BEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office

Similar documents
Adaptation to a Changing Climate

Climate Adaptation and Preparedness

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

The California Environmental Protection Agency works to restore, protect,

2007 Operating Budget Capital Budget 2007 Proposed Water and Wastewater Service Rate

Toward a Resilient Denver: Preparing for Climate Change. Celia VanDerLoop Denver Environmental Health

Climate Adaptation Overview. City of Chicago Rahm Emanuel, Mayor

Chicago Climate Action Plan Update

Toronto s Wet Weather Flow Master Plan

Assessment of Vulnerability to the Health Impacts of Climate Change in Middlesex-London

Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.

A Developer s Guide: Watershed-Wise Development

Nurse s Role as an Environmental Activist. Author: Naomi Higenbottam. York University, Toronto, ON

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

PE9.4 Corrected Report

Engineers Canada s Pre Budget Submission

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

Adapting to Climate Change Through Asset Management Planning. Tiffany Batac David Rose, PhD Parsons Brinckerhoff

City of Cambridge Climate Protection Action Committee. Recommendation to the City Manager on Urban Heat Island Mitigation

City of Cambridge Climate Protection Action Committee. Recommendations for Adaptation to Climate Change. Purpose

Climate Change and Infrastructure Planning Ahead

Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions

Table of Contents ESF

Corporate Energy Conservation and Demand Management Plan Engineering Department. Public Works Division

later damage - Loss ControL

City of Toronto Electric Vehicle Working Group

Growing the Green Economy

REPORT TITLE: TERM OF COUNCIL PRIORITY NO. 6 - ENHANCE INTEGRITY OF WASTEWATER COLLECTION SYSTEM INCLUDING FLOOD REMEDIATION PROGRAM

Prevention. Cause. Causes: Groundwater seepage through the basement walls. Prevention: OPEN 24 Hours. Surface runoff. Sanitary sewer backup

Empowering Local Clean Energy Action FEDERAL POLICY AGENDA FOR 2011

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

Oregon. Climate Change Adaptation Framework

PREPARING FOR A FLOOD

Department Business Plan. Utilities

Green Building Incentives in New York, New Jersey and Connecticut

STAFF REPORT TO COMMITTEE OF THE WHOLE

Department Business Plan. Utilities

University of Ottawa Pandemic Plan

HOW DOES THIS SERVICE CONTRIBUTE TO THE QUALITY OF LIFE IN THE CITY OF LONDON?

Reducing Natural Hazard Risks in New Residential Developments

Hanover Declaration Local Action Driving Transformation

General Statement of Duties

Climate Change Long Term Trends and their Implications for Emergency Management August 2011

Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator

Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist

Fleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES BUSINESS PLAN

Faculty of Environment University of Waterloo

Doing Business, Small & Medium Enterprise Support and Information Access

City of Atlanta CLIMATE ACTION PLAN

Practical Measures for the Prevention of Basement Flooding Due to Municipal Sewer Surcharge. Plumbing stack. Figure 1

Weeping Tile Disconnection to Reduce the Impact of Basement Flooding London, Ontario

Organizational Change Management for Sustainability Pearson Inc

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Pay Later: The Cost of Inaction. Climate change will have a negative impact on many of the industries that

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

Engineering Major Service Actual Budget Projected Request Executive Adopted

Kansas City s Overflow Control Program

Floods are too much water on normally dry land. Rivers can flood after heavy rain has fallen over a long period of time. River flooding can last

Engineering Department. Public Works Division. August 14th, 2014

Factor Restoration. simplifying IT

All about. insurance and. water damage

Town of Essex NE Lagoon. Service Area. Essex Plant. Service Area. Pumping Station No. 4. Wastewater Pumped To NE Lagoons (Treatment Plant No.

Disaster Preparedness

The Metropolitan St. Louis Sewer District. Sewer Overflows In Our Community

Preliminary advances in Climate Risk Management in China Meteorological Administration

Managing Capital Assets

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

Source Water Protection Practices Bulletin Managing Sanitary Sewer Overflows and Combined Sewer Overflows to Prevent Contamination of Drinking Water

good to know... SEWER BACKUP A guide to protecting your home

Materials Needed: Time Needed: Adaptations: 2 flyswatters (optional) Vocabulary Definitions (below) Vocabulary Scramble Sheets (below)

STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON

Challenges. Estimated Damages from 100-Year Flood

BASEMENT FLOODING. Prevention Guide for. Homeowners

Preparing for a Water Emergency

Storm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines

Clear Water Projects in Cooksville Creek Watershed

CERT Damage Assessment Operations

Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54

EPA Trends for wastewater Treatment in California

FIRE INSURANCE CLAUSES

A Century of Progress with Pride

CLIMATE ACTION IN BRITISH COLUMBIA 2014 PROGRESS REPORT

Chapter 2 Asset Management

Mandatory Weeping Tile Disconnection to Reduce the Impact of Basement Flooding

What is A Triple Bottom Line Economic Analysis of Improving Urban River Quality?

Emergency Restoration Plan (ERP) Components

Transcription:

BEYOND THE STORM: Toronto s Climate Change Adaptation Program Its about Risk and Cost Management David MacLeod Toronto Environment Office June 16, 2011

Agenda Mitigation & Adaptation: Both are needed Impacts of climate change on the GTA Examples of adaptation actions Drivers for Action GTA: Adaptation Related Groups CC Risk Assessment Project Beyond the Storm: Climate Change Risk Management 1

Examples of Actions to combat climate change Mitigation Adaptation Sustainable transportation Energy efficiency Building Code changes Renewable energy Expand deep lake water cooling Improve vehicle fuel efficiency Capture & use landfill & digester gas Tree planting & care Healthy green space conservation Local food production Water conservation Green roofs Infrastructure upgrades: sewers & culverts Residential programs: sewer backflow & downspout disconnection Health programs: West Nile, Cooling Centres, Smog Alerts, Air Quality Health Index Help for vulnerable people during severe weather Countering invasive species Taking action to protect our citizens, our environment, our economy 2

Anticipated CC Impacts on Toronto Infrastructure Assets More extreme weather events e.g.: Heavy rain, flash floods, high wind, freezing rain, hail, tornadoes, etc. Damage to: Buildings, water, sewer & transportation infrastructure Electrical system, causing blackouts 3

Anticipated Climate Change Impacts on Toronto More heat waves, smog days, related illness & deaths Stress on electrical supply from increased use of A/C Declining lake levels, affecting water quality & shipping 4 Source on Anticipated Impacts: Scan of Climate Change Impacts on Toronto; Clean Air Partnership, 2006

Anticipated CC Impacts on Toronto - Ecosystems Increased disease carried by insect vectors Damage to urban trees from insect pests & storms Increased stress & damage to vulnerable ecosystems & habitats 5

Local Vulnerable Population: Heat is bothersome & lethal Streets to Homes worker attending to a client Homeless Low-income people Housing conditions Limited mobility Lack of insurance, savings People in poor health Isolated seniors Infants & small children 6

Flooding: a growing Problem Toronto, 2005 - $547 Million Calgary, 2005 - $300 Million Edmonton, 2004 - $166 Million Peterborough, 2004 - $87.3 Million and Hamilton

Toronto: August 2005 Storm Toronto has 154 large culverts TOTAL $547 Million

9 Some affected more than others

Finch Ave in Toronto Photos courtesy Jane-Finch.com 10

Exposed utilities at Finch Ave Wash Out 11

New stream crossing at Finch Ave 12

toronto: 2005 storm Impact Summary Impact Area Physical Structures City Operations, Business & Households Impacts Damage to infrastructure, homes, businesses, vehicles Loss of cultural and natural heritage features Arterial road closed 14 months Businesses disrupted in flooded areas Basement contents destroyed City workers & budgets redeployed (e.g. tree disposal instead of planting & care) Safety, Health & Security Cars caught in floods; blackouts in some neighbourhoods Mold affecting health Financial Repair costs & overtime Loss of staff productivity Claims against the City

Residential Protection Doing what makes sense Lot grading Sewer backflow valve 14

Mitigation & adaptation benefits Green Roof Incentive Program Photos courtesy Toronto Water 15

16 Sustainable Parking Lots Working with nature

Urban Naturalization Working with nature 17

Trees where we need them Sustainable Sidewalks Silva cell 18

Road Weather Info System Real time weather information Sensors: Wind speed, gusts & direction Precip [yes/no] Temp & humidity Cabinet contains: Processing unit (RPU / Data logger) Telecom Power connection Digital barometer - pressure Optional sensors: Visibility Precip amount & type Cameras Traffic counters 19

3 In 1 Salt Truck Salt Management Program Brine tanks 20 Flexibility to variable road & weather conditions

New Street Sweepers Clean Roads to Clean Air Program Can operate dry in cold weather if there is no snow 21

Drivers for Action on Climate Change Risks 1. Council directive from Climate Change Adaptation Strategy (approved July 2008) 2. Safety: avoid harm to citizens & staff 3. Customer Service 4. Cost avoidance: a) damage from extreme weather b) credit & insurance risk rating of City & taxpayers 5. Personal legal liability of Staff & Council 6. Evidence of due diligence Beyond the Storm: Climate Change Risk Management 22

Importance of Due Diligence and Personal Liability Environmental due diligence: Employees must take all reasonable steps Employees must adhere to laws and regulations Employees must anticipate risks Organization and individuals can be held liable! Applicable standard of care: Having proper management systems Having effective operations Consider leading practices: City practice Other cities / comparable organizations Emerging technology Potential consequences: Fines Incarceration Civil liability Beyond the Storm: Climate Change Risk Management Information courtesy of Graham Rempe, Environmental Lawyer, City of Toronto 23

Environmental Risk Management Current State Assessment Environmental risk management practices & processes are in place & formalized in some Divisions, but cannot be considered to be institutionalized on a large scale. Level 5 C Level 4 Level 3 Strategic Level 1 Level 2 Comprehensive Integrated Initial/Ad-hoc Fragmented Environmental Risk Management Maturity Scale A strong foundation exists in select Divisions a good starting point for further City-wide efforts. Beyond the Storm: Climate Change Risk Management 24

Figure 1: Climate Change Adaptation Groups in the Toronto Region Greater Toronto CivicAction Alliance: Greening Greater Toronto - Catalyst & Liaison to business community Toronto Region Action Group on Extreme Weather Resilience Gov t & private sector infrastructure owners & major employers - Understand risks - Implements adaptation actions City of Toronto: Toronto Environment Office - Catalyst & Liaison to city divisions, science & adaptation practitioners Emergency Planning / Business Continuity Groups: Toronto Office of Emergency Management Emergency Management of Ontario ICLR DRIE MMAH Ontario Regional Climate Change Consortium Scientists from 12 universities, gov t & sector groups - Climate data & analytical services - Managed by CC-RAI Toronto Climate Change Science Advisory Group Scientists from 3 orders of government, universities & NGOs - Review best science -Develop consensus on how the climate has changed & will change in Toronto - Provide general level climate change info Climate Consortium for Research Action and Integration (CC-RAI) -Climate research, training, outreach (e.g.occiar) - Lead by York U. & TRCA Ontario Regional Adaptation Collaborative Provincial Ministries - Weather / Water information gateway - Municipal training - Includes OCCIAR Beyond the Storm: Climate Change Risk Management 25

TORONTO: Major adaptation programs Heat and Smog Alerts Wet Weather Flow Master Plan (2003) $1 Billion investment over 25 years Basement Flooding Program (2006) $833 Million investment over 10 years 5 of 32 flooded areas now studied (recent cost estimate to address risk is $226 Million for the 5 areas) Climate Change Adaptation Strategy (2008) Ahead of the Storm : Identifies short & medium term adaptation actions Climate Drivers Study : Improves local knowledge of future weather extremes Climate change risk assessment to identify & prioritize long term actions

Environmental Risk Assessment Initiative CC Risk Assessment Project Context This project addresses two key mandated initiatives: General Environmental Risk Assessment (from Auditor General); Climate Change Risk Assessment (from Council). Climate Change Adaptation Strategy Step 1: Adaptation process initiation Step 2: Stakeholder engagement Step 3: Policy updates Step 4: Local climate change analysis Step 5: Risk assessment & impact prioritization Step 6: Toronto vulnerability assessment Phase 1: Develop Environmental Risk Assessment process and tool Step 7: Adaptation options assessment Scope of this project Step 8: Adaptation strategies execution Step 9: Monitoring & evaluation Phase 2: Geographical Information System integration & web- enable tool Phase 3: Tool application within remaining divisions: climate change risks Phase 4: Tool application within remaining divisions: general environmental risks Beyond the Storm: Climate Change Risk Management 27

Project Scope Climate change risk is a subset of environmental risk Enterprise Risk Environmental Risk Climate Change Risk Risks from Extreme Weather Events Climate Change Risk Assessment Process & Tool (screening level) Adaptive Actions by City Operations Residual Risks Scope of project is developing a process for screening & prioritizing all environmental risks - first application will focus on climate change risks Beyond the Storm: Climate Change Risk Management 28

Environmental Risk Project Overview Project Purpose: To develop organizational capacity towards a culture of env. risk management Primary Project Activities: Developed a screening-level env. risk assessment process & tool; Piloted process & tool Transportation Services Shelter, Support & Housing Administration Project Benefits: 1. Provide consistent means for City to identify & assess env. risks; 2. Enable City staff to prioritize risks & prepare adaptive actions; and 3. Demonstrate climate change adaptation leadership for Toronto area organizations. Beyond the Storm: Climate Change Risk Management 29

Transportation Services - Level of Effort 95 high priority assets and services were assessed; Approximately 1700 risk scenarios were developed; For each of the time periods 2010-2020 and 2040-2050; One lead risk assessor and 8 risk assessor with high level of expertise and many years of experience were selected; Risk assessors were trained in the risk assessment process; 15 half day risk assessment sessions; and 3 half day risk treatment session were held. Beyond the Storm: Climate Change Risk Management 30

Activities Completed High Priority Assets and Critical Services Risk Sources Extreme Freezing Rain Extreme Rain Extreme Heat Freeze/Thaw Cycle Extreme Snowfall Extreme Cold Extreme Wind Transportation Services Infrastructure Asset Management & Programming Expressway and Structures Urban Traffic Control Systems Business Systems Plant Installation and Maintenance Road Operations Roads, Bridges, Culverts Inspection, Maintenance and Construction Traffic Controls Signals, RESCUE Operation; Traffic Control Systems; Road Operation Equipment; Staff Health and Safety; Winter Maintenance; Road Repairs; Street Sweeping Service; Inspections and Patrolling; Investigations Beyond the Storm: Climate Change Risk Management 31

Communicate & Consult Monitor & Review Risk Management Framework Establish the Context Identify Risks Analyze Risks Scope of this project Evaluate Risks Treat Risks Source: Australia New Zealand AS/NZS 4360 Beyond the Storm: Climate Change Risk Management 32

Climate Change Risk Assessment Tool: Key Features: Adaptable to any kind of risk (e.g. climate, environment, health & safety) Large data handling capacity Powerful capability to analyze trends Ability to attach reference documents Captures the knowledge of experienced staff before they retire A good record of due diligence Helps management see the big picture Beyond the Storm: Climate Change Risk Management 33

QUESTIONS? Contact David T. MacLeod Sr. Environmental Specialist Toronto Environment Office 416 392-4340 dmacleo2@toronto.ca Beyond the Storm: Climate Change Risk Management 34