Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process



Similar documents
BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions

FracPT FZE. Stimulation Training Courses & Consulting.

Certificate Programs in. Program Requirements

DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)

FAN group includes NAMVARAN UPSTREAM,

OilSim. Talent Management and Retention in the Oil and Gas Industry. Attract, identify, develop, and retain the right people

Consultants, Inc. Independent Petroleum Engineers

Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*

Graduate Courses in Petroleum Engineering

RESERVOIR GEOSCIENCE AND ENGINEERING

The ever increasing importance of reservoir geomechanics

EnerCom The Oil & Gas Conference. An Integrated Workflow for Unconventional Reservoirs

Reserve Definitions Total Petroleum-initially-in-place Discovered Petroleum-initially-in- place

Oil and Gas Training and Competency Development. Developing expertise to efficiently meet key industry challenges

Lists of estimated quantities to be performed and prices Estimated quantities to be performed. Prices

Integrated Reservoir Asset Management

WELL LOGGING TECHNIQUES WELL LOGGING DEPARTMENT OIL INDIA LIMITED

Fiber Optics in a Bakken Multi-Stage Fractured Well. Montana Tech 2011 SPE Drilling Symposium Presented by: Chelsea Kadler

SPE Life beyond 80 A Look at Conventional WAG Recovery beyond 80% HCPV Injection in CO2 Tertiary Floods David Merchant, Merchant Consulting

Shale Field Development Workflow. Ron Dusterhoft

Storing of CO 2 offshore Norway, Criteria for evaluation of safe storage sites

University of Cyprus

Fracture Technologies 9. Frac Candidate Selection

Technion Israel Institute of Technology Masters of Engineering in Energy Engineering

Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS

Energy Data and Information

IPIMS.ep IHRDC. The best e-learning solution for the E&P industry. ... join the worldwide ipims learning network! Word is spreading...

Nexus. Reservoir Simulation Software DATA SHEET

SPE Copyright 1999, Society of Petroleum Engineers Inc.

Guidelines for the Evaluation of Petroleum Reserves and Resources

Help Shape the Future of Energy as an Engineer at Chevron

Nautilus Global Schedule 2016

GAS WELL/WATER WELL SUBSURFACE CONTAMINATION

Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources

Unconventional Challenges: Integrated Analysis for Unconventional Resource Development Robert Gales VP Resource Development

An Integrated Rock Catalog for E&P Geotechnologists

Midland Houston. In Alliance With

Objectives. Describing Waterflooding. Infill Drilling. Reservoir Life Cycle

Main areas of services are:

Well Integrity Basics, Prevention, Monitoring, Red Flags & Repair Options

Study Assesses Shale Decline Rates

Pattern Recognition and Data-Driven Analytics for Fast and Accurate Replication of Complex Numerical Reservoir Models at the Grid Block Level

P-83 Lawrence Berkeley National Laboratory High-Resolution Reservoir Characterization Using Seismic, Well, and Dynamic Data

Collecting and Analyzing Big Data for O&G Exploration and Production Applications October 15, 2013 G&G Technology Seminar

OFFSHORE FIELD DEVELOPMENT

Reservoir Simulation

RESERVOIR EVALUATION. The volume of hydrocarbons in a reservoir can be calculated:

RPSEA Project Management Plan

Degree/ Higher Education Jobs:

Tight Gas Reservoirs R&D Project Approach

Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1

PRELIMINARY REPORT ON THE NORTHSTAR #1 CLASS II INJECTION WELL AND THE SEISMIC EVENTS IN THE YOUNGSTOWN, OHIO AREA

DecisionSpace Earth Modeling Software

Design of High Temperature Electronics for Well Logging Applications

2014 Salary Report Salary Report

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

Strategic Review April 2013

Enhanced Oil Recovery (EOR) in Tight Oil: Lessons Learned from Pilot Tests in the Bakken

SPE/WPC/AAPG/SPEE Petroleum Resources Management System (PRMS)

MILLER AND LENTS, LTD.

Re-Fracturing and Water Flooding Western Canada Tight Oil Reservoir Horizontal Wells

Overview of the Hugoton Asset Management Project (HAMP) southwest Kansas and Oklahoma Panhandle

Waterflooding. A Tried and True Technique for Secondary Oil Recovery. Houston Bar Association Oil, Gas and Mineral Law Section March 26, 2013

The Process Below are the steps for creating and presenting digital short courses:

Paradigm High Tech and Innovative Software Solutions for the Oil and Gas Industry

Search and Discovery Article #40356 (2008) Posted October 24, Abstract

Specialized Financing in the Oil & Gas Industry

Programme title Minimum entry requirements Additional information

Tax Executives Institute

Wellbore Integrity Restoration Services

Analysis and Calculation Method for Automatic Water Flooding Technology

Drilling Problems. pull

EPRI Global Climate Change Research Seminar. Natural Gas Supply. Francis O Sullivan, Ph.D. May 25 th, 2011

eeducation realisation

Search and Discovery Article #40256 (2007) Posted September 5, Abstract

Plug and Abandonment Forum

Harold Vance Department of Petroleum Engineering

BEng (Honours) Petroleum Engineering

On the Impact of Oil Extraction in North Orange County: Overview of Hydraulic Fracturing

Field Office. Real-time Production Optimization Software. A software suite designed for comprehensive production optimization.

Industrial Technology

Oil and Gas Steve Oliver

Specialist Reservoir Engineering

Introduction. The following is an outline of the contents of this paper: Definition of Artificial Lift Page 2. How an Oil Well is Produced Page 2

ASX Release. Romania Exploration Update. 2 October 2014

Chapter 1 Introduction

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

INDIAN STANDARDS FOR NATURAL GAS PIPELINE SYSTEM

Hydrocarbon Production from the South Ellwood Field and the Effects on Naturally Occurring Oil and Gas Seeps*

HESS CORPORATION. Lean Leads the Way in a Low-Cost Environment

Comparison Between Gas Injection and Water Flooding, in Aspect of Secondary Recovery in One of Iranian Oil Reservoirs

The material of which a petroleum reservoir. Effects of the Workover Fluid on Wellbore Permeability. t e c h n o l o g y

Wellbore Integrity Restoration Services

For personal use only

API FORUM (21 st March 2013) MIDA

Background. Scope. Organizational Training Needs

Presentation To: Houston Energy Finance Group. Ryder Scott Company, L.P.

Transcription:

Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process The following guideline describes the process of evaluating a proposed training course for consideration by the Society's Global Training Committee (GTC) to become an approved SPE course. For a course to be offered under SPE auspices it must be of the highest technical quality, comprehensive in the way it addresses its topic and judged relevant to today s demanding E&P activity. The review process generally takes three six months to complete. The Global Training Committee is comprised of volunteer experts in the various Petroleum Engineering disciplines. These experts come from different geographic regions, and different corporate backgrounds to reflect the diversity of SPE membership. We are looking for 2, 3, 4 and 5 day courses or 60 70 minute webinars featuring practical, hands-on approaches to real-world problems. Courses need to have explicit learning objectives and the use of case studies is encouraged. In keeping with the objectives of SPE and its Global Training Program, commercialism during training courses or on course materials is not permitted. Thus company logos, company names, and company product names are prohibited on all but the cover slides. Software should only be used as a tool or reference and not as the only means of achieving course objectives. SPE in no way endorses any specific company, product or service in the delivery of training courses. Our focus is not to compete with commercial providers but to offer a balance of introductory, intermediate and advanced courses and those addressing emerging technologies. Course submission and approval process 1. A potential instructor, Subject Matter Expert (SME) contacts the SPE Global Training (GT) Specialist to request consideration of a proposed training course to become approved for offering under SPE auspices. 2. The GT Specialist will ask the SME to submit a course outline form (see attached) which includes the course title, course, duration, technical discipline, intended audience, learning objectives, course description and topics covered, any special requirements, and instructor biographical information or CV including education, and professional experience which will support his/her request. The SME will also submit a detailed syllabus (see attached syllabus) and complete course materials/presentation. If the course is in development, a sample of materials, 10-12 slides need to be supplied. 3. Upon receipt of the training course form, syllabus and course materials, the GT Specialist will ask for a volunteer team of two or more GTC members with the appropriate technical background to review the submitted outline and material. GTC members may seek outside expert technical opinion on the proposed course content if necessary. 4. Once a course is approved, it will be nominated as a pilot training course. The time and location for conducting the pilot will be determined by SPE Global Training and the SME. 1

5. After the course is piloted and evaluated by participants, GTC and SPE Global Training staff will review the evaluations and if satisfactory, will recommend adding the course to the SPE Global Training Catalog and be posted on SPE s website. 6. Future offerings of the course will be determined mutually by the SPE Global Training and the SME. Global Training Committee Training Course Development We are specifically looking for 2, 3, 4 and 5 day courses; and/or 60 70 minute webinars addressing the following disciplines and topics: Water management Data to Action Well Integrity Drilling and Completions Health Safety, Security, Environment and Social Responsibility Projects, Facilities and Construction Offshore oil and gas exploration, development and production Deepwater operations High temperature high pressure operations Hydraulic fracturing Flow assurance EOR/IOR Heavy oil operations Arctic operations Development and production of unconventional resources Optimizing brown field (marginal field) development 2

Society of Petroleum Engineers Global Training Committee - Training Course Review Sample Form Please provide this information when submitting a training course outline to the Society of Petroleum Engineers for technical review. This is the first step in the process in getting a course approved as an SPE training course. Submitting this course outline and sample material is not a guarantee of approval. If you have any questions, please contact SPE staff via email at trainingcourses@spe.org and staff will respond as quickly as possible. Below is a sample form to give you an idea of the desired level of detail. Please pay special attention to the Learning Objectives. A blank form is provided in Word format as an attachment to this document. Both a sample syllabus and a blank syllabus form are also attached. Well Cementing Course Title Instructor Name, Organization, Contact Information Joe Engineer, John J. Instructor Drilling Company, 222 Palisades Creek Drive, Richardson TX 75080, 972.952.9393 jengineer@spe.org; jinstructor@spe.org Two days Drilling and Completions Course Duration Technical Discipline Specify Who Should Attend (Target Audience) & Level of Experience Please be very specific when listing who should attend. (Introductory, Intermediate, Advanced) Engineers that are involved in designing and evaluation of cement jobs. This is a fundamental course for Engineers new to cementing Identify What Attendees Will Learn Learning Objectives List 3 to 5 specific learning objectives What will students be able to do after attending the training At the end of this course, participants will be able to: Read and analyze drilling data Use the drilling data to select the appropriate equipment and cement design for the job Design a pumping schedule that will ensure there is no fracturing or threat of a kick Evaluate and make a decision on whether or not a remedial job is necessary by using cement bond evaluations Design a shoe squeeze if required 3

Course Description and Topics Covered Be as descriptive and as complete as possible. This will be used in marketing materials. This 2 day course examines methods for detecting fluid channels, voids and leaks, and how to repair them. Discussions will begin with the fundamental design principles and progresses through materials, performance, loads and design. A significant portion of the course covers mechanical performance, including working limits, buckling, lockup and fatigue. Discussions will also include knowledge of cements, additives used in cementing and proper procedures for placement. Guidelines for cementing will be discussed for job role performance. Topics discussed will be: - Mixing equipment used in cementing - Laboratory testing - Case histories - Differences between primary cementing and remedial cementing Special Requirements Please list any special requirements needed for the course. Example: - Laptop - Participants should have moderate experience or exposure to the topic - Attendees need to bring relevant field well designs and problems to use as in-class exercises Why You Should Attend Poor cement coverage affects nearly every aspect of a well. This course will give you a better understanding of some critical well safety and integrity issues. Instructor Resume/CV Please attach an up-to-date resume or CV Prior Teaching or Speaking Experience Please list any prior experience you have had with teaching or speaking engagements. 4

Form 2 Sample Syllabus Society of Petroleum Engineers Training Course Well Cementing by Joe Engineer and John J. Instructor Day 1 Morning Session 8:00 11:30 Registration ½ hr (SPE) Student Introduction/Course Expectations ½ hr (JE/Students) Awareness Exercise ½ hr (JE/Students) Introduction Cement Life Cycle, Cement Management Process, Need for Cementing Performance Analysis ¾ hr (JE) Coffee Break ¼ Data acquisition, analysis and management ¼ (JE) Integrated reservoir modeling for performance analysis -- integration of data from geology, geophysics, petrophysics, geostatistics, and engineering ¾ hr (JIJ) Lunch 11:30 12:30 Afternoon Session 12:30 5:00 Geological controls on reservoir performance--depositional environment and digenesis, reservoir structure, compartmentalization, heterogeneity, fractures, flow units, sweep efficiency and initial distribution of hydrocarbons and water. Where to drill wells for maximum recovery - 2 hrs (JIJ) Pore level controls on reservoir performance--recovery efficiency, stress dependent permeability, casing collapse and surface subsidence ½ hr (JIJ) Formation damage--practical aspects of clay-rock reactions - ½ hr (JIJ) Rapid prediction of reservoir performance using data from wireline logs, cuttings and/or cores--how to prevent setting pipe on intervals that look good on logs and perform poorly - ¾ hr (JIJ) Review Expectations and Feed Back ½ hr. 5

Day 2 Morning Session 8:00 11:30 Review ½ hr Dynamic control on reservoir performance - natural producing mechanisms, fluid contacts, variations in layer permeabilities, layer continuity, faults and fracture orientations, directions of flow, kind and number of phases flowing, relative permeabilities, special distribution of wells, well completions, and rates 1 1/2 hr (JE) Reservoir performance analysis techniques - volumetric, correlation, decline curve, classical material balance, and simulation 1 1/4 hr (JE) Lunch 11:30 12:30 Afternoon Session 12:30 5:00 Reservoir performance analysis techniques (cont d) 3/4 hr (JE) Reserves determinations - proved, possible, and probable ½ hr (JIJ) Actual examples of integrated field studies - oil, gas, and gas-condensate reservoirs 1 hr (JIJ) Examples of reservoir performance through the reservoir life cycle - economically viable development plan for a newly discovered offshore oil field, revitalization of an actual mature offshore oil field, and economically viable development plan of a Waterflood project for a primary depleted oil reservoir 1 ½ hr (JE) Feedback and Course Evaluations ½ hr 6

Society of Petroleum Engineers Global Training Committee - Training Course Review Please provide this information when submitting a training course outline to the Society of Petroleum Engineers for technical review. This is the first step in the process in getting a course approved as an SPE training course. Submitting this course outline and sample material is not a guarantee of approval. If you have any questions, please contact SPE staff via email at trainingcourses@spe.org and staff will respond as quickly as possible. Course Title Instructor Name, Organization, Contact Information Course Duration Technical Discipline Specify Who Should Attend (Target Audience) Identify What Attendees Will Learn Learning Objectives Course Description and Topics Covered Special Requirements Why You Should Attend Instructor Resume/CV Prior Teaching or Speaking Experience 7

Syllabus Society of Petroleum Engineers Training Course by Day 1 Morning Session 8:00 11:30 Registration ½ hr (SPE) Student Introduction/Course Expectations ½ hr (Instructor/Students) Coffee Break ¼ Lunch 11:30 12:30 Afternoon Session 12:30 5:00 Review Expectations and Feed Back ½ hr. 8

Day 2 Morning Session 8:00 11:30 Review ½ hr Lunch 11:30 12:30 Afternoon Session 12:30 5:00 Feedback and Course Evaluations ½ hr 9