Project Portfolio Optimisation: Do you gamble or take informed risks?



Similar documents
Project Risk Management

Effective reporting for construction projects: increasing the likelihood of project success

Monitoring capital projects and addressing signs of trouble

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

Project organisation and establishing a programme management office

Strategies to successfully manage your major project

KPMG New Zealand Project Management Survey 2010

Suncorp Accelerates Project Delivery and Reduces Costs with CA Project & Portfolio Management

KPMG s Financial Management Practice. kpmg.com

Asset Management Policy March 2014

Strategies to Help Vendors Optimize Their Long-term Global Contracts

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

NSW Government ICT Benefits Realisation and Project Management Guidance

Reducing Cost and Risk Through Software Asset Management

Risk management and the transition of projects to business as usual

White Paper. PPP Governance

KPMG Advisory. Microsoft Dynamics CRM. Advisory, Design & Delivery Services. A KPMG Service for G-Cloud V. April 2014

Stakeholder Relationship Management

Providing standards, methodologies and a set of PM tools. Promoting project management within the organisation

University of Wisconsin Platteville IT Governance Model Final Report Executive Summary

Ensuring Optimal Governance and Relationship Management Between Parties

Assessing the Appropriate Level of Project, Program, and PMO Structure

Adoption of a PPM Solution Using An Agile Approach. Andy Robinson

G-Cloud IV Services Service Definition Accenture Force.com Cloud Services

Document management concerns the whole board. Implementing document management - recommended practices and lessons learned

Microsoft Enterprise Project Management. James Wright Christopher Pond

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL:

Innovation Portfolio Management Process

Infrastructure Asset Management Report

The Asset Management Landscape

Frank P.Saladis PMP, PMI Fellow

PROJECT MANAGEMENT SURVEY

TEC Capital Asset Management Standard January 2011

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

INEUM Kurt Salmon INE_06_0409_Logo_CMYK 14/12/2010. Ce fichier est un document d exécution créé sur Illustrator version CS3. K100

The Short-Term Insurance Industry: Organising by Common Capability

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

Information Technology Services Project Management Office Operations Guide

The Software Experts. Software Asset Management Services & Solutions

Taking Your PMO to the Next Level:

IT service management: resetting priorities for an uncertain economy.

Project, Programme and Portfolio Management Delivery Plan 6

TAX MANAGEMENT CONSULTING. How can you be more efficient at managing tax?

White Paper: AlfaPeople ITSM This whitepaper discusses how ITIL 3.0 can benefit your business.

To have or not to have a PMO - is that the right question? Transforming knowledge into action. To have or not to have a PMO 1

Creating a project management office (PMO)

Solve Your IT Project Funding Challenges

ENTERPRISE RISK MANAGEMENT POLICY

Outcome performance measures

Making the business case for C4RISK databasebased Operational Risk Management software

Genesis Energy delivers IT projects faster with standardised processes and CA Clarity PPM.

A P3M3 Maturity Assessment for Attorney Generals Department Prepared by James Bawtree & Rod Sowden Dated 18 th November 2010

White Paper. Making the case for PPM

Establishment of the Entrepreneurs Infrastructure Programme

MGMT 4135 Project Management. Chapter-16. Project Oversight

It s tough to make the right IT decisions...

Insights and Trends: Current Portfolio, Programme and Project Management Practices

FINANCIAL MANAGEMENT MATURITY MODEL

Quick Guide: Meeting ISO Requirements for Asset Management

Sustainability reporting What you should know kpmg.com

Information Technology Governance Overview and Charter

Selecting a project management methodology

A Project Manager s Guide to Tracking Time and Resources

HR Function Optimization

Cyber threat intelligence and the lessons from law enforcement. kpmg.com.au

place-based asset management

Project Management and the Organisational Strategy

The Concept of Project Success What 150 Australian project managers think D Baccarini 1, A Collins 2

Project and Programme Management survey 2015

Operations. Group Standard. Business Operations process forms the core of all our business activities

IT Professional Standards. Information Security Discipline. Sub-discipline 605 Information Security Testing and Information Assurance Methodologies

Benefits of conducting a Project Management Maturity Assessment with PM Academy:

WHITE PAPER. Portland. Inventory Management. An Approach to Right-sizing your Inventory. By Andrew Dobosz & Andrew Dougal January 2012

What you need to know about PMOs

Enterprise Project Management (EPM) from Microsoft

White Paper from Global Process Innovation. Fourteen Metrics for a BPM Program

PERFORMANCE-BASED BUDGETING METHODOLOGY AND TOOLS

PORTFOLIO & PROJECT MANAGEMENT

Identity & Access Management new complex so don t start?

Published by the National Regulatory System for Community Housing Directorate. Document Identification: /NRSD. Publication date: January 2014

The PMO as a Project Management Integrator, Innovator and Interventionist

Project Risk Management

Central Bank of Ireland Guidelines on Preparing for Solvency II Pre-application for Internal Models

Driving Excellence in Implementation and Beyond The Underlying Quality Principles

Consulting. PMOver Transforming the Program Management Office into a Results Management Office

The National Commission of Audit

Setting smar ter sales per formance management goals

Project Management Survey Report 2013

TRAINING CATALOGUE ON IMPACT INSURANCE. Building practitioner skills in providing valuable and viable insurance products

Enterprise Performance Management in the Pharmaceutical Industry. kpmg.co.uk

diversified industrials Supply and Demand Risk Management in Turbulent Times

Enterprise Asset. Public Sector

It s all about the results Moving from process to outcome management for strategic project execution with the Results Management Office

Project Management Manual

A NEW APPROACH TO CYBER SECURITY

Asset Management Excellence Utilising the AMCL Asset Management Excellence Model (AMEM) to achieve world class Asset Management.

Capital Adequacy: Advanced Measurement Approaches to Operational Risk

Energy saving technology to deliver the fastest returns. Top 10 energy saving options

CAPITAL PLANNING GUIDELINES

UK ICT Outsourcing Service Provider Performance and Satisfaction (SPPS) Study: 2013

Transcription:

PROJECT ADVISORY Project Portfolio Optimisation: Do you gamble or take informed risks? Leadership Series 8 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes, but its content is applicable to all entities or stakeholders involved with major projects. The intent of the Project Leadership Series is to describe a framework for managing and controlling large capital projects based on the experience of our project professionals. Together with our simplified framework, we offer a sound approach to answer the questions most frequently asked by project owners. Introduction You have probably heard the phrase cannot fail, too big to fail, and bet the company used to describe major capital projects such as gas pipelines, bridges and roading. For these types of projects, wouldn t it be nice to know that your decision to select or proceed with a project is the best decision for the company or organisation? Wouldn t it also be nice to know how to optimise the project screening and selection process throughout the project delivery lifecycle? This paper addresses these questions by highlighting some of the challenges and pitfalls of inefficient capital allocation and portfolio optimisation. It also provides examples, approaches and practices for identifying, screening, selecting and budgeting projects throughout the project lifecycle.

. How much does inefficient capital allocation cost an organisation? Given the proposition that major capital projects are lengthy endeavours often taking more than four or five years to complete, how do you evaluate the project decision-making process? How many years can an organisation, whether a public entity or private company, misallocate capital before it is forced into bankruptcy or the organisations leaders are voted out or fired? These are difficult questions but it is clear that capital allocation across a project portfolio is something all governments and companies wrestle with on a continual basis. For many industries, the relative success or failure of this allocation process determines which companies thrive and which may not even survive. Every capital allocation process should have core components that drive the overall process. For owners, the first component is a capital budgeting and planning policy that links the organisations business strategy to its project portfolio needs. The policy must describe in detail how projects are funded and address both in-cycle and outof-cycle capital allocation and approval. The second component of an owner s capital allocation process are capital budgeting and planning procedures that describe in detail how the policy is to be implemented. Those procedures should include appropriate project management processes and controls and establish performance timelines. The third and last core component is a cross functional capital review committee that is tasked with overseeing the overall capital allocation process. This review committee should be instituted above and beyond any required executive management or board of director s involvement. Included on the following page is an example of a high level project portfolio optimisation framework. This is by no means the only framework that will work; the key is having a framework that is supported by policy and by established guidelines, so business development teams pursue projects that fit the organisations strategies and overall growth and profitability targets. Asset management For asset intensive organisations, one of the pillars of the portfolio project optimisation framework is asset management. Asset management, if executed well, involves much more than merely the tracking of assets. It requires an integrated approach to optimising a portfolio of assets throughout the asset lifecycle from planning, specification, and development through utilisation monitoring, maintenance and disposal. As with any integrated lifecycle process, the benefits are the greatest when individual processes and resources are functionally aligned. The key benefits of strong asset management processes are improved transparency, risk management, and intelligent data utilisation for making informed decisions. Due to the increasing cost of capital and focus on capital governance, asset management is an area that has also gone through tremendous development over the past decade. In 004, the UK Institute of Asset Management, in conjunction with British Standards Institution, developed PAS 55, the first publically available specification for optimised management of physical assets. The International Standards Organisation (ISO) has now accepted PAS 55 as the basis for development of the new and soon to be released ISO 55000 series of international standards.

. How do you efficiently identify all of the most critical and beneficial potential projects? Identifying which projects to consider from the endless pool of possible projects can be tricky, as it requires balancing a number of competing interests. If you cast the net too wide and do not employ some basic guidelines, you will likely suffer from information overload and unnecessary organisational conflict. However if the process is too narrow and does not provide a mechanism for innovative thinking, many valuable projects can be missed. In order to maintain the balance, here are some examples to consider: (See table ) For most organisations, authorisation requests will be for capital projects in the conceptual stage, which means the information available for any given project may be limited. During this stage, it is important to gather a consistent set of facts and information for each potential project to avoid a lot of follow up work. The information does not have to be extremely detailed, but it needs to cover all the basic areas such as the requestor, project names, project number or ID, department / business unit, brief description, justification / purpose, project type, ROM estimate, and target completion date. It is important at this stage to ensure that all projects are unique and that any interrelationships between projects are identified. For example, if one project is predicated on another, or if one project cannot proceed until another project is completed, these relationships need to be specified so that they can be taken into account during analysis and project screening.. How do you screen projects and avoid utilising costly resources analysing projects that are not viable? After all of the projects are identified, the hard work of screening the large pool of potential projects begins. Qualitative and quantitative risk analysis are two approaches for identifying the best candidates. Risk analysis is often attractive when screening complex projects that need to be assessed from multiple dimensions such as operational, schedule, financial, safety,environmental, legal, and market/ commodity risks. Risk analysis only provides one view of the viability of a project. Consequently, additional financial analysis is needed to address NPV, IRR and payback schedule. An example financial analysis summary table is included below. (See table ) Some projects in the portfolio may be unique and more difficult to assess accurately with a risk or financial analysis. For those projects, the screening process should always include qualitative factors such as public relations, availability and competency of project and support resources etc, as opposed to blindly churning out figure from a quantitative risk or financial analysis. To compare projects easily, the results of the analysis phase should be consolidated into a single document. Table Example area Asset management Identification process Asset inventory & condition assessment New safety & regulatory requirements Safety & regulatory violations or Issues Growth Customer demand growth Stakeholder needs Customer satisfaction & service levels Company planning and HC forecasting Sustainability Sustainability targets for existing & new facilities Government Table Projects Project A Project B Project C Project D Project E Project F Project G Project H Project I Project J Project K Financial analysis Financial.60.00.00.00.70.0.70.90.80.80 0.70 Grants Tax incentives Other Government programmes / opportunities IRR 75% 75% 45% 5% 75% 85% 65% 47% 4% 8% 4% Payback (years).00.45.75.90 6.60 5.5.0.0 5.70 7.70 0.0 NPV ($M) $450 $,099 $68 $684 $965 $75 $,599 $7 $965 $88 $4 IRR (0%) Payback (0%) 0 NPV (0%)

Included on the right is an example summary table of the consolidated results of aproject prioritisation exercise. (See table ) Table Projects Tier Financial Score Aggregate Risk Ranking Other Factors The effectiveness of your analysis will depend heavily on the accuracy of the data compiled for the analysis. That is why organisations with extensive databases regarding historical project costs and current trends will have more accurate financial and risk analysis models to compare capital projects. Project A Project B Project C Project D Project E Project F.60.00.00.00.70.0 Low Weather is extremely limited Local government officials are due for re-election Requires several potential challenging land purchases Area is prone to flooding increasing operating costs New & unproven technology Lack of experience in geographic region Project G.70 High Land purchases may become very costly Project H.90 Local opposition to the project Project I.80 High Site permit may take several years Project J.80 High potential for competition in the region Project K 0.70 Low Limited local market Risk Legend Low = Aggregate Risk <$50m = Aggregate Risk <$500m High = Aggregate Risk >$500m 4. What are some of the key factors to consider in prioritising project according to your business needs? Developing an objective project scoring process is one of the most critical steps in the capital allocation process. It would be nice to have a standard scoring template that works in all organisations for every capital project; unfortunately no such template exists. Each organisation must develop a tailored scoring process to address its specific organisational strategy, operational model and business drivers. To avoid bias in project selection, the process of prioritising capital projects should be both multidepartment as well as multi discipline. Many organisations like to group projects into tiers included in the analysis section above. Grouping projects into tiers also makes it easier to develop project hurdle rates and thresholds that can be used to analyse out-of-cycle projects. Out-of cycle-projects are often difficult to analyse in isolation. However if there are established hurdle rates and targets based on current project priorities it is much easier to make quick and informed decision regarding specific out-of-cycle project requests. Once the capital project portfolio has been grouped into tiers, the top tiered projects should be analysed and reviewed further detail by gathering additional project information. This is where there is the greatest degree of variation among organisations. Organisations that routinely deal with very large, high-risk/high-reward projects will often proceed to the feasibility stage or beyond with many projects at one time. Other organisations will make the go/ no go decision much earlier in the project lifecycle. This means that during the annual project screening phase, some companies will continually shuffle the pipeline of eligible projects as opposed to employing a more linear process. As shown in the graphic below, an organisation may have several tiers of eligible projects in varying stages of the project lifecycle. Low tiered projects either graduate to a higher tier or remain low and are cancelled.

5. How do you align final project selection with capital budgeting and forecasting? Whether your organisation utilises an ongoing approach to project selection or more of an annualised approach, the final and most important stage is the capital project selection process. Having a capital review committee at this stage provides tremendous benefit. Assuming the projects presented to the capital review committee have followed the required policy and guidelines and are appropriately aligned with the business strategy, the selection process should be straightforward and methodical. Typically, all top-tier projects are reviewed by the capital review committee and issues are raised and discuss in face-to-face meetings between the committee members and project proponents. Projects either receive full approval or are flagged for further discussion at a later date. The organisations financial situation may change during the project analysis, prioritisation and selection process. Therefore, it is important for the capital review committee to work closely with the organisations financial team to help ensure the final selection of projects is based on the latest financial information for the organisation. Some projects may be approved tentatively pending the next quarter s financial results. Even after a project is selected, the process of evaluating performance against the original business case should be assessed and lessons learned as well as financial data should be documented and incorporated into the overall process. 6. How do you build in capacity to address emergency projects as well as opportunistic projects? The realisation of a business need or the identification of an opportunity may be initiated outside the normal project investment cycle. This can occur in response to an emergency, immediate market demand, or regulatory requirement. For these projects, a rigorous analysis and economic considerations must be performed along with an appropriate alternative analysis to accomplish the desired objectives. Out-of-cycle projects can be expedited, but the same level of capital allocation control and transparency must be performed as is the case with in-cycle projects. Today, with capital construction levels at their highest in years and with intense pressure and competition for market share, companies and organisations have great incentives to enhance their project portfolio processes and controls. Aimed at optimising capital across a wide range of projects, an effective approach is strategic, comprehensive and properly designed to meet your organisations needs.

About KPMG KPMG s services are objective, professional approaches to managing the many risks associated with major change: risks that involve complexity, technology, governance, selection and management of vendors and partners, implementation of solutions and acceptance of change throughout the organisation. KPMG applies leading concepts and practices, supported by: Experienced practitioners Recognised best practices Effective tools and templates International standards Built-in knowledge transfer Services can assist organisations to generate significant cost savings by minimising poor selection decisions, costly overruns, misalignment with business needs, poor quality deliverables and failed projects. Our project advisory services include INDEPENDENT QUALITY ASSURANCE (IQA) Is your project or programme on track? Are the key risks and issues being effectively managed and addressed? Independent Quality Assurance is KPMG s approach to providing objective, practical and open feedback to senior executives, independently assessing project status, risks and issues. Advice is provided by experienced staff who are not part of the delivery team. PORTFOLIO, PROGRAMME AND PROJECT MANAGEMENT (PM) PRACTICES PM provides services for the purpose of designing or evaluating portfolio, programme, or project management practices. The objective is to assist in implementing or improving PM practices to reduce project costs, increase project success and create an organisational PM support environment which is valued by internal and external stakeholders alike. LARGE PROJECT AND PROGRAMME MANAGEMENT ASSISTANCE This cornerstone service of KPMG s Advisory practice is designed to address the full lifecycle of a project or programme, providing an integrated approach to managing large initiatives the result: significant efficiencies and enhanced outcomes. The methodology incorporates concepts from well-known risk, benefits, project and quality management disciplines to help companies achieve the results they expect during every phase of a large project or programme. PROJECT RISK ASSESSMENT AND MONITORING These services provide a highly focused, activity-based approach to project risk management. They provide management with an objective and independent assessment of the risks associated with a business initiative, programme or project, and evaluate the effectiveness of planned or implemented controls to mitigate the risks. BENEFITS MANAGEMENT AND REALISATION ADVISORY KPMG professionals help you identify the measurable business changes that you will to see at the successful completion of your project and to tie these into an effective Benefits Management and Realisation strategy which can be referenced in your Business Case. Even for projects where outcomes are enabling or intangible, our Project Advisory team will be able to assist with the identification of proxy indicators and benefit relationships to support the approval of your Business Case and its successful delivery. PORTFOLIO MANAGEMENT Effective portfolio management helps large organisations make sound decisions by prioritising the deployment of scarce resources to change initiatives and maximising their value to help achieve the organisation s strategy. Organisations operate in increasingly dynamic environments, which often make it a struggle to satisfy fluid business requirements. KPMG s Portfolio Management (PfM) Advisory and Assistance services help organisations to develop appropriate processes and capabilities to achieve this aim. We provide practical guidance for conducting capability development, maturity assessments and performance reviews. Our methodology provides a fl xible, comprehensive approach that can help our clients achieve their goals. PROGRAMME MANAGEMENT OFFICE ASSISTANCE Programme Management Office Assistance is intended to help our clients develop the processes to support a Programme Management Office. We assist with the development of a client s programme office processes and facilitate communication across client leadership to help make sure that enterprise programme initiatives are aligned with the organisation s business strategies. The focus of the PMO is to increase project visibility across client leadership in order to help achieve strategic programme performance. PROJECT ADVISORY Our practitioners know that successful projects are the result of clear vision, careful planning, and meticulous execution. Bottom line: services drive speed and effectiveness of change within your organisation by reducing costs and increasing success.

Leadership Series Please look for important topics covered by our Leadership Series in the coming months: Project Risk Management Contact us Gina Barlow Director T: (04) 86 4798 E: gbarlow@kpmg.co.nz Chris Dew Partner T: (09) 6 0 E: cdew@kpmg.co.nz Perry Woolley Director T: (09) 67 5960 E: pwoolley@kpmg.co.nz Harriet Dempsey Associate Director T: (04) 86 488 E: harrietdempsey@kpmg.co.nz kpmg.com/nz 04 KPMG, a New Zealand partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative ( KPMG International ), a Swiss entity. All rights reserved. Printed in New Zealand. The KPMG name, logo and cutting through complexity are registered trademarks or trademarks of KPMG International. The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavour to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act on such information without appropriate professional advice after a thorough examination of the particular situation. 0040