SANTA CRUZ COUNTY BOARD OF SUPERVISORS INDEX SHEET



Similar documents
Project Name: Project No.: CONTRACTOR BID FORM. BID FROM: Name: Address:

APPROVAL OF CONTRACT AMENDMENT FOR COMP HEALTH FOR MEDICAL SERVICES

DEVELOPER S AGREEMENT EXHIBIT A PERFORMANCE BOND AGREEMENT. THIS PERFORMANCE BOND AGREEMENT is entered into by and between

KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned,

This page left blank intentionally

Faithful Performance Bond/Certificate of Deposit Application City of Temecula Planning Department

BID BOND. are held firmly bound unto the LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY, hereinafter called Metro, DOLLARS.

LABOR & MATERIAL PAYMENT BOND

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS FAITHFUL PERFORMANCE BOND. For Tract/Parcel Map No.

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

RECOMMENDATION: SUMMARYIDISCUSSIONIFINDINGS: ALAMEDA COUNTY HEALTH CARE SERVICES. AGENCY ALEX BRISCOE, Director

#5 Independent Contractor Form - With Insurance With Bonds

BY THIS BOND,, whose principal address is, business phone number is as Principal,hereinafter Contractor, and, whose principal address is

PAYMENT/PERFORMANCE BOND. This is the front page of the payment/performance bond issued in compliance with Florida Statutes

Payment Bond. as Principal, (Legal title of the Contractor) (Street, City, State, Zip Code) and as Surety, (Legal title of the Surety)

California Solar Initiative (CSI) Program 2007 Reservation Request Form and Program Contract [follows the second page Reservation Request form]

Contract for the Sale of Motor Vehicle Owner Financed with Provisions for Note and Security Agreement

EXHIBIT B. Insurance Requirements for Construction Contracts

RIGHT OF ENTRY PERMIT (For providing Debris Removal on Private Property)

RIGHT OF ENTRY RECITALS. A. WHEREAS, CITY owns and operates the Norman Y. Mineta San Jose International Airport ( Airport ); and

Pu6lic Works works for the Public. COUNTY OF IMPERIAL Sunbeam Lake RV Park, Water Tank Re-Coating, located at 1750 Drew Road, Seeley, CA

EXHIBIT A-1 PERFORMANCE BOND AGREEMENT. THIS AGREEMENT is entered into by and between GARLAND GRIFFIN HOMES,

Overriding Limitations. In no event shall Assignor:

(LABOR HOUSING LOAN AND GRANT TO A NONPROFIT CORPORATION)

Asphaltic Wedge Paving

HomeGuard. Roof Inspection Report

PROJECT NO. 2733, RFP NO /02. Peralta Community College District. 333 East 8th Street, Oakland, CA Questions

INVESTMENT CONSULTING SERVICES AGREEMENT

Application Package for License for Sidewalk Dining Adjacent to Eating Establishment

(Affix Principal s corporate seal.)

PITTSBURG UNIFIED SCHOOL DISTRICT

INVESTMENT MANAGEMENT SERVICES AGREEMENT

Translation Services for Parent Meetings. Lynbrook/East Rockaway Herald

SUBCONTRACTOR LABOR AND MATERIAL PAYMENT BOND ("Bond") SURETY Address

DEPOSITORY CONTRACT FOR FUNDS OF INDEPENDENT SCHOOL DISTRICTS UNDER TEXAS EDUCATION CODE, CHAPTER 45, SUBCHAPTER G, SCHOOL DISTRICT DEPOSITORIES

CITY OF SAN JOSE REQUEST FOR.QUALIFICATIONS (RFQ) EVALUATOR (ATTORNEY) AND INVESTIGATOR- SAN JOSE ELECTIONS COMMISSION

AIA Document A310 TM 2010

COLLATERAL SECURITY AGREEMENT FOR ARIZONA PUBLIC DEPOSITS SECURED UNDER POOLED COLLATERAL PROGRAM

Performance Bond. as Principal, (Legal title of the Contractor) (Street, City, State, Zip Code) and as Surety, (Legal title of the Surety)

COUNTY OF MARIN PROFESSIONAL SERVICES CONTRACT Edition 1

CITY OF AVENTURA PERMIT APPLICATION W Country Club Drive 4 th Floor Aventura, FL Tel (305) Fax (305)

AGREEMENT BETWEEN CONTRACTOR AND OWNER FOR CONSTRUCTION

CONSTRUCTION AGREEMENT FOR

MASTER ROAD REPAIR AGREEMENT STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF HOOD

NC General Statutes - Chapter 44A Article 3 1

REQUEST FOR PROPOSAL RFP GPS FLEET MANAGEMENT SOLUTIONS FOR FREMONT UNIFIED SCHOOL DISTRICT 4210 TECHNOLOGY DRIVE FREMONT, CA 94538

RONALD WASTEWATER DISTRICT LINDEN AVENUE NORTH - P.O. BOX SHORELINE WA (206)

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

CALIFORNIA TRANSPORTATION COMMISSION DESIGN-BUILD DEMONSTRATION PROGRAM STANDARD FORM OF PAYMENT AND PERFORMANCE BOND

Ohio Department of Transportation

QSP INFORMATION AT A GLANCE

Retaining Wall Replacement at the Currituck County Veterans Memorial Park

TROUP COUNTY COMPREHENSIVE HIGH SCHOOL

CITY OF FAIRFAX TELECOMMUNICATION FACILITY BONDING PACKAGE

AGREEMENT FOR FINANCIAL AND ACCOUNTING CONSULTATION SERVICES

OSWEGO COUNTY PURCHASING DEPARTMENT

Roof Inspection Report

CITY OF COMMERCE CITY BID BOND

COMMERCIAL CONSTRUCTION AGREEMENT. This CONTRACT AGREEMENT ( Contract ) is made on, 20, by and between <> ( Owner ) and <> ( Contractor ).

DRAFT VEHICLE MAINTENANCE AGREEMENT BETWEEN THE COUNTY OF SANTA CLARA AND OUTREACH

DEVELOPMENT INFRASTRUCTURE COMPLETION BOND. Name of Approved Construction Drawings ( Required Infrastructure ):

DEED OF DEDICATION WITNESSETH:

STATE OF NORTH CAROLINA AGREEMENT COUNTY OF WAKE

Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT

Rock Island County Raffle License Application Packet

BUSINESS ACCOUNT AGREEMENT

CITY OF TYBEE ISLAND RFP # THE CITY OF TYBEE ISLAND IS ISSUING THIS REQUEST FOR PROPOSAL FOR FURNISHING THE SERVICES DESCRIBED HEREIN:

SAN BERNARDINO MOUNTAINS COMMUNITY HEALTHCARE DISTRICT

AGENDA STAFF REPORT. ASR Control

WHO CAN PULL A BUILDING PERMIT?

SECTION AWARD AND EXECUTION OF CONTRACT

Exhibit D CONTRACT DOCUMENTS

PREQUALIFICATION QUESTIONNAIRE

Stormwater Treatment Facility Maintenance Agreement

WITNESSETH: WHEREAS, the parties desire to enter into this Right-of-Way Use Agreement for their mutual benefit, protection, welfare, and necessity.

City of Piedmont COUNCIL AGENDA REPORT

BOND AGREEMENT: IRREVOCABLE LETTER OF CREDIT FOR COMPLETION OF IMPROVEMENTS

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri Manchester Road. Des Peres, Missouri 63131

ATTACHMENT A ADMINISTRATIVE MEMORANDUM SELECTION OF INDEPENDENT CONTRACTORS

BID BOND 9/7/12 BS - 1. KNOW ALL MEN BY THESE PRESENTS, that I/We. as Principal, hereinafter called Contractor, and

388 Blohm Ave. PO Box 388 Aromas CA (831) FAX (831) ADDENDUM NO. 1

DEFAULTED PROPERTY TAX REDUCTION PROGRAM IMPLEMENTATION INSTRUCTIONS/GUIDELINES

SECTION PERFORMANCE BOND., hereinafter called PRINCIPAL, and

WITNESSETH. That Contractor, for the consideration hereinafter fully set out, hereby agrees with the County as follows:

THE CORPORATION OF THE CITY OF BURLINGTON D1 - AGREEMENT

REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSTRUCTION MANAGEMENT SERVICES

Insurance Requirements for Contractors (Without Construction Risks)

ALL LOAN BROKERS AND ORIGINATORS DOING BUSINESS IN INDIANA FROM: OFFICE OF SECRETARY OF STATE TODD ROKITA, SECURITIES DIVISION

Transcription:

~ SANTA CRUZ COUNTY BOARD OF SUPERVISORS INDEX SHEET Creation Date: 9/2/03 Source Code: GENSV Agenda Date: 9/9/03 I NVENUM: 53324 Resolution(s): Ordinance(s): Contract(s1: Continue Date(s): Index: --Letter of the General Services Director of August 27, 2003 --Notice of Completion --Attachment A: Conditional Waiver and Release Upon Final Payment --Contract Change Order No. 1 Item: 16. ACCEPTED the Wall Waterproofing Trade Component of the Building Envelope Repairs project at the Health and Human Services Building as completed; approved additional costs associated with the contract change order in the amount of $14,396; authorized the Director of General Services to sign the change order on behalf of the County; approved final cost of $97,996; and authorized the Clerk of the Board to take related action, as recommended by the Director of General Services

0045 County of Santa Cruz GENERAL SERVICES OEPARTMENT 701 OCEAN STREET, SUITE 33p, SANTA CRUZ, CA 950604073 August 27,2003 AGENDA: September 9,2003 Board of Supervisors County of Santa Cruz 701 Ocean Street Santa Cruz, CA 95060 NOTICE OF C~MPLETION: Wall Waterproofing Component of the Building Envelope Repairs Project at the Health and Human Services Building Project #OlC1-020-24 Members of the Board: As your Board is aware, several prime contractors have been working on the repair and remediation project at the Health and Human Services Building at 1400 Emeline. The wall-waterproofing component of the project was completed on July 3 1, 2003 by Blues Roofing. This project consisted of installing a self-adhering, rubberized-asphalt waterproof membrane over new exterior sheathing, at window openings, and at stucco terminations. The original bid amount was $76,000. Circumstances arose during the final testing of the construction work that made it necessary to authorize additional work for $21,996 for repairs made to strip windows and to repair the wall membrane at the parapet. Contingencies originally set aside for this project totaled $7,600. This additional work increased the cost of the project by $14,396 over approved contingencies. There are sufficient funds available within the project budget (Index 19 1023; sub-object 6610; Q44008) to cover the increased costs. The final construction cost is $97,996. It is therefore RECOMMENDED that your Board take the following actions: 1. Accept the project as completed; 2. Approve additional costs associated with a contract change order in the amount of $14,396 and authorize the Director of General Services to sign the change order on the behalf of the County; 3. Approve the final cost of $97,996.00; and 4. Authorize the Clerk of the Board to file the executed Notice of Completion with the Office of County Recorder, a copy of which is attached. Very truly yours, RECOMMENDED BOB WATSON Director SUMN A. MAURIELLO County Administrative Officer

Board of Supervisors Agenda: September 9,2003 Notice of Completion-Wall Waterproofing, Building Envelope Repairs Project Page 2 0046 BW:SD Attachments: Notice of Completion with Certificate Change Order - cc: Recorder s Office Auditor-Controller General Services Department Blues Roofing

RECORDED AT. THE REQUEST OF: GENERAL SERVICES DEPARTMENT VLkn WHEN RECORDED +&Wk TO: Alicia Murillo - I - RECORDER WILL PROVIDE RECORDED COPY Clerk of the Board of Supervisors 701 Ocean Street, Room 500 General Services delivered to Recorder on 9/10/03, Santa Cruz, CA 95060 (83 1) 454-2328 (Space above this line for Recorder's use only) NOTICE OF COMPLETION: Wall Waterproofing Component of the (Document Building Envelope Repairs Project at the Health and Human Services Building Project THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Cal. Gov. Code 527361.6) REC 33 (1-93)

- 0047 When Recorded please return to: Clerk of the Board, 500 Contract #2-2834 NOTICE OF COMPLETION NOTICE IS HEREBY GIVEN that the COUNTY OF SANTA CRUZ, owner of the property hereinafter described, whose address is 701 Ocean Street, Santa Cmz, California, has caused a work of improvement to be performed, more particularly described as follows: Wall Waterproofing Component of the Building Envelope Repairs Project at the Health and Human Services Building, Project #OlC1-020- 24. The work of improvement was completed by Blues Roofing whose address is 1 18 1 Campbell Avenue, San Jose, CA, 95 126. The work of improvement was completed on July 3 1, 2003 and accepted by the. Board of Supervisors at the County of Santa Cruz on September 9,2003. BOB WATSON Director of General Services Date The undersigned states: That he is the Director of General Services for the County of Santa Cruz, owner of the property referred to on this Notice of Completion; that the Board of Supervisors of said County, on the 9th day of September, 2003 accepted said work of improvement and directed the filing of the Notice of Completion; that he has read the Notice of Completion and knows the contents thereof, and that the facts stated therein are true. I declare under penalty of perjury that the foregoing is true and correct. Executed this gth day of September, 2003. BOB WATSON Director of General Services Date cc: Recorder s Office Auditor-Controller General Services Department Blues Roofing

ATTACHMENT A NOTICE OF COMPLETION CONDITIONAL WATVER AND RELEASE UPON FINAL PAYMENT UPON RECIEPT BY THE UNDERSIGNED OF A CHECK FROM: County of Santa Cruz County General Services 701 Ocean Street, Room 330 Santa Cruz, CA 95060 IN THE SUM OF 29,596.00 and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanics lien, stop notice, or bond right, the undersigned has on the job of: PROJECT NAME: LOCATED: Wall Waterproofing Component of the Building Envelope Repairs Project at the Health and Human Services Building PROJECT #OlCl-O20-24 1400 Emeline Santa Cruz, CA This release covers the final payment to the undersigned for all labor, services, equipment or materials furnished on the job, except for the disputed claims for additional work in the amount of $-0-, before any recipient of the document relies on it, the party should verify evidence of payment to the undersigned. Contractor: Blues Roofing By: c Address: 1181 Campbell Ave San Jose CA 95 126 Phone: (4~~31 634.- 3.t 94 COUNTY CONTRACT #: 22834 1

- COUNTY OF SANTA CRUZ DEPARTMENT OF GENERAL SERVICES CHANGE ORDER # 1 CONTRACT# 22834 NAME OF PROJECT: 1400 Emeline Remediation -Wall waterproofing CONTRACTOR: Blues Roofing The parties hereto agree and contractor is hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and i specifications on this contract as shown in the follow ng items: ITEM NO $ INCREASE $ DECREASE CHANGE (DESCRIBE OR ATTACH PROPOSAL) IN CONTRACT IN CONTRACT 1 I Repairs made to strip windows I 21,383.00 I 2 I Repairs to wall membrane at parapet 61 3.00 I TOTAL $ 21.996.00 0.00 Net Increase (Decrease) in Contract Cost is : 21,996.00 Contract duration Increase (Decrease) is: 0 Days Project Manager Approval : Date: Attachments: Original Contract Price: 76,000.00 Total Prior Change Orders: 0.00 Total of this Change Order: 21,996.00 Revised Contract Price: 97,996.00 THIS MODIFICATION IS HEREBY MADE A PART OF THE CONTRACT, ALL OTHER PROVISIONS OF SAID CONTRACT SHALL REMAIN THE SAME. General Services Project Manager Date: / fi P/,,4d*s Contractor Authorpdd Signature Date: 6-/s kaj3 NOTE: THIS FORM MAY BE USED FOR CONTRACT CHANGE ORDERS ONLY WHEN IT IS WITHIN THE CONTINGENCY AMOUNT APPROVED BY THE BOARD OF SUPERVISORS AND WHEN SIGNED BY THE DEPARTMENT HEAD AUTHORIZED BY THE BOARD OF SUPERVISORS TO APPROVE CHANGE ORDERS FOR THIS PROJECT. CHANGE ORDERS IN EXCESS OF THE CONTINGENCY AMOUNT OR IN CASES WHEN THE BOARD DID NOT GIVE PRIOR CHANGE ORDER AUTHORIZATION REQUIRE SPECIFIC BOARD OF SUPERVISORS APPROVAL. Distribution: Contract File, Project Manager, Auditor, Clerk of the Board, Contractor

COUNTY OF SANTA CRUZ DEPARTMENT OF GENERAL SERVICES CHANGE ORDER # I - CONTRACT# 01C1-020.24 NAME OF PROJECT: CONTRACTOR: Wall Waterproofing BLUES ROOFING COMPANY The parties hereto agree and contractor is hereby directed to make the herein described changes from the plans and specifications or do the followng described w rk not included In the plans and specifications on this contract as show in the folloving Items: ITEM NO 5 INCREASE 5 DECREASE CHANGE (DESCRIBE OR AlTACH PROPOSAL) IN CONTRACT IN CONTRACT 1 Repalrs made to strip vrindo= 21,383.00 2 Repalrs to wall membrane at parapet 613.00 TOTAL $ 21,99600 Net Increase (Decrease) in Contract Cost 1s : #VALUE! Contract duration Increase (Decrease) is: 0 Days Project Manager Approval : Date: Attachments: Origlnal Contract Price: Total Prior Change Orders: 000 Total of this Change Order: Revised Contract Price: #VALUE! #VALUE! THIS MODIFICATION IS HEREBY MADE A PART OF THE CONTRACT, ALL OTHER PROVISIONS Contractor Authorized Signature NOTE: THIS FORM MAY BE USED FOR CONTRACT CHANGE ORDERS ONLY WEN IT IS WTHIN THE CONTINGENCY AMOUNT APPROVED BY THE BOARD OF SUPERVISORS AND WEN SIGNED BY THE DEPARTMENT HEAD AUTHORIZED BY THE BOARD 6F SUPERVISORS TO APPROVE CHANGE ORDERS FOR THIS PROJECT. CHANGE ORDERS IN EXCESS OF THE CONTINGENCY AMOUNT OR IN CASES WEN THE BOARD DID NOT GIVE PRIOR CHANGE ORDER AUTHORIZATION REQUIRE SPECIFIC BOARD OF SUPERVISORS APPROVAL Distributlon: Contract File, Project Manager, Auditor, Clerk of the Board, Contractor