APPLICATION FOR NEW CONSTRUCTION



Similar documents
Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Applications for building permits will not be reviewed until all of the required information has been submitted.

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

City of Elk River BASEMENT Office Use Only

PLUMBING PERMIT REQUIREMENTS AND CHECKLIST

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

C I T Y O F P E A R S A L L

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

2016 BUILDING PERMIT FEES*

The City of Basehor, Kansas

City of Douglas Commercial Building Permit Site Application

COMMERCIAL BUILDING PERMIT INFORMATION

HOMEOWNER S PERMIT GUIDE

Building Permits: When are they required?

2. What building projects are exempted? (permit not required)

Does Wall Township require an inspection by the building department on resale of a home?

BUILDING PERMIT SPECIFICATIONS

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

CHARLOTTE COUNTY Community Development Department

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

CITY OF CRESTVIEW. TRADES PERMIT APPLICATION (Mechanical, Electrical, Plumbing, Irrigation, Fire Alarm & Gas Permits)

City of Riverside. Building & Safety Division Phone: (951)

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

BUILDING DIVISION CONSTRUCTION PERMIT FEES

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

Development Services Guidelines

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Inspection Item COMMENTS

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

Plumbing Installations. A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM REQUIREMENTS

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

VILLAGE OF GREAT NECK ESTATES

VILLAGE OF BETHALTO COMMERCIAL BUILDING PERMIT APPLICATION

Time/Date Stamp when received:

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Schedule B to By-law

Building Information Packet

How To Get A Building Permit In Florida

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

C-2 Construction, Inc. - NAICS Codes

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

Plumbing Installations A homeowner guide to the City of Winnipeg plumbing requirements for a single-family dwelling

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

Residential Building Permits

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

Schedule B to By-law Part A Fees Payable for Permits

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

Seller s Property Disclosure Statement. Property address: Seller:...

Building Permit Application

TOWN OF TRURO BUILDING PERMIT APPLICATION

Open House and Home Tour Checklist

Development Services Guidelines

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

RESIDENTIAL WINDOW REPLACEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

BUILDING PERMITS. Santa Rosa County Building Inspection

Single Family Residential Building Permit Questions & Answers

PLAN SUBMITTAL INFORMATION

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

Single Family Residential Basement Finish

Bureau Veritas Contact Information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Botetourt County, Virginia. Frequently Asked Questions

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

Residential Plan Routing Information

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

City of St. Charles Basement Finish or Remodel

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

SECTION THREE CONSTRUCTION CODES

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

WHEN IS A PERMIT REQUIRED?

PROPOSED Plumbing Fee Ordinance Amendment

Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents

CERTIFICATION OF ENROLLMENT SUBSTITUTE SENATE BILL th Legislature 2015 Regular Session

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Basement Development Construction requirements for the development of basements in residential dwellings.

Inspecton Report. Property Address:

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

SECTION 19 RESIDENTIAL CONSTRUCTION IN FLOODZONES

Propery Inspection Report

Residential Building Permit Guide

EXPRESS PERMITS (No Plan Check Required)

A Guide for the Homeowner/Builder

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

VILLAGE OF BETHALTO RESIDENTIAL BUILDING PERMIT APPLICATION AND INFORMATION

Transcription:

CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT INSTRUCTIONS: For all applications, complete parts 1, 2, 3, 4, & 5 of this form. If electrical work, also complete Part 6. If plumbing work, also complete Part 7. If mechanical work, also complete part 8. For other permits, also complete Part 9. Site Plan (Part 10) is to be shown on Page 4 or attached hereto. Parts 11-18 (Pages 5 & 6) are for department use only. TYPE PERMIT Electrical (E) Plumbing (P) Is Owner Applicant? Y/N Street Address Building (B) Mechanical (M) Other (O) (see item 9) 1. PROPERTY INFORMATION Apt. Zip. Parcel No. Zoning Subdivision First Name Last Name or Business Name Lot No. Parcel Type Residential (R) Industrial (I) 2. OWNER INFORMATION Commercial (C) Other (O) Phone Street Address City, State Zip Applicant (not owner) Architect/Engineer General Contractor Excavation Concrete Carpentry Electrical Plumbing Sewer mechanical Roofing Masonry Drywall or Lathing Sprinkler Paving Fire Alarm 3. CONTRACTOR INFORMATION Name of Contractor Street Address City, State License No. 4. CERTIFICATION I hereby certify that I am the owner of record of the named property, or that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his/her authorized and I agree to conform to all applicable laws of this jurisdiction. In addition, if a permit for work described in this application is issued, I certify that the code official or the code official's authorized representative shall have the authority to enter areas covered by such permit at any reasonable hour to enforce the provisions of the code(s) applicable to such permit. Signature of Applicant Address Phone No. Responsible person in charge of work Title Phone No. Page 1 of 6

5. BUILDING PERMIT APPLICATON For Dept. Use Only Request Plan No. Assignment (Y/N) PROPOSED USE: INSTITUTIONAL OTHER (24) Plan Number ASSEMBLY THEATRE (1) GROUP HOME (12) HOSPITAL (13) PARKING GARAGE CARPORT NIGHT CLUB (2) JAIL (14) MOTOR FUEL SER IMPROVEMENT TYPE: RESTAURANT (3) MERCANTILE (15) REPAIR GARAGE NEW CONSTRUCTION (1) CHURCH (4) RESIDENTIAL PUBLIC UTILITY ADDITION (2) OTHER ASSEMBLY (5) HOTEL, MOTEL (16) HPM ALTERATION (3) BUSINESS (6) MULTI-FAMILY (17) REPAIR/REPLACEMENT (4) EDUCATIONAL BOCA TWO FAMILY (18) DEMOLITION (5) (GRADES 1-12 (7) CABO TWO FAMILY (19) RELOCATION (6) DAY CARE FACILITY (8) BOCA SINGLE FAMILY (20) FOUNDATION ONLY (7) FACTORY CABO SINGLE FAMILY (21) CHANGE OF USE ONLY (8) MODERATE HAZARD (9) STORAGE LOW HAZARD (10) MODERATE HAZARD (22) HIGH HAZARD (11) LOW HAZARD (23) Structural (check all that apply) Exterior (Check those applicable) Frame Walls Steel (1) Concrete (3) Other (5), Identify: Steel (1) Concrete (3) Other (5), Identify: Masonry (2) Wood (4) Masonry (2) Wood (4) Are any structural assemblies fabricated off-site? Yes No Street Frontage (feet) Stories (number) Lot Area (sq. ft) Front Setback (feet) Bedrooms (number) Building Area (sq. ft) Rear Setback (feet) Full Baths (number) Parking Area (sq. ft) Left Setback (feet) Partial Baths (number Living Area (sq. ft) Right Setback (feet) Garages (number) Basement Area (sq. ft) Height Above Grade (feet) Windows (number) Garage Area (sq. ft) New Residential Units (number) Fireplaces (number) Office/Sales (sq. ft) Existing Residential Units (number) Enclosed Parking (number) Service (sq. ft) Elevators/Escalators (number) Outside Parking (number) Manufacturing (sq. ft) Est. Start Date: / / Est. Finish Date: / / Building Est. Value: 6. ELECTRICAL PERMIT APPLICATON Electrical Work Yes No Total Service AMPS Number of Circuits: 2WIRE 3WIRE 4 WIRE Number of Service Outlets: 110V 220V POWER DEVICES # output/load POWER DEVICES # output/load 1 7 2 8 3 9 4 5 6 Total Number of Motors Utility Service Revisions: Estimated Start: / / Estimated Finish: / / Electrical Work Estimated Value: Page 2 of 6

7. PLUMBING PERMIT APPLICATION Plumbing Work Yes No Enter the Number of Fixtures Being Installed, Replaced, or Repaired Tubs/Showers Shower Stalls Lavatories Toilets Urinals Sinks Drinking Fountains Floor Drains Water heaters Water Softeners Sewage Ejectors Sump Pumps Back Flow Prevention Water Pumps Roof Openings Parking Lot Drains Inside Downspouts Swimming Pools Laundry Tubs Grease Traps Standpipes (Y/N) (Number Hose Outlets) Dishwashers Bidets Fire Sprinklers (Y/N) (Number of Heads) Garbage Disposals Lawn Sprinklers (Y/N) (Number of Heads) Total Fixtures Public Water (Y/N) Public Sewer (Y/N) Water Service Size IN Water Meter Size IN Avg. Daily Water Use GPD Utility Service Revisions: Estimated Start: / / Estimated Finish: / / Plumbing Work Estimated Value: 8. MECHANICAL PERMIT APPLICATION Mechanical Work Yes No Forced Air Furnace Unit Heater Gas/Oil Conversion Space Heater Gravity Furnace Solid Fuel Appliance Enter Number of New or Replacement Units Incinerator Air Handling Unit Boiler Heat Pump Coil Unit Air Cleaner Window A/C Unit Kitchen Exhaust Hood Split System A/C Hazardous Exhaust System A/C Compressor Electric Furnace Utility Service Revisions: Type of Heating Fuel: (Check One) Gas(1) Oil (2) Electric (3) Coal (4) Wood (5) Other (6) Estimated Start: / / Estimated Finish: / / Mechanical Work Estimated Value: Permit Type: Description of Work: 9. OTHER REQUIRED PERMIT APPLICATION(S) Estimated Start: / / Estimated Finish: / / Estimated Value: Page 3 of 6

10. SITE PLAN Show lot lines, easements, and work layout & dimensions Page 4 of 6

Application Received: / / : Application Reviewed: / / : Data Entry: / / : 11. DATA ENTRY 12. FLOODPLAIN EVALUATION FLOOD MAP NUMBER & DATE LOWEST FLOOR ELEVATION FLOOD ZONE BASE FLOOD ELEVATION 13. ZONING PLAN EVALUATION ZONING DISTRICT MAP NUMBER LOT AREA (From Page 2) LOT COVERAGE (%) LOT AREA PER ROOM ENCROACHMENTS OFF STREET PARKING SPACES, REQUIRED PROVIDED LOADING SPACE SIGNS: NUMBER SIZE OF EACH SIGN PLANNING COMMISSION APPROVAL REQUIRED BOARD OF ZONING APPEALS APPROVAL REQUIRED Plans Review Required BUILDING PLUMBING MECHANICAL ELECTRICAL TOTAL Check Plan Review Fee 14. PLAN REVIEW RECORD Date Plans Started TO BE ENTERED ON PART 18 15. ADDITOINAL PERMITS REQUIRED Date Plans Approved Notes Permit or Approval Check Date Obtained Number Permit or Approval Check Date Obtained Number BOILER PLUMBING CURB OR SIDEWALK CUT ROOFING ELEVATOR SEWER ELECTRICAL SIGN OR BILLBOARD FURNACE STREET GRADES GRADING USE OF PUBLIC AREAS OIL BURNER DEMOLITION Page 5 of 6

16. PROJECT DOCUMENTS (DRAWINGS & CALCULATIONS) TYPE DRAWINGS/REPORT SUBMITTED SIGNED AND SEALED DATE REVISION DATE SITE PLAN Yes No Yes No SOIL REPORT Yes No Yes No ARCHITECTURAL DRAWINGS Yes No Yes No STRUCTURAL DRAWINGS Yes No Yes No MECHANICAL DRAWINGS Yes No Yes No ELECTRICAL DRAWINGS Yes No Yes No JOB SPECIFICATINS Yes No Yes No STRUCTURAL CONNECT.DRWNGS. Yes No Yes No STRUCTURAL CALCULATIONS Yes No Yes No SPECIAL INSPECTION DATA Yes No Yes No SPRINKLER DRAWINGS Yes No Yes No SPRINKLER CALCULATIONS Yes No Yes No 17. OTHER DEPARTMENT APPROVALS Signature Date Signature Date Fire Health and Sanitation Public Works Water Zoning Planning Architectural Review Environmental Management Building Committee Building Permit Electrical Permit Plumbing permit Mechanical Permit 18. VALIDATION Plan Review Fee (From Part 14) Certificate of Occupancy Fee Other Fee TOTAL FEES Prepared : Date: Approved : Title: Page 6 of 6