Class II General Permit G35-C Registration to (Construct, Modify, etc.)



Similar documents
ENGINEERING EVALUATION/FACT SHEET

Oil and Gas Air Quality Regulations and Permitting

NSPS Subpart OOOO: Applicability and Compliance Basics

West Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet

Air Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013

Implementation Question and Answer Document. for

Statement of Basis SCA Tissue North America, LLC

REGULATORY ANALYSIS. February 11, Colorado Department of Public Health and Environment

EPA s Air Quality Regulations for Stationary Engines

FAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations

Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond. Garry Kaufman Holland & Hart LLP

NOTIFICATION OF PERFORMANCE TESTING FOR GASOLINE DISPENSING FACILITIES (GDFs) NESHAP 40 CFR, Part 63, Subpart CCCCCC (Sections

Garry Kaufman Colorado Air Pollution Control Division May 14, 2014

Natural Gas Dehydrator Optimization

Oil and Natural Gas Sector: Standards of Performance for Crude Oil and Natural Gas Production, Transmission, and Distribution.

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of the Art (SOTA) Manual for Commercial Sterilizers and Fumigators using Ethylene Oxide

Rule Overview Regulation No.3, 6 and 7

Air Permit Application Volume II Warren County Combined-Cycle Project

EPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.

Highlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014

PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Expansion Pitfalls, Permitting and Compliance A Case Study

Control Device Requirements Charts For Oil and Gas Handling and Production Facilities

EPA s Air Quality Regulations. Melanie King U.S. Environmental Protection Agency

Site Identification No.: AAO Application No.:

Emissions from Natural Gas Production in the Barnett Shale Area and Opportunities for Cost Effective Improvements

COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT Stationary Sources Program / Air Pollution Control Division. PS Memo 14-03

THE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -

Assessment of Air Emissions Martin Marietta Materials Facilities on Highway 34, Weld County, Colorado Project No.:

Regulatory Impact Analysis

COLORADO REGULATION 7

Comparison of Emission Calculation Methodologies for the Oil and Gas Industry. Presented by: Leanne Sills

Addition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.

Emissions from Natural Gas Production in the Barnett Shale Area and Opportunities for Cost-Effective Improvements

ADEM Form /10 m5

Company Name: City, State, Zip Code: Annual Report Summary

TECHNICAL SUPPORT DOCUMENT FOR. AIR EMISSION GENERAL PERMIT: PART 70 LOW-EMITTING FACILITY GENERAL PERMIT April 30, 2015

State of the Art (SOTA) Manual for Boilers and Process Heaters

Wolverine Clean Energy Venture

Industries. March Prepared for Environmental Defense Fund 257 Park Avenue South New York, NY 10010

Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements

Test and Quality Assurance Plan

COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS

POTENTIAL TO EMIT SUMMARY FIBERIGHT, LLC HAMPDEN, MAINE

DRAFT White Paper Asphalt (non-permitted) Strategy Evaluation Portland Air Toxics Solutions

Guidelines for Calculating and Reporting Emissions from Bulk Loading Operations December 2013

STATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

!Rl DEPARTMENT OF NATURAL RESOURCES

PART 70 PERMIT TO OPERATE

CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc South County Road 150 West Greencastle, Indiana 46135

VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT 669 County Square Drive, Ventura CA / FAX 805/

GENERAL AIR QUALITY OPERATING PERMIT FOR PERCHLOROETHYLENE DRY CLEANERS APPLICATION PACKAGE

Subpart XX Standards of Performance. Terminals. Environmental Protection Agency

Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations

STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

Air Quality PERMIT TO CONSTRUCT

Environmental Due Diligence: How Much Diligence Is Due?

Notice of Construction Application for Landfill Gas to Pipeline Gas Treatment Facility

Pennsylvania Marcellus Shale Short- Term Ambient Air Sampling Project

Lessons Learned from Natural Gas STAR Partners. Installing Vapor Recovery Units on Storage Tanks. Executive Summary. Technology Background

Colorado Oil and Gas Emissions Rules

GUIDELINES FOR SOURCE TESTING

AESTHETIC AND NOISE CONTROL REGULATIONS

FINAL UPDATES TO REQUIREMENTS FOR STORAGE TANKS USED IN OIL AND NATURAL GAS PRODUCTION AND TRANSMISSION

Fundamentals of Vapor Recovery

Tips from the Help Desk

Technical Contact. Timothy Roberts Environmental Manager (919) Capital Boulevard Raleigh, NC 27616

GREENHOUSE GAS PREVENTION OF SIGNIFICANT DETERIORATION PERMIT APPLICATION. Red Gate Power Plant South Texas Electric Cooperative, Inc.

STATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT

Subpart I Delaware. 40 CFR Ch. I ( Edition) (10) Amendments to Section V (Surveillance)

TECHNICAL SUPPORT DOCUMENT. San Diego Gas & Electric Company. Desert Star Energy Center

Out in Front? State and Federal Regulation of Air Pollution Emissions from Oil and Gas Production Activities in the Western United States

Transcription:

West Virginia Department of Environmental Protection Division of Air Quality Earl Ray Tomblin Governor Randy C. Huffman Cabinet Secretary Class II General Permit G35-C Registration to (Construct, Modify, etc.) for the Prevention and Control of Air Pollution in regard to the Construction, Modification, Relocation, Administrative Update and Operation of Oil and The permittee identified at the facility listed below is authorized to construct the stationary sources of air pollutants identified herein in accordance with all terms and conditions of General Permit G35-C. G35-C (Registration Number) Issued to: [Company Name] [Facility Name] [Company ID #] William F. Durham Director Issued: [Date of Issuance] Revision 3/29/05

Class II General Permit G35-C Page 2 of 12 This Class II General Permit Registration will supercede and replace (Permit registration number, include any applicable permits, consent orders, etc. These may include R13 permits or versions of the G30 or G35 General Permits) Facility Location: Mailing Address: Physical Address: Facility Description: NAICS Code: SIC Code: Longitude Coordinates: Latitude Coordinates: Directions to Facility: Registration Type: Description of Change: (City), (County Name) County, West Virginia (Facility Mailing Address) (Facility Physical Address, if none available, list road, city or town and zip of facility) (Facility description (Production, Compressor, Dehydration)) (NAICS code) (SIC code) (NAD83, Decimal degrees to 5 digits) (NAD83, Decimal degrees to 5 digits) (Directions to the facility from nearest state road) (Administrative update, construction, modification) (Description of change) Any person whose interest may be affected, including, but not necessarily limited to, the applicant and any person who participated in the public comment process, by a permit or registration issued, modified or denied by the Secretary may appeal such action of the Secretary to the Air Quality Board pursuant to article one [ 22B-1-1 et seq.], Chapter 22B of the Code of West Virginia. West Virginia Code 22-5-14. The source is not subject to 45CSR30.

Class II General Permit G35-C Page 3 of 12 Permit Section Applicability for the Registrant All registered facilities under General Permit G35-C are subject to Sections 1.0, 2.0, 3.0, and 4.0 of General Permit G35-C. The following additional sections of General Permit G35-C apply to the registrant: GENERAL PERMIT G35-C APPLICABLE SECTIONS Section 5.0 Storage Vessels Containing Condensate and/or Produced Water 1 Section 6.0 Section 9.0 Storage Vessel Affected Facility (NSPS, Subpart OOOO) Control Devices and Reduction Devices not subject to NSPS Subpart OOOO and/or NESHAP Subpart HH Small Heaters and Reboilers not subject to 40CFR60 Subpart Dc Pneumatic Controllers Affected Facility (NSPS, Subpart OOOO) Section 10.0 Centrifugal Compressor Affected Facility (NSPS, Subpart OOOO) 2 Section 11.0 Reciprocating Compressor Affected Facility (NSPS, Subpart OOOO) 2 Section 12.0 Reciprocating Internal Combustion Engines, Generator Engines. Microturbine Generators Section 13.0 Tanker Truck Loading 3 Section 14.0 Glycol Dehydration Units 4 1 Registrants that are subject to Section 5 may also be subject to Section 6 if the applicant is subject to the NSPS, Subpart OOOO control requirements or the applicable control device requirements of Section 7. 2 Registrants that are subject to Section 10 and 11 are also subject to the applicable RICE requirements of Section 12. 3 Registrants that are subject to Section 13 may also be subject to control device and emission reduction device requirements of Section 7. 4 Registrants that are subject to Section 14 are also subject to the requirements of Section 8 (reboilers). Registrants that are subject to Section 14 may also be subject to control device and emission reduction device requirements of Section 7.

Class II General Permit G35-C Page 4 of 12 STORAGE VESSELS Unit Point Content Condensate Produced Water TEG Lube Oil Maximum Volume (gal) Annual Throughput Limit (gal/yr) Control Device Manuf. Date 1 Commenced construction, modification or reconstruction after August 23, 2011. VRU Subject to 40CFR60 Subpart OOOO? 1 G35-C Applicable Sections tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 5 of 12 FUEL BURNING UNITS See Unit Point Heater Treater Description MDHI (MMBTU/hr) G35-C Applicable Sections Gas Processing Units In line Heaters Reboilers tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red PNEUMATIC CONTROLLERS Are there any applicable pneumatic controllers subject to 40CFR60 Subpart OOOO at this facility? Approximate Number of Applicable Pneumatic Controllers See Section 9.0 tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 6 of 12 CENTRIFUGAL COMPRESSORS Are there any applicable centrifugal compressors subject to 40CFR 60 Subpart OOOO at this facility? See Section 10.0 Description tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red RECIPROCATING COMPRESSORS Are there any applicable reciprocating compressors subject to 40CFR60 Subpart OOOO at this facility? See Section 11.0 Description tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 7 of 12 RECIPROCATING INTERNAL COMBUSTION ENGINES See Section 12.0 Unit Point Make/Model/HP Control Device Engine Manufacture Date Subject to 13.1.4/ 13.2.1 Engine Type 2SLB 4SLB 4SRB 2SLB 4SLB 4SRB 2SLB 4SLB 4SRB 2SLB 4SLB 4SRB 2SLB 4SLB 4SRB Applicable Rules 40CFR60 Subpart JJJJ 40CFR60 Subpart IIII 40CFR63 Subpart ZZZZ NESHAP ZZZZ/ NSPS JJJJ Window 40CFR60 Subpart JJJJ 40CFR60 Subpart IIII 40CFR63 Subpart ZZZZ NESHAP ZZZZ/ NSPS JJJJ Window 40CFR60 Subpart JJJJ 40CFR60 Subpart IIII 40CFR63 Subpart ZZZZ NESHAP ZZZZ/ NSPS JJJJ Window 40CFR60 Subpart JJJJ 40CFR60 Subpart IIII 40CFR63 Subpart ZZZZ NESHAP ZZZZ/ NSPS JJJJ Window 40CFR60 Subpart JJJJ 40CFR60 Subpart IIII 40CFR63 Subpart ZZZZ NESHAP ZZZZ/ NSPS JJJJ Window 40CFR63 Subpart ZZZZ New or Existing? New Existing New Existing New Existing New Existing New Existing New or reconstructed sources in accordance with 63.76590(c) must only meet the requirements of 40CFR60 Subparts IIII or JJJJ. tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 8 of 12 Unit SPARK IGNITION RECIPROCATING INTERNAL COMBUSTION ENGINES TESTING REQUIREMENTS Point Make/Model/HP Control Device See Section 12.0 Engine Manufacture Date 40CFR60 Subpart JJJJ Testing Requirements tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 9 of 12 TANKER TRUCK LOADOUT Are there any tanker truck loadout operations at this facility? See Section 13.0 Unit Point Description Annual Throughput Limit (gal/yr) Control Device Closed System Collection? Tanker trucks passing the MACT level annual leak test Tanker trucks passing the NSPS level annual leak test Tanker trucks not passing one of the above annual leak tests but has vapor return tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 10 of 12 GLYCOL DEHYDRATION UNITS Are there any glycol dehydration units at this facility? See Section 14.0 Unit Point Description (Make, Model) Subject to 40CFR63 Subpart HH? 1 Pump Optimization Pump Optimization Pump Optimization Pump Optimization 40CFR63 Subpart HH Exemptions Benzene Exemption Flowrate Exemption Benzene Exemption Flowrate Exemption Benzene Exemption Flowrate Exemption Benzene Exemption Flowrate Exemption Max Dry Gas Flow Rate (mmscf/day) APCD/ERD 1 If, specify if registrant meets benzene or flowrate exemption. tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red Please list any exemptions (< 1tpy of benzene, 3 mmscf/day throughput) and whether or not dehy is located in UA/UC for each unit.

Class II General Permit G35-C Page 11 of 12 AIR POLLUTION CONTROL DEVICES Are there any air pollution control devices at this facility? See Sections 6.0, 7.0 Control Device Control Efficiency (%) Control Device Description (Make/Model) Max Design Capacity (state units) Subject to: tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red EMISSION REDUCTION DEVICES (ERD) Are there any ERDs (VRU, Recycled Reboiler, BTEX Eliminator, etc.) at this facility? See Sections 6.0, 7.0 ERD ERD Efficiency (%) ERD Description (Make/Model) Max Design Capacity (state units) tes to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) remove red

Class II General Permit G35-C Page 12 of 12 EMISSION LIMITATIONS Unit Point Unit Description Engine Data Pollutant Nitrogen Oxides Maximum Potential s Hourly (lb/hr) Annual (tons/year) Carbon Monoxide Volatile Organic Compounds Formaldehyde Glycol Dehy Still Vent/ Control Device Data Volatile Organic Compounds Benzene Toluene Ethylbenzene Xylenes Storage Vessels / Control Device Data Volatile Organic Compounds Total HAPs Tanker Truck Loading / Control Device Data Volatile Organic Compounds Total HAPs Control Device Data (Flares, pilots, etc.) te to permit engineer: (1) customize for specific registration and add/delete lines as necessary; (2) emission limits are required for condensate storage tank(s); (3) remove red