RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE



Similar documents
Application for Builders Risk & Wrap-Up Liability Coverage

BUILDERS RISK / WRAP-UP LIABILITY APPLICATION

Form C: Application for Construction Insurance

7. Do you perform any out of state work?... If yes, in what states and provide details of work performed

CONTRACTORS LIABILITY QUESTIONNAIRE

Complete Application & Fax to (845) APPLICANT INFORMATION OPERATIONS

Building Insurance under TripleGuard Insurance

CENTURY INSURANCE GROUP CONTRACTORS QUESTIONNAIRE AND WARRANTY General Agency

ROOFING CONTRACTORS QUESTIONNAIRE

Philadelphia Insurance Companies Builder s Risk Application

CONTRACTOR S SUPPLEMENTAL APPLICATION General Contractor/Artisan Contractor) (Include Acord Application)

CONTRACTORS QUESTIONNAIRE

How To Fill Out A Construction License Form

CONTRACTORS GENERAL LIABILITY APPLICATION Note: Throughout this questionnaire the words you and your include all entities seeking coverage

NATIONAL CONTRACTORS INSURANCE COMPANY

6. GIVE FULL DETAILS OF TYPE OF WORK, OPERATIONS AND ATTACH BROCHURES IF APPLICABLE:

A&E PRACTICE BUSINESS OFFICE PACKAGE APPLICATION

General Liability Insurance Application (Contractors Supplemental Questionnaire)

CONTRACTORS QUESTIONNAIRE

NEW YORK CONTRACTORS SUPPLEMENTAL APPLICATION (Excluding Residential Contractors)

Penn-America Insurance Company Contractors General Liability Application

17 East Main Street Cuba,NewYork Code Enforcement

Contractors General Liability Supplemental Questionnaire

INSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts:

General Contractors/Developers General Liability Application

BUILDERS & CONTRACTORS INSURANCE COMPANY, RRG, A RISK RETENTION GROUP CONTRACTORS APPLICATION NATIONAL BUILDERS INSURANCE SERVICES, INC.

Crump Insurance Services

CONTRACTORS GENERAL LIABILITY APPLICATION (Other than E-Z Rate Contractors)

Contractors Questionnaire Contractors Insurance Program - EIFS

specified contract works and legal liability proposal

If any work as a Project or Construction Manager does applicant carry an E & O policy? Yes No If yes, describe:

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

PROPOSAL FOR CONTRACTORS ALL RISKS

A Guide for the Homeowner/Builder

REMODELING CONTRACTORS PROGRAM APPLICATION

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

12/14/2015 HOT TOPICS IN MULTI-USE BUILDINGS: INSURANCE, CONSTRUCTION AND DEVELOPMENT INTRODUCTION AND OVERVIEW

HOT TOPICS IN MULTI-USE BUILDINGS: INSURANCE, CONSTRUCTION AND DEVELOPMENT

Substantially incomplete submissions will be declined

Pre-Existing Structures at the Site Project Duration Type of Structure Under Construction Any Other Entities with Interests in the Property

HEALTH OWNER INSURED CONSTRUCTION PROJECTS

CONSTRUCTION RISK MANAGEMENT. TABLE of CONTENTS:

INSURANCE/ RISK EXPOSURE SURVEY

ROOFING CONTRACTOR SUPPLEMENTAL APPLICATION

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

Restoration Contractors Questionnaire

A&E A&E. ProSurance TM. Application Form INSURANCE FOR ARCHITECTS & ENGINEERS

Contract Works. Proposal Form

James River Insurance Company 7130 Glen Forest Drive, Suite 210 Richmond, VA CONTRACTORS SUPPLEMENTAL APPLICATION

CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM

SHEET METAL, MECHANICAL, AIR CONDITIONING AND PLUMBING CONTRACTORS PROGRAM (SMAP) Supplemental Application Construction Insurance Solutions (CIS)

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

CONTRACTORS AND DEVELOPERS

CONTRACTORS SUPPLEMENTAL INSURANCE APPLICATION

ARTISAN CONTRACTORS GENERAL LIABILITY SUPPLEMENTAL ACCIDENT/MADISON INSURANCE COMPANY

CSC-DIVISION 1-MASTER SECTIONS Description

Contractors All Risks Insurance

NEW YORK CONSTRUCTION CERTIFICATE OF LIABILITY INSURANCE ADDENDUM

STATE OF CALIFORNIA DEPARTMENT OF INSURANCE 45 Fremont Street, 21st Floor San Francisco, California FINAL TEXT OF REGULATION

ENVIRONMENTAL CONTRACTORS & CONSULTANTS

SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION Definitions CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

Development Services Guidelines

James Villanueva / Street Address: City/State/Zip: Street Address: City/State/Zip: Name: Phone Number: Fax Number:

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

APPLICATION FOR NEW CONSTRUCTION

TD AMERITRADE Park Omaha

Presented By: James T. Giffen MGB Claims Consultants Inc Toronto ON

Commercial Building Valuation Report

Pro Builders Specialty Insurance Company, RRG contact Nations Builders Insurance Services, Inc.

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CGU Padlock. insurance application

Course of Construction Questionnaire

A. Fire Protection Plan. B. Access and Parking

CONTRACTOR S SUPPLEMENTAL QUESTIONNAIRE

PRO PRO. ProSurance TM. Application Form INSURANCE FOR PROFESSIONALS

GABRIELE BRIDGES 8/9/2013-8/9/ DP3 STANDARD. Date of Birth ***-**-**** Social Security Number SINGLE. Cell Phone

SCHEDULE 17. Insurance Requirements. Part 1 Insurance Requirements applicable to the Phase 2 Work

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

Builders Risk - Sticks & Stones CAN Hurt You! sponsored by

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Transcription:

RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Residential Course of Construction policies, also known as Builder s Risk, are designed to cover the property owner for potential loss while the property is under construction. Potential losses include an injury on site which results in a lawsuit, a fire loss to the partially completed construction and theft of building materials stored on site. Course of Construction policies are rated by underwriters for the entire period of the build, from ground breaking to occupancy. At the beginning of a build, the risk of property loss for the house itself is quite minimal as not much is on site. However, the risk of a liability loss is quite high. At the end of the building process, the risk of property loss is very high, and the risk of liability is relatively low. Rather than charge a very high premium at the end, and not much at the beginning, the entire premium is amortized over the construction period. It is very important that you determine the full rebuilding cost of the project, including the contractor s overhead and profit, and insure to that value at the outset of the project. While cost overruns are understood and expected, any increase in premium for an increase in the final value of the home is charged over the entire construction period. The underwriters may request, near the end of the build, a review of the rebuilding value using an approved questionnaire as well as photographs to substantiate the value. It is also important that you estimate as accurately as possible the construction period as underwriters will provide extensions, but with a fee for every extension term. If you have any unique characteristics of your new home or construction situation please indicate them on the form or attach a separate sheet. If you have any questions or require assistance in completing this form please contact our office. Lower Mainland: #303 8678 Greenall Avenue Burnaby, BC V5J 3M6 Phone: (604) 437-6200 Fax: (604) 437-5347 Southern Interior: #105 1950 Harvey Avenue Kelowna, BC V1Y 8J8 Phone: (250) 763-3840 Fax: (250) 762-9633 www.wmbeck.com

GENERAL INFORMATION: RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Legal names of all owners: Legal Name of General Contractor: Project Name, if applicable: Occupancy once completed: Mortgagee name and address: Name of Architect/Engineer: Name of Mechanical/Structural Consultants: Project Manager: CONTRACT INFORMATION: Construction start date: Period of partial occupancy: Contract period (number of months): Percentage of work subcontracted: Coverage required for subcontractors? Yes No If yes, attach list of subcontractors stating number of years experience and loss history for the past five years If no, are certificates of insurance obtained? Yes No What is the minimum limit of liability requested? $ Describe, in detail, any testing that will be performed and by whom: PROJECT INFORMATION: Civic address: Legal address: Nature of terrain: Flat Hillside Hilly Swampy Other Nature of soil: Shale Sand Rock Filled Ground Other Has a geo-technical report been completed? Yes No If yes, attach a copy of the report summary and recommendations Public Fire Protection: Protected Semi-protected Unprotected Volunteer Protected = fire hydrant within 300 metres AND firehall within 8 kilometres Semi-protected = firehall within 8 kilometres; no hydrant within 300 metres Unprotected = no firehall within 8 kilometres; no hydrant within 300 metres PROJECT DETAILS: What is the estimated completed contract price? $ (attach breakdown if available) (If the total estimated complete contract price is over $1,000,000, if it is commercial occupancy, or if you require CGL or wrap-up liability, please also the complete supplemental application found on last page) What is the value of other property to be insured? $ (existing structure, equipment etc.) If there is other property to be insured, please describe: Sublimits: Transit: $ Offsite: $ Are soft costs/delayed start up coverage required? Yes No Delayed Start Up: Type of Income: Amount: $ Hard Costs Amount: $ (Replacement Cost to rebuild) Soft Costs Amount: $ (Finance costs, leasing, marketing, legal etc.) Scheduled Completion Date: Anticipated Replacement Times for key items: Total area (square feet or metres) Cost per square foot: $ Total finished area:

PROJECT DETAILS: Demolition details: Subsurface Operations (describe the nature, duration, value and relationship to both the project and adjacent structures): Blasting: Shoring: Pile Driving: Underpinning: Dewatering (ie. number of pumps): Forms and form supports: Wood forms/support Period of usage: Steel forms/support Period of usage: Height of structure (stories): Below grade: Above grade: Height of structure (feet or metres): Construction materials: Exterior walls: Framework: Floors (structure & covering): Roof (structure & covering): Type of foundation: Standard frame construction? Yes No If no, explain: Any unusual or experimental features in construction or design? Yes No If yes, please describe (attach details if necessary): Temporary heating type: Type of insulation: Will the following be used? tarpaulins straw wood boarding scaffolding cranes hot tar roofing torch on application plastic weather enclosures Asbestos, lead or urea formaldehyde foam abatement? Yes If yes, describe: No Hazards or Exposures: Flood or surface water Name of nearest body of water: Distance to project: Past flood history at site: Yes No Federal flood zone? Yes No Height of project above nearest body of water: What is being done to prevent run-off damage? Describe precautions, if any, take to prevent windstorm, ice and/or sleet damage to project: Describe details of exposure to Transit (point of origin of key items): Describe details of adjacent structures (type of construction, occupancy, distance etc.): Connecting/surrounding exposures: bush existing structures shafts, tunnels or walkways waterfront Special Precautions: Security 6 site fencing patrol service lighting video surveillance street lighting only monitored alarm at lockup project visible from road Other (attach a copy of the contract for patrol and video services) Type of neighbourhood: Residential Commercial Mixed Rural Other Crime: Low Crime High Crime Declining Improving Other Is entry to the site possible only with an authorized person? Yes No If no, explain: Fire protection (private): standpipe and hose system sprinkler system portable fire extinguisher hot work permit system hydrants Flood protection (private): sand bags 4 skids or pallets pumps Explosion (detail use of any flammable liquids, gases, or explosive materials to be present on site: Is there a daily clean up program? Yes No Is refuse burned on site? Yes No

COVERAGE REQUIRED: All Risk Broad Form Fire & Extended Coverage Form Other Deductible desired: $1,000 $2,500 $5,000 Other Flood: Yes No Deductible: $ Earthquake: Yes No Deductible: $ Testing of Equipment: Yes No Deductible: $ Delayed Start-up: Yes No Deductible: $ Other : Yes No Deductible: $ LOSS HISTORY: Has the owner sustained any losses in the last five years? Yes No Has the General Contractor sustained any losses in the last five years? Yes No Has the owner or General Contractor had insurance refused or cancelled? Yes No INSURANCE HISTORY: Number of years the General Contractor has been in business: CGL Insurer CGL Limit: $ Bonded? Yes No List similar projects in the past five (5) years: Supporting Business: Yes No (include any liability or wrap-up coverage) Company: Please attach the following: Site Plan Schedule of Construction Structural Plans and Specifications Construction Budget Sheet (build-up of construction values) SIGNATURES: Application prepared by: Signature of Applicant: Position/Company: Phone Number: Facsimile: Website Address: (please print) (position of applicant ie. Property Owner, General Contractor, Engineer, Architect etc.) Cell Phone Number: Email Address: Broker Name: Brokerage Name: Date:

SUPPLEMENTAL APPLICATION PAGE: (For residential projects over $1,000,000, all commercial projects and projects requiring CGL or Wrap-Up Liability) Is the General Contractor a member of Canadian Home Builder s Association? Yes No List Project Manager s three recent large projects in the past five years: Name Type Location Value Detail any claims over $5,000 incurred by the owner, general contractor or project members in the past three years: Is this new construction? Yes No Describe project (duplex, apartment etc.) Is this a renovation? Yes No Is this a heritage building or site? Yes No Any underground parking? Yes No How many stories of underground parking? Describe adjacent structures (attach site plan if available): Direction Type of Construction Occupancy Distance (in feet) North East South West If the project is sprinklered, advise date sprinklers to be operational: Is there a full-time (24/7) on-site watchman? Yes No Security Patrol? Yes No SUBCONTRACTORS: Name of Framing firm: Name of Roofing firm: Name of Plumbing firm: Name of Heating firm: Name of Electrical firm: Name of Architecture firm: Name of Engineering firm: Name of Geo-technical firm: Is project in compliance with geo-technical recommendations? Yes No If no, explain: Any claims over $5,000 by these subcontractors within the past five years? Yes No If yes, explain: TESTING: Coverage required for electrical/mechanical breakdown during commissioning? Yes No If yes, number of weeks: Who will perform the testing operation? Describe testing operation: Will installation involve used equipment? Yes No CGL and WRAP-UP LIABILITY: Total estimated project value: $ Completed Operations period: 12 months 24 months Limit of liability required: $ Deductible required: $ Does the project attach to or communicate with an existing structure(s)? Yes No If yes, describe manner: If yes, describe occupancy of existing structure(s): Business Interruption or Loss of Use coverage for existing structure(s): Yes No Limit: $ Is coverage required for damage to existing structure(s): Yes No If there will be any occupancy prior to completion, provide details of period, extent and nature of occupancy: Detail exposures to utilities, including relocation both below and above grade: Describe offsite operations or locations which require coverage: Detail any loss control program to be implemented to protect others from operations, including traffic control, vibration monitoring, reconstruction surveys, etc.: