SharePoint Implementation Planning Document 1 Template



Similar documents
10231B: Designing a Microsoft SharePoint 2010 Infrastructure

Advanced IT Pro Course for Office SharePoint Server 2007 and SharePoint Services 3.0

Module: Sharepoint Administrator

Designing IT Platform Collaborative Applications with Microsoft SharePoint 2003 Workshop

SSC2016: SharePoint 2016 Administrator s Survival Camp

MICROSOFT CERTIFIED SYSTEMS ENGINEER Windows 2003 Track

MCSE SYLLABUS. Exam : Managing and Maintaining a Microsoft Windows Server 2003:

Planning, Implementing and Managing a Microsoft SharePoint 2003 Infrastructure

Designing a Microsoft SharePoint 2010 Infrastructure

DottsConnected SHAREPOINT 2010 ADMIN TRAINING. Exercise 1: Create Dedicated Service Accounts in Active Directory

Course Syllabus. 2553A: Administering Microsoft SharePoint Portal Server Key Data. Audience. At Course Completion.

Microsoft SharePoint 2010 Administration

CVE-401/CVA-500 FastTrack

Nintex Licensing Guide

Day 1 - Technology Introduction & Digital Asset Management

126 SW 148 th Street Suite C-100, #105 Seattle, WA Tel: Fax:

Cloud & Datacenter Monitoring with System Center Operations Manager

JOB DESCRIPTION. DATE ISSUED: 08/15 FLSA: Exempt PTO: VCS TITLE. SharePoint Administrator JOB SUMMARY

Deploying, Configuring, and Administering Microsoft Lync Server 2010

RESPONSES TO QUESTIONS AND REQUESTS FOR CLARIFICATION Updated 7/1/15 (Question 53 and 54)

Designing a Windows Server 2008 Applications Infrastructure

Course 10534A: Planning and Designing a Microsoft Lync Server 2010 Solution

Advanced planning / change impact features

Disaster Recovery White Paper

Microsoft Premier Deployment. Office 365 Service Description

MS Planning and Designing a Microsoft Lync Server 2010 Solution

Who is SharePoint Joel?

NOS for Network Support (903)

SHAREPOINT ARCHITECTURE FUNDAMENTALS

SSM6437 DESIGNING A WINDOWS SERVER 2008 APPLICATIONS INFRASTRUCTURE

Designing a Windows Server 2008 Active Directory Infrastructure and Services

Statement of Work: SharePoint Migration Services. Supplement 1

6436: Designing a Windows Server 2008 Active Directory Infrastructure and Services (5 Days)

Fundamentals of Windows Server 2008 Network and Applications Infrastructure

Using Microsoft Operations Manager To Monitor And Maintain Your Farm. Michael Noel.

Cisco Wide Area Application Services Optimizes Application Delivery from the Cloud

MS-55115: Planning, Deploying and Managing Microsoft Project Server 2013

Designing a Windows Server 2008 Applications Infrastructure

JOB DESCRIPTION CONTRACTUAL POSITION

U.S. Department of Housing and Urban Development Data Center Consolidation Plan

Administering Team Foundation Server 2013

Microsoft SharePoint Architectural Models

This course is intended for IT professionals who are responsible for the Exchange Server messaging environment in an enterprise.

Course 6437A: Designing a Windows Server 2008 Applications Infrastructure

Microsoft Training and Certification Guide. Current as of December 31, 2013

LEARNING SOLUTIONS website milner.com/learning phone

SharePoint 2010 Interview Questions-Architect

Course 10533A: Deploying, Configuring, and Administering Microsoft Lync Server 2010

Implementing and Administering an Enterprise SharePoint Environment

SharePoint Operational Governance. al 1

5053A: Designing a Messaging Infrastructure Using Microsoft Exchange Server 2007

Marathon Information Management Program

Course 55115: Planning, Deploying and Managing Microsoft Project Server 2013

Configuring and Deploying a Private Cloud

Advanced Solutions of Microsoft SharePoint Server 2013

SERENA SOFTWARE Authors: Bill Weingarz, Pete Dohner, Kartik Raghavan, Amitav Chakravartty

Microsoft Training and Certification Guide. Current as of March 16, 2015

Preliminary Course Syllabus

Advanced Solutions of Microsoft SharePoint Server 2013 (20332) H6C76S

MOC 10964C: Cloud and Datacenter Monitoring with System Center Operations Manager

Department of Finance and Deregulation 2011/004 Portfolio Panels for IT Services ATTACHMENT A

SHAREPOINT DEPLOYMENT GUIDE AND CHECKLISTS ESSENTIALS OF A SUCCESSFUL SHAREPOINT DEPLOYMENT

Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010

Configuring and Deploying a Private Cloud 20247C; 5 days

MOC 5047B: Intro to Installing & Managing Microsoft Exchange Server 2007 SP1

FUNCTIONAL AREA 12. Network Administration (NET)

10533: Deploying, Configuring, and Administering Microsoft Lync Server 2010 Duration: Five Days

Global Headquarters: 5 Speen Street Framingham, MA USA P F

MOC 6436A: Designing Active Directory Infrastructure and Services in Windows Server 2008

SharePoint 2013 Logical Architecture

Microsoft Dynamics CRM 2011 Installation and Deployment

Managing and Maintaining Windows Server 2008 Servers

An Introduction to SharePoint Governance

Microsoft Enterprise Search for IT Professionals Course 10802A; 3 Days, Instructor-led

Deploying Microsoft SharePoint Services with Stingray Traffic Manager DEPLOYMENT GUIDE

Scaling out a SharePoint Farm and Configuring Network Load Balancing on the Web Servers. Steve Smith Combined Knowledge MVP SharePoint Server

Syste. Microsoft. Center 2012 UNLEASHE. Rand Morimoto, Ph.D., MCITP Pete Handley, MCITP David E. Ross, MCITP lechnical Edit by Guy YardenI

Planning, Deploying and Managing Microsoft Project Server 2013

Configuring and Deploying a Private Cloud. Day(s): 5. Overview

BlackBerry Enterprise Server Version: 5.0. Upgrade Planning Guide

MCSA/MCITP: Enterprise Windows Server 2008 Course 9952; 14 Days, Instructor-led

Advanced Solutions of Microsoft SharePoint Server 2013 Course 20332A; 5 Days, Instructor-led

Transcription:

Suite 3, Level 7, 16 Wentworth Street, Parramatta NSW 2150 Tel: 1300 797 838 - Fax: 1300 797 848 URL: www.empowercs.com.au SharePoint Implementation Planning Document 1 Template Attention: Prepared by: EmpowerCS Date: Version: 0.0

1 Purpose This document has been compiled by Empower CS and serves as a template/guide for XXXXXXXXX staff for the implementation of Microsoft SharePoint. Empower CS Page 2 of 8

2 Project Overview 2.1 Define Business Goals << Customer Project Champion>> Understand the business objective for the project 2.2 Define Problem Statement << Customer Project Champion>> What are the current issues/problems 2.3 Determine Success Criteria << Customer Project Champion>> What are the business success criteria elements 2.4 Identify Project Stakeholders Person Job Title Contact Number(s) Email Address Department Empower CS Page 3 of 8

3 Project Team 3.1 Project Teams, Define Roles Customer Project Champion Empower IT Project Manager Development/Design team members Infrastructure/network administrator Test/QA lead Education/training lead 3.2 Define Communication Strategy Define communication strategy for each phase Coordinate communication strategy with business owner Define communication audiences Define communication delivery mechanism Empower CS Page 4 of 8

4 Preliminary Planning 4.1 Current Operating Environment Review/detail current server hardware and software inventory Review/detail current client hardware and software inventory Review/detail current administrative/service delivery model 4.2 End User Non Functional Requirements Determine audience Determine permission and access needs (identify the groups of users and roles) Determine User Experience requirements 4.3 Preliminary Business Requirements Review/detail content management requirements Review/detail workflow requirements Determine any content migration requirements Detail taxonomy or content type requirements 4.4 Preliminary Design Objectives Map vision/scope to current computing environment Determine Microsoft SharePoint strategy Determine Microsoft SharePoint Server storage requirements Determine project information dissemination strategy (Internet, intranet, e-mail) Determine Information Architecture approach Determine branding requirements Review preliminary design objectives with executive sponsor 4.5 Identify Coexistence Strategies Identify interoperability issues within the company (operating systems supported, topology, protocol, etc.) Identify interoperability issues with the organization's partners (topology, protocol, etc.) Document as needed Identify coexistence strategies complete Empower CS Page 5 of 8

4.6 Establish Test Environment/Pilot Project Strategy Determine test environmental requirements Determine physical hardware requirements (server and network connection) Identify the testing team Identify user acceptance criteria 4.7 Perform Risk Assessment Identify and analyse potential risks Quantify potential impact of the risks Detail escalation / resolution processes 4.8 Define Education / Training Strategy Coordinate training strategy with business owner Define user assistance and help requirements Define education strategy for deployment demographics (administrators, help desk, endusers) Define education delivery mechanism Establish education timeline by phase 4.9 Determine Software / Hardware Requirements Determine hardware requirements Determine software requirements Review browser requirements Empower CS Page 6 of 8

5 Implementation Plan 5.1 Strategy Information portal and site collection taxonomies and hierarchies Information policy and file plan as applicable Branding approach Structure Information security policies 5.2 Server Provisioning User group size identification Server Roles Identification: front end, document management, search and indexing services Capacity Planning: o Determine normal load from roles and usage patterns o Determine number of documents stored and document store size o Estimate index size o Determine needs for growth o Determine peak load factor o Determine approach between single server, server farm, or shared services o Evaluate caching, load balancing, and other scaling techniques o Determine future scale-out approach o Draw system architecture 5.3 Security Determine Microsoft SharePoint Server Roles Determine Authentication provider - AD versus LDAP Identify Security Measures for Connecting to the Internet o Evaluate using SSL o Evaluate techniques to prevent unauthorized access 5.4 Performance Review connectivity and bandwidth requirements Review current network Establishing minimum performance levels Performance testing of network Empower CS Page 7 of 8

Diagram future network topology Upgrade WAN and LAN as required 5.5 Failover and disaster recovery 5.6 Plan Maintenance Empower CS Page 8 of 8