MATERIAL REQUIREMENTS PLANNING



Similar documents
12 MRP and ERP. Dr. Ron Lembke

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Operations Management

1 Material Requirements Planning (MRP)

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

2.4 Capacity Planning

MASTER PRODUCTION SCHEDULE

ERP(Enterprise Resource Planning) & MRP

Material Requirements Planning (MRP)

Material Requirement Planning (MRP) Mohd Yusnurahman Bin Mohd Yuznah

Material Requirements Planning. Lecturer: Stanley B. Gershwin

Material Requirements Planning (MRP)

Chapter 7. Production, Capacity and Material Planning

A New Approach for Finite Capacity Planning in MRP Environment

Alessandro Anzalone, Ph.D. Hillsborough Community College, Brandon Campus

IM 322 Inventory Management

MANAGEMENT ISSUES-MRP

Demand

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

ISE 421 QUANTATIVE PRODUCTION PLANNING

Planning Optimization in AX2012

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling

BILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING

SPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN

SAMPLE QUESTIONS EXAM EXEMPLAR QUESTIONS. AD6 - Operations management in supply chains. Level 5 Advanced Diploma in Procurement and Supply

Short-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste?

Basics of Supply Chain Management (BSCM) Curriculum

Inventory Management. Material Requirements Planning. Chris Caplice ESD.260/15.770/1.260 Logistics Systems Oct 2006

CHAPTER 3: PRODUCTION BILL OF MATERIALS

GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE

Material Requirements Planning MRP

CHAPTER 3: PRODUCTION BILL OF MATERIALS

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System

E217 Inventory Management (4 Modular Credits)

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

Teaching Manual-Operation Management. Gunadarma University. Week : 9 Subject : INVENTORY MANAGEMENT Content :

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

Functional Area Systems Production / Operation Systems

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT

Chapter 7 Production Planning

Production Planning Solution Techniques Part 1 MRP, MRP-II

Document Summary: HowTo Manufacturing Light v3.odt

1.3 ERP System Evolution

Item Master and Bill of Material

How to Configure and Use MRP

10 SECRETS EVERY SOFTWARE BUYER SHOULD KNOW

Development of Material Requirements Planning MRP Software with C Language

Expert s Guide to Successful MRP Projects. September 2012

CHAPTER 3: PRODUCTION BILL OF MATERIALS

Ud Understanding di inventory issues

Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite. Debbie Miksiewicz. Elaine Kithcart BSA 375. Mr.

EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY

Inventory Theory 935

Module 5 The R+ Available Stock Calculation

DEVELOPMENT OF LOW COST MRP SOFTWARE FOR A MANUFACTURING,

NETWORK BUSINESS SYSTEMS SOFTWARE SYSTEM DOCUMENTATION MANUFACTURING SYSTEM FEATURES

Chalmers Publication Library

Sage 200 Manufacturing Datasheet

Vaibhav Jha / International Journal of Engineering Research and Applications (IJERA)

Principles of Inventory Management (PIM)

Manufacturing Planning and Control for Supp Chain Management

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.

D Lab: Supply Chains

TU-E2020. Capacity Planning and Management, and Production Activity Control

Master Planning The Forgotten, But Vital, Manufacturing Supply Chain Planning Process

Simulations can be run at item and group level giving users flexibility. In brief

OR topics in MRP-II. Mads Jepsens. OR topics in MRP-II p.1/25

Functional Area Systems Lecture 5

Manufacturing Planning and Control for Supply Chain Management

Materials Management and Inventory Systems

for Sage 100 ERP Bill of Materials Overview Document

User Guide QAD Manufacturing

Manufacturing Efficiency Guide

Bill of Manufacturing Guide

INDUSTRIAL STATISTICS AND OPERATIONAL MANAGEMENT. 7. Inventory Management

CHAPTER 5: MEASURING GDP AND ECONOMIC GROWTH

Job Manager for Tool and Die Shops

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

Page 1

Master Scheduling Course

INDEPENDENT STUDY PAILIN UDOMSANTI

Master Scheduling and Rough-cut Capacity Planning

Society of Certified Management Accountants of Sri Lanka

Production Planning and Execution (PP)

Lecture No. 12: Delivery Improvement and Inventory System. Takahiro Fujimoto

Chapter 9 Managing Inventory in the Supply Chain

Manufacturing Flow Management

Issues in Information Systems Volume 14, Issue 2, pp , 2013

Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham

ORACLE MANUFACTURING MPS FOR PROCESS MANUFACTURING

Chapter 11. MRP and JIT

Best Practices in Inventory Management Systems. Best Practices in Inventory Management Systems

Chapter 12 Inventory Control and Management

Program Number. 1 System Parameters SYS800 Defines system-wide parameters. 2 Chart of Accounts GLD103 Defines chart of accounts

SAP BUSINESS ONE TOP 10 BENEFITS FOR YOUR BUSINESS

Transcription:

MATERIAL REQUIREMENTS PLANNING A basic tool for performing the detailed material planning function in the manufacture of component parts and their assembly into finished items. MRP s Managerial objective is to provide the right part at the right time to meet the schedules for completed products MRP is central to developing detailed plans for part needs of companies assembling end items from components produced in batch manufacturing process. Time-phased planning and the associated time-phased records is basic to understanding many other aspects of the manufacturing planning and control system Material requirement planning is characterised by the use of time-phased (periodby-period) requirement records As MRP requires time-phased records, master production schedule also should be represented in time-phased manner Two other inputs for the MRP are Bill of material (BOM) and Inventory status A BOM shows, for each part number, what other part numbers are as direct components The MRP output (time-phased requirement for a part number) can also be used as input to the detailed capacity planning Developing material and capacity plans is an iterative process where the planning is carried out level by level THE BASIC MRP RECORD At the heart of the MANUFACTURING PLANNING AND CONTROL system is a universal representation of the status and plans for any part number, which is the MRP time-phased record Period 1 2 3 4 5 Gross requirements 10 40 10 Scheduled receipts 50 Projected available balance 4 54 44 44 4 44 Planned order release 50 Lead time = 1 period Lot size = 50 units Period Fig. 3 A Basic MRP Record Periods can vary in length from a day to a quarter or even longer. The periods are also called a time bucket. Widely used time bucket is one week. The current time is the beginning of the first period 7

The number of period in the record is the planning horizon Gross Requirements It is the anticipated future usage of or demand for the item during each period Gross requirements are time phased which means they are stated on a unique period-by-period basis, rather than aggregated or averaged This method of presentation allows for special orders, seasonality, and period of no anticipated usage to be explicitly taken into account A gross requirement in a particular period will be unsatisfied unless the item is available during the period Availability is achieved by having the item in inventory or by receiving either a scheduled receipt or a planned replenishment order in time to satisfy the gross requirement The item must be available at the beginning of the time period in which it is required Scheduled Receipts It is the existing replenishment orders for the item due in at the beginning of each period Scheduled receipts result from previously made ordering decisions and represent a source of item to meet gross requirements It represents a commitment Projected Available Balance It is the current and projected inventory status for the item at the end of each period It is the projected balance after replenishment orders have been received and gross requirements have been satisfied The projected available balance shown at the end of a period is available to meet gross requirements in the next periods Planned Order Releases It is the planned replenishment orders for the item at the beginning of each period Whenever projected available balance shows a quantity insufficient to satisfy gross requirements, additional material must be planned for. This is done by creating a planned order release in time to keep the projected available balance from becoming negative MRP system creates a planned order by offsetting the lead-time to the beginning of a week The difference between the inventory available to a period and the gross requirement of the period is the net requirement Orders are placed to meet this net requirement 8

A planned order in the most immediate period or current period is in the action bucket A quantity in the action bucket means some action is needed to avoid a future problem. The action is to release the order, which converts it to a scheduled receipt Managing All the Single Part Records A single record provides the correct information on each part in the system All the single records associated with the parts needed for a complex product is linked together for proper managing Key elements for linking the records are the bill of material, the explosion process and lead time offsetting Bill of Material (BOM) BOM shows exactly what goes into what instead of being just a part list Two ways the bill of material is represented Product structure diagram Indented bill of material (See the figure 4 - Snow shovel with component Parts and Assemblies, figure 5 - product structure diagram and figure 6 - Indented bill of material) Explosion Process Explosion is the process of translating product requirements into component part requirements, taking existing inventories and scheduled receipts into account until every part number (purchased parts, raw material, manufactured components, subassembly and assembly) requirements are exactly calculated As explosion take place, only the component part requirement net of any inventory or scheduled receipts are considered In this way, only the necessary requirements are linked through the system Gross to net explosion not only provides the basis for calculating the appropriate quantities but also serves as the communication link between part numbers This is the basis for dependent demand estimation and it remove uncertainty from the requirement calculation The independent demand items, such as the end item, are subjected to demand from outside the firm The need for end items will have to be forecasted The concept of dependent demand is often called the fundamental principle of MRP 9

Fig. 4 - Snow Shovel Shown with Component Parts and Assemblies 10

1605 End product - Shovel 048 Scoop-shaft connector 13122 Top handle assembly 118 Shaft 062 Nail (4 required) 314 Scoop assembly 14127 Rivet (4 required) 457 Top handle 082 Nail (2 required) 11495 Bracket assembly 2142 Scoop 019 Blade 14127 Rivet (6 required) 129 Top handle bracket 1118 Top handle coupling Fig. 5 - Product Structure Diagram for Shovel 1605 End product Shovel 13122 Top Handle Assembly (1 required) 457 Top handle (1 required) 082 Nail (2 required) 11495 Bracket Assembly (1 required) 129 Top Handle Bracket (1 required) 1118 Top Handle Coupling (1 required) 048 Scoop Shaft Connector (1 required) 118 Shaft (1 required) 062 Nail (4 required) 14127 Rivet (4 required) 314 Scoop Assembly (1 required) 2142 Scoop (1 required) 019 Blade (1 required) 14127 Rivet (1 required) Fig. 6 Indented Bill of Material 11

Lead Time Offsetting Lead time offsetting is related with when each component and subassembly is needed The BOM contains precedent relationships. They indicate the order in which things must be done When to schedule each component part depends on how long to produce the part (i.e., lead-time). Usually this information is also incorporated in the BOM Linking the MRP Records The Gross requirements for end items or options come from MPS Gross requirement of a part shows the quantity and timing - when it is required for the parent to make Planned order release of the parent becomes the gross requirements for the components Planned order release quantity is the net of gross requirement, scheduled receipt and projected available balance As MRP record of a part is available, the planned order release of the part is passed down as gross requirement to its components, following the BOM on a level-by-level basis When a part receives its requirement from more than one source, the gross requirement will reflect needs from more than one planned order release source MRP records take account of gross to netting, back scheduling, allows for explicit timings, desired lot sizing procedure, safety stocks and part commonality With the MRP approach, the person planning a part need not explicitly coordinate his planning with planning of component parts. The MRP system accomplishes the coordination Example on Linking MRP Records The master production schedule of snow shovel shows the requirements as follows: Week Requirements 20 10 20 5 35 10 The lead time to make this item is 2 week when the level 1 component parts are available. The lot sizing procedure for snow shovel is lot-for-lot. One of the component part required to make snow shovel is top handle assembly. The above requirements of snow shovel create a gross requirement for top handle assembly as shown in the MRP record of this item in figure 7. This record shows that there is no order which is outstanding. So there is no scheduled receipt. There are 25 units available on hand. This is the 12

projected available balance which is available as beginning inventory for period 1. The planned order release is calculated as follows: First the net requirement is determined. Net requirement of current period = Gross requirement of current period Scheduled receipt in the current period Project available balance of previous period If this net requirement is a negative quantity, an order has to be planned. The order quantity is adjusted according into the lot sizing method. If the lot sizing method is lotfor-lot, the order quantity is the net requirement. For other method of lot sizing: if the lotsize quantity is greater than the net requirement, the order quantity is the lot size quantity. If the net requirement is greater than the lot size quantity, order the net requirement. Now, the order quantity shows the quantity required in the period of gross requirement for which an order has to be placed. The quantity corresponds to the planned order release is the order quantity but, the period in which the order release will occur depends on the lead time of the item. The period of planned order release is obtained when the gross requirement period is advanced by lead time. For instance, there is a net requirement of 5 units in period 4 for this item and the lead time is 2 weeks. The planned order release will be in the period 2 as you have to advance by 2 periods from the gross requirement period. Top handle, nail and bracket assembly are required to make the top handle assembly. When planned order release is executed, it is assumed that these items are available. Hence, similar to the planning of the top handle assembly, a planning has to be carried out for these items also. That is, planned order release of top handle assembly creates gross requirement for these items. For example, the planned order release of top handle assembly for 5 units in period two generates a gross requirement in period two for top handle. Similarly for other items nail and bracket assembly the gross requirement can be identified. If current status about the items - top handle, nail and bracket assembly are available, the MRP record of these items can be prepared and these records are available in figure 3. Like this the MRP record of children of bracket assembly can be prepared. 13

13122 Top handle assembly Period Gross requirements 20 10 20 5 35 10 Scheduled receipts Projected available balance 25 25 5 5 0 0 0 0 0 0 0 0 0 Planned order release 5 20 5 35 10 Lead time = 2 periods Lot size: Lot-for-lot 457 Top handle Period Gross requirements 5 20 5 35 10 Scheduled receipts 25 Projected available balance 22 22 17 42 22 17 17 0 0 0 0 0 0 Planned order release 18 10 Lead time = 2 periods Lot size: Lot-for-lot 082 Nail (2 required) Period Gross requirements 10 40 10 70 20 Scheduled receipts 50 Projected available balance 4 54 44 44 4 44 44 24 4 4 4 4 4 Planned order release 50 50 Lead time = 1 period Lot size: 50 11495 Bracket assembly Period Gross requirements 5 20 5 35 10 Scheduled receipts Projected available balance 27 27 22 22 2 0 0 0 0 0 0 0 0 Planned order release 3 35 10 Lead time = 2 periods Lot size: Lot-for-lot 129 Top handle bracket Period Gross requirements 3 35 10 Scheduled receipts Projected available balance 15 15 15 12 12 0 0 0 0 0 0 0 0 Planned order release 23 10 Lead time = 1 period Lot size: Lot-for-lot 14

129 Top handle coupling Period Gross requirements 3 35 10 Scheduled receipts 15 Projected available balance 39 39 54 51 51 16 6 6 6 6 6 6 6 Planned order release Lead time = 3 periods Lot size: Lot-for-lot Fig. 7 MRP Records for the Shovel Top Handle Assembly 15

Assembly Chart Assembly chart Caster wheel Components of caster wheel Fig. Assembly for a caster 16