Compensation Methods for Architectural Services



Similar documents
Document Comparison. AIA Documents A and A131CMc 2003

STANDARD FORM OF CONTRACT FOR DESIGN-BUILD CONSULTANT SERVICES

Pricing of Construction Contract Change Order Documentation

THIS AGREEMENT is made effective as of this day of in the year of.

Contract Administration

Additional limitations to fixed fee or profit may be addressed by an IO s Operating Procedures.

The Consultant is a person or an entity engaged by the Client or the Architect to provide services supplementary to those provided by the Architect.

Attachment 5 Electrical Engineering

MASTER AGREEMENT FOR PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES

AGENDA FOR LUNCH SEMINAR WITH FMI AUGUST 28, :30 PM INTRODUCTION TO GOVERNMENT CONTRACTING

You & Your Architect A GUIDE FOR A SUCCESSFUL PARTNERSHIP.

INSTRUCTIONS FOR PROVIDING PROFESSIONAL CONSULTING SERVICES

DEMO Version. Owner and Contractor OCNMP103

TEXAS DEPARTMENT OF TRANSPORTATION. Fourth Quarter 2007

General Report Requirements

Schedule to Regulation PR No. 30/53

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts

Auditing construction contract change orders

North American Development Bank. Model Bidding Document: Consultant Services

Ontario Works Directives

Construction Contracts

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS HEALTH SCIENCE CENTER AT SAN ANTONIO and PROJECT ARCHITECT for A PROJECT OF LIMITED SIZE OR SCOPE

DETERMINATION OF ACQUISITION AND FIELD SUPERVISION COST BY LINES OF BUSINESS FOR CASUALTY INSURANCE

International Accounting Standard 11 Construction Contracts

SAMPLE INDIRECT COST PROPOSAL FORMAT FOR NONPROFIT ORGANIZATIONS

CHAPTER 5. ALLOWABLE COSTS TO BE REPORTED ON FORM HUD A

The AIA B Standard Form of Agreement between the Owner and Architect is hereby amended as follows:

CHAPTER 7 COST PRINCIPLES

How To Build A House

Architects aspire to financial health. The reason is simple they cannot attain

EXEMPT VS. NON-EXEMPT Identifying Employee Classification

REVIEW GUIDE FOR NON PROFIT ORGANIZATION S INDIRECT COST PROPOSALS

Allowable and Unallowable Costs Reference Guide Description Allowable Unallowable

Agreement between Owner and Architect

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES. Responsibilities of Construction Manager Scope of Construction Manager s Basic Services

Memorandum Potentially Affected AIA Contract Documents AIA Document A AIA Document B Important Information

Independent Contractor or Employee? Worker Classification Rules under IRS Guidelines

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

INDEPENDENT CONTRACTOR vs. EMPLOYEE:

AGREEMENT BETWEEN THE UNIVERSITY OF TEXAS M. D. ANDERSON CANCER CENTER SERVICE PROVIDER for A PROJECT OF LIMITED SIZE OR SCOPE

CONSTRUCTION MANAGER-AT-RISK AGREEMENT. between. Houston Independent School District. and. [insert legal name of firm] for

CHAPTER 50:02:04 PUBLIC SAFETY ANSWERING POINTS. (1) Board, the South Dakota 911 Coordination Board established pursuant to

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

DelDOT Professional Services Procurement Manual. Chapter Contents. Chapter Six Progress Payment and Reporting Procedures 6.1 PROGRESS PAYMENTS...

COST SHARING AGREEMENT FOR SERVICES. between. Royal Holloway and Bedford New College. and. Royal Holloway Enterprise Limited

WORKERS' COMPENSATION INSURANCE

Christopher Noble, Negotiating Owner-Architect Agreements: Theory and Practice (revised February 2011)

Capital Area Council of Governments FY 2015 Cost Allocation Plan

CONTENTS I. PREMIUM ADJUSTMENT BY AUDIT 2 II. REMUNERATION INCLUSIONS AND EXCLUSIONS 2 III. TYPE OF LABOR HIRED 3 IV. WORKERS COMPENSATION 4

QBS USER S GUIDE THE PROCESS FOR SELECTION

Frequently asked questions. FP7 Financial Guide

Capital Professional Services SCOPE and FEE NEGOTIATION POLICY University of Illinois

OWNER-ARCHITECT AGREEMENT FOR DESIGN AND ADMINISTRATION SERVICES

SECTION III. Examples of Exhibits to Support Indirect Cost Rate Proposals

b. Deliverables Prepare and deliver draft report ( copies); Prepare and deliver final report (

Accounting Basics: The Income Statement & Key Performance Indicators

WATER UTILITY REFERENCE MANUAL

REIMBURSEMENT PROCEDURE for FEMA PUBLIC ASSISTANCE

DATE: 12 January : INCOME TAX ACT, NO. 58 OF 1962 (the Act)

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors

UNION COUNTY Workforce Development Board

REQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office

LONG-TERM CONTRACTS: New Accounting Regulations

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS

AIA Document A107 TM 2007

IESL GUIDELINE STRUCTURE FOR ENGINEERING CONSULTANCY FEES 1. INTRODUCTION

Payroll Inclusions & Exclusions

ENGAGING A LANDSCAPE CONSULTANT GUIDANCE FOR CLIENTS ON FEES SEPTEMBER 2002

Object Code Numbers: Object Descriptions: SECTION M EXPENDITURE / EXPENSE FUNCTION AND OBJECT CODES

Fundamentals of a Construction Audit. August 7, 2014

Construction Contracts

Independent Government Cost Estimate Guide and Template

Consulting Services for CORPORATE SPONSORSHIP ASSET INVENTORY & VALUATION

Frequently Asked Questions (FAQ s)

PAYCHEX. Mastering Payroll Compliance. 10 Missteps to Avoid

PENNSYLVANIA HOUSING FINANCE AGENCY COST CERTIFICATION GUIDE TAX CREDIT PROGRAM

NJEMs Bill ID: This is a unique identification number created by the billing software to identify this particular invoice with the responsible party.

Request for Proposal for Construction Management Services

FINANCIAL MANAGEMENT GUIDE FOR NON-PROFIT ORGANIZATIONS

AN INTRODUCTION TO FINANCIAL MANAGEMENT FOR GRANT RECIPIENTS

Provisional Billing Rates. Beth Citeroni Acquisition Cost/Price Analyst

Section 4.01: 4.02: 4.03: 4.04: 4.05: 4.06: 4.07: 4.08: 4.01: General Provisions

PREVAILING WAGE RESOURCE BOOK 2010 SCA COMPLIANCE PRINCIPLES

Statement of Financial Accounting Standards No. 43

Applicability / Objective

NOAA Grants Management Division Budget Narrative Guidance

Transcription:

Compensation Methods for Architectural Services Compensation Methods for Architectural Services By: Thomas R. Gossen, AIA, PE Secretary/Treasurer and Chief Operating Officer Gossen Livingston Associates, Inc. Compensation methods for architectural services take varied forms. This article discusses fees from the broadest perspective applicable to architectural services as a whole. Most architects are willing to do business under any of a number of fee arrangements; generally, the method chosen is for the convenience of the client. Definitions of the standard terms used in this article are covered in Section 2. Section 1 - Fees The term "fee" means the Consulting Architect's compensation for services. The method used to establish a fee should be compatible with the character of the services performed and provide adequately for salaries, office and other operating expenses, taxes, and a reasonable profit. Computation of fees for services is usually determined in one of the following ways, or a combination of the following as may be applicable for a particular project. 1.1 Lump Sum/Fixed Fee A lump sum contract specifies that a predetermined scope of services will be furnished for a fixed fee. This amount remains fixed unless there is a change in the scope of services. A fixed lump sum fee agreement should include a stated time limit for the performance of the services. A provision should be included for additional compensation for time delays not caused by the Architect, and for changes requested by the Owner after the documents have been approved. It is essential that a detailed scope of the planned services be agreed upon under a fixed lump sum contract. Provisions should also be made for equitable adjustment in compensation should the original project be expanded or reduced in scope. In such cases, the amount of fee adjustment is often determined on a cost-plus basis. Lump sum compensation is usually arrived at by negotiations which include the following five items: a. Estimated "Direct Salaries or Wages" to be paid to complete the services or the estimated "Direct Payroll Expense" to be incurred to complete the services based on the estimated number of drawings, staff hours, schedule requirements, etc. b. Estimated "Payroll Burden and Fringe Cost" associated with the above "Direct Salaries or Wages." c. Estimated "general Overhead Costs." d. Estimated "Reimbursable Expenses." e. A reasonable profit. 1.2 Cost-Plus A cost-plus contract specifies that payments to the Architect will be determined on the basis of his or her costs for the services. This arrangement generally presupposes that the scope

of the services and therefore the costs of those services cannot be reasonable estimated at the time of contract negotiations. For budget purposes, a contract based on a cost-plus fee may appropriately have an established upper limit beyond which the Architect is not to be compensated unless the limit is renegotiated due to a change in scope such as additional services or a change in the duration of the Project. A cost-plus fee is normally determined by one of the following two methods: a. "Direct Salaries or Wages" paid times a "multiplier" rate (for payroll burden and fringe cost, general overhead cost, and profit) plus "reimbursable expenses," or "Direct Payroll Expenses" times a "multiplier" rate (for overhead cost and profit) plus "reimbursable expenses." b. "Direct Salaries or Wages" paid plus "payroll burden and fringe cost" plus "general overhead costs" plus "reimbursable expenses" plus a fixed fee, or "Direct Payroll Expenses" plus "general overhead costs" plus "reimbursable expenses" plus a fixed fee. These cost-plus methods are frequently used for projects for which the Architect is required to begin providing services before the total scope of services can be accurately defined, when the scope of services is complex, or when determination of the extent or duration of services difficult or impossible to determine. Such an indeterminate project generally results from the requirement for speed, special studies, research or experimental work, preparation of estimates for alternate types of construction, and other similar requirements. The project, however, should carry a general description or statement of the scope of work contemplated, such as the number, size, and character of the improvements, the extent of utilities, and other items. 1.3 Percentage Basis Percentage basis contracts specify that payment to the Architect for a certain scope of services will be determined by multiplying a specified percentage times the awarded, estimated, or final total construction cost of the project for which the services are furnished. "Percentage of construction cost" is a method which has been used extensively in the past for establishing compensation for professional services. Compensation based on this method is not necessarily best suited to professional encouragement and reward, since it penalizes rather than rewards the Architect for reducing construction costs through economical design. Vagaries of local construction markets may affect construction costs and create inequities in charges for professional services either to the Client or to the Architect. However, it should be recognized that the "percentage of construction cost" method has been used for many years and it may be desired by Clients who have traditionally relied on it. Charges based on a percentage of construction cost are usually determined by one of the following methods: a. A mutually agreed-upon "Estimated Total Construction Cost" using unit prices established on the date of the contract for design, or unit prices expected to be current at the time of bidding. b. The "Final Total Construction cost," so long as care is taken in the contract to protect the Client against extremely high construction bids and the Architect against loss resulting from extremely low construction bids. The "Estimated Total Construction Cost" is the Architect's estimate of construction cost to the Client based on plan quantities and prevailing construction costs of all elements of the

Project designed or specified by the Architect, but excluding design costs, cost of financing, right-of-way or real estate cost, legal, administrative, or other similar expenses. "Final Total Construction Cost" constitutes the cost to the Client of actual total construction in place of all elements of the Project design or specified by the Architect, but excluding design costs, cost of financing, right-of-way or real estate costs, legal, administrative, and other similar expenses. In Percentage Basis contracts, compensation to the Architect for such services as resident agent, property surveys, soil borings and subsurface exploration, laboratory analyses, sampling, and testing, and other "extra services" is in addition to the basic compensation. In some instances, the Client requests preparation of alternate designs and proposals or certain portions of the project that may be deleted after design work has been performed. In such cases, the design portion of the fees should be based on the construction cost value of all alternate designs (or delete work) prepared by the Architect. For rejected alternate designs or deleted work, the compensation for design should be based on bid prices (if bids had been received) or otherwise on the Architect's estimate of construction cost. Consideration should be given to any items or changes which involve additional service or expense, but which do not reflect sufficient increase in construction cost to cover these expenses if the Architect were compensated solely on the basis of some percentage of the construction value of the change. In such cases, the changes should be provided on a costplus basis. 1.4 Hourly Rates for Individual Services Hourly fees are well suited for consultation services, testimony in court, or similar work involving miscellaneous personal service. Most Architects have standard published schedules of hourly rates for various classifications of technical and non-technical employees. Subconsultant and reimbursable direct expenses are usually billed at invoice cost plus an agreed service charge for handling. 1.5 Retainer The employment of Architects on a retainer-fee basis is a common practice of clients who wish to be assured of always having available the services of an individual architect or architectural firm. It is also used when the services of an architect specialist are not required on a full-time basis. The amount of the retainer varies with the character and value of the services to the Client and the reputation and standing of the consultant in his or her profession. The terms of agreements for services on a retainer-fee basis also vary widely, and it is important that the service to be rendered be clearly defined. The compensation may be based on a fixed sum, paid monthly, or by some other mutually agreeable terms, with per diem or hourly rates for additional time spent at the request of the Client. Retainer fees are frequently on an annual basis. The same principles as explained previously for hourly (or Cost-Plus) charges, in Section 1.2, apply to retainer-fee contracts. 1.6 Special Considerations

Projects of a special nature, such as those involving repetitive use of drawings and specifications or extensive application of standard drawings and specifications to a particular project, require special fee consideration. Charges for such services must be adequate to compensate for the estimated cost of services, the Architect's liability exposure, and to provide a fair return. 1.7 Selection of Fee Basis The fee basis selected depends primarily on the complexity and types of architectural and engineering services to be provided. The following criteria should also be considered: a. Time schedule for furnishing services and possible changes that may affect the consultant's costs. b. Studies, programs, and other professional input furnished by the Owner or Client. c. Client's procedure and timing for review and approval of the Architect's recommendations/designs. d. Costs of administration, including records to be maintained and preserved. e. Probability of contingencies that are not included in the estimates of design costs. f. Number of third parties or agencies required to be consulted or furnished plans, specifications, reports, and similar documents. Architectural fees are affected by many variables and it is impractical to generalize any one fee basis as preferable for a specific project. Section 2 - Definition of standard terms and explanatory notes concerning the architect's costs 2.1 Direct Salaries or Wages Direct Salaries or Wages are defined as the cost of salaries or wages paid to architects, planners, designers, technicians, drafters, observers, clerks, and other employees for time directly chargeable to the project. Time spent by partners or principals in the performance of technical or advisory services directly applicable to the project is to be charged as part of Direct Salaries or Wages. 2.2 Overhead or Direct Labor Overhead on Direct Labor Costs includes contributions for social security, unemployment and other payroll taxes, workers compensation insurance, paid holidays, vacation, and sick leave, retirement benefits or pension, and medical and associated insurance. 2.3 Direct Payroll Expenses Direct Payroll Expenses is defined as the direct salaries of the Architect's personnel engaged on the Project and the portion of the cost of their mandatory and customary contributions and benefits such as employment taxes and other statutory employee benefits, insurance, sick leave, holidays, vacations, pensions and similar contributions and benefits. Time spent by partners or principals in the performance of technical or advisory services directly applicable to the project is to be charged as part of the Direct Payroll Expense. 2.4 General and Administrative Overhead Costs Such costs, while difficult to define due to differences in accounting procedures in various firms, do comprise a major portion of the compensation generated by the multiplier on

Direct Salaries or Wages or Direct Payroll Expense, and include, but are not limited to, the following "indirect" costs which are not directly allocable to specific projects: a. Provisions for office, light, heat and similar items for working space, depreciation allowances or rental for furniture, equipment, and office and drafting supplies not identifiable to the specific project. b. Taxes and insurance other than those included as Payroll Burden and Fringe cost, but excluding state and federal income taxes. c. Library and periodical expense and other means of keeping abreast of advances in technology, such as attendance at technical and professional meetings, and other professional development costs. d. Executive, administrative, accounting, legal, clerical salaries and expenses (other than identifiable salaries incurred as Direct Salaries or Wages and expenses, included in reimbursable expenses) plus salaries or imputed salaries of partners and principals to the extent that they perform general executive and administrative serves as distinguished from technical or advisory services directly applicable to projects. These services and expenses, essential to the conduct of the business, include preliminary arrangement for new projects or assignments and interest on borrowed capital. e. Business promotion expenses, including salaries of principals and employees so engaged. f. Provision for loss of productive time of technical employees between assignments, and for time of principals and employees on public interest assignments. Special Note: The Architect who performs services under a cost-plus contract must make provision for the accounting work necessary to segregate and record the expenditures thereof. He or she must maintain adequately detailed time records for all principals, partners, and technical employees who devote time to the project, and any part of whose salaries are included in direct cost. If contracted for, his or her applicable payroll records may be open for inspection or audit by the Client. Records of time and expenses directly allocable to the project should be provided periodically to substantiate all expenditures. The Architect should be prepared to support the basis for his or her overhead charges. 2.5 Multiplier Rates The multiplier which is applied to Direct Salaries or Wages is a factor which compensates the Architect for payroll burden and fringe costs, for general overhead costs as previously defined, plus a reasonable margin for contingencies, and profit. The multiplier which is applied to Direct Payroll Expenses is a factor which compensates the Architect for general overhead costs, as previously defined, plus a reasonable margin for contingencies and profit. The size of the multiplier may vary with the type of services, the organization and experience of the Architect and geographic area in which its office is located. A higher multiplier is ordinarily necessary on projects of short duration or small size. The rate will ordinarily be higher, also, on consulting engagements for providing recommendations based primarily on experience or special knowledge, or for expert testimony in legal proceedings. It may also vary with the experience and special capabilities of the Architect. 2.6 Direct Reimbursable Expenses Reimbursable expenses usually include, but are not limited to, the following, and are charged at cost plus a reasonable administrative charge: a. Transportation and subsistence expenses of employees, principals and partners

incurred during travel in discharge of duties connected with the project. b. Communication expenses such as long distance telephone, telegraph, facsimile, express and messenger charges, and postage. c. Identifiable cost of production supplies and expenses charged to the project as distinguished from such supplies and expenses applicable to two or more projects and as distinguished from the payroll burden and fringe costs noted in Section 2.2. d. Reproduction costs applicable to the project, such as blueprinting, photocopying, photographs, printing, binding, etc. e. Subconsultant expenses for special services for associated consultants such as structural, mechanical and electrical engineering, acoustical, surveying, soil investigations, testing, observation, etc. f. Specialized equipment including computers, software (CADD), etc., for which a reasonable "rental rate" may be developed. 2.7 Work Done by Associate Professionals Work performed by associated consultants, architects, and/or engineers generally falls into two categories: a. Work which forms a "basis for design." This work provided information which guides the Architect in his work. Little or no coordination or direction of the consultants effort is required once their scope of services is established. The cost for these types of services is customarily charged as a reimbursable consultant expense plus a reasonable administrative charge. b. Work performed on specialized parts of the project which is incorporated into the project design and which requires coordination and supervision during performance of the consultants services. This effort forms a part of the Architect's project design. The associate professional (usually engineers) is, in effect, a part of the Architect's staff on a part-time basis. The cost of the time for these services is customarily included as a part of the Architect's direct cost. On Cost-Plus contracts, the charge to the Client is normally based on the Direct Salaries or Wages or Direct Payroll Expense and "multiplier" of the associated consultant plus a reasonable administrative charge. On Lump Sum or Percentage contracts these costs would be included in the basic fee. Section 3 - Payments 3.1 Time of Payments The schedule or provisions for payment normally provide for progress payments on monthly intervals unless no significant services are provided within such an intervening period. 3.2 Payment for Additional Services The agreement between the Client and the Architect should include provisions for payment for additional services should the project be changed, delayed, postponed or terminated prior to its completion, taking into account the following: a. Commitments the Architect may be required to make in anticipation of completing the project and which have been approved by the Client, including the schedule for design. b. Redesign requested by the Client after previously approving the design. c. Changes in the scope of the project. d. Escalation in project costs due to external influences beyond the control of the Architect affecting scope and/or time of the project.

e. Cost and expenses incidental to termination. 3.3 Interest The agreement between the Client and the Architect should include provisions for the payment of interest in the case of late or delinquent payment for services rendered. Section 4 - Records Any Architect performing services under an hourly or cost-plus type contract is obligated to segregate and record the expenditures thereof and to maintain adequately detailed records. These records should be open for inspection by the Client.