuration Guide for Microsoft Network Load Balancing. Ethernet Switch and Ethernet Routing Switch Engineering

Best Practices: Pass-Through w/bypass (Bridge Mode)

Configuring a Mediatrix 500 / 600 Enterprise SIP Trunk SBC June 28, 2011

APNIC Internet Resource Management (IRM) Tutorial. Petaling Jaya, Malaysia 24 February 2014

Installation Guide Avi Networks Cloud Application Delivery Platform Integration with Cisco Application Policy Infrastructure

Firewalls. CEN 448 Security and Internet Protocols Chapter 20 Firewalls

E2BN Direct - Network Services for Schools and Academies

Transport and Network Layer

V310 Support Note Version 1.0 November, 2011

WildFire Reporting. WildFire Administrator s Guide 55. Copyright Palo Alto Networks

How to Configure Web Authentication on a ProCurve Switch

Device Interface IP Address Subnet Mask Default Gateway

Small Business Server Part 2

vcloud Director User's Guide

Overview. Firewall Security. Perimeter Security Devices. Routers

Chapter 3 LAN Configuration

Pre-lab and In-class Laboratory Exercise 10 (L10)

Transcription:

Supporting Notes for the Provider Independent (PI) Assignment Request Form RIPE NCC Document-ID: ripe-491 Date: March 2009 Obsoletes: ripe-337,ripe-357, ripe-454, ripe-455 This document contains instructions for LIRs on how to complete the "Provider Independent (PI) Assignment Request Form" The instructions are based on the "IPv4 Address Allocation and Assignment Policy for the RIPE NCC Service Region". General Information Address Space User Initial Information Addressing Plan Equipment Description Network Description Supporting Documentation Database Template(s) End of Request General Information #[GENERAL INFORMATION]# Please add your RegID. request-type: pi-ipv4 form-version: 1.3 x-ncc-regid: nl.bluelight Please do not change the value of the "request-type" and "form-version" fields. Enter your Registry Identifier (RegID) in the "x-ncc-regid" field. RegIDs have the following format: <country code>.<name>. If you do not know your RegID, please contact ncc@ripe.net.

Address Space User #[ADDRESS SPACE USER]# Who will use the requested address space? legal-organisation-name: North SantaBank organisation-location: Santa City, NN website-if-available: http://www.nsb.nn Is this request being sent by a sponsoring LIR on behalf of an End User? (Yes/No) end-user-of-sponsoring-lir: Yes If yes, please confirm that the "End User Assignment Agreement" contains all of the elements listed in paragraph 2.0 of "Contractual Requirements for Provider Independent Resource Holders in the RIPE NCC Service Region".(Yes/No) confirmation: Yes Does this End User already have address space that can be used for this assignment? (Yes/No) space-available: No Enter the legal name and primary location of the organisation that will use this PI address space in the "legal-organisation-name" and "organisation-location" fields. If this End User has a website, enter the URL in the "website-if-available" field. Otherwise, enter "none" in this field. If you are an LIR sending this request on behalf of an End User, you should answer Yes in the end-user-of-sponsoring-lir field. If you answered Yes you should also confirm that all of the elements of paragraph 2.0 of Contractual Requirements for Provider Independent Resource Holders in the RIPE NCC Service Region are listed in the 'End User Assignment Agreement' that is signed by the End User and the sponsoring LIR. PI assignments can only be made to End Users if there is a signed 'End User Assignment Agreement' between the sponsoring LIR and the End User. You can find an example agreement online: http://www.ripe.net/membership/lir-end-user-agreement.html You can send us an agreement in your local language or use the English version. If this request is sent by a Direct Assignment User, you answer No to the above two questions. Direct Assignment Users have already signed an 'End User Assignment Agreement' with the RIPE NCC. If the request is for an LIR, you should also answer with No.

If there is any address space assigned to this End User that is not in use, indicate this in the "space-available" field. If you answer "yes", you can explain why the End User needs another assignment of address space in the "Network Description" section. Initial Information #[INITIAL INFORMATION]# Why is PI address space required rather than PA address space? why-pi: North SantaBank will be multihomed. We cannot use PA address space because our uplinks do not allow their address space to be announced by other Autonomous Systems. Is the End User requesting extra address space for routing and/or administrative reasons? (Yes/No) routing-reasons: No. Is the End User aware of the consequences and disadvantages of PI address space? (Yes/No) confirmation: Yes. In the "why-pi" field, explain why PA address space cannot be used for this assignment. Remember that you should encourage the use of PA address space where possible. You cannot request a larger assignment of address space than needed as conservation is one of the most important goals of the Internet Registry System. You can state whether you are requesting more address space than needed in the "routing-reasons" field. You must ensure that the End User understands and accepts that PI address space may be more difficult or more expensive to route than PA address space and then confirm this in the "confirmation" field. You can find more details on the consequences and disadvantages of PI address space in the document "IPv4 Address Allocation and Assignment Policy for the RIPE NCC Service Region". Addressing Plan #[ADDRESSING PLAN]# #As of 1 January 2010 assignments are for a period of up to 12 months. #As of 1 July 2010 assignments are for a period of up to 9 months. #As of 1 January 2011 assignments are for a period of up to 6 months. #As of 1 July 2011 assignments are for a period of up to 3 months. How will the End User use this address space?

Subnet Immediate Intermediate Entire Purpose size (/nn) Requirement Requirement Period subnet: /26 32 64 64 Employee VPN Access subnet: /26 18 34 64 Financial Services subnet: /26 22 30 60 Workstations subnet: /27 11 15 28 Public Services subnet: /27 7 18 30 Operations subnet: /24 176 192 240 Branch Offices totals: /23 266 353 486 number-of-subnets: 6 Will the End User return any address space? address-space-returned: 85.118.187/24 to nl.bluelight in 3 months The addressing plan shows how the End User will use the requested address space. You can repeat the "subnet" row as many times as needed. Delete any empty "subnet" fields before you send the request. In the "Subnet size (/nn)" column, enter a slash notation prefix for each subnet. Each entry should be large enough to contain the number of addresses needed for that subnet over the next two years. In order to demonstrate the predicted growth of your network, you must provide an estimate of the address space you will require over three distinct periods: Immediate, Intermediate and the Entire period. Your estimates should include interfaces used for hosts, routers, gateways, terminal concentrators and any other machines requiring one or more network interfaces. These columns can either contain numbers (for example, 128) or slash notation prefixes (for example, /25). Multiple slash notation prefixes must be separated by comma(s) with no blank spaces (for example, /25,/27). Starting on 1 January 2010, a gradual reduction in the assignment period will be applied. As the assignment period changes, so to will the information required: Up to 30 June 2010, assignments are for a period of up to 12 months. Therefore, your request should reflect your immediate requirements, predicted requirements for the coming 6 months, and predicted requirements for the coming 12 months. As of 1 July 2010, assignments are for a period of up to 9 months. Your request should reflect your immediate requirements, predicted requirements for the coming 6 months, and predicted requirements for the coming 9 months.

As of 1 January 2011, assignments are for period of up to 6 months. Your request should reflect your immediate requirements, predicted requirements for the coming 3 months, and predicted requirements for the coming 6 months. As of 1 July 2011, assignments are for a period of up to 3 months. Your request should reflect your immediate requirements, predicted requirements for the coming 2 months, and predicted requirements for the coming 3 months In the "Purpose" column, write a short description of each subnet. If needed, you can write a more detailed description in the "Network Description" section at the end of this form. In the "totals" row, add the totals of each column. The total of the "Subnet size (/nn)" column should be the total amount of address space you are requesting for this assignment. In the "number-of-subnets" field, enter the total number of subnets listed in the addressing plan. If there is any address space assigned to the End User that they will return, list each prefix in separate "address-space-returned" fields. The expected time for renumbering is three months. You can use the following syntax: <x.x.x.x/xx> to <which LIR/ISP> in <time period> for this field.

Equipment Description #[EQUIPMENT DESCRIPTION]# What equipment will be used and how will it use the requested address space? equipment-name: Core switches manufacturer-name: Cisco model-number: 25xx other-data: 3 units equipment-name: Servers manufacturer-name: HP model-number: various other-data: 40 units equipment-name: Firewalls manufacturer-name: Cisco model-number: PIX 515 E other-data: 2 units, 8 IP addresses equipment-name: Workstations manufacturer-name: Dell model-number: GX150 other-data: 22 units, 1 IP address each equipment-name: Routers manufacturer-name: Cisco model-number: 3825 other-data: 2 units equipment-name: Routers manufacturer-name: Cisco model-number: AS5300 other-data: 1 unit, 32 ports The equipment description will help us to understand the requirements listed in the addressing plan and can be repeated as many times as needed. Leave an empty line before each new "equipment-name" field. In the "equipment-name" field, enter the type of equipment requiring address space from this assignment. Enter the vendor name and model number for the piece of equipment in the "manufacturername" and "model-number" fields. If you have any more information about how this piece of equipment will use the requested address space, add this in the "other-data" field.

Network Description #[NETWORK DESCRIPTION]# Please add more information if you think it will help us understand this request. We have 11 branches across Santa City linked by corporate fibre channels. We will assign a /28 subnet for each branch. Each branch will have SMTP, WWW, file server, e-banking and dial-up pool. Public Internet Services: SMTP (2 IP addresses), WWW (6 IP addresses, 2 servers), FTP (1 IP address), DNS (2 IP addresses) Financial Services: 6 servers, 3 IP addresses each. Operations network: Security, Monitoring, VPN, Proxy, DNS You can use this space for additional information that you think will be helpful for us (RIPE NCC) when we evaluate your request. A clearer understanding of the network and its addressing needs can help us to evaluate your request more quickly. Supporting Documentation #[SUPPORTING DOCUMENTATION]# If this request is being sent by a sponsoring LIR on behalf of an End User, please attach a copy of the signed "End User Assignment Agreement" and the company registration papers of the End User. You can also attach a network diagram or other supporting documentation. Have you attached any files/documents to this request? (Yes/No) file-attached: Yes For each PI assignment that is requested through a sponsoring LIR for an End User, we need to receive a copy of 'End User Assignment Agreement' and the company registration papers of the End User. If this request is for an LIR or a Direct Assignment User, you do not have to attach a copy of 'End User Assignment Agreement' and company registration papers. A network diagram (topology map) can help us to understand the set-up of the network and its addressing needs.

Database Template(s) #[DATABASE TEMPLATE(S)]# Please complete all of the fields below. inetnum: netname: descr: country: org: admin-c: tech-c: status: mnt-by: mnt-lower: mnt-by: mnt-routes: mnt-domains: changed: source: NSB-NET North SantaBank NN ORG-NS31-RIPE ACM2-RIPE HOHO1-RIPE ASSIGNED PI RIPE-NCC-END-MNT RIPE-NCC-END-MNT SANTA-MNT SANTA-MNT SANTA-MNT hostmaster@ripe.net RIPE Leave the "inetnum" field empty as we will choose the address range. The "netname" should be a short and descriptive name for the network and should reflect the organisation name of the End User. Enter the End User's organisation name in the "descr" field. Use the ISO country code of the End User's location in the "country" field. If the End User is multi-national, repeat the "country" field as many times as needed. Alternatively, you can use EU or ZZ if you do not wish to show the End User's location in the inetnum object. Enter the org-id of the End User's organisation object in the "org" field. The nic-handle of the role or person object in the "admin-c" field should reflect someone who is administratively responsible for the network. The nic-handle of the role or person object in the "tech-c" field should reflect someone who has technical knowledge of the network. The "status" field must be ASSIGNED PI. The "mnt-by" and "mnt-lower" fields must contain RIPE-NCC-END-MNT. You can put the LIR's or End User's maintainers in separate "mnt-by", "mnt-routes" and "mnt-domains" fields. The "mnt-by" field shows which maintainer authenticates object updates. The "mnt-routes" and "mnt-domains" fields show which maintainers authenticate the creation of route and domain objects.

The RIPE Database must contain all of the objects that you use. The "changed" field must be hostmaster@ripe.net. The "source" field must be RIPE. End of Request #[END of REQUEST]# Best Regards, Jan Janssen, Bluelight Admin Please write your full name below the "#[END of REQUEST]#" header.