SBM OFFSHORE Q1 2010 TRADING UPDATE SOLID PERFORMANCE WITH IMPROVING MARKET



Similar documents
PRELIMINARY RESULTS SBM OFFSHORE NEW CEO IN 2008

Press release. SBM Offshore Q1 Trading Update 16 May Highlights First Quarter Post Period Highlights

General Presentation, October SBM Offshore All rights reserved.

General Presentation, November SBM Offshore All rights reserved.

Financial Review / Financial Statements SBM Offshore Annual Report FPSO P-57 at quay side in Singapore during construction

Financial Review / Financial Statements SBM Offshore Annual Report FPSO Espirito Santo in Brazil

General Presentation. May 7, SBM Offshore All rights reserved.

Third quarter results 2012

In respect of Angola and Equatorial Guinea there is some evidence that payments may have been made directly or indirectly to government officials;

Visiongain. -v1531/ Publisher Sample

Press Release. SBM OFFSHORE HALF-YEAR RESULTS 2014 Revenue up 6%; Outlook confirmed August 6, 2014

Finance. Peter Van Rossum. Chief Financial Officer September 19, SBM Offshore All rights reserved.

Conference Call 1Q 2015 Results May 28, 2015

Table of contents 6 Financial Report Company Overview and Financial Review 6.2 Consolidated Financial Statements 6.3 Statutory Financial

Ship Finance International Limited (NYSE: SFL) - Earnings Release. Reports second quarter results and quarterly dividend of $0.

Monitor Oil PLC (incorporated under the laws of the Cayman Islands) (formerly Monitor Oil Production, Limited) Registered Number: HL (MONI)

General Presentation. October 10, SBM Offshore All rights reserved.

Strategy. Øivind Tangen. Group Strategy Director September 19, SBM Offshore All rights reserved.

FORACO INTERNATIONAL REPORTS Q3 2014

2012 Company overview. A year of

Fleet and operations Performance record

VAALCO ENERGY ANNOUNCES FIRST QUARTER 2015 RESULTS

Seadrill Partners LLC. Wells Fargo Pipeline, MLP and Energy Symposium December 2012

4Q14 Conference Call. Jan. 29, 2015

Reports Results for First Quarter 2007 and Declares Quarterly Dividend

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

Maersk Drilling Annual Result 2014

MODEC, Inc. Mid-term Business Plan May 2015

Challenges. Client-focus. company overview 2014

2.1 Introduction and Meetings of the Supervisory Board Remuneration Report Information regarding the Supervisory Board members

RESULTS FIRST QUARTER 2015

CGGVeritas announces Q results

Full year and fourth quarter 2014 results 1

Oceaneering Announces Record Quarterly Earnings

Table of contents 1 Overview Message from the CEO 2 2 Company Profile Ownership and Operating Structure Shareholder and Stakeholder

FY 2014 Results March 19, 2015

Market Outlook on the Deepwater Subsea Sector. Marine Richard, Associate Analyst 6th February 2014

Contractual Allocation Of Risks / Insurance Requirement FPSO Projects Presentation Lillehammer Energy Claims Conference 2012

Odfjell Drilling Ltd.

1 (one) for 10 (ten) rights issue of 18,914,221 new ordinary shares at an issue price of EUR per ordinary share

First quarter 2015 results 1

The entry of Private Equity into Shipping a Lender s perspective. Energy, Commodities and Transportation October 2013

Lockheed Martin 3 rd Quarter 2013 Financial Results Conference Call

H1/2014 Results VTG AG Growing together. Dr. Heiko Fischer, CEO Dr. Kai Kleeberg, CFO August 21, 2014

Q1 RESULTS APRIL Harald Wilhelm I Chief Financial Officer

Oslo, 29 August Pareto Securities Oil and Offshore Conference Arne Austreid, President and CEO

WEBCAST CONFERENCE CALL Second Quarter 2015 Results

Earnings Release Q April 1 to June 30, Good Q3 Results Challenges in Energy Sector. Fiscal Year Outlook Confirmed. Financial Highlights*:

Speech of the Board of Management. General Shareholders Meeting, 9 June 2015

Second Quarter Results of Operations

FINANCIAL RESULTS FOR THE THREE MONTHS ENDED JUNE 2015

Disclaimer. NFF FPSO conference

BOARD OF DIRECTORS REPORT 2005

Service Tax Planning - Expected Revenue Growth in FY 2015

Press Release Q1 key figures Q1 14 Q1 13 Change

2.1 Supervisory Board Report Remuneration Report Information regarding the Supervisory Board Members

ICT Automatisering H1 Results Jos Blejie (CEO) & Jan Willem Wienbelt (CFO) 8/19/2015

Agenda. Forward-looking Statements Denis Jasmin, Vice-President, Investor Relations

Second quarter 2015 results 1

2015 Third Quarter Results

2015 FIRST QUARTER RESULTS. 13 May 2015

Press Release July

CorpBanca Announces First Quarter 2011 Financial Results and Conference Call on Tuesday, May 17, 2011

Fugro Q trading update

Lockheed Martin Corporation

Lockheed Martin Corporation

NOTICE INVITING EXPRESSION OF INTEREST FOR FORMING AN ALLIANCE WITH COMPANY OWNING, OPERATING & EXPERIENCED IN CONVERTING/ BUILDING FPSO

TRADING UPDATE YTD Q RESULTS ROYAL VOPAK 6 NOVEMBER 2015 ANALYST PRESENTATION

Transcription:

Press release - SBM Offshore N.V. 12 May SBM OFFSHORE Q1 TRADING UPDATE SOLID PERFORMANCE WITH IMPROVING MARKET Highlights Turnover for the first quarter of US$ 722 million, 6% above prior year; Total order backlog at 31 March at US$ 10.0 billion, same as 2009 year-end; One year extension for lease contract for FPSO Kuito; Pre-commitment from Petrobras for lease FPSO for pre-salt area; FPSO Capixaba arrived on the Cachalote field in Brazil and is ready for oil production. Tony Mace, CEO of SBM Offshore: In all three of our business segments we see an increase in realistic opportunities for sanction of projects. The pre-commitment for a lease FPSO for the pre-salt area from Petrobras is an important project for the Company and represents the largest value FPSO we will have ever contracted. We have also seen an improvement in performance in our more recent projects with execution within schedule and budget. Outlook Full Year Turnover in the same range as 2009 now around 90% secured from current backlog; EBIT margin from Turnkey Systems solidly within 5% - 10% range; Outlook for EBIT margin from Turnkey Services improving; Lease and Operate EBIT contribution below 2009. 1. Results For the first quarter of, consolidated turnover totalled US$ 722 million (6% above prior year of US$ 681 million). Segmental split was for Turnkey Systems US$ 464 million (64% of total), Turnkey Services US$ 65 million (9%) and Lease and Operate US$ 194 million (27%). Operating margins in all three segments in the first quarter are in line with or ahead of plan. Cumulative order intake for the first three months amounted to US$ 680 million including variation orders and other portfolio adjustments concerning lease contract turnover recognition. Backlog at 31 March totals US$ 10.0 billion of which approximately US$ 1.9 billion will be recognised as turnover in. Net debt at 31 March amounted to US$ 1,606 million (31 December 2009: US$ 1,464 million), with cash and cash equivalent balances of US$ 147 million and committed, undrawn bank facilities of US$ 493 million. The corporate Revolving Credit Facility is currently being expanded from US$ 500 million to US$ 750 million, with completion expected in June. Net gearing was 88%, which is slightly above expectations due to equity adjustments resulting from downward revaluation of foreign exchange and interest rate hedges. Capital expenditure in the first three months of amounted to US$ 178 million (US$ 158 million for the first three months of 2009). Page 1 of 5

2. Order Portfolio development The following new orders have been obtained since 1 January : A Letter of Pre-commitment (LOP) was received from PETROBRAS NETHERLANDS B.V. (PNBV), PETROLEO BRASILEIRO S.A. PETROBRAS as Operator of the Consortium BM-S-11, established by companies PETROBRAS (65%), BG E&P do Brasil LTDA (25%), and PETROGAL BRASIL LTDA (10%) for the charter and operation of an FPSO for the pre-salt area, offshore Brazil. The agreement covers the early phase of the project and allows SBM Offshore and QGOG to commence engineering and procurement work on the project; An extension of one year for the operating contract of the FPSO Serpentina from ExxonMobil in Equatorial Guinea; In Turnkey Services the order portfolio is developing better than expected with orders for CALM buoys, swivel stacks, offshore contracting and other services related orders; Variation orders on several contracts including the MOPUstor TM for Yme. Orders obtained since 31 March : An extension of one year for the lease and operations of the FPSO Kuito, offshore Angola, was signed with Chevron; A contract with Dubai based Lamprell Energy for the design supply of two windmill installation jackup vessels including the supply of the continuous jacking systems and large 800 ton offshore cranes that will be fitted on these vessels; An extension of one year for the lease and operations of the FPSO Xikomba with ExxonMobil, subject to a three months notice cancellation provision. 3. Operations The FPSO Capixaba has arrived ahead of schedule on the Cachalote field in Brazil and has been hooked up, accepted by Petrobras and is ready for oil production. The final component of the turret for BP Skarv has been completed and delivered to BP in accordance with the schedule. Petrobras P-57 FPSO vessel refurbishment and conversion has been completed at Keppel shipyard in Singapore and the vessel is currently at BrasFELS in Brazil for topsides integration and commissioning. The topsides modules fabrication in Brazil is completed and delivery of the FPSO is on schedule for offshore installation in Q4 of. The Woodside FPSO Okha construction works are progressing according to plan at Keppel shipyard in Singapore with completion planned in Q4 of. Progress on the FPSO Aseng is in accordance with the Company s plans. The construction contracts have been awarded and the vessel has arrived in Keppel yard in Singapore. The Talisman MOPUstor for Yme in Norway is completed and ready for load out in Abu Dhabi for transport to Norway. On arrival in Norway the legs will be fitted inshore and subsequently the unit will be installed offshore with first oil expected in Q4 of. The semi submersible drilling rigs construction is progressing with delivery of the three units scheduled in Q2, Q3 and Q4 of respectively. The first rig has been moved from the construction yard to deeper waters in the port of Abu Dhabi for installation of the propulsion system and final commissioning is in progress. The construction of the MOPU for EnCana is in the assembly stage in the dry dock in Abu Dhabi and completion of the unit is scheduled for the end of. One of the Company s tankers in inventory will be used for the Petrobras pre-salt development project in Brazil. The three remaining tankers, as well as the FPSO Falcon are currently laid-up and being proposed for new FPSO projects. Page 2 of 5

4. Market Developments The stable higher oil price combined with the lowest input cost base experienced in the past two years provides the right climate for sanction of oil and gas field production developments. Several of these developments relate to deepwater projects, which is the Company s main focus, providing realistic opportunities for the obtention of new orders. A softening market has led to lower input costs and shorter delivery terms for equipment supply and services being obtained in the Company s more recent projects in execution and on current bids. The Company is keeping close track of several input indicators including steel price to identify and react to the potential heating up of the market in view of the expected acceleration of new projects. Several projects appear to be firming up for FLNG developments which the Company is actively pursuing. 5. Outlook Operating margins in all three segments in the first quarter are in line with or ahead of plan. However, at this stage, the Company maintains its previously announced outlook except for an improvement in the forecast EBIT margin in the Turnkey Services segment, and an increase in capital expenditure. Turnover to be in the same range as 2009; Average EBIT margin in the Turnkey Systems segment is expected to be solidly within the 5% - 10% range; Turnkey Services average EBIT margin is expected to be within the 15% - 20% range; The EBIT contribution from the Lease and Operate segment is expected to be below the level achieved in 2009 due to the end of certain lease contracts in 2009 and lower expected operating bonuses; Capital expenditure, excluding any new operating lease contracts to be obtained in and including variation orders on ongoing projects, is expected to amount to around US$ 0.6 billion. Net interest charge will increase by up to 20% compared to 2009 due to start of operations on major lease contracts and low expected interest income on liquidities; Net gearing at year-end is expected to remain below 100%, with all financial ratios well within banking covenants. 6. Conference Call Management of SBM Offshore will be available to discuss the contents of this press release in a conference call at 10:00 hrs (CEST) on Wednesday 12 May. The dial-in number for participants will be +31 (0)10 29 44 224 and the replay number, available for 48 hours, is +31 (0)10 29 44 210, replay code: 18 09 07 #. There will also be a live Audio Webcast of the Conference Call on SBM Offshore s website: www.sbmoffshore.com The call will be hosted by Tony Mace, CEO and Mark Miles, CFO. Page 3 of 5

7. Financial Agenda Half-year Results - Press Release Half-year Results - Analysts Presentation (Amsterdam) Trading Update Q3 - Press Release 18 August 18 August 10 November 8. Corporate Profile The Dutch public company SBM Offshore N.V. is the holding company of a group of international, marine technology orientated companies. Its business is to serve on a global basis the offshore oil and gas industry by supplying engineered products, vessels and systems, and offshore oil and gas production services. The product line comprises: Offshore import/export terminals for crude oil, refined products, LPG and LNG, mostly based on the single point mooring principle, Floating Production and/or Storage and Offloading systems (FSOs and FPSOs) and other floating production facilities based on ship hulls, semi-submersibles and Tension Leg Platforms (TLPs); Offshore oil and gas production services through the leasing of integrated production and storage facilities owned and operated by the Company; Design, construction and supply of semi-submersible drilling platforms; Special designs and engineering services and delivery of specific hardware components for dynamically positioned drillships, semi-submersible drilling platforms, jack-up drilling platforms, jack-up platforms for civil construction, large capacity offshore cranes, elevating and lifting systems, crane vessels and other specialised work vessels; Offshore construction and installation contracting services. The Board of Management Schiedam, 12 May Page 4 of 5

For further information: SBM Offshore N.V. Karel Doormanweg 66 3115 JD Schiedam Post address: P.O. Box 31 3100 AA Schiedam The Netherlands Contact person: Mr. Sebastiaan de Ronde Bresser Telephone: (+377) 92 05 85 15 Mobile: (+33) 643 919 312 Fax: (+377) 92 05 89 40 E-mail: sebastiaan.derondebresser@sbmoffshore.com Website: www.sbmoffshore.com Disclaimer Some of the statements contained in this release that are not historical facts are statements of future expectations and other forward-looking statements based on management s current views and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance, or events to differ materially from those in such statements. Such forward-looking statements are subject to various risks and uncertainties, which may cause actual results and performance of the Company s business to differ materially and adversely from the forward-looking statements. Certain such forward-looking statements can be identified by the use of forward-looking terminology such as believes, may, will, should, would be, expects or anticipates or similar expressions, or the negative thereof, or other variations thereof, or comparable terminology, or by discussions of strategy, plans, or intentions. Should one or more of these risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described in this release as anticipated, believed, or expected. SBM Offshore NV does not intend, and does not assume any obligation, to update any industry information or forward-looking statements set forth in this release to reflect subsequent events or circumstances. Page 5 of 5