Gold. Grade. Infrastructure. CORPORATE PRESENTATION



Similar documents
AVINO SILVER & GOLD MINES LTD.

WILLAMAX PROJECT. TSX-V: DVN Reach us at Developing B.C. mining assets to create profitable gold production.

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

NOVEMBER January 2013

Focusing on Near Term Production and Exploration in Quebec

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

Lalor Project Base Metal Zones and Gold Mineralization January 2009

INVESTOR PRESENTATION JULY 2013

How To Know If Goldcorp Is A Successful Company

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset

Corporate Presentation October 2015

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

Barkerville Gold Mines Investor presentation q The last great Canadian gold mining camp controlled by a junior mining company.

Unprecedented Opportunities in Final Frontier of B.C. s Golden Triangle. Exploration and mineral resource development

TSX-V: CDA WKN: A0M6U5

FORWARD LOOKING STATEMENTS

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

FIRST QUARTER CONFERENCE CALL MAY 4, 2010

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

CREAM MINERALS LTD. Suite Granville Street Vancouver, B.C. V6C 3P1

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading

DUFFERIN GOLD MINE. Targeting First Gold Dore Q Nova Scotia, CANADA

Sabina Gold & Silver Corp.

Coeur Reports Fourth Quarter and Full-Year 2015 Production and Provides 2016 Production Guidance

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

The last great Canadian gold mining camp controlled by a junior mining company.

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

Strategic Metals Ltd.

AGNICO-EAGLE MINES LIMITED

Aurvista Gold Plans Significant Exploration Program at Douay

For Immediate Release Date: February 3, 2016 # Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

Copper and Gold at Our Core

HISTORIC INTERSECTIONS INCLUDE 19.8 G/T AU OVER 8.9 METRES AND 24.4 GT AU OVER 9 METRES

How To Understand The History Of The American Gold Mine

First Quarter 2015 Investor Conference Call May 7, 2015

(NYSE-MKT:XRA, TSX:XRC,

Condor Gold plc. (''Condor'' or "the Company") Whittle Consulting's Optimisation Study Significantly Enhances Economics

Forward Looking Statement

Detour Gold Provides New Life of Mine Plan for Detour Lake

A Cash and Project Generator FOCUSED ON MINERAL PROCESSING AND EXPLORATION IN PERU

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

Brian Groves CEO & Director

The Point Rousse Project - An Economic Analysis

Nevada Lithium. Nevada Sunrise Gold Corp. Lithium: the Energy Metal

FIJI GOLD LION ONE METALS

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

How To Mine And Treat Ore From Castle Hill Stage 1

SAVANT LAKE GOLD PROJECT. May 24,

Acquisition of Rice Lake. December 2015

TD Securities Mining Conference JANUARY 26-27, Developing the third-largest copper mine

Q Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

LUPAKA GOLD ANNOUNCES JOSNITORO GOLD PROJECT OPTION WITH HOCHSCHILD MINING PLC

FOR IMMEDIATE RELEASE

Trip to Pulacayo. Pulacayo - Paca

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

FOR IMMEDIATE RELEASE NR15-19 November 10, 2015 RENAISSANCE GOLD REPORTS FIRST QUARTER 2016 RESULTS

For personal use only

ASX ANNOUNCEMENT 2 December 2014 PRESENTATION

C o r p o r a t e P r e s e n t a t i o n A u g u s t

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

FORWARD-LOOKING STATEMENTS

CANADA S INTERMEDIATE GOLD PRODUCER

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

African Barrick Gold. BMO Global Metals & Mining Conference February 2013

Barkerville Gold Mines Investor presentation q Mines are found in the shadows of headframes

Miocene Metals and Carube Resources Announce Start of Drilling on Bellas Gate Copper- Gold Joint Venture Project in Jamaica

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

Positioned for Production: Exploring for Growth

February Chinchillas Silver-Lead-Zinc Deposit. Technical Update GROSSO GROUP MEMBER COMPANY

Gold. Energy & Tech Stocks Februa. Gainey Capital Corp. Progress Rating: Phone: (1)

BUILDING VALUE THROUGH DISCOVERY. Nickel Exploration in Labrador

Year End 2014 Earnings Conference Call

Quarterly Activities Report - for the period ended 31 December 2015

March, 2013 Update. A Company in Transition

A Global Resource Investment Corporation and Merchant Bank

Golden Band Resources Inc.

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

Mexico s next silver mine. Corporate Presentation October 2015

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

Q3 Highlights. Company earnings during the quarter totaled $3.3 million ($0.01 per share).

September 2015 Quarterly Activities Report

Transcription:

Gold. Grade. Infrastructure. CORPORATE PRESENTATION

Disclaimer Certain statements in this presentation constitute forward looking statements or forward looking information within the meaning of applicable securities laws ( forward looking statements ). Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of Andover Ventures Limited ( Andover ), or developments in Andover s business or in its industry, to differ materially from the anticipated results, performance, achievements or developments expressed or implied by such forward looking statements. Forward looking statements include all disclosure regarding possible events, conditions or results of operations that is based on assumptions about future economic conditions and courses of action. Forward looking statements may also include any statement relating to future events, conditions or circumstances. Andover cautions you not to place undue reliance upon any such forward looking statements, which speak only as of the date they are made. Forward looking statements relate to, among other things, changes in the resource market; the market focus of Andover, Andover s revenue mix and margin targets; Andover s operations priorities; and Andover s strategy for its products and solutions. The risks and uncertainties that may affect forward looking statements include, among others, the completion and integration of acquisitions, the possibility of technical,logistical or planning issues in connection with deployments, the continuous commitment of Andover's customers, demand for Andover's products and other risks detailed from time to time in Andover's filings with the Securities and Exchange Commission and Canadian provincial securities regulators. Forward looking statements are based on management s current plans, estimates, projections, beliefs and opinions, and the Company does not undertake any obligation to update forward looking statements should assumptions related to these plans, estimates, projections, beliefs and opinions change.

Company Strategy Andover Ventures (TSX.V: AOX), (AOVTF:US), (R2X.F) is a precious and base metals exploration and development company with high grade, world class projects located in both the historic Tintic Mining District of Utah and the Polymetalic rich Ambler Mining District of Alaska, USA.

Management & Directors Gordon Blankstein, MBA, Chairman and CEO Larry Segerstrom., P Geo., COO Roland Vetter, CA., CFO Manfred A. Schauer, Director Peter Legault, Director Mr. Mark Bloom, B.A.,Director David Lajack, B.Sc. Geo, Director Dr. Stewart Jackson, PhD, Geo, Director Dr. David A. Hedderly Smith PhD., P.G., Director Sherman Young, B.Sc.Geo, Juris Doctrate, Director Dr. William L. Iggiagruk Hensley, Director

Capital Structure Symbol: AOX: TSX.V, AOVTF: OTC:BB Shares Issued: 103,203,352 Options: 6,050,000 Warrants: 10,500,000 Management Ownership: 35% Institutional Ownership: 20% Avg. Daily Trading Volume: 250,000 + Market Cap: $41.3 Auditors: Meyers Norris & Penny., Chartered Accountants Domicile: B.C. company incorporated February 12, 2003. Cusip No: 034388 10 8 Year End: March 31.

Portfolio of Projects Tintic Mining District, UTAH Trixie Mine Burgin Project Ball Park Big Hill Ambler District, ALASKA Sun Project - VMS

Tintic Mining District, Utah Andover s subsidiary; Chief Consolidated has land holdings of more than 16,000 acres within this prolific mining district Historic Tintic District Production Tons: 16.5 million Gold: 2.3 million ounces Silver: 250 million ounces Copper: 250 million pounds Lead: 2.2 billion pounds Highlights of Project: Surface and mining rights owned Abundant infrastructure including permitted and bonded mill, roads, railhead, power and productions shafts 23 past producing deposits on project Near term gold production Quickly upgrade historic resources to NI 43 101 Bingham Canyon Mine Tintic Mining District

Major Projects THE BALL PARK THE BURGIN THE BIG HILL THE TRIXIE

The Big Hill Project Advanced Lithocap Overlaid on Quartz Vein Stockwork The porphyry target is located in the East Tintic Mining District near Provo, Utah. A stockwork of quartz veinlets occupies the core zone of the Big Hill target area with a lithocap superimposed on the stockwork, a process known as telescoping. Lithocaps usually define the shallow parts of porphyry copper systems typically above the main Cu-Au/-Mo zone.

Big Hill Project Joint Venture Rio Tinto RIO TINTO EARN 55% AT COMPLETION OF FEASIBILITY Work Completed to Date Airborne Magnetics-MPX Geophisics Magneto-telluric Survey-Western Geco.LLC Induced Polarization Survey-Quantec Geoscience Surface Mapping, sampling and historical data compilation-kennecott Exploration Company Drilling-3 porphyry targets-boart Longyear

Tintic Mining District, Utah Plan for Advancement 1. Production at Trixie Mine Near term Gold Producer Previous cost of production of < $125/oz Cash flow used to complete Burgin exploration 2. Exploration at Burgin Project multiple targets Targeting 5M tonnes with gross metal values in excess of $3B Sunshine Zone Zone A/Footwall Area Burgin Gold 50 02 Zone Burgin Tailings Ball Park

Infrastructure on Tintic District 250 TPD Ball Mill Refurbished in 2001 Production Shaft at Burgin Project

Trixie Mine The Trixie is a permitted mine that has previously recorded production of approximately 200 tons per day of gold/silver ore, processed via flotation in the nearby Burgin concentrator.

Trixie Infrastructure Production Shaft Cyanide Circuits Flotation Circuit Cone Crusher

Trixie s Historic Production 1 Quarter of Production Dec. 2001 thru Feb 2002 2001 Jan. 2002 Feb. 2002 Total Tons Mined 5,384 771 1,653 7,808 Tons Milled 381 3,391 4,036 7,808 Mill Head Grade (Au) 0.28 0.63 0.83 0.72 Recovery 85.9% 79.7% 80.1% 80.1% Recovered ounces 91.31 1,694.6 2,674.5 4,460.4 Ounces sold 3,316.7 Ounces in mill circuit 1,143.6 Total Mining & Milling Cost $694,591 Cost per Ton Processed $88.96 Average cost of production per ounce of $123.55

Preparatory Work on Agitator/Concentrator Tanks

Tailings Pond Being Prepared For Production

Burgin Project Past Precious and Base Metal Producer National Instrument 43 101 completed by Mine Development Associates Receiving PEA (preliminary economic assessment) Q4 2011 Insert Property Map Exploration Targets: Burgin Extension Sunshine Target Burgin Gold Zone A Ball Park

3D Model Historic Drill Results

ALASKA SUN DEPOSIT

Sun Project Location

Sun Deposit, Alaska The Company has a 100% interest in this Zinc Copper Lead Silver Gold project in Northwestern Alaska. The SUN Property consists of 36,800 acres. The VMS style structures extend approximately three kilometers along strike. The highly prospective metavolcanic Ambler Schist Belt around and to the west of the SUN Property has been traced another 16 Kilometers on the Andover claim block. Alaska, Brooks Range

Ambler District

SUN Property

The Sun Deposit Ranks Among the World s Largest Undeveloped Copper Zinc Deposits

The four volume historic Anaconda Pre-feasibility study completed September 1977 by Canadian Mine Services Ltd., Kilborn Engineering (BC) Ltd and Swan Wooster Engineering Co. Ltd are not NI 43-101 compliant but the Company has no reason to believe that the professionally written data is not accurate, but this information should not be relied upon.

Why Invest? High Grade Gold & Silver Production to begin at Trixie Mine 2012 Bonded Permitted Mill for Production on Site Preliminary Economic Assessment (PEA) Study Underway for Burgin, Silver Lead Zinc Deposit Rio Tinto/ Kennecott Earn in Agreement on Big Hill Copper Gold Molybdenum Porphyry Project, East Tintic Mining District, Utah Road initiative to Access Ambler District Alaska NI 43 101 Compliant Upgrades to historic SUN Deposit Resources Alaska Aggressive Work Program Summer 2011 Management Experienced in Both Exploration and Precious Metal Production High Grade, High Metal Value Projects in Politically Safe Jurisdictions Targeting Global Metal Values of Greater than $7B in Ground within 2 projects: Burgin and Sun

Contact Us Investor Relations Contact: Mr. Richard Martens Phone: 604 682 2168 Email: info@andoverventures.com Website: www.andoverventures.com Office Address: 890 999 West Hastings Street Vancouver B.C. Canada V6C 2W2