Timesheet audit trail and absence reporting for DCAA. Syed Ali May 2014

Similar documents
Feature for India (Third-party invoice)

Features for France. Microsoft Corporation. Published: November 2006

Deploying the Workspace Application for Microsoft SharePoint Online

Integration points: Project management and accounting and other Microsoft Dynamics AX 2012 modules

Credit Card Processing

Workflow approval via

Reservations in Warehouse management. Warehouse management team May White paper

Pipeliner CRM Phaenomena Guide Sales Target Tracking Pipelinersales Inc.

Pipeliner CRM Phaenomena Guide Administration & Setup Pipelinersales Inc.

Microsoft Dynamics AX 4.0 SP2 new India localization feature (Stock transfer)

Microsoft Dynamics NAV. Prepayments. White Paper. Date: May 2011

Management Reporter Integration Guide for Microsoft Dynamics AX

Pipeliner CRM Phaenomena Guide Sales Pipeline Management Pipelinersales Inc.

ENHANCE. The Style Sheet Tool for Microsoft Dynamics NAV. Microsoft Dynamics NAV 5.0. User s Guide

Pipeliner CRM Phaenomena Guide Add-In for MS Outlook Pipelinersales Inc.

Update and Installation Guide for Microsoft Management Reporter 2.0 Feature Pack 1

Pipeliner CRM Phaenomena Guide Opportunity Management Pipelinersales Inc.

Management Reporter Integration Guide for Microsoft Dynamics GP

Connector for Microsoft Dynamics Configuration Guide for Microsoft Dynamics SL

Solutions for Microsoft Project Server and Microsoft Dynamics GP Timesheet Integration

Pipeliner CRM Phaenomena Guide Lead Management Pipelinersales Inc.

What s New in Microsoft Dynamics GP 2015 R2. Microsoft Dynamics GP June 2015

Microsoft Dynamics NAV

Benchmark Study on the User Experience of Microsoft Dynamics NAV 5.0 and Microsoft Dynamics NAV 2009

Product Development. Using Critical Path EVM for the Microsoft Project Desktop Application Readme

Configuring budget planning for Microsoft Dynamics AX 2012 R2

Financial consolidations and currency translation

System Requirements for Microsoft Dynamics NAV 2013 R2

Pipeliner CRM Phaenomena Guide Getting Started with Pipeliner Pipelinersales Inc.

Newsletter Service pack 1

Microsoft Dynamics GP. Electronic Signatures

Microsoft Dynamics NAV 2013 R2 Release Notes Follow-up

Business Portal for Microsoft Dynamics GP. Project Time and Expense Administrator s Guide Release 10.0

Windows Small Business Server 2003 Upgrade Best Practices

CRM to Exchange Synchronization

Interactive Timeline Visualization for Microsoft Dynamics NAV 2009 R2

Overview of Microsoft Office 365 Development

CRM Form to Web. Internet Lead Capture. Installation Instructions VERSION 1.0 DATE PREPARED: 1/1/2013

Helm 4 Windows Event Viewer

Microsoft Dynamics GP. Electronic Signatures

UPGRADE. Upgrading Microsoft Dynamics Entrepreneur to Microsoft Dynamics NAV. Microsoft Dynamics Entrepreneur Solution.

Microsoft Dynamics GP. Field Service - Preventive Maintenance

Payment Processing Frequently Asked Questions. Microsoft Dynamics RMS

MICROSOFT DYNAMICS CRM Roadmap. Release Preview Guide. Q Service Update. Updated: August, 2011

Microsoft Dynamics NAV 2013 R2 Sizing Guidelines for Multitenant Deployments

Scalability. Microsoft Dynamics GP Benchmark Performance: Advantages of Microsoft SQL Server 2008 with Compression.

Statement of Direction

Microsoft Project Server 2010 Integration

Performance data collection and analysis process

Security Analytics Engine 1.0. Help Desk User Guide

CRM Form to Web. Internet Lead Capture. Web Form Configuration Instructions VERSION 1.0 DATE PREPARED: 1/1/2013

Quick Install Guide - Safe AutoLogon For First-time Users - Installing and Running the Software. Published: February 2013 Software version: 5.

Microsoft Dynamics CRM Adapter for Microsoft Dynamics GP

Lab Answer Key for Module 6: Configuring and Managing Windows SharePoint Services 3.0. Table of Contents Lab 1: Configuring and Managing WSS 3.

Item Tracking in Microsoft Dynamics

Working with the Call Center

AvePoint SearchAll for Microsoft Dynamics CRM

Microsoft Dynamics GP. Pay Steps for Human Resources Release 9.0

FOR WINDOWS FILE SERVERS

Enable File and Folder Auditing

White Paper. Software version: 5.0

Office Language Interface Pack for Farsi (Persian) Content

Connecting the RoleTailored Client over a Wide Area Network

Microsoft Dynamics GP. Project Accounting Cost Management Guide

What is New Whitepaper. White Paper

Our goal is to create total solutions that are as unique as our clients.

Integrating Business Portal 3.0 with Microsoft Office SharePoint Portal Server 2003: A Natural Fit

Integration of SAP and Microsoft Dynamics AX. Financial Consolidation

Microsoft Corporation. Status: Preliminary documentation

DeviceAnywhere Automation for Smartphones Setup Guide Windows Mobile

CRM to Exchange Synchronization

MICROSOFT DYNAMICS CRM Vision. Statement of Direction. Update: May, 2011

Spotlight Management Pack for SCOM

AvePoint SearchAll for Microsoft Dynamics CRM

Microsoft Dynamics GP. Audit Trails

Troubleshooting File and Printer Sharing in Microsoft Windows XP

Implementing Business Portal in an Extranet Environment

Writers: Joanne Hodgins, Omri Bahat, Morgan Oslake, and Matt Hollingsworth

AvePoint Record Rollback for Microsoft Dynamics CRM

Microsoft Dynamics CRM Online. Pricing & Licensing. Frequently Asked Questions

AvePoint Meetings for SharePoint Online. Configuration Guide

Microsoft Dynamics GP. Project Accounting Accounting Control Guide

CRM to Exchange Synchronization

Microsoft FTP Configuration Guide for Helm 4

Configuring a SQL Server Reporting Services scale-out deployment to run on a Network Load Balancing cluster

Step-by-Step Guide for Microsoft Advanced Group Policy Management 4.0

ALTIRIS Notification Connector Configuration Guide

Microsoft Dynamics GP. Purchase Order Enhancements

Standalone Trial Guide

AvePoint Tags 1.1 for Microsoft Dynamics CRM. Installation and Configuration Guide

Delivering Vertical Solutions to a Global Market

Microsoft Dynamics GP. Check Printing

Checking System Requirements. How-To Guide

Accounting for stocked items on product receipts and vendor invoices

Microsoft Dynamics CRM Online. Pricing & Licensing. Frequently Asked Questions

WINDOWS 7 & HOMEGROUP

Pipeliner CRM Phaenomena Guide Importing Leads & Opportunities Pipelinersales Inc.

Expanded Frequency Capping

RedBlack CyBake Online Customer Service Desk

Dell Spotlight on Active Directory Server Health Wizard Configuration Guide

Transcription:

Timesheet audit trail and absence reporting for DCAA This document describes the timesheet audit trail and absence reporting features in Microsoft Dynamics AX 2012 R3 that help organization meet requirements of the Defense Contract Audit Agency. White paper Syed Ali May 2014 www.microsoft.com/dynamics/ax Send feedback.

Contents 3 About absence projects 3 About audit trails 3 Configuring parameters 3 Validation on time entry 4 Absence reporting 4 Audit trail 5 Configuring absence categories 5 Create a shared category 6 Create a project category for absence 6 If required: Configure project/category validation 7 User scenarios 8 Scenario 1: Workers enter project time in timesheets 8 Scenario 2: Timesheet audit trail 10 2

Microsoft Dynamics AX 2012 R3 includes support for absence reporting and audit trails for timesheets. These features help organizations meet certain requirements of the Defense Contract Audit Agency (DCAA). About absence projects An absence project is used exclusively for workers to report the hours that they are absent from work. Instead of including timesheet categories for absences in all other projects, all absences are reported in the absence project. The new features for absence project support in AX 2012 R3 include the following: Timesheet administrators can prevent workers from entering time for future days in timesheets for any project. Timesheet administrators can create an absence project and make it the only project for which time for future dates can be entered. Project workers can enter hours for all absences, including future absences, in an absence project. About audit trails An audit trail for timesheets provides a history of any changes that are made to a timesheet. These changes can include both updates to a timesheet and deletion of a timesheet. With an audit trail, the timesheet administrator or auditor can trace the history of all updates made to a timesheet. The new features for timesheet audit trail support in AX 2012 R3 include the following: Timesheet administrators can enable tools for workers to record reasons for updating and deleting timesheets. Timesheet administrators can make timesheet change comments optional or mandatory. Project workers can enter comments to explain why they are updating or deleting a timesheet. Timesheet auditors can view worker comments explaining timesheet changes. Timesheet auditors can compare versions of timesheets to see the changes that were made. This rest of this white paper provides a detailed overview of features that were introduced as a part of the audit trail and absence reporting set. We will take a look at the configuration and function of each feature. Configuring parameters Most of the configuration for the audit trail and absence reporting features is done in the Project management and accounting parameters form. Note: Before you can specify which project you will use for future absence reporting in the Project management and accounting parameters form, you must create that project. For information about creating projects in Microsoft Dynamics AX, see Create and manage projects. To access the fields in Microsoft Dynamics AX that are used to configure audit trails and absence reporting, follow these steps. 1. Project management and accounting > Setup > Project management and accounting parameters. 2. In the Project management and accounting parameters form, in the left pane, click Timesheet. 3. Locate the Validation group in the lower-right corner of the form. Note: The configuration options you choose apply only to the legal entity that you are working in when you set them. The following illustration shows the Timesheet area of the Project management and parameters form, with the Validation group highlighhted in the lower-right corner. 3

In the following sections, we will cover the following three features that can be enabled by using the fields in the Validation group: Validation on time entry Absence reporting Audit trail Validation on time entry Field Block future timesheet entries Description When this check box is selected, project workers can enter time only for past dates and the current day in all projects, with the exception of an absence project, if one is selected in the Absence project list lower in the form. Time entry for future dates will be disabled in all other projects. Note: This parameter is completely independent of other parameters in the Validation group but is mutually exclusive with the Require start/stop time parameter in the Timesheet management page group. If you select one of these check boxes, the other check box becomes unavailable. Absence reporting The absence reporting feature lets administrators configure an absence project and categories. This project bypasses the rules regarding future time logging that apply to all other projects, and in the absence project, users are able to record absence for any future date. 4

Field Validate absence Description Selecting this check box accomplishes two things: It lets the administrator choose a project (usually a Time project) to use as an absence project. It ensures that the only categories that show up in the Category list in timesheets are absence categories that have been created for use only in absence projects. Absence project The Validate absence check box must be selected before the Absence project list is available. Select the project that timesheet users will report absence against. To complete the absence project setup, you must also create and select absence categories, because those are the only categories that will be available for selection in the Category list when a worker is entering time in the absence project. For information about creating absence categories, see Configuring absence categories later in this document. Audit trail The audit trail system enables tracking of timesheets from the time they are created until they have been submitted or deleted. If a timesheet is recalled and modified, those changes are also tracked. Field Require timesheet audit trail Description Selecting this check box enables the audit trail, so that all the timesheets that are created and modified are tracked. Allow timesheet change reason The Require timesheet audit trail check box must be selected before the Allow timesheet change reason check box is available. Selecting this check box lets workers enter a reason for the changes that they make to their timesheets. The reasons that the workers enter are added to the audit trail, so that the auditor can review the explanations for the timesheet changes. Workers are also prompted to enter a change reason when they delete timesheets, but entering reasons for deleted timesheets is not required. Require timesheet change reason The Allows timesheet change reason check box must be selected before the Require timesheet change reason check box is available. Selecting this check box makes it mandatory that workers enter a reason every time they make a change to their timesheet. When this check box is selected, workers are also required to enter a reason for the change when they delete a timesheet. The only exception to this is for the first entry a worker makes in a timesheet line on the current day that is, the first entry made in a timesheet against a work project or absence project. Configuring absence categories In addition to configuring absence reporting by using the Validate absence and Absence project fields in the Project management and accounting parameters form, you must complete two or three of the following tasks to configure an absence category so that it can be used together with the absence project: Create a shared category Create a project category for absence If required: Configure project/category validation 5

Create a shared category 1. Click Project management and accounting > Setup > Categories > Shared categories. 2. Click New to create a new shared category. 3. Enter a category ID and category name. 4. Select the Can be used in Project check box. The following illustration shows the Shared categories form. Create a project category for absence 1. Click Project management and accounting > Setup > Categories > Project categories. 2. Click New to create a new project category. 3. In the Category ID field, select the category ID that you just created. The category name will be automatically populated. 4. In the Category group field, select a category group that has a transaction type of Hour. 5. In the Set up category group, select the Absence and Active in journals check boxes. The absence category configuration is now completed. All categories that are set up by using the preceding procedures will be used only for the absence project that has been configured by an administrator. The following illustration highlights the Absence and Active in journals check boxes in the Project categories form. 6

If required: Configure project/category validation Validation for projects in Microsoft Dynamics AX helps ensure that only workers who have been assigned to a particular project can enter work hours for it, and that only categories that have been designated for a certain project can be entered. Note: Validation is set up in the General area of the Project management and accounting parameters form. If validation has been set as Mandatory for Project/category, Worker/project, or Category/worker, some additional steps are required to complete the setup of the absence reporting feature. Specifically, the absence project and the absence categories need to be added to a project/category validation. This task can be completed only after you have created an absence project. To add the absence project and absence categories to project/category validation, follow these steps. 1. Click Project management and accounting > Setup > Validation > Project/category validation groups. 2. Click New. 3. In the Project/category field, enter an ID for the validation group. 4. In the Name field, enter a name to identify the project/category validation group for the absence project. 5. In the Remaining projects area, select the absence project that you want to add to project/category validation. 6. Click the left arrow (<) button. The following illustration shows the Project/category validation groups form. 7

Note: If Project/worker or Worker/category is also set to Mandatory in the Project management and accounting parameters form, make sure that the appropriate combinations are available to appropriate users. You will also need to enable validation for individual workers in the Project setup form. For information about setting up validation for individual workers, see Project setup (form). User scenarios After the timesheet audit trail and absence reporting features have been configured, they are used in two major scenarios: Scenario 1: Workers enter project time in timesheets Scenario 2: Timesheet auditors review the timesheet audit trail Scenario 1: Workers enter project time in timesheets If the Allow timesheet change reason check box was selected in the Project management and accounting parameters form to enable change reasons for timesheets, a Change reason FastTab is added to the New timesheet form and the Edit timesheet form. The following illustration highlights the Change reason FastTab in the Edit timesheet form. 8

If the Require timesheet change reason check box was also selected in the Project management and accounting parameters form, workers cannot save or submit their timesheet entries without providing a reason for a change. If workers do not enter a change reason, an Infolog message will prompt them to enter a change reason before they can save their changes. The following illustration shows the Infolog message that reminds users to enter a reason for making a change to their timesheets. Similarly, if change reasons are configured as mandatory, workers cannot delete timesheets without providing a reason for the deletion. 9

The following illustration shows the dialog box that prompts workers to enter a reason why they are deleting a timesheet. Note: If the Block future timesheet entries check box was selected in the Project management and accounting parameters form, workers cannot submit timesheet entries for future periods for any project except an absence project. Timesheets can be created for future periods in other projects, but when the worker clicks the Submit button, the timesheet status will remain Draft. It is possible to submit future timesheets only against an absence project. Scenario 2: Timesheet audit trail If the Require timesheet audit trail check box was selected in the Project management and accounting parameters form, a Timesheet versions button is added to the Action Pane on the All timesheets list page (Project management and accounting > Common > Projects > All projects). The following illustration highlights the new Timesheet versions button on the All timesheets list page. To begin reviewing a timesheet trail in the Timesheet versions form, select a timesheet on the All timesheets list page, and then click the Timesheet versions button. The Timesheet versions form shows the timesheet auditor a list of all the changes that have been made to the timesheet each time a timesheet line was saved. The following illustration shows the Timesheet versions form. 10

To examine timesheet changes in more detail, select a change line in the Timesheet versions form, and then click the Compare button to open the Compare timesheet versions form. In the Compare timesheet versions form, you can compare any earlier version of a timesheet with the latest version that has been created. The following illustration shows the details of a timesheet line update in the Compare timesheet versions form. 11

Send feedback. Microsoft Dynamics is a line of integrated, adaptable business management solutions that enables you and your people to make business decisions with greater confidence. Microsoft Dynamics works like and with familiar Microsoft software, automating and streamlining financial, customer relationship, and supply chain processes in a way that helps you drive business success. United States and Canada toll free: (888) 477-7989 Worldwide: (1) (701) 281-6500 www.microsoft.com/dynamics The information contained in this document represents the current view of Microsoft Corporation on the issues discussed as of the date of publication. Because Microsoft must respond to changing market conditions, this document should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information presented after the date of publication. This white paper is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED, OR STATUTORY, AS TO THE INFORMATION IN THIS DOCUMENT. Complying with all applicable copyright laws is the responsibility of the user. Without limiting the rights under copyright, no part of this document may be reproduced, stored in, or introduced into a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), or for any purpose, without the express written permission of Microsoft Corporation. Microsoft may have patents, patent applications, trademarks, copyrights, or other intellectual property rights covering subject matter in this document. Except as expressly provided in any written license agreement from Microsoft, the furnishing of this document does not give you any license to these patents, trademarks, copyrights, or other intellectual property. 2014 Microsoft. All rights reserved. Microsoft, Microsoft Dynamics, and the Microsoft Dynamics logo are trademarks of the Microsoft group of companies. 12