REPORT ON THE SCHOOL RENOVATION PROJECT AT ST. JOSEPH SENIOR SECONDARY SCHOOL VVUMBA



Similar documents
Schneps, Leila; Colmez, Coralie. Math on Trial : How Numbers Get Used and Abused in the Courtroom. New York, NY, USA: Basic Books, p i.

Outline Of Classroom Management Plan (Management plan is designed for an elementary school placement. Refer to classroom map when needed.

UNIVERSITY OF MUMBAI

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Skills for Youth Employment

Subproject plan II: Renovation first school building. - Namu Nigeria -

CSI: Crime Scene Investigation

Renovation instructions

STORIES FOR HOPE. ph: (US) / (RW) ppasick@gmail.com

Name of course: Residential Construction Site Management (RCSM) Level 1

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

Bathroom Installation Guide

2013 AHERA 3 Year Re-Inspection Report For. Northeast Elementary School 82 Scofieldtown Road Stamford, CT. Performed by

SJV1435 INFOSHEET EXPERIENCING CULTURE WITH ETHNIC PEOPLE AT BUOC-VILLAGE.

PRESERVATION PLANNING ASSOCIATES 519 Fig Avenue, Santa Barbara, CA Telephone (805)

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Sample Maintenance Plan

CHAPTER NO. 27 QUANTITIES OF MATERIALS

SCHOOL BUILDING RENOVATION REPORT I. BUILDING BEFORE RENOVATION

My name is Ana Maria Alvarez

Building Trades Pre-Apprenticeship Program: Job Training Program for Disadvantaged Workers Michael Charles Cimasi SUNY at Buffalo Law Student

G. Common Defects in Buildings - Leakage

PUBLIC RESTROOMS, DESIGN INTENT

PUSD High Frequency Word List

PANEL CONCEPTS LLLP.

HOUSTON ELEMENTARY SCHOOL

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

NATEF On-Site Evaluation Photo Album

A Revolution in Floor Restoration Technology

INFOSHEET SJV1437 WARM CHRISTMAS FOR DISADVANTAGED CHILDREN

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: Inspection Date: Saturday, February XX, XXXX

DESIGNING A RESTORATION PROGRAM FOR THE BOMA A HISTORIC BUILDING IN BAGAMOYO, TANZANIA.

Canyon Rim Academy Emergency Preparedness Plan

Moncton High School Staff Concerns Compiled September Duct work needs to be cleaned and or blocked. Lintels above bus slip doors are cracked

Spill Containment. Contents

FAUQUIER HIGH SCHOOL FAUQUIER HIGH SCHOOL 200 E MARKET STREET, CHARLOTTESVILLE, VA PH : WWW VMDO.COM

Recover. Be Disaster Safe K-2. Disaster Cycle LESSON PLAN 4. Key Terms and Concepts. Purpose. Objectives. Activities

WELCOME TO THE AFFTON EARLY CHILDHOOD CENTER!

Riverside Community College District / Renaissance Block

Slip, Trip & Fall Program Table of Contents

Pumphouse Museum at the Historic Ottawa Beach Parks Park Township

Task 1 Dry 2D impressions. What you will need: Flour and a camera, a clean tray if you wish.

Small-scale poultry keeping housing layers

Building Managers EDGEWOOD COMMUNITY

PROPOSAL COMMUNITY MANAGED MICRO HYDRO POWER PLANT WOLOFEO COMMUNITY, MAUMERE, FLORES, INDONESIA

Baseline Report Marýs Matriculation Hr. Sec. School (Non Governmental Organization) 2013

Re: Damages to Alaska Building from Legislative Information Office Construction

St. Augustine & St. Joseph. Hospitality Checklist

SECTION 3 ONM & J STRUCTURAL ANALYSIS

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

Historic Preservation Certification Application Part Main Street West South Haven, Vermont NPS Project No

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

IN A SMALL PART OF THE CITY WEST OF

REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:

Slips, trips and falls Policy

How To Replace A Roofing System In Florida

HOMEOWNER MAINTENANCE MANUAL

MINUTES. Date: March 24, 2010 LPC 50/10 Location: 728 St. Helens, Tacoma Municipal Bldg North, Room 16

COLEGIO BOSQUES DE SHERWOOD

Introduction. 1. Heat Transfer. In Townsville s climate it is essential to choose building materials that perform well in our local conditions.

Chapter. Restoration of Damaged Structures

Items in red were complete Items in green were complete on Lined out items are Life Safety Codes.

Goals for Preschool aged Children: (Compiled from several State Guidelines) Compilation by Narcissa Summerfield Language Community Goals

Sunflowers. Name. Level and grade. PrimaryTools.co.uk

Botetourt County, Virginia. Frequently Asked Questions

Building Condition Assessment Report

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Budget for re-construction Of Centre for Empowerment

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

New Jersey City University Gilligan Student Union Center

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Slips Trips and Falls Protocol

Memorandum. July 16, To: Plan Commission City of Madison

Mrs. Kirklin s Child Development Class Rules, Procedures, and General Information

Facts about Asbestos. Council policy

Exemplary Retrofitting of an Old School in Stuttgart - EROS -

Columbia flooring will resist fading from exposure to sunlight or artificial light.

A Chair for My Mother written and illustrated by Vera B. Williams

IMPORTANT SAFETY RULES TO FOLLOW

Vision Home Inspection

Policy Seminar on Women s Entrepreneurship Development in Central Asia. Note by the Secretariat

THEME: God has a calling on the lives of every one of His children!

Borges Construction Company A limited liability Corporation Page1 of 1

Enter & View Visit to Runfold Ward, Farnham Hospital Stroke Pathway

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Activ ActivTM self-cleaning glass Activ

Building Condition Assessment Report

LAYING BLOCK AND BRICK

Civil Service Conciliation and Arbitration Scheme General Council Report 1332

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

C P W R. Research & Training

Guidance on preventing Slips, Trips and Falls

BUNKER HILL ELEMENTARY SCHOOL

A Guide to Flood Resilient Repairs

FIRST GRADE AIR AND WEATHER STUDY

WATERPROOFING SYSTEMS IN BUILDING CONSTRUCTION

Mould Mould A Basic Guide

Living space reinvented

March Madness Week. Day 1 3/12. Day 2 3/13. Day 3 3/14. Day 4 3/15. Day 5 3/16. Hello Teachers and Staff,

Student House Australia Rules and Procedures

Transcription:

REPORT ON THE SCHOOL RENOVATION PROJECT AT ST. JOSEPH SENIOR SECONDARY SCHOOL VVUMBA Report-March 2015 Page 1

In November 2014, Global Friends Foundation partnered with Action for Rural Women s Empowerment to support the renovation of a four-classroom block at St Joseph Senior School Vvumba. The program is aimed at enhancing a better learning environment for the students. The four classroom block accommodated four classes with 240 students. This report captures the progress of the construction from December 2014 to March 2015. The construction and renovation has been going for four months now. Completed activities include: i. Conduct consultative meetings with the school management team and the sub county local leaders ii. Conduct meeting with the school management team and Parents Teachers Association, Contracting the construction company iii. Demolishing the wall between the two classes to create a main hall iv. Removing the old plaster from the walls v. Removing the old cement from the floors vi. Building the walls to reach the roof vii. Plastering the inside walls viii. Changing the blackboards ix. Cementing the inside classrooms x. Plastering the outside walls xi. Demolishing the old cement for the verandas xii. Making blackboards Activities under progress include the following: Construction of the block veranda The veranda was in a poor state before in that the floor was destroyed. It also had no provision for students with disabilities. During the construction, the veranda was rebuilt with bricks, concrete stones and cement and smoothened for easy use and cleaning. Access points to the classrooms were built on the veranda and these included a stair case and access points for students with disabilities. These access points were constructed on both ends of the building for reasons for convenience. The veranda behind the block was enlarged to give sitting space for students. Students utilize this space for revision during their optional subjects and conducting small group discussions. Report-March 2015 Page 2

Watering the cemented floors During the construction, there was continuous watering of the floor in the morning and evenings by sprinkling water on the classroom floors and the block veranda. This was aimed at preventing it from cracking and strengthened it for use. Putting window glasses Engineer fitting in the glasses in the windows. Putting window glasses ensured security for the block during the night, protection from harsh weather conditions like heavy rains and wind, but also most importantly controlled ventilation and aeration. All 20 window glasses were fitted in, this was done using pati substance and kerosene liquid. This process was very tasking as the initial window sizes were not standard measurement. Glasses had to be cut one by one, window slot per slot. Electrical wiring of the building The whole building was wired with electricity, lights both internal and external. Power sockets were installed in the main hall and all classes. This activity was aimed at creating opportunity for boarding students to study at night (prep classes), provide security lights to the school in the night and also support studying during dark rainy seasons. The power grid extension was picked from the initially renovated five classroom block. Report-March 2015 Page 3

Classroom block at night fully powered Roughcasting the outside the building The outside wall was rough casted using red oxide, cement, sand and water. This was applied on both the back and sides of the building block excluding the front. The mix of the red oxide not only gave the building beauty but also was the color standard for school. It also acts as protection for the walls since harsh weather conditions like heavy rains and students activities like touching, writing on it among others are inevitable Painting the block Walls being rough casted with cement and red oxide paint This activity was aimed at providing beauty and building color standard formality for the school. The other element of the color was to support classrooms with adequate light and cleanliness. The inside walls were painted with soft white and skirted with gloss red oxide. The front of the building was painted with soft white and half way leveled skirted with gloss red oxide. The gloss red oxide was applied in classes to prevent cleaning routines from dirtying the wall and in the Report-March 2015 Page 4

block was mainly to prevent students activity from dirtying it. The doors were painted a dark grey color and the windows with a soft white. Painting the classroom block outside and inside Students cleaning the new main hall after painting Beneficiaires say,... My name is Sylvia Namugenyi. I am 17 years old and in senior three. I am a day scholar. I stay in Vvumba village. My class senior three is using the school block. Before the renovation, the building had no cement and because of it, we were exposed to jiggers that not only made it comfortable for us in studying but also affected our self esteem since having jiggers is stigmatized in our society. With the well cemented floor now, jiggers have been dealt with and Report-March 2015 Page 5

we have a comfortable learning environment. I want to thank funders for the renovation; it has made our school shine and a cleaner. The school has come out with the second best performing students (2) Kyankwanzi District in Uganda Advanced Certificate Examinations (Senior Six) with 16 points. Actually one of the students Muyanja Charles is an orphan who participated in the renovation of the first building and was the student who dearly welcomed and sung for the GFF team when it visited the school. He totally affiliates his success to not only the teachers but the improved study environment. Muyanja giving a speech during the visit of GFF to the school in May 2014. I am called Jovia Nazziwa. I am 16 years old and in senior three. I am in the boarding section. Before the renovation, you can imagine studying from a building whose doors or windows you could not different since all were not closed up. It felt like we were studying from open space and not under a building. With the renovation of our classroom block, we feel very comfortable in our classes. St Joseph SSS Vvumba is now one of the best looking and performing in Kyankwanzi district. Students from other schools admire our school because of the new look. I wasn t to thank everyone who has made it possible for us to study in such a beautiful and safe environment. May the lord grant them blessings and long life. 16 year old Steven Ssekamate is a senior five student in day section. He says, The building didn t have plaster, it was a breeding place for pests like jiggers and lice. The un plastered wall also undermined our hygiene level. I am so happy to have to study from a cleaner and safer environment. I thank all the supporters of this work and I pray they also support other school who have poor studying environments. I am grateful to ARUWE and the partners for the successful and marvelous work of renovating this building for us. Most importantly, we now have a school main hall that we never had before. We believe also with the new space created we will be able to admit more students. The project is moving on well and I believe will be finished in time, said Mr. Pintos, School secretary. Report-March 2015 Page 6

Students cleaning the compound in front of the renovated classroom to ensure a clean studying environment Handing over the building to the school This activity is awaiting a date which the school and ARUWE are working towards setting in consideration with the school time table. Preparations of the activity are underway and the students, teachers, parents, district and community leaders and education officers are eagerly waiting for it. We will be sending communication regarding the dates. Tracking changes ARUWE the school will design data capturing tools to track changes as a result of this project. Data to be captured include: 1. Increase in School enrollment 2. School performance at senior four and senior six levels 3. Teachers motivation 4. Improvement in number of hours while studying are revising Compiled by: ARUWE team Report-March 2015 Page 7