The value of IT Optimiztion with Power5 on iseries. Roberto Téllez C. iseries Porduct Manager Certified Specialist IBM de México, S.A.



Similar documents
Positioning the Roadmap for POWER5 iseries and pseries

The Consolidation Process

Featuring: GUI screen designer to edit DDS source for 5250 Display Files

CS z/os Application Enhancements: Introduction to Advanced Encryption Standards (AES)

IBM Systems and Technology Group Technical Conference

IBM Tivoli Storage FlashCopy Manager Overview Wolfgang Hitzler Technical Sales IBM Tivoli Storage Management

Managed Services - A Paradigm for Cloud- Based Business Continuity

CS z/os Network Security Configuration Assistant GUI

Title. Click to edit Master text styles Second level Third level

Backups in the Cloud Ron McCracken IBM Business Environment

IBM Systems Director Navigator for i5/os New Web console for i5, Fast, Easy, Ready

Rational Developer for IBM i (RDi) Introduction to RDi

Migrating LAMP stack from x86 to Power using the Server Consolidation Tool

How to Deliver Measurable Business Value with the Enterprise CMDB

How To Write An Architecture For An Bm Security Framework

Creating a Cloud Backup Service. Deon George

TSM (Tivoli Storage Manager) Backup and Recovery. Richard Whybrow Hertz Australia System Network Administrator

IBM WebSphere Data Interchange V3.3

IBM Sales and Distribution IBM and Manhattan Associates

Maximo Business Intelligence Reporting Roadmap Washington DC Users Group

IBM Storwize Rapid Application Storage solutions

RUN BETTER Become a Best-Run Business with Remote Support Platform for SAP Business One

Integrated and reliable the heart of your iseries system. i5/os the next generation iseries operating system

IBM Managed Hosting - server services virtual xseries

HANA Operations for Outsourcing Providers. SAP Ecosystem & Channels, SAP Hosting Certifications November 7, 2013

Redbooks Redpaper. IBM TotalStorage NAS Advantages of the Windows Powered OS. Roland Tretau

SAP Central Process Scheduling (CPS) 8.0 by Redwood

SuSE Linux High Availability Extensions Hands-on Workshop

Reduce your data storage footprint and tame the information explosion

Global Headquarters: 5 Speen Street Framingham, MA USA P F

Global Storage Architecture

How To Manage Energy At An Energy Efficient Cost

Energy Management in a Cloud Computing Environment

Session Title: Cloud Computing 101 What every z Person must know

Forecasting Performance Metrics using the IBM Tivoli Performance Analyzer

DB2 Database Demonstration Program Version 9.7 Installation and Quick Reference Guide

Systems Management with IBM i5/os

Session 1494: IBM Tivoli Storage FlashCopy Manager

6 Things To Think About Before Implementing BYOD

Tivoli Automation for Proactive Integrated Service Management

SAP Portfolio and Project Management

Why Finance Should Automate Management & Regulatory Reporting Processes

IBM Lotus Enterprise Integrator (LEI) for Domino. Version August 17, 2010

Data Protection with IBM TotalStorage NAS and NSI Double- Take Data Replication Software

Introducing the SAP Business One starter package. A Great Start to help you to Streamline Your Small Business

IBM WebSphere Business Integration Monitor, Version 4.2.4

IBM Software Services for Collaboration

Rational Developer for IBM i (RDi) Working offline using i Projects

Intelligent Business Operations Chapter 1: Overview & Strategy

Lisa Gundy IBM Corporation. Wednesday, March 12, 2014: 11:00 AM 12:00 PM Session 15077

Communications Server for Linux

IBM Tivoli Web Response Monitor

IBM Lotus Instant Messaging and Web Conferencing 6.5.1

WebSphere Process Server v6.2 WebSphere Enterprise Service Bus v6.2 WebSphere Integration Developer v6.2

Integrated Release Management Maximize IT s business value. Swen Conrad, PMP Senior Director Solution Marketing IT Business Management

IBM Storwize Rapid Application Storage

Arwed Tschoeke, Systems Architect IBM Systems and Technology Group

BUSINESS PROCESS MANAGEMENT

How To Understand And Understand The Basic Principles Of An Ansper System

Best Practices for Monitoring a Vmware Environment. Gary Powell Senior Consultant IBM SWG Tivoli

Performance and scalability of a large OLTP workload

SAP Master Data Governance- Hiding fields in the change request User Interface

IBM Maximo Asset Management Essentials

IBM System i Integrated Collaboration

Budget Control by Cost Center

How To Manage The Sas Metadata Server With Ibm Director Multiplatform

Service Component Architecture, Apache Tuscany & WebSphere SOA Feature Pack Beta

SAP Cloud Strategy - Timeless Software. Frank Stienhans on behalf of Kaj van de Loo SAP

IBM and Vision Solutions application availability and data protection for IBM PureFlex System

UPSTREAM for Linux on System z

IBM, Linux and You: Real Experience, Real Solutions... for Real Business. John Sarsgard. General Manager, Linux IBM Corporation

User Experience in Custom Apps

Microsoft System Center 2012 SP1 Virtual Machine Manager with Storwize family products. IBM Systems and Technology Group ISV Enablement January 2014

IBM Service Management solutions White paper. Make ITIL actionable with Tivoli software.

How To Write An Ets Request For Proposal (Rfp)

iseries Navigator: Managing System Performance

Accelerate server virtualization to lay the foundation for cloud

Effective Storage Management for Cloud Computing

IBM Blueprint for Technical Sales Support

How To Improve Your Business Process With Sap

IBM Tivoli Service Request Manager

Application Monitoring Maturity: The Road to End-to-End Monitoring

Compliant, Business-Driven Identity Management using. SAP NetWeaver Identity Management and SBOP Access Control. February 2010

How To Use Ibm Tivoli Monitoring Software

Total Cost of Ownership (TCO): Comparing System z and Distributed Platforms

SAP Business ByDesign Reference Systems. Scenario Outline. SAP ERP Integration Scenarios

How To Improve The Fit For Purpose Model At Nationwide It

BUSINESS STRUCTURE: FUNCTIONS AND PROCESSES

Redbooks Paper. Local versus Remote Database Access: A Performance Test. Victor Chao Leticia Cruz Nin Lei

Analyzing Java Performance on iseries

SAS deployment on IBM Power servers with IBM PowerVM dedicated-donating LPARs

Project Governance The Role Of The Business Process Owner

IBM Tivoli Directory Integrator

Active Directory Synchronization with Lotus ADSync

Deploying a private database cloud on z Systems

Effective storage management and data protection for cloud computing

Exam : IBM : Iseries Linux Soluton Sales v5r3

Process Archiving using NetWeaver Business Process Management

Performance Best Practices Guide for SAP NetWeaver Portal 7.3

Transcription:

The value of IT Optimiztion with Power5 on iseries Roberto Téllez C. iseries Porduct Manager Certified Specialist IBM de México, S.A.

Agenda 1. Consolidation and Optimization for Existing Workloads Concepts Methodology 2. Best Practices When Planning for New Functionality 3. IT Optimization with POWER5 on iseries PAGE 2

Concepts: Reduction of Cost + Enablement IT Optimization, is more than simply replacing smaller servers with fewer bigger servers. It is about simplifying and optimizing end-to-end IT infrastructure Servers Databases Applications Networks Systems management processes The goals of consolidation are Reduction of costs and complexity Delivering a rational, stable IT foundation that enables growth PAGE 3

Concepts: Reduction of Cost + Enablement Without the constraints of technology, skills or money, the ideal target environment would be: One hardware platform, potentially clustered for DR and HA One operating system, database, and middleware stack 3 instances of the OS: trusted network, DMZ and Test Why? Concentrate skills, and maximizes productivity Enable enforcement of best practices across all services Largely eliminate data integration issues Enable enterprise disaster recovery The ideal environment is almost never achieved IT Optimization strives to get as close to the ideal as possible, while balancing constraints PAGE 4

Concepts: Relevance of On Demand and eserver On Demand reflects IBM s execution on the strategy of leveraging intellectual property across the entire company IT Optimization consulting IP influences OnDemand vision On Demand vision dictates responses from product teams eserver product teams share and merge IP across product lines, to enable customers for IT Optimization PAGE 5

Concepts: Relevance of On Demand and eserver On Demand at the infrastructure level: Focused on IBM s core technology competencies Virtualization Automation and systems management Optimize the ENTIRE environment All hardware, all OS, all services not just what we build Storage virtualization Hardware virtualization OS consolidation Application modernization Automation Technology foundations of OnDemand and eserver Linux and POWER PAGE 6

Reduction of Cost + Enablement PAGE 7

Concepts: Reduction of Cost + Enablement Highly Visible Customer Benefits 1.Lower Costs Reduced administration Lower hardware, software and support costs Optimized space and power Enhanced predictability for budget planning 2.Improve Service Levels Increased performance Improved availability Facilitation of change management 3.Enable New Capabilities True enterprise disaster recovery Accelerate applications/process integration On Demand flexibility --cost effectively deploy new services PAGE 8

Correlating Company Performance with IT Budgets Revenue growth. In a 2002 Forrester survey of 122 IT executives, 22% said that their top priority is to help acquire and retain customers. Return on assets (ROA). A company s ability to generate profits from its existing asset base, including IT, is a good metric for a down economy. Cash-flow growth. IT helps convert receivables into cash, but CIOs are becoming increasingly creative at managing down discretionary spending by breaking projects into smaller chunks or exploring pay-bythe-drink outsourcing contracts. Linking IT Spend To Business Results Forester 10/02 PAGE 9

Doing more with less! IT Optimization PAGE 10

Concepts: Enablement drives IT considerations up the value chain PAGE 11

Concepts: A Process, Not A Project PAGE 12

Technology Independent The consolidation process is always technology independent iseries is a natural option to evaluate Amazing infrastructure for consolidating workload Often leverages existing skills and investments Almost every IT department can be optimized, but iseries will not always be a fit Application not available Can t make the business case PAGE 13

Methodology PAGE 14

Methodology Step 1: Discovery Identifying costs centers that we can optimize PAGE 15

Methodology Step 1: Discovery Recommending an alternate architecture that delivers a lower future cost PAGE 16

Methodology Step 1: Discovery Understanding IT requirements and issues Significant requirements for IT to adapt to new business initiatives or requirements Key IT priorities and concerns Budget not lining up with actuals Service level targets not being met Can t afford to implement what you need Project running late IT funding model Investment thresholds -ROI and payback pre-requisites Annual budget Department charge back PAGE 17

Methodology Step 2: Data Collection 1. Create an IT inventory A. Hardware, OS, middleware and application 1) Specification 2) Location 3) Utilization 4) Version and release level 5) Level of Service 6) Application status (sunset, static, growing) B. Investment plans 1) Upgrade, replace, maintain, remove 2) Value of upgrade or replace 3) Lease or capital asset 4) Support costs PAGE 18

Methodology Step 2: Data Collection (continued) 2. Understand topology A. Locations B. WAN variables 1)Connection type and capacity 2)Utilization rates 3)Rent and support costs 4)Infrastructure re-investment (all new routers?) C. LAN variables (same as B) 3. Document impact of growth factors A. New applications B. Mergers and acquisitions PAGE 19

Methodology Step 2: Data Collection (continued) 4. Document remaining cost variables A. IT staff 1) Number of employees 2) Categorize job responsibilities 3) Burdened cost for each category (salary times X.X) B. Downtime 1) Estimates or internal cost metrics 2) Penalties and business impact C. Licensing and Support 1) Document any agreements that don t fit within an individual server discussion Enterprise support agreements Enterprise software agreements PAGE 20

Methodology Step 3: Island Identification Process 1. Group servers into common sets of function A. Common applications: Domino, DB2, WebSphere B. Similar services: Email, database, Web, network 2. Identify islands of complexity 3. Prioritize based on preliminary estimate of ROI, effort and risk Some indications that an island is ripe for optimization A. Inefficiency: consuming resources at a rate that is disproportionate to return or alternatives B. Disruption: not meeting service level agreements C. Erosion: lack of currency and maintenance D. Duplication: delivering the same service multiple ways PAGE 21

Methodology Step 4: Infrastructure Redesign 1. Choose new architecture based on A. Ability to maximize ROI B. Risk associated with migration 2. Consider all costs associated with the new architecture A. Acquisition B. Migration C. Maintenance and support D. Space and environments E. Service levels F. Administrative G. LAN/WAN capacity PAGE 22

Methodology Step 4: Infrastructure Redesign A balanced perspective PAGE 23

Methodology Step 4: Infrastructure Redesign A balanced perspective PAGE 24

Methodology Step 5: Business Case 1. Contrast new cost structure to the existing solution, and calculate return on investment 2. Stress test assumptions 3. Review findings and assumptions with team 4. Incorporate feedback, and refine business case An iterative process PAGE 25

Methodology Step 6 and 7: Implementation and Monitoring 1. Implementation A. Strong emphasis on project management B. Frequent verification of progress, relative to expectations C. Establish a process for communicating issues 2. Monitoring A. Track results relative to projections B. Document and share successes C. Address deviations quickly PAGE 26

Agenda 1.Consolidation and Optimization for Existing Workloads Concepts Methodology 2.Best Practices When Planning for New Functionality 3. IT Optimization with POWER5 on iseries PAGE 27

Best Practices When Planning for New Functionality Clearly business requirements come first, but Once you ve optimized your environment, put controls in place that align new services with existing infrastructure and skills Have a review process for all new services/functionality Weigh the fit with existing skills and infrastructure in your decision Operating system Database Middleware Programming skills Security, backup and disaster recovery model Where alternatives exist, favor solutions that fit your environment PAGE 28

Agenda 1.Consolidation and Optimization for Existing Workloads Concepts Methodology 2.Best Practices When Planning for New Functionality 3. IT Optimization with POWER5 on iseries PAGE 29

IT Optimization with iseries Application Flexibility Technology Leverage Integrating People, Processes, Information Risk Mitigation Infrastructure Efficiency Aligning IT Resources with Business Goals Flexibility, Efficiency, Cost Savings Increased choice Reduced vendor lock-in Low integration costs Outstanding price/performance Consolidate workloads Flexible growth Upgrade investment protection Reduced system downtime Business continuity Capacity upgrades Flexible financing options On Demand Operating Environment High utilization of IT assets Low management costs Effective use of skills T C O R e d u c tio n PAGE 30

IBM Software Optimizing PAGE 31

Optimize Intellectual Capital iseries Opportunities Consolidate Intel Messaging/Collaboration Servers Empower your employees Integrate Collaborative Tools with Core Business Making more people more productive in the context of the business they do every day by enabling the creation of dynamic, collaborative workplaces with ease. Collaborative Tools Business Application The combination of the power of business processes and collaborative tools resulting in a rapid decision making environment. PAGE 32

User Perspective User Perspective IT Perspective IT Perspective Integration at the glass ERP 5250/3270 IT Optimization with iseries Navigation Business Intelligence Customization Groupware Personalization Client Server Single Sign On People Awareness Secure Access Syndicated Content Collaboration Productivity Portlets PAGE 33

Optimize Windows Server Deployment Costs Low cost, flexible and reliable server deployment Centralized management; consolidated storage Simplified Disaster Recovery Solutions Before consolidating on the iseries and xseries we required at least three dedicated administrators to run our servers now because of its ease of use, we need only two administrators to run the new system. Brendan Carlton Systems Administrator, Huhtamaki PAGE 34

Optimize Linux Server Deployment Costs "We selected Linux on the iseries because it was such a compelling alternative to the cost and complexity of managing nine separate Intel-based servers," Nigel Fortlage, Vice President of IT. On demand virtualization optimizes choice, reduces complexity and cost Integrated platform simplifies e-business deployment on Linux PAGE 35

LPAR, Virtual I/O, and Shared Storage Spaces lowers TCO System Variable Static Tape LAN RAID System Variable Static Tape LAN RAID Intel Solutions LAN, RAID and TAPE device for each server memory, disk, and CPU is allocated to each server each server has to have its own backup and recovery solution Do you have a DR plan for this? System Variable Static Tape LAN RAID System Variable Static Tape LAN RAID iseriessolutions Shared resources - Fewer disk drives, tape drives and LAN adapters can be used Reduce disk administration - iseries Storage Mgmt Improve performance with more disk arms Consolidated Backup of OS/400, Windows, & Linux (now that's DR!!) Resources can easily be moved to where they are needed PAGE 36

iseries Delivers ROI for Infrastructure Server Consolidation IDC study finds SMBs that consolidated Intel-based infrastructure servers to iseries using Linux or Windows achieved Strong costs savings 90% reduction in downtime 22% increase in IS Productivity Payback with 1 year 14% 13% 22% Cost Reduction User Productivity 51% IT Productivity Downtime Revenue 3 Year ROI for Server Consolidation per 100 Users Cost Savings $542,728 Net Present Value $302,052 Total Investment $141,227 ROI (NPV/Investment) Payback (Investment/Yr 1 Cashflow) 213.9% 216 Days Source: IDC White Paper: The Return on Investment of Windows / Linux Infrastructure Server Consolidation with iseries. Case Studies in SMBs 7/03 PAGE 37

IT Optimization with iseries Application Flexibility Application Flexibility Technology Leverage Risk Mitigation Infrastructure Efficiency Infrastructure Efficiency Increased choice Reduced Increased vendor choice lock-in Low integration Reduced vendor costs lock-in Low integration costs Outstanding price/performance Consolidate workloads Flexible growth Upgrade investment protection Reduced system downtime Business continuity Capacity upgrades Flexible financing options High utilization of IT assets Low management costs High utilization Effective of IT assets use of skills Low management costs Effective use of skills Technology Leverage Risk Mitigation Outstanding price/performance Consolidate workloads Flexible growth Upgrade investment protection iseries Reduced system downtime Business continuity Capacity upgrades Flexible financing options PAGE 38

IBM i5 & i5/os http://www.ibm.com/iseries

Trademarks and Disclaimers IBM Corporation 1994-2003. All rights reserved. References in this document to IBM products or services do not imply that IBM intends to make them available in every country. The following terms and trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. This list is not a comprehensive list of all IBM trademarks. 400 ClusterProven e business(logo) IBM.COM PowerPC System/38 AIX DataPropogator e(logo) business InfoPrint PR/SM ThinkPad AIX/L (logo) DB2 e-business (logo) iseries pseries Tivoli AIX 5L DB2 Extenders e-business Hosting Magstar Redbooks VisualAge Application System/400 DB2 OLAP Server e-business on demand MQSeries SecureWay WebSphere AS/400 DB2 Universal Database FlashCopy Operating System/400 SmoothStart X-Architecture AS/400e DRDA IBM OS/400 SQL/400 xseries Chipkill e(logo)server IBM (logo) Parallel Sysplex System/36 zseries Cc:Mail, Domino.Doc, Domino, Freelance Graphics, inotes, LearningSpace, Lotus Notes, Lotus, Notes, QuickPlace, Sametime are trademarks owned by IBM-Lotus in the United States, other countries, or both. C-bus is a trademark of Corollary, Inc. in the United States, other countries or both. Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both. ActionMedia, LANDesk, MMX, Pentium and ProShare are trademarks of Intel Corporation in the United States, other countries, or both. UNIX is a registered trademark of The Open Group in the United States and other countries. SET and the SET Logo are trademarks owned by SET Secure Electronic Transaction LLC. Other company, product and service names may be trademarks or service marks of others. Information is provided AS IS without warranty of any kind. All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Information in this presentation concerning non-ibm products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for non-ibm list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or any other claims related to non-ibm products. Questions on the capability of non-ibm products should be addressed to the supplier of those products. All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Contact your local IBM office or IBM authorized reseller for the full text of the specific Statement of Direction. Some information in this presentation addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here to communicate IBM s current investment and development activities as a good faith effort to help with our customers future planning. Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience may vary depending upon considerations such as the amount of multiprogramming in the user s job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements equivalent to the ratios stated here. Photographs shown are of engineering prototypes or representation of product functions. Changes may be incorporated in production models. PAGE 40