Capital Maintenance Planning From a historical and future perspective

Similar documents
Staff Paper 6. Allowed for operating costs. 6.1 Introduction

OUR ASSURANCE PLAN 2016/17 MARCH Our Assurance Plan 2016/17

Future water and sewerage charges : Final determinations

Consultation on United Utilities statement of risks, strengths and weaknesses 2015/16 Our annual performance reporting

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

The Asset Management Landscape

Asset Management Policy March 2014

Changing data needs from a life cycle perspective in the context of ISO 55000

Contents BUSINESS PLAN Part A Business Plan Summary

TEC Capital Asset Management Standard January 2011

Thames Water: Decision Support Tools, Whole Life Costing and Asset Data Improvements Marie Linscott

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

Thames Water s Thames Tunnel Consultation

FINANCIAL MANAGEMENT MATURITY MODEL

Specification Document (11/1023)

Inputs, outputs and outcomes what should price limits deliver? A discussion paper

Managing sewer flood risk

Transfer pricing in the Scottish water industry: Scottish Water s compliance with Regulatory Accounting Rule 5

Slough Borough Council. Highway Asset Management Strategy

25 NOVEMBER Assessing the Value for Money of Regulation of Infrastructure Networks

Infrastructure Asset Management Report

HITRUST CSF Assurance Program

Appendix 10: Improving the customer experience

Literature Review of Business Process Improvement Methodologies: Executive Summary

Monitoring and Treatment of Network Rail s Underspend and Efficiency: Policy Statement

Capital Adequacy: Advanced Measurement Approaches to Operational Risk

Optimise. Achieving the perfect reward and benefits programme

P3M3 Portfolio Management Self-Assessment

Quick Guide: Meeting ISO Requirements for Asset Management

Case Study: Eskom Distribution Asset Management Assessment and Way Forward

This document outlines Wales & West Utilities Business Plan for the next regulatory period from

Head of Internal Audit:

HARLOW COUNCIL PERFORMANCE MANAGEMENT FRAMEWORK

Request for Proposal. Supporting Document 3 of 4. Contract and Relationship Management for the Education Service Payroll

RISK MANAGEMENT MATRIX FOR ACADEMIES. Contents. Introduction. Mission/objectives. Law and regulation. Governance and management.

LOCAL GOVERNMENT AND PLANNING MINISTERS COUNCIL. Local Government Financial Sustainability. Nationally Consistent Frameworks.

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT

TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding

Internal Audit - progress report and plan

Our Challenging Future

The changing nature of doctoral programmes

University of Sunderland Business Assurance Information Security Policy

Need to optimize your assets? Be proactive with ISO

JUNE Assurance for high risk projects

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

How To Manage Asset Management

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Confirm our understanding of the position on water business rates.

Who s next after TalkTalk?

NHS Procurement Dashboard: Overview

External Review of Sewer Flooding Risk Registers. Report. October 2008

South African Green Drop Certification for Excellence in Wastewater Treatment Plant Operation

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

Town of Mattawa Asset Management Plan. December 2013

Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Application Value Assessment

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT

QUALITY ASSESSMENT & IMPROVEMENT. Workforce ACUTE HOSPITAL SERVICES. Supporting services to deliver quality healthcare JUNE 2013

Vocational Education and Training Reform Submission

Operational Risk Management - The Next Frontier The Risk Management Association (RMA)

Data Communications Company (DCC) price control guidance: process and procedures

Campbelltown City Council Asset Management Strategy

Bridgend County Borough Council. Corporate Risk Management Policy

Scottish Independence. Charting the implications of demographic change. Ben Franklin. I May 2014 I.

Guide to Conservatory Installation and Sewers

A FRAMEWORK FOR NATIONAL HEALTH POLICIES, STRATEGIES AND PLANS

Universities Superannuation Scheme 2014 Actuarial Valuation

LHT S ASSET MANAGEMENT STRATEGY It s My Home

Principles and Trade-Offs when Making Issuance Choices in the UK

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Communications Strategy and Department Work Plan

The Government's Drug Strategy

A Risk Management Standard

ASSET MANAGEMENT STRATEGY

The 39 Subjects and 6 Subject Groups

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

Transcription:

Capital Maintenance Planning From a historical and future perspective This paper has been written by Anglian Water as a contribution to Water 2020, Ofwat s programme for determining the form of the 2019 review of water price controls. July 2015 This pack designed to be printed double sided

The knowledge and capability of asset management in the UK has evolved over the past 15 years. The catalyst for asset management development in the UK water industry was the House of Commons Environmental Audit published in November 2000. Where the water industry was accused of intellectual neglect. Since the commencement of AMP3 Ofwat s and Water Companies asset management journey has been inextricably linked. Since PR99 and the issue of MD161, Ofwat s approach has centred around the Common Framework methodology (CMPCF), which by the middle of 2003 had developed into a substantial conceptual framework methodology facilitated by UKWIR. The output included a supporting best practice manual. The following statement from Ofwat s user manual of 2004 illustrates their thinking: The CMPCF has had a major impact in that it has become the de-facto standard of best practice, even to the extent that many companies refer to compliance with CMPCF. This implies that capital maintenance planning methodologies can be tested against the CMPCF standard. # The following timeline clearly demonstrates the above. However, in PR14 this forward looking approach was not explicitly used in the Ofwat modelling approach. Source: # Mott MacDonlad Capital Maintenance Review 2004. Independent Assessment of Ofwat s PR04 Process. 2

Asset Management Development Timeline External Environment May 2002 Capital Maintenance Planning A Common Framework (CMPCF) The Common Framework is founded on risk-based principles so that in most cases capital maintenance will be justified on the current and future probability of asset failure and the resultant consequences for customers, the environment and water service providers, including the costs arising. 20 December 2010 Infrastructure UK. Infrastructure Cost Review Water Industry cost data mentioned as good practice May 2014 New Expenditure Framework New expenditure framework incorporating 2007 Totex and all investment areas AMPAP Self assessment of company asset management capability PAS 55 V1 2004 PAS 55 V2 2008 ISO 55000 Feb 2014 Historical expenditure approach Forward looking risk based approach Gap PR99 PR04 PR09 PR14 AMP1 1990/95 AMP2 1995/00 AMP3 2000/05 AMP4 2005/10 AMP5 2010/15 AMP6 2015/20 April 2000 MD 161 Capital maintenance and operating expenditure, recognising the trade off between cost and risk, whilst ensuring compliance with statutory duties May 2002 RD14/02 Ofwat assessment approach. Stage B has a scoring of companies application of the CMPCF Asset Management Assessment (AMA) Assessment of business plans adapted from AMPAP Feb 2006 MD 212 Asset Management Planning to maintain serviceability 1 November 2000 House of Commons Environmental Audit Seventh Report The Committee believes that this approach has amounted to intellectual neglect of this important problem. Regulatory Environment January 2004 NAO Out of sight but not out of mind Ofwat and the public sewer networks of England and Wales. Long term requirements of investment Ofwat Final Determination Companies should develop and apply the principles in these two publications (CMPCF and MD161) to capital maintenance by the 2009 price review. 3

Since 1920 there has been a gradual increase in expenditure. With the tightening of Drinking Water and Environment standards being the primary drivers. The introduction of the Capital Maintenance Planning: Common Framework enabled the industry to answer the why is the future is different rather than a historical backward looking analysis which was used prior to AMP3 (prior to 2000). In 2005 the industry had a step change in Capital Maintenance expenditure. Customer expectations have seen increasing levels of service since privatisation which are expected to be maintained. 4

Historical expenditure trends Water UK Published Data The chart below details the trends in actual capital expenditure since 1920. The charts show the increase in investment since privatisation and the peaks and troughs that follow the regulatory cycle. There has been a rising trend in capital maintenance expenditure. With the move to a totex modelling approach at PR14, it is not possible to separate out the comparable level of maintenance investment. The modelling approach undertaken by Ofwat for capital maintenance was based on historical data and no reference was made to companies forward looking risk analysis and application of the Common Framework. 5

Membranes Ozone IT Many of the new process for water, wastewater and sludge treatment use advanced technology to meet more stringent standards, which are generally short to medium life assets. At the same time we have seen the growth in population and increasing demands for water from agriculture both of which require the development and extensions to the asset base. Sludge Pasteurisation Granular Activated Carbon Sludge Dryers Tertiary Treatment Activated Sludge UV Disinfection Ortho Acid Dosing 6

Impact of new regulations Water Wastewater Sludge Changes in treatment processes and regulations 7

In anticipation that companies would need to justify increased maintenance expenditure as a result of tightening quality standards and growth, two UKWIR projects were commissioned. Implications for maintenance of growth in the asset base. Understanding the impact on shorter life assets on the longer term maintenance requirements of the UK Water Industry The result from the first project focused on company specific issues and no overall industry position was developed. The second study identified the impact at a UK level of the future requirements for capital maintenance as a result of enhancement expenditure. Whilst a simplistic asset renewal rate was used the results show the bow wave of future investment. 8

Impact of new regulations Capital Maintenance Planning : Implications for maintenance of growth in the asset base. Report Ref. No 03/RG/05/9 Summary (from introduction of report) In preparing their business plans, water companies have applied their interpretation of the UKWIR Common Framework for Capital Maintenance Planning, which is based on a forward-looking view of the need for capital maintenance in order to maintain service to customers at least cost over time. As part of this framework, an historical analysis is required, to identify whether past spend has been adequate and to provide a benchmark against which forecast spend can be compared. Companies are expected to explain changes from past spending levels. One of the most significant areas where the future is different to the past is the capital maintenance requirement of assets commissioned since privatisation. Many companies have made significant investment in enhancing their asset base to deliver improved performance standards, driven by a wide range of statutory obligations, over the past 15 years. As the assets age and start to need replacing, their impact on companies capital maintenance requirements will be significant. This assets are unlikely to have had a significant impact on either historic capital maintenance spend or the serviceability trends. The framework methodology was developed to contribute to the application of the Common Framework by providing supporting evidence as to why the future period is different. This is recognised in the Common Framework: there is a need to consider the impact of differences between future and historical periods in estimating future CM needs, with particular regard to historical investment cycles and the requirements of large or unusual assets; the structure of this analysis is not well defined, and yet is critical if future service problems are to be averted. The report details company specific examples, no overall industry data was available. There is a recognition that growth in the asset base could have a significant impact on future expenditure levels. 9

Impact of new regulations Understanding the impact on shorter life assets on the longer term maintenance requirements of the UK Water Industry Report Ref. No 12/RG/06/1 Summary Water industry capital maintenance expenditure has more than doubled in real terms in the 20 years since privatisiation. The report explores the reasons for increasing non-infrastructure capital maintenance requirements including growth in the asset base and an increase in the proportion of shorter life assets resulting in more frequent replacement cycles. The report also sets out to quantify at industry level historical expenditure by asset type and asset life category and then to forecast the impact of this historical investment on future maintenance requirements. The report shows that due to the nature of enhancement expenditure since privatisiation the trend of increasing non-infrastructure capital maintenance requirements is expected to continue in future. Capital maintenance requirements are not expected to stabilise until a significant period after enhancement expenditure is ceased. Charts A and C (see over) show modelled maintenance from 1989 to 2025 based on enhancement additions to the asset base from 1989-2010 for water and sewerage respectively. Charts B and D show total modelled maintenance against actual and planned maintenance. Chart A shows that short and medium life assets have the greatest impact on future maintenance for water. Chart C shows that medium life assets have the greatest impact on future maintenance for sewerage. Charts B and D show that enhancement additions from 1989-2010 will have significant maintenance requirements over the next 15 years for both sewerage and water. This work was not based on forward looking risk approach (aligning to Capital Maintenance Planning: A Common Framework) a simplistic asset age replacement life was used. However this does show the long term impact of new regulatory standards on base maintenance. 10

Charts A and C show modelled maintenance from 1989 to 2025 based on enhancement additions to the asset base from 1989-2010 for water and sewerage respectively The long term impact of new regulatory standards on base maintenance is detailed below and shows an upward trend Charts B and D show total modelled maintenance against actual 11 and planned maintenance

Generally, Ofwat and Companies have been aligned in the amount of capital maintenance required to maintain serviceability for customers. The proportion of capital maintenance has moved from 50% to 60%. 12

Impact of new regulations Ofwat Data Commonly know as the barking dog chart Trends in capital maintenance (England and Wales) Water industry capital investment requirements have increased considerably over the last 30 years. The chart show the trends in capital maintenance since 1981. During the 1980 s and 1990 s quality and other improvements made up more than 50% of the total expenditure. However, from AMP5 capital maintenance made up nearly 60% of total capital expenditure. The increase in capital expenditure over the last 30 years can be attributed to several factors: An aging asset base (older assets may require more maintenance) Growth in population/supply (more assets require more maintenance) Growth in the asset base to meet more stringent standards for water and effluent quality Changes in construction costs (above/below RPI) Changes in asset life apportionment, particularly growing numbers of shorter assets (that need replacing more often) Source: Ofwat Future water and sewerage charges 2009-10. Final Determinations. Page 2 of 12/RG/06/1 13

Sewers - Out of Sight Not Out of Mind: Ofwat and the Public Sewer Network in England and Wales The National Audit Office, January 2004 While incidents of sewer flooding in properties are relatively rare, few could deny that it is highly distressing. This must be especially so for those who suffer repeat incidents. And the harm to the environment should not be dismissed. That is why I have made these recommendations to encourage the work that is already being done to reduce the risks of sewer flooding. In the key recommendations of the Capital Maintenance Planning: A Common Framework was highlighted as an area where Ofwat should encourage and rely on companies judgements for 2009 and beyond. The water industry has invested 39 billion pounds over the last 25 years in improving the sewerage system. The industry manages 624,200km of sewers. The Delivering 21 st Century Drainage programme sponsored by Water UK has expenditure as a work stream which may quantify the future investment requirements. No expenditure forecast were given in the NAO document. 14

Sewers Recommendations relating to expenditure Companies should develop a clearer understanding of the rate of deterioration of their sewerage network assets. The industry or individual companies could achieve this by instituting a long-term programme (over perhaps 25 years) of surveys of a selected sample of different types of sewer. Ofwat should consult on the benefits and costs of either an industry-wide initiative to research the rate of deterioration of sewers or a requirement for each company to include such a sample in its regular five-year asset inventory assessments. In the longer term, once there is a better understanding of the condition of these assets, Ofwat should place more reliance on this information in its assessment of the needs of the networks. Each sewerage company needs to have a thorough risk-based understanding of its networks and the linkages between condition, performance and the likely impact of intervention options. The common framework provides a means by which each company can achieve such an understanding through a coherent and convincing forward plan. The importance of a successful implementation of the common framework to the industry, and ultimately to customers, should not be underestimated. Ofwat should continue to encourage each company to implement processes consistent with the common framework as quickly as possible. Ofwat should encourage companies by identifying where its judgements have been informed by robust early work by companies on implementing the common framework. Full implementation of the common framework by each company at the 2009 review should enable them to make robust and convincing assessments of capital maintenance needs that can be largely relied upon by Ofwat when it sets price limits for 2010 and beyond. Ofwat should set out more good practice and give each company tailored feedback on weaknesses in their submissions. Companies can use this feedback to develop their understanding of what Ofwat expects of them in the years leading up to the 2009 review. Ofwat should also ensure that its process for reviewing company submissions is quality controlled and that the company reporters Source: NAO Out of sight Not out of mind. Published January 2004 15

Information Technology has become the fifth service area of capital maintenance, with approximately 20% of maintenance expenditure being targeted in this area. Increasing reliance on IT and its short cyclical replacement has become a significant part of the companies forward looking investment plans and will remain so. 16

Total M&G Expenditure ( M) Management and General The Common Framework and Justifying Investment in Management and General Asset Types UKWIR Ref: 11/RG/05/31 Conclusions and Recommendations It is clear that investment in M&G is considered to be significant by both water companies and the regulator yet there is a broad range of approaches to justifying investment which in some cases are inadequate. 500 450 400 350 300 Ofwat recognises the importance of M&G investment and is expecting companies to formulate well argued business plans which are based on evidence and which include problem definition, the consideration of a range of options, a demonstration that the proposed solution is the most costeffective (or cost-beneficial) and a statement of the anticipated benefits. 250 200 150 100 50 0 The historical data shows there is an increasing trend of expenditure in this area 1995-96 1996-97 1997-98 Water Infrastructure Sewerage Infrastructure Year 1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 Water Non Infrastructure Sewerage Non Infrastructure 17

Summary Evidence indicates there will be increasing requirements for capital maintenance expenditure being driven by: New technology (IT) Advanced treatment processes Growth in the asset base The introduction of the new Expenditure Framework replacing the Common Framework which now covers all expenditure planning still focuses on risk and a forward looking analysis, this approach aligns to the ISO standard. ISO 55001 Asset Management standard requires companies to have strategic asset management plans (SAMP) and to understand asset and service risk. In the past Ofwat has been a great supporter and has encouraged companies to advance their asset management capability. At PR14 Ofwat took a more historical approach in modelling expenditure, with little reference to the Common Framework. The question is whether this approach is sustainable for the future or whether the PR19 methodology needs to evolve to take account of company specific risks and be forward looking? 18