Frequently Asked Questions

Similar documents
City of Fort Smith Building Permit Process Frequently Asked Questions

Botetourt County, Virginia. Frequently Asked Questions

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

17 East Main Street Cuba,NewYork Code Enforcement

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Single Family Residential Building Permit Questions & Answers

Residential Building Permit Process

ADMINISTRATIVE CODE CHAPTER 1

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

City of Mt. Juliet Public Works

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

PITT COUNTY BUILDING CODES ENFORCEMENT ORDINANCE

C I T Y O F P E A R S A L L

How To Write A Building Code In Kendall County

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

Building Code Inspections and Fees

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

CHESTERFIELD COUNTY DEPARTMENT OF BUILDING INSPECTION RESIDENTIAL FEE SCHEDULE SUMMARY 7/1/2016-6/30/2017

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

Fill out all sections or mark with N/A (not applicable)

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

FREQUENTLY ASKED QUESTIONS General Licensing Issues

Building Permit, Fire Inspection and Operating Permit Fee Schedule

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950 KENANSVILLE, NC PHONE: (910) FAX: (910)

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Check Off (Below) Information That Is Submitted With Permit

Building Construction and Development in Norristown: A User s Guide to the Land Development and Building Permit Process 1/25/11

A Guide for the Homeowner/Builder

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

Development Services Guidelines

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

Placement of Manufactured Homes on Private Property

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

City of St. Charles Basement Finish or Remodel

INFORMATION BULLETIN NO.

Commercial Construction Permit Application

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

Contractor Information 2011

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)

SECTION 7: SITE INFORMATION (refer to 780 CMR for details on each item) Sewage Disposal: Indicate municipal or on site system

CITY OF MIAMI FEE ORDINANCE

Applications for building permits will not be reviewed until all of the required information has been submitted.

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Building Mechanical Inspector Senior Building Mechanical Inspector Principal Building Mechanical Inspector Chief Building Mechanical Inspector - 2

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

City of Hill Country Village Residential Construction/Development Packet

RANDOLPH COUNTY CENTRALIZED PERMITTING ORDINANCE

Development Services Guidelines

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

City of Mandeville. Guidelines for Construction and Development

STATE OF MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY 443 Lafayette Road North St. Paul, Minnesota (651) or DIAL-DLI

Building Permits: When are they required?

If any work as a Project or Construction Manager does applicant carry an E & O policy? Yes No If yes, describe:

The City of Basehor, Kansas

Chapter 5. Code Enforcement

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Additions and Alterations

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

CHARLOTTE COUNTY Community Development Department

BUILDING PERMIT SPECIFICATIONS

WHEN IS A PERMIT REQUIRED?

2880 International Circle Colorado Springs, CO Telephone Executive Summary Pikes Peak Regional Building Code Revisions

Financing Options to support Energy Efficiency & Contractors

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Concord Building Department Frequently Asked Questions

NEW CONSTRUCTION FINANCING PROGRAM

Exhibit A CITY OF PRESCOTT ADMINISTRATIVE BUILDING CODE

Notice to Property Owners

BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF. Amendments to Chapter 9, In General. Chapter 9 of the Orange County

PERMIT APPLICATION. PLEASE PRINT LEGIBLY INCLUDE STREET NUMBER/NAME, CITY & STATE 1 Job Name:

BEFORE YOU BUILD GUIDE

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

Chapter 3 Pre-Installation, Foundations and Piers

SECTION THREE CONSTRUCTION CODES

CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Dream It. FInance It. BuIlD It.

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

Time/Date Stamp when received:

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Transcription:

Warren County, Tennessee Building & Environmental Codes Department 201 Locust Street, Suite 6 McMinnville, TN, 37110 931.474.2633 Frequently Asked Questions What building codes are the Warren County Building & Environmental Codes office enforcing? The International Residential Code for One- and Two-Family Dwellings, 2012 edition with the following amendments: - Remove Chapter 11 (International Energy Conservation Code) and adopt 2009 edition of same; - Remove the words or fuel fired appliances in Section R501.3(2); - Remove the words for piping systems other than plastic in Section P2503.7; - Remove the words equipped with a self-closing device in Section R302.5.1; - Remove Chapters 34-43; - Remove Section R313.2. The International Energy Conservation Code, 2009 edition The International Building Code, 2012 edition The International Mechanical Code, 2012 edition The International Plumbing Code, 2012 edition The International Fuel Gas Code, 2012 edition The International Fire Code, 2012 edition Where can I obtain a copy of the adopted codes? o The code books can be purchased through the International Code Council or other retail bookstores. You may also find them online at http://publicecodes.cyberregs.com/icod/ Do the adopted codes apply to new residential construction? o Yes. Blueprints or working drawings, including square footage, are required in order to obtain a building permit. Do the adopted codes apply to new commercial construction, including cell towers? o Yes. Blueprints or working drawings, including square footage, are required in order to obtain a building permit.

Do the adopted codes apply to additions and/or renovations? o Yes. Construction of additions to existing structures with a minimum area of thirty (30) square feet, and any remodeling project which changes the structural integrity of an existing building or if financial assistance for the project is obtained from a bank or lending institution. Construction of a deck qualifies as an addition; therefore a building permit is required for construction of a deck having a minimum area of thirty (30) square feet or a cost exceeding $1,000.00 including labor and materials. Do the adopted codes apply to decks? o Yes. A building permit is required for decks greater than thirty (30) square feet. No permit fees are required regardless of size or cost of deck. Do the adopted codes apply to pools? o Yes. A building permit is required for installation of above-ground or in-ground pools. No permit fees are required regardless of cost of pool. Do the adopted codes apply to storm shelters? o Yes. A building permit is required for installation of in-ground storm shelters. A flat rate permit fee of $50 will be applicable to all inground storm shelters regardless of cost of structure. Do the adopted codes apply to agricultural structures? o No. Building permits will not be required for agricultural-related structures. Do I need a residential building permit to place a manufactured home or modular home? o No. Manufactured and modular homes are inspected at the factory. Manufactured homes must be installed by licensed installers and must have an installation decal applied after completion of the setup. If a manufactured home owner chooses to have an inspection of the installation, he or she should call (615) 741-7192. Do I need a permit for a manufactured home or modular home? o Only if a custom addition, site built deck, porch or stoop is built next to the home.

Do I need other permits if I have a county residential building permit? o The county building permit is a building permit only. It is not: Planning approval Grading or fill approval Determination of flood plain compliance A septic or sewer permit; or An electrical permit. o The permit does not authorize any violation of any state law or regulation or any local ordinance. A permit only gives you the right to build if you are in compliance with all other state and local laws, regulations and ordinances. Can a homeowner build his/her own house? o Yes. Pursuant to TCA 62-6-103, an owner of property may construct a single residence once every two years for his/her own use, as long as it is not for resale, lease or rent without being a licensed contractor. However, anyone hired by the homeowner whose portion is $25,000 or more would not be exempt from the contractors licensing requirements. How do I check to see if my contractor is licensed? o You can check it online at verify.tn.gov How long is my permit valid? o Work must be started within 180 days after the permit is issued. A permit expires upon completion of the work and every building permit expires two years from the date of issuance or upon issuance of a certificate of occupancy, whichever occurs first, unless: (1) the inspector determines that substantial progress has been made in the work authorized by the permit; and (2) the Warren County Building & Environmental Department Director, or designee thereof, grants an exception in writing after receiving a written request. Who is responsible for requesting/scheduling an inspection? o The permit holder is solely responsible for requesting an inspection. Subcontractors should not schedule an inspection. Homeowners should only schedule an inspection if the homeowner is the permit holder.

How long will it take to get an inspection? o The law requires all inspections to occur within three working days of when the request is made to the inspector, except for footer inspections which are to be performed within one working day of the request. Additionally, the rules allow any inspection to be waived if an inspection letter approving the work is signed and submitted by an architect or engineer currently registered in the State of Tennessee. How many inspections will be required? o Seven inspections will be required: the foundation prior to pour, the framing rough-in, the plumbing rough-in, the mechanical rough-in, and the final plumbing, the final mechanical, and final construction. If your foundation is to be a concrete slab under a living space with separately poured footing, you will need an eighth inspection. When should I request an inspection? o Foundation Inspection - After poles, piers, trenches or basement areas are excavated and any required forms erected and any required reinforcing steel is in place and supported prior to the placing of concrete. The foundation inspection includes excavations for thickened slabs intended for the support of bearing walls, partitions, structural supports, equipment and special requirements for wood foundations. If rebar is required in the footing or slab, it should be in place prior to the inspection. Monolith poured slabs are inspected the same as a footing. o Slab Foundation Other Than a Monolith Pour Inspection - This occurs when a slab is poured that does not have integral footings. An inspection is required in addition to the foundation inspection. The inspection should be requested after excavation, fill material is placed and compacted, and reinforcement and forms are in place. This is not required for garage slabs, only for slabs of living spaces. o Framing, Plumbing, and Mechanical Rough-In Inspections - After floor, wall and roof framing; fire stopping; draft stopping; bracing; rough-in plumbing; rough-in mechanical and rough-in electrical are in place. If batt or roll wall insulation is used, it must be in place prior to requesting an inspection. If a plastic vapor barrier is used, it should be installed after the inspection. If loose-fill or spray applied insulation is used, the request should be made before it is installed (a manufacturer s product data sheet and installation certificate

stating the product meets or exceeds the energy code will be required). o Final Inspection - after the permitted work is complete and prior to occupancy. What happens when I call for an inspection and when can I expect to hear from an inspector and get an inspection? o When you call 931-474-2633 you will need your permit number. At that time, you can notify the inspector of the inspection request. The inspector will then contact the permit holder and schedule a time for the inspection. Can an inspection be waived? o Any inspection may be waived if an inspection letter approving the work is signed and submitted by an Architect or Engineer currently registered with the State of Tennessee. Do I have to pay for a re-inspection? o No. If I have a complaint about an inspector, who do I call? o You may call the County Executive s office at 931-473-2505. What happens if my contractor or owner permit changes? o If, during the construction process, a property owner hires a contractor or there is a change of contractor, a new permit must be obtained. A refund of any inspection fees for inspections not performed on the original permit may be requested from the Department. Refund requests must be made from the Department and not an Issuing Agent. If my permit gets lost or destroyed, what should I do? o Contact the Building & Environmental Codes Department to request a new permit card. Only the Department may issue a duplicate building permit. What are the benefits for and costs to citizens in a city or county with a qualifying one and two family residential code? o First, consumers will have protection from substandard construction and will benefit from the reduced energy costs in soundly

constructed homes. The U. S. Department of Energy estimates that homes built to a modern code save 30% to 50% in energy usage costs. Appraisals of energy-efficient homes could be higher than one that does not meet energy standards, which could impact mortgage loan to value ratios positively. o Identifying any mistakes before they have been concealed by further construction will make any correction less costly. Reputable home builders benefit from having standards that apply to all contractors and from enforcement of those standards. o Homes built to a residential code are safer for you, your family, and guests. o Homes required to properly dispose of waste will protect the environment. o New homeowners in cities and counties with codes that are effectively enforced may benefit from an ISO Building Code Effectiveness Grading System premium discount on their homeowner s insurance. Homes that are constructed meeting higher standards may suffer less damage in a storm, for example, and in the long term reduced claims would impact risk-based insurance rates. o Reduced energy costs more than offset applicable permitting and inspection fees in a very short period of time, which impacts the long-term affordability of a residence. What is the cost of a permit? o The permit fee is based on the cost of construction. You can use our fee schedule to estimate your permit fee. This fee covers the cost of all required inspections. My question is not answered above, how should I contact the Department? o You may email the department at wccodes@warrencountytn.gov or you may call 931-474-2633.