IRIS International Railway Industry Standard



Similar documents
Camar Aircraft Products Co. QUALITY MANUAL Revision D

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

In some cases the exclusion may not be justified depending on who is the customer, and what is the product.

Network Certification Body

SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS

ONTIC UK SUPPLIER QUALITY SURVEY

Vigilant Security Services UK Ltd Quality Manual

Quality Manual ISO9001:2008

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

23. The quality management system

CORPORATE QUALITY MANUAL

ISO 9001:2008 Quality Systems Manual

Quality Management System Manual

ISO 9001 : 2000 Quality Management Systems Requirements

Cartel Electronics. AS 9100 Quality Systems Manual

MTAT Software Engineering Management

Engineering Inspection Plans For Entity in Charge of Maintenance Certificates. May 2012

ISO 9001:2008 Audit Checklist

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April Authorised by: Managing Director.

Implementation of a Quality Management System for Aeronautical Information Services -1-

QUALITY MANAGEMENT SYSTEM FOR THE AEROSPACE INDUSTRY

QUALITY MANAGEMENT SYSTEM REQUIREMENTS


ISO/TS 16949:2002 Guidance Document

Uncontrolled Document

G & R Labs. Quality Assurance Manual. G&R Labs Scott Boulevard Santa Clara CA Light Meters and Calibration

New Guidelines on Good Distribution Practice of Medicinal Products for Human Use (2013/C 68/01)

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

Turbo Resources International Quality Procedure

Quality Manual. ISO/TS 16949:2009 Quality Management System. Sensing and Control

ISO 9001:2015 vs. ISO 9001:2008

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

Quality Management System

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Certificate of Acceptance

Quality Management System Manual

GE Oil & Gas. Quality at. GE Oil & Gas. GE imagination at work QUALITY

Wharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA

Comparison ISO/TS (1999) to VDA 6.1 (1998)

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

NABL NATIONAL ACCREDITATION

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

AS9100 B to C Revision

Index of issues discussed

PHARMACEUTICAL QUALITY SYSTEM Q10

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

Quality Agreement Template

QUALITY MANAGEMENT SYSTEM Corporate

ISO 9001:2015 Overview of the Revised International Standard

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Quality Management System Policy Manual

Sector Development Ageing, Disability and Home Care Department of Family and Community Services (02)

Eagle Machining, Inc. Quality Management System

Certificate of Acceptance

QUALITY OPERATING PROCEDURE QOP QUALITY ASSURANCE SYSTEM MANUAL

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

Quality Management System and Procedures

Derbyshire Trading Standards Service Quality Manual

Supplier Quality Requirements

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

ISO/IEC QUALITY MANUAL

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

Quality at GE Energy

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL

Quality Management Subcontractor QM Guide-Section Two

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

Preparation of a Rail Safety Management System Guideline

CENTRIS CONSULTING. Quality Control Manual

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum

Certification Process Requirements

LinkTech LLC 3000 Bunsen Ave. #A Ventura, CA 93003

The Encana Service Provider Safety Manual

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

ISO 9001:2000 AUDIT CHECKLIST

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

COMMISSION REGULATION (EU)

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

ISO 9001 Quality Management Systems Professional

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

QUALITY MANAGEMENT SYSTEM

Table of Contents 1. SCOPE APPLICABLE DOCUMENTS TERMS AND DEFINITIONS QUALITY MANAGEMENT SYSTEM...4-8

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC , Explosive Atmospheres - Edition 1.

Engineering Procurement Construction Quality Plan

ICH guideline Q10 on pharmaceutical quality system

Tender Dossier. Vehicles, Tracking and Equipment

TfNSW Standard Requirements TSR T Technical Management

ISO 9001:2008 Quality Management System Requirements (Third Revision)

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0

ISO 9000 Quality Standard Background Information Quality Systems Implementation

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Table of Contents INTEGRATED MANAGEMENT SYSTEM MANUAL

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

NOTICE. Re: GD210: ISO 13485:2003 Quality Management System Audits Performed by Health Canada Recognized Registrars

Transcription:

English Addendum, 19th June 2008 IRIS International Railway Industry Standard Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen Hier kann ein kleiner Text stehen

Chapter 1 3 IRIS Certification Process IRIS Addendum as per 19th June 2008 to the IRIS booklet, revision 01, November 2007 The aim of this addendum is to inform you about: o the extension of IRIS to maintenance activities, o improvements / clarifications in the IRIS booklet, revision 01, November 2007. This addendum is provided in each IRIS booklet sold from June, 23rd 2008 or can be accessed via the IRIS Portal (http://www.iris-rail.org/). Modifications are marked bold italic. CHAPTER 1: IRIS CERTIFICATION PROCESS 4.4 Award of certificates; page 15 An ISO certificate is awarded independently of the IRIS certificate according the ISO 9001 rules and can be awarded even if the conditions for awarding of an IRIS certificate are not fulfilled. After certification of all sites of a multi-site corporation, the IRIS Management Centre can issue a letter of compliance on request. The IRIS portal contains an on-line database that provides all important and necessary information about the audit results. Railway companies can register as member in the IRIS portal by paying a fee. On level 1 of the database only non-detailed data on passed audit and certification are available to all members, 5 Withdrawal of IRIS certificates; page 17 Withdrawal of IRIS certificate does not necessarily affect other certificates such as ISO 9001. Finally, the IRIS Management Centre will inform the initiator of the complaint about the results after maximum 10 days of resolution. The above described process is applicable to justified customer claims concerning the business management system; Not concerning non-conforming products. Claims regarding non-conforming products shall be initially discussed with the partner concerned.

4 Chapter 1 Headline IRIS Addendum, 19th June 2008 CHAPTER 3: IRIS REQUIREMENTS 1.1 General; page 28 This standard, in conjunction with ISO 9001:2000, defines the business management system requirements for the design and development, manufacturing, maintenance and when applicable, installation, customer service of rolling stock and signalling-related products. 1.2 Application; page 28 All requirements of this International Standard are generic and are intended to be applicable to all organizations, regardless of type, size and product, provided that they have activities in design and / or manufacturing and / or maintenance (fleet maintenance, refurbishment and component overhaul / repairs). 4.2.3 Control of documents; page 30 The organization shall demonstrate effective management and control of all documents pertinent to the products it supplies. Names of personnel who authorize and carry out reviews of the necessary documentation shall be identified. Effective systems shall be in place to review impact of external documentation on product supply e.g TSI s, Notified National Technical Rules (NNTR s), ISO, EN etc. The organization shall have a process to ensure 4.2.4 Control of records; page 30 Records shall be available for review by / release to customers and regulatory authorities in accordance with contract or regulatory requirements. 6.2.2.3 Training; page 35 The organization shall establish and maintain documented procedures for identifying and planning training needs in order to achieve the necessary competence of personnel performing activities affecting product quality and safety at all levels of the organization, consistent with the local regulatory requirements, e.g in the UK the Office of Rail Regulation (ORR) Railway safety publication 1, Developing and Maintaining Staff Competence. Output of Personnel performing specific assigned tasks (e.g. special processes, engineering change activities) shall be competent and qualified, as required, with particular attention to the satisfaction of customer, local and regulatory requirements. A system shall be in place to maintain and upgrade the qualifications of such personnel. 7.2.2. Review of requirements related to the product; page 37 Multidisciplinary approach (including suppliers when appropriate) shall be used. Project management and design / development shall be appropriately represented in all requirements reviews. The organization shall have a process to ensure that requirements identified are: a) individually compliant (e.g. clause by clause), b) negotiated and updated with impact on the offer identified, c) evaluated and taken into account,

5 d) properly transferred, understood, acknowledged and committed to by everybody involved, and e) complete, clear, precise, unequivocal, verifiable, testable, maintainable and feasible. This process shall also control contract variation including liaison with customers. NOTE 1 The requirements 7.3.2. Design and development inputs; page 39 This new technology / new product shall apply the design and development requirements described in this clause. The organization shall demonstrate appropriate awareness of the criticality of the product and the function and risks of a product within the system / vehicle of which it forms a part. RAMS / LCC shall be considered as design inputs. 7.4.1 Purchasing process; page 41 The organization shall: a) maintain a register of approved suppliers which includes the scope of their approval, b) ensure where required that both the organization and all suppliers use customer approved special processes, c) ensure that the function having responsibility for approving supplier quality systems has the authority to reject the use of sources, and d) assess and manage the risks for supply of critical products throughout the supply chain. The organization 7.4.2 Purchasing information; page 42 In addition to the ISO 9001:2000 requirements purchasing information shall include d) the name or other identification, and applicable issues of specifications, drawings, process requirements (including special ones), inspection instructions, appropriate details from the organization s quality plan and other relevant technical data, e) requirements for design, 7.5.1 Control of production and service provision; page 43 In addition to the ISO 9001:2000 requirements, controlled conditions shall include for all shifts: g) accountability for all products during manufacturing (e.g., parts quantities, split orders, nonconforming product), h) evidence that all manufacturing and inspection operations have been completed as planned, or as otherwise documented and authorized. The organization shall demonstrate appropriate awareness of the criticality of the product and ensure it has appropriate production control procedures to implement risk mitigation. 7.7.7 Communication management; page 47 The organization shall ensure that the project team determines and communicates needs of the stakeholders (e.g. communication plan). This information, including performance information, product specific requirements, defect reporting and railway industry risks, shall be made available to project stakeholders in a timely manner. NOTE 1 This is in addition.

6 IRIS Chapter Addendum, 3 IRIS 19th June Requirements 2008 7.7.9 Change management; page 48 The organization shall have a process to control and react to changes that impact product realization. For maintenance activities, the organization shall have a procedure to control and react to changes that impact product realization including the definition of which Engineering Changes need to be referred back to the Customer for authorisation in line with local and customer requirements. The organization shall have a process to control deferred and abnormal work. 8.2.4 Monitoring and measurement of product; page 50 The Organization shall be able to demonstrate that the product complies with customer requirements. Measurement requirements for product The effects of any change, including those changes caused by any supplier, shall be assessed and verified. Validation and approval activities shall be defined, to ensure compliance with customer requirements before implementation. Where the organization does not undertake design and development activities in the relevant scope it shall have controls in place which prevent engineering changes from being implemented without prior authorization from all appropriate stakeholders. For proprietary designs, impact on form, fit and 8.2.1 Customer satisfaction; page 50 In addition to the ISO 9001:2000 requirements, the organization shall monitor external incident reports associated with their products and have a process in place to manage the information and take action where necessary.

7 ANNEX 3 Processes/activities to be documented in procedures Procedure Clause Processes/activities to be documented in procedures 15 7.7.9 Change management ANNEX 4 Processes required by IRIS Process Clause Processes required by IRIS 20 7.2.2 Review of requirements related to the product 21 8.2.1 Customer satisfaction ANNEX 6 Terms and definitions for the railway industry Term Abnormal work Critical Product Criticality Engineering Change First Article Inspection Definition Abnormal work with respect to maintenance of rolling stock, is work or supply of parts which is not included within the scope of work and could not have been reasonably anticipated by the supplier, but is required to be completed in order to attain acceptance. Product which has been identified as having the potential to introduce risks that can directly or indirectly threaten health and safety and/or a business performance. The rating of how much risk is attached to the failure of a Critical Product. Implementation of new or revised standards, processes and procedures, suppliers and supply arrangements, or new or revised designs, that have the potential to impact on health and safety or the customer s business performance. Inspection, verification, and documentation of a representative item from the first serial production run of a new part or major upgrade to an existing part. If the product is a one-off or a software, FAI is meant as validation. Field support activities Includes: commissioning and warranty, servicing, customer training, spare parts supply, maintenance, overhauling, etc. Activities of the organization in support of the introduction of the products into operations, including the support for their reliable performance including feedback of field experience, during the warranty period and thereafter through product maintenance.

8 Chapter 1 Headline IRIS Addendum, 19th June 2008 Term Manufacturing process / Production process Safety Definition Manufacturing: Activities to realize products including overhaul and repair. Part of an organization s value chain. Production: Activities to plan, design, buy, realize and deliver products, all parts of the organization s value chain. For signalling, the term safety in this railway standard is to be understood in the spirit of the Safety Integrity Level according to EN 50129:2003. IRIS QUESTIONNAIRE The mandatory/valid IRIS questionnaire is programmed in the IRIS Audit-Tool, to be used during the certification process.