PRACTICE NOTES FOR QUANTITY SURVEYORS



Similar documents
Nominated Subcontractors on International Projects: Approaches to Risk Allocation

Basic Guide. General Conditions of Contract for Construction Works (GCC 2004)

Appendix 18 NEC3 Options

PUBLIC SECTOR STANDARD CONDITIONS OF CONTRACT FOR CONSTRUCTION WORKS

New-Gen Electrical (ABN ) Terms & Conditions

How To Write A Contract In The European

Bills of Quantity. D. Atkinson December Nature of Bills

Tender forms and letters 1. Final accounts 7 Cost items 7 Presenting the final account 9. Retention and defects liability period 11.

MR GREGORY YAU-MING TUNG. (Bachelor of Science in Quantity Surveying with Honours) (Date of Qualification 1987)

CLIENT / PROJECT MANAGER AGREEMENT

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

HONG KONG HOUSING AUTHORITY GUIDELINES FOR THE GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS 2013 EDITION

HONG KONG HOUSING AUTHORITY GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS 2013 EDITION

The RIAI Standard Form of Contract 2012 Edition: a Review

THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL CONDITIONS OF CONTRACT FOR BUILDING WORKS $ EDITION

Practice Note Deciding on the appropriate JCT contract

BMT Tax Depreciation Pty Ltd - Terms of Engagement

NEC3: Early Warning and Compensation Events

Letters, Instructions, etc.

A JCT 2011 Minor Works Building Contract

Explaining an architect s services. General information on the usual tasks undertaken by an architect

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

Terms and Conditions of Offer and Contract (Works & Services) Conditions of Offer

General Terms of Public Procurement in Service Contracts JYSE 2014 SERVICES

Dr. Simon Chee, Professor Michael Hor, Distinguished Guests, Ladies and. 2. Hong Kong has never been short of infrastructure and construction

IN FIDIC 99 RED BOOK COULD IT BE SUPERVISION CONSTRUCTION. Dr. Munther M. Saket. The Role of the Engineer

Thames Water Utilities Limited. Settlement deed

Foreign Currency Forward Master Contract

b) The management plans and policies which the Authority requires the Provider to develop maintain and use to manage the operation of this Contract;

SURETY. and Title: (Any additional signatures appear on the last page of this Performance Bond.)

Code of Practice for Agents Undertaking Renovation Grants

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

PUBLIC POWER CORPORATION S.A. DISTRIBUTION

Hong Kong Institute of Surveyors. Seminar on Conditions of Building Contract Questions and Answers Conducted by Mr. Colin B. Lee

Li Bao Ge Group Limited

International Construction Warranties Limited. Terms & Conditions. Version UK1

General Terms of Public Procurement in Supply Contracts JYSE 2014 SUPPLIES

JCT Standard Building Contract SBC/Q

Invitation to Tender

Expert evidence. A guide for expert witnesses and their clients (Second edition)

ISSUES OF CONTRACTUAL CHAIN AND SUB- CONTRACTING IN THE CONSTRUCTION INDUSTRY

NZS 3910:2013. Conditions of contract for building and civil engineering construction NZS 3910:2013. New Zealand Standard

Best Practices in Managing Specialist Subcontracting Performance

Conditions of Contract

General Terms of Public Procurement in service contracts JYSE 2009 SERVICES

EXPERIENCE SHARING ON THE ADMISITRATION OF THE DSD PILOT CONTRACT (NEC

inform practice note SUBCONTRACTING ARRANGEMENTS Content Synopsis: Practice Note # 7 May 2007 (Version 1 - May 2007) construction industry development

Banking & Finance Terms of Reference

Baqqa Limited. Terms and Conditions

BUILDING AGREEMENT. between: ( the Owner ) and. ( the Builder )

Bonds. Brian E. Rawling, Brian E. Rawling & Associates

CHAPTER 11 APPEALS AND DISPUTES

香 港 特 別 行 政 區 政 府. The Government of the Hong Kong Special Administrative Region. Development Bureau Technical Circular (Works) No.

TERMS AND CONDITIONS FOR PAYMENT CARDS SERVICING

How To Exchange Currency In Australia

The amount to be included in any such application shall be the amount due to the Sub-Contractor from Cardy which shall be:

Drain unblocking terms and conditions.

INLAND REVENUE BOARD OF REVIEW DECISIONS. Case No. D8/01. Profits tax whether diminution in value of properties whether deductible.

The New Standard Construction Contracts: NZS3910, 3916 and 3917

SPECIAL CONDITIONS OF EMPLOYMENT/CONTRACT AND NOTE TO TENDERERS/CONSULTANTS

Jigsaw24 Support Contract Terms & Conditions

Queen Margaret University, Musselburgh, Edinburgh, EH21 6UU APPENDIX A: CONFERENCING & EVENTS GENERAL TERMS & CONDITIONS

TLHAMATSI AFRICA PROJECTS CONSTRUCTION MANAGEMENT PRESENTATION. PRESENTED BY: BAKANG MOENG

Chartered Architectural Technologists: Client information for domestic projects

Consumer Code. for Home Builders. This document contains the Rules that govern the behaviour of Home Builders and Home Warranty Bodies

This agreement is a binding legal contract between you and your solicitor/s. Before you sign, please read everything carefully.

TENDER DOCUMENTS. Procurement of Works. Small Contracts (Small Value, Short Duration and Low Risk) Public Procurement Board.

Digital Web Company (UK) Ltd. Terms and Conditions

AIA Document A312 - Electronic Format. Performance Bond

A Guide to the Design Build Process

Product Disclosure Statement. WHAT YOU NEED TO KNOW Flexible Forward Cash Settled. Issue date: 12 March 2014 Issued by:

CLAIMS UNDER THE NEW FIDIC CONDITIONS OF CONTRACT. JOHN PAPWORTH FRICS, FCIArb, MInstCES, MACostE Managing Director, John Papworth Limited, UK

A Guide to Standard forms of Construction Contract Outlining Key Characteristics and Components

DIRECTORATE OF ESTATES & FACILITIES

An organization which employs, or is about to employ, any of the above, has a financial or other interest in the firm selected for award.

Software Development. Standard Terms and Conditions. V2.0 January 2013

The FIDIC Form of Contract. The Fourth Edition of the Red Book. 2nd Edition. Nael G. Bunni

Bendigo Rewards. Terms & Conditions. 21 December

ICC UNIFORM RULES FOR CONTRACT BONDS

A CLIENT GUIDE TO PART 36 - OFFERS TO SETTLE

Business leases guide

[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices

Kentucky Department of Education Version of Document A

GUIDANCE NOTE Building Control (Amendment) Regulations 2014 Procurement Implications for Contracting Authorities

This innovative Scheme has been developed to resolve small claims disputes within the maritime industry.

General Conditions Of Contract for Use in the Procurement and Erection of Plant at Site in the United Kingdom

Consultant s Services Small Assignments, Lump-Sum Payments

qbcc Insurance Policy Conditions Edition 8 1 queensland building and construction commission

BROKER/SHIPPER AGREEMENT

How To Build A House

MANAGEMENT AGREEMENT ENTERED INTO BY AND BETWEEN: THE BODY CORPORATE OF SECTIONAL TITLE SCHEME, SCHEME NO: /. ( the Body Corporate ) AND

MISCO SOLUTIONS GENERAL SUPPLY TERMS & CONDITIONS

AIA Document A310 TM 2010

General Terms and Conditions for Service companies

ARTWORK COMMISSION AGREEMENT

CASE EXAMPLES CONTRACTUAL INDEMNITIES & OBLIGATIONS TO INSURE

Transcription:

PRACTICE NOTES FOR QUANTITY SURVEYORS

Preface Preface A Working Committee with representatives of the Hong Kong Institute of Surveyors, the Association of Consultant Quantity Surveyors and the Hong Kong Construction Association was set up in October 2010 to establish a set of Practice Notes for the benefit of Quantity Surveying professionals in Hong Kong. The Practice Notes are not intended to promulgate a standard of practice, but rather to produce some basic guidelines for the following core practices : 1. Tendering 2. Cost Control and Financial Statements 3. Valuation for Interim Payment Certificates 4. Valuation of Variations 5. Handling of Contractual Claims 6. Settlement of Final Account As different client organisations will have their own procedures and requirements, the Practice Notes, which are prepared mainly for private sector projects using the HKIA/HKIS Standard Forms of Building Contract, should be adapted as appropriate. The members of the Working Committee are: - Representing the Hong Kong Institute of Surveyors Mr. Raymond KONG Mr. SO Chee Sing Ms. Sandy TANG Ms. Amelia FOK Representing the Association of Consultant Quantity Surveyors Mr. Kenneth POON Mr. CHAN Choi Hing Mr. Amen HOR 1. 2. General The Final Account is a summary of the financial effect of all activities carried out under the Contract. Clause 32.6 of the HKIS Standard Form of Building Contract (2005 Edition) requires the Quantity Surveyor to prepare the final account within the period stated in the Appendix (normally 12 months from substantial completion of the whole of the Works). To provide effective post contract cost control and to expedite the settlement of final accounts, Quantity Surveyors shall aim at having periodic cost review meetings with the Contractors to settle the valuation of instructed variations. Variations (A) General The Quantity Surveyor should conduct early evaluations of issued variations for the following reasons: (a) To enable close monitoring of the final contract sum; Representing the Hong Kong Construction Association Mr. FUNG Chi Yiu Mr. Patrick LO Mr. YU Lap Chu The Working Committee expresses its gratitude to the following HKIS members in the Architectural Services Department and the Housing Authority for sharing their experience in and knowledge of Quantity Surveying practice in the public sector for the improvement of the document. Professional Quantity Surveyor from the Architectural Services Department Mr. Alvin CHAN Professional Quantity Surveyor from the Housing Authority Mr. James FUNG (b) (c) To identify early any potential claims related to the variations; To provide the Contractor as early as possible with the Quantity Surveyor s assessed amount of the variation to allow him to carry out cost control of his own domestic sub-contracts; and 1 2

(d) To expedite final account settlement. (C) Verbal Instructions If the Quantity Surveyor does not issue an evaluation for the issued variation, the Contractor should submit his own assessment/claim to the Quantity Surveyor for his notice and early processing. Unless the Contract states otherwise, the Quantity Surveyor should note that Confirmation of Verbal Instructions are also variations and should be treated in the same manner as Architect s Instructions. (B) Methodology (a) Quantifying the changes (i) the changes should be quantified by measuring the omissions and the additions from the drawings. (ii) where changes are very substantial, a total remeasurement of the works affected may be appropriate. In such cases, the Quantity Surveyor and the Contractor should agree on the set of drawings to be used. If all variations are to be covered only via written Architect s Instruction, the Quantity Surveyor should remind the Contractor that those changes cannot be included in the final account measurement and that he has to separately seek an appropriate Architect s Instruction. (D) Taking Site Measurements When visiting site to take measurements, the Quantity Surveyor should :- (a) record the Quantity Surveyor s name, company, time of arrival and departure in the site visitor s book (if any). (b) Assessing the rates (i) the contract rates shall be used where the works are of the same nature and are carried out under the same circumstances; (ii) If the works are similar but not the same, the contract rate should be used as the basis for forming a pro-rata rate; (b) (c) ensure that all measurements taken are properly recorded. Each page entry must have the date of the m e a s u r e m e n t recorded against it. if measurements are jointly taken with the Contractor, request the Contractor to initial against the measurements. (iii) If the works are of a different nature, a fair valuation should be made for the variation works using star rates. 3 4

(E) Cost Review Meetings The Quantity Surveyor should arrange regular Cost Review Meetings with the Contractor throughout the construction and final account periods to discuss and finalise the financial effect of the variations and other claims by the Contractor. The Architect, Engineer or the Project Manager should be invited to attend the Cost Review Meetings when necessary to resolve ambiguities as to the scope of variations or disagreements on its actual effect on the Works. A fundamental principle of any claim for a loss/expense claim by a Contractor is that the onus lies with the Contractor to establish the following facts in his submission to the Architect and Quantity Surveyor : (a) That an instruction amounting to a variation has been validly issued and acted upon; (b) The date of issue and receipt of the variation instruction; (c) The nature of the variation; 3. 4. Remeasurements The Quantity Surveyor should remeasure all provisional quantities in the Bills of Quantities as soon as the For Construction drawings are issued to the Contractor for implementation. A copy of the remeasurement, duly priced should be issued to the Contractor for his information as soon as it is available. It is bad practice to wait for works to be completed before doing the remeasurement. Early remeasurement once construction drawings are available will give a chance to the Client to revise the design if the remeasurement shows a budget over-run. Contractual Claims (A) General The validity of contractual claims depends a lot on the wording of the contract conditions and specification clauses. Reference should be made to the specific clauses of the contract being used in order to approach a claim correctly. (d) The time required to carry out the work pursuant to the instruction; (e) That the carrying out of the variation instruction affected regular progress of the works which would not otherwise have been affected; (f) The extent to which the work was affected as a direct result of the carrying out of the variation; (g) Sufficient particulars of the direct loss and/or expense suffered or incurred directly resulting from the variation; (h) That the Contractor made a proper and timely application to the Architect in respect of direct loss and/or expense. The above list is not exhaustive and claims can always be made under other contractual grounds. (See also Good Practice Notes on Handling Contractual Claims for more details.) 5 6

(B) Extension of Time Claims for extensions to the contract time are considered and decided by the Architect. However, it is not uncommon for the Architect to request the Quantity Surveyor to advise on the contractual validity of the claims. The following principles should be observed : (a) The Contractor should "upon it becoming apparent that the progress of the Works is delayed" give written notice of the cause of delay to the Architect. (b) The event delayed must be "critical" (i.e. the activity in question must lie on the project s critical path). (c) Whether an event caused a delay or not should be decided by reference to the actual progress on Site, not to the original programme prepared at commencement of work. Whether or not a Contractor is entitled to an extension of time is to be decided by the Architect. The Quantity Surveyor should only make suggestions for consideration if requested by the Architect to do so. (C) Prolongation Claims When assessing prolongation claims, the Quantity Surveyor should differentiate the extension of time granted under certain events (commonly known as neutral events) for which the Contractor may be entitled to an extension of time, but not prolongation costs, such as the following: force majeure; inclement weather; fire; civil commotion, etc.; 5. 6. As a general rule the Employer will only be liable for loss and expense incurred by the Contractor when it is caused by acts for which the Employer or his agents are responsible. Nominated Sub-Contracts/Supply Contracts If it is within his scope of services, the Quantity Surveyor should prepare the final account statements for the Nominated Sub-contracts and Nominated Supply Contracts for incorporation within the Contractor s final account for the whole of the works. The Quantity Surveyor should follow the same guidelines given for preparing the Contractor s final account when handling the final accounts for the Nominated Sub-contracts and Nominated Supply Contracts. Agreement of the Final Account During the cost review meetings, the Quantity Surveyor and the Contractor will exchange comments on each other s assessment and try to reach agreement on the appropriate financial figure for each item of change. Assessments done by the Quantity Surveyor should be issued to the Contractor in advance of the meeting with a request that they mark in red their comments and return to the Quantity Surveyor before the meetings are held. Vice versa, the Quantity Surveyor should check quotations submitted by the Contractor and mark in red their comments and return to them before the meetings for their advance information. It should be noted that the Quantity Surveyor s duty regarding the Final Account is primarily to make fair and proper assessments of all changes made in accordance with the contract provisions. Whether the assessments are agreeable to the Contractor should not be a factor influencing the Quantity Surveyor s assessment. 7 8

Most Standard Forms of Contract have a provision that the Contractor should submit all his claims and substantiations within a certain period. The Quantity Surveyor should check this period and formally write to the Contractor advising him to comply with it as the Quantity Surveyor may refuse to accept any further submissions after this date. When all claims and substantiations made have been taken into consideration by the Quantity Surveyor and negotiations held with the Contractor prove to be of no avail, the Quantity Surveyor may seek the Client s consent and support before proceeding to unilaterally close out the final account. The common headings to be found in a Final Account will include : 1. Architect s Instructions 2. Confirmation of Verbal Instructions 3. Prime Cost Rates Adjustment 4. Prime Cost Sums Adjustment 5. Provisional Sums Adjustment 7. A report on the non-agreed items should be prepared listing the items, the Contractor s figures versus the Quantity Surveyor s assessed figures, the arguments given by the Contractor and the Quantity Surveyor s judgments on why their arguments were not accepted. Note that it is not normally a contractual requirement that the Final Account needs to be agreed by the Contractor. This is only good practice. In situations where agreement cannot be reached, the Quantity Surveyor should prepare a Recommended Final Account incorporating a report on non-agreed items and issue it to the Client with a recommendation to either intervene to reach a settlement with the Contractor or unilaterally close out the Final Account by issuing the Final Certificate. Final Account Format 8. 6. Provisional Quantities Adjustment 7. Fluctuations Adjustment 8. Contractual Claims 9. Others The Agreement and Issuance of the Final Account Under normal circumstances, the Final Account should either be agreed between the Contractor and the Quantity Surveyor or the Quantity Surveyor should issue their Final Account Recommendation within 12 months of substantial completion of the whole of the Works. The Final Account should clearly list all items that have a financial effect on the original contract sum. Extra care should be taken in writing the item descriptions to give a brief indication of what changes were actually involved. Do not just copy the headings of the Architect s Instructions as these tend to be very general. 9 10

Nov. 2012