Falcon 9 Launch Vehicle NAFCOM Cost Estimates. August 2011 NASA Associate Deputy Administrator for Policy



Similar documents
Appendix B: Work Breakdown Structure (WBS)

Space Flight Project Work Breakdown Structure

CHAPTER 53 COST ACCOUNTING STANDARDS

System Engineering: A Traditional Discipline in a Non-traditional Organization

Space Launch System Status Briefing to NAC Space Operations Committee

ESA s Data Management System for the Russian Segment of the International Space Station

System Development and Life-Cycle Management (SDLCM) Methodology

Systems Development Life Cycle (SDLC)

How to Write a Software Process Procedures and Policy Manual for YOUR COMPANY

CITY OF SALEM DATA CENTER INFORMATION SYSTEMS SPECIALIST SERIES

NASA s Use of Space Act Agreements

BENCHMARK EVALUATION. Highways and Public Works Information and Communications Technology

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION HUMAN CAPITAL PLAN FOR MISSION EXECUTION, TRANSITION, AND RETIREMENT OF THE SPACE SHUTTLE PROGRAM

Knowledge Management from a

How To Understand The Waterfall Model Of Software Development

Commercial Crew Program Status

MONITORING PERFORMANCE

Maximizing the Utility of Your Tool Set for Project Support

Atlas Emergency Detection System (EDS)

STSG Methodologies and Support Structure

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 16 R-1 Line #145

DRAFT RESEARCH SUPPORT BUILDING AND INFRASTRUCTURE MODERNIZATION RISK MANAGEMENT PLAN. April 2009 SLAC I

Introduction to the ITS Project Management Methodology

CHAPTER 4 TYPES OF COST ESTIMATES

NASA Independent Review Team Orb 3 Accident Investigation Report

Criteria for Flight Project Critical Milestone Reviews

National Aeronautics and Space Administration (NASA) Fleet Management Plan

Audit of the Data Center Consolidation Initiative at NARA. OIG Draft Audit Report No May 10, 2012

Surviving a DCAA. Audit. Nicole Mitchell, CPA Director Aronson LLC. March 29, 2011

2015 Small Satellite Market Observations. Copyright 2015, SpaceWorks Enterprises, Inc. (SEI)

GENERAL SERVICES ADMINISTRATION Federal Supply Schedule Authorized Federal Supply Schedule

Guidance for Applicants

MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION

ATTACHMENT 1: CONTRACTOR PAST PERFORMANCE REPORT CONSULTING SERVICES Note: Continuation sheets may be used if more space is required.

A Characterization Taxonomy for Integrated Management of Modeling and Simulation Tools

Improving the Life-Cycle Cost Management of Planetary Missions (Finding Summary)

DRAFT Publication 4812 State of Security (SoS) Package

OVERHEAD, GENERAL, AND ADMINISTRATIVE COSTS

Position Descriptions. Aerospace

In today s acquisition environment,

Master Document Audit Program

Software Test Plan (STP) Template

Department of Commerce National Institute of Standards and Technology (NIST)

Offsets in Defense Trade

PDS (The Planetary Data System) Information Technology Security Plan for The Planetary Data System: [Node Name]

Ms. Sally Ericsson Program Associate Director Office of Management and Budget New Executive Office Building Washington, DC Dear Ms.

EXECUTIVE SUMMARY...5

Space Communications and Navigation: NASA s Management of the Space Network

Innovation and Technology Department

PROPOSALS REQUESTED THE TOWN OF OLD ORCHARD BEACH POLICE DEPARTMENT FOR IP-BASED VOICE COMMUNICATION SYSTEM

STATEMENT OF WORK FOR SUPPORT SERVICES FOR THE OFFICE OF HUMAN CAPITAL MANAGEMENT AT THE GODDARD SPACE FLIGHT CENTER DECEMBER 2012

Lessons Learned during the Refurbishment and Testing of an Observatory after Longterm

SYSTEMS ENGINEERING FUNDAMENTALS 4/10/2003 1

Earned Value Management Tutorial Module 1: Introduction to Earned Value Management. Prepared by:

An introduction to Earned Value Analysis

INTRODUCTION TO DIGITAL PHOTOGRAPHY

SOFTWARE ASSURANCE STANDARD

PROJECT CHARTER GUIDE

NASA s Intelligent Synthesis Environment Program Revolutionizing the Agency s Engineering and Science Practice

Project management. Objectives. Topics covered. Organizing, planning and scheduling software projects DISCUSSION

U.S. ELECTION ASSISTANCE COMMISSION OFFICE OF INSPECTOR GENERAL

Bid & Proposal Cost: How can Government and Industry work to get Better Bang for your Buck?

WORKFORCE COMPOSITION CPR. Verification and Validation Summit 2010

Statement. Mr. Paul A. Brinkley Deputy Under Secretary of Defense for Business Transformation. Before

Federal Business Opportunities (FedBizOpps.gov) Change Management Plan (CMP)

PART ONE OVERVIEW. ESMD - Integrated Collaborative Environment

DATA REQUIREMENTS DESCRIPTION (DRD)

PROVIDER MONITORING TOOL FOR NEW PROVIDERS

Putting Business Capabilities to Work

Project Procurement Management

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

2. Please describe the project s alignment with the Common System Principles (Appendix 1).

Business Unit CONTINGENCY PLAN

Transcription:

Falcon 9 Launch Vehicle NAFCOM Cost Estimates August 2011 NASA Associate Deputy Administrator for Policy 1

Falcon 9 Launch Vehicle NAFCOM Cost Estimate The objective of the analysis was to estimate the cost to develop the Falcon 9 launch vehicle using two different approaches: 1) traditional NASA environment/culture, and 2) a more commercial ildevelopment culture approach. The analysis was performed late 2010 early 2011 using the NASA Air Force Cost Model (NAFCOM) with results provided to ESMD in November 2010. These results were used for Appendix B of the Commercial Market Assessment for Crew and Cargo Systems and for the Deputy Administrator s presentation at the National Space Symposium. Results: The activity estimated Falcon 9 would cost $3.977B based on NASA environment/culture. NAFCOM predicted $1.695B when all technical inputs were adjusted to a more commercial development approach. Working with different inputs from the preliminary data provided by SpaceX after a trip to the SpaceX facility, NASA recently inputted revised data into the NAFCOM model and a different output was the result. 2

Original Cost Estimates versus SpaceX Actuals NASA did not perform a detailed analysis to explain the significant differences between the cost estimates and SpaceX actual costs. However, SpaceX attributed their cost efficiencies to a few primary factors. 1. Workforce Total vehicle DDT&E costs are primarily a product of the total workforce needed to accomplish the effort (SpaceX workforce numbers substantiate their development cost claims), 2. Organizational complexity SpaceX estimates that every dollar sent out of the company actually costs between $3 and $5 based on subcontractor overhead and profit, and 3. Infrastructure Total infrastructure required for the DDT&E effort and infrastructure utilization percentage. These factors suggest that reducing the total workforce; number of management layers and infrastructure can substantially reduce DDT&E costs when compared to traditional NASA environment/culture. 3

Update to the Cost Estimates The original estimates were based on technical parameters and inputs supplied by SpaceX in the fall of 2010. Provided only a Cost Plus Fee approach Included a single first flight unit NASA personnel subsequently visited the Space X facilities and spoke with SpaceX personnel about the inputs and results of the initial modeling effort. The updated estimates provided both Cost Plus Fee and Firm Fixed Price approaches and included two flight unites The initial and updated cost estimates are not NASA budget estimates. Do not include all costs that would be included in a NASA project budget Are schedule and time phasing independent Both the initial and updated cost estimates are included in this presentation. 4

Falcon Falcon 9 NAFCOM 9 Cost Cost Estimates Estimate Trace Comparison Falcon 9 NAFCOM Cost Estimate Comparison (All Costs Are In FY2010 $M) Initial Estimate Updated Estimate Cost Plus Fee Cost Plus Fee Firm Fixed Price Cost Plus Fee Total Total Total Total Elements (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) Falcon 9 Total $1,695 $3,977 $443 $1,383 Assumptions inserted after Space X visit: More heritage from Falcon 1 and use of off the shelf hardware than the initial information Nine redundant controllers and wiring harnesses were not identified in the initial information Structure weights were included in the electronics Separation subsystem mass was included in structure Interstage (composite material) was included in structures (aluminum lithiumlithium material) Falcon 9 test program initially included only one test flight unit Excludes Program Support costs (Firm Fixed Price only). Excludes Contingency costs (Firm Fixed Price only). Excludes Contractor fee (Firm Fixed Price only). 5

Modeling Explanation of Difference Primary Differences In Firm Fixed Price Vs. Cost Plus Fee Acquisition Model Input Assumptions Firm Fixed Price Cost Plus Fee 1- Acquisition Strategy No Oversight Oversight 2- Requirements Stability Stable Unstable 3- Team Effeciency Efficient Less Efficient 4- Management Structuret Lean Less Lean 5- Early Phase studies/sys. Engineering Disciplined Less Disciplined 6- Funding Commitment Fixed Annual Note: Order represents relative weighting 6

Backup Material 7

Falcon 9 NAFCOM Cost Estimate Comparison Initial (BothEstimates Are Cost PlusFee) (All Costs Are In FY2010 $M) Cost Plus Fee Cost Plus Fee Space x Approach NASA Approach Weight DDT&E Flight Unit Total DDT&E Flight Unit Total Elements (lbs) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) Stage One (Including Engines) 39,080 $614 $87 $701 $1,535 $206 $1,741 Stage Two (Including Engine) 6,520 $331 $12 $343 $608 $44 $651 Fee (12.5%) $118 $12 $130 $268 $30 $298 Program Support (10%) $107 $4 $111 $241 $21 $263 Contingency (30% Vehicle, 10% Engine)) $251 $11 $262 $674 $68 $741 Vehicle Level Integration (8%) $106 $5 $111 $258 $24 $282 Total 45,600 $1,528 $131 $1,659 $3,584 $393 $3,977 Based on November, 2010 weight estimate and technical data from SpaceX Represents DDT&E and one flight unit Both estimates represent cost plus fee acquisition approach (include fee, program support, and contingency) 8

Falcon 9 NAFCOM Updated Cost Estimate Comparison Updated (Cost Plus Fee Vs. Firm Fixed Price) Firm Fixed Price Acquisition Cost Plus Fee Acquisition Weight DDT&E 2 Test Flt Units Total DDT&E 2 Test Flt Units Total Elements (lbs) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) (FY2010 $M) Stage One (Including Engines) 39,080 $188.7 $109.3 $298.0 $370.6 $218.3 $588.9 Stage Two (Including Engine) 6,506 $89.0 $23.6 $112.6 $184.7 $59.6 $244.4 Fee (12.5%) $0.0 $0.0 $0.0 $69.4 $34.7 $104.2 Program Support (10%) $0.0 $0.0 $0.0 $62.5 $31.3 $93.7 Contingency (30% Vehicle, 10% Engine)) $0.0 $0.0 $0.0 $193.2 $91.7 $284.9 Vehicle Level Integration (8%) $22.2 $10.6 $32.8 $44.4 $22.2 $66.7 Total 45,586 $299.9 $143.6 $443.4 $924.9 $457.9 $1,382.7 Based on technical corrections and the additional insight in to the mass summary information as well as hardware heritage gained from a recent trip to the SpaceX facility. Represents DDT&E and two test flight unit Cost plus fee acquisition approach include fee, program support, and contingency where firm fixed price acquisition reflects a space act agreement approach 9