Availability Management Plan Template



Similar documents
ITIL Introducing service design

IT Service Management Practitioner: Plan & Improve (based on ITIL ) (IPPI.EN)

ITIL v3. Service Management

Business Requirements Document Template. SR OASDI Employee Rate Change

1. Which of the following best means Combination of Internal & External Sourcing? 3. Which of the following CANNOT be stored and managed by a tool?

ITIL Terms and Definitions Terms in Bold are Foundation exam terms

BCIS 5520 IT Service Management. Service Design (Part 2)

The Official ITIL v3 Foundation Study Aid Glossary of Terms and Definitions

ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists

ISEB Practitioner Certificate in IT Service Management: Specialising in Availability Management

SERV SER ICE DE SIGN

Business Continuity Management

Which ITIL process or function deals with issues and questions about the use of services, raised by end users?

ITIL Essentials Study Guide

Problem Management Overview HDI Capital Area Chapter September 16, 2009 Hugo Mendoza, Column Technologies

Executive Summary WHAT IS DRIVING THE PUSH FOR HIGH AVAILABILITY?

ITIL V3 Application Support Volume 1

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA

Preparation Guide. EXIN IT Service Management Associate Bridge based on ISO/IEC 20000

Tait Support Agreement. Assured network communications. Service Description

PHASE 9: OPERATIONS AND MAINTENANCE PHASE

Service Improvement. Part 3 The Strategic View. Robert.Gormley@ed.ac.uk

ITIL V3 differences from V2

Module 1 Study Guide

Service Management ITIL Service Design

Manage IT Service Continuity and Availability

Desktop Scenario Self Assessment Exercise Page 1

BUSINESS CONTINUITY PLAN (TEMPLATE)

Preparation Guide. EXIN IT Service Management Associate based on ISO/IEC 20000

AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY

Client Study Portfolio

PULSE SECURE CARE PLUS SERVICES

TECHNICAL SUPPORT AS A BASIS OF HIGH AVAILABILITY LEVEL AND IT SYSTEM SERVICE QUALITY*

ITIL V3 Service Lifecycle Key Inputs and Outputs

Availability Management: A CA Service Management Process Map

Improving. Summary. gathered from. research, and. Burnout of. Whitepaper

Juniper Care Plus Services

How to measure your business resiliency

Design Ideas. LANDesk Service Desk Suite

Q uick Guide to Disaster Recovery Planning An ITtoolkit.com White Paper

ISO/IEC ITIL Service Management V.2 V s V.3 Project ACE Andy Evans Programme Director and Strategic Programme Advisor

Considerations for firms thinking of using third-party technology (off-the-shelf) banking solutions

ITIL: Service Transition

Enterprise Business Service Management

Business Continuity Planning Instructions

ITIL Intermediate Capability Stream:

Business Continuity Plan

How To Manage A Patch Management Process

Technology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs

Continuity of Business

Introduction to ITIL: A Framework for IT Service Management

pavassure Resolve Service desk Onsite diagnosis and recovery Enhanced hours support Monitor Event monitoring & alerting Reporting Services

Capacity Plan. Template. Version X.x October 11, 2012

RELIABILITY AND AVAILABILITY OF CLOUD COMPUTING. Eric Bauer. Randee Adams IEEE IEEE PRESS WILEY A JOHN WILEY & SONS, INC.

[Insert Company Logo]

Application / Hardware - Business Impact Analysis Template. MARC Configuration Requirements. Business Impact Analysis

The Task. First things first what is a Service Level Agreement?

Business Continuity Planning. Description and Framework. White Paper. Preface. Contents

Disaster Recovery and Business Continuity Plan

WHITE PAPER December, 2008

Information Security. Incident Management Program. What is an Incident Management Program? Why is it needed?

An ITIL Perspective for Storage Resource Management

Cisco Network Optimization Service

Measuring the Return on IT Security Investments. White Paper Intel Information Technology Computer Manufacturing Information Security

IT Services Management Service Brief

Achieving Control: The Four Critical Success Factors of Change Management. Technology Concepts & Business Considerations

DISASTER RECOVERY PLANNING GUIDE

ITSM Process Maturity Assessment

Huawei Managed Services Unified Platform (MS UP) v1.0

IT Services. Service Level Agreement

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

An Introductory Overview of ITIL V3

Information Services. Standing Service Level Agreement (SLA) Firewall and VPN Services

TO AN EFFECTIVE BUSINESS CONTINUITY PLAN

EMERGENCY PREPAREDNESS POLICY

Business Continuity Management Policy and Framework

Cisco IT Technology Tutorial Overview of ITIL at Cisco

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

Federal Financial Institutions Examination Council FFIEC BCP. Business Continuity Planning FEBRUARY 2015 IT EXAMINATION H ANDBOOK

BUSINESS CONTINUITY MANAGEMENT POLICY

NOTTINGHAMSHIRE OFFICE OF THE POLICE AND CRIME JOB DESCRIPTION. Project Manager ECINS Development and Implementation 1 year project

Integrating Project Management and Service Management

ITIL v3 (Lecture II) Service Management as a Practice

i. Maintenance of the operating system, applications, content on the server, or fault tolerant network connections

Foundation. Summary. ITIL and Services. Services - Delivering value to customers in the form of goods and services - End-to-end Service

Business continuity management policy

University of Glasgow. Policy for. Business Continuity Management

Information Services IT Security Policies B. Business continuity management and planning

Application Maintenance and Development Attachment C for RFP#

Everything You Need To Know About Cloud Computing

EXIN.Passguide.EX0-001.v by.SAM.424q. Exam Code: EX Exam Name: ITIL Foundation (syllabus 2011) Exam

Service Transition and Support: A CA Service Management Process Map

NHS 24 - Business Continuity Strategy

Transcription:

Availability Management Plan Template Your Logo ( v 1.0 ) Author Reviewers Signatories DOCUMENT INFORMATION Master Location : File Name : Distribution CHANGE HISTORY Version No. Date Details of Changes included in Update Author(s) Authors name Availability plan template v1.00 Page 1 30 November 2012

AVAILABILITY PLAN PURPOSE: A Plan to ensure that existing and future Availability Requirements for IT Services can be provided cost effectively. GOAL: To improve the overall availability of IT services and infrastructure components, to ensure that existing and future business availability requirements can be met. SCOPE: As agreed, but as a minimum should include existing key IT services, new and planned services in development. (State the services covered by the plan) The Availability Plan should be updated on a regular (Monthly) basis and aligned to Capacity and Financial plans. Availability plan template v1.00 Page 2 30 November 2012

EXECUTIVE SUMMARY: The Executive or Management Summary should contain a one or two page overview of the most important aspect of the overall plan. Availability plan template v1.00 Page 3 30 November 2012

PERFORMANCE: Document actual levels of availability versus agreed levels of availability for key IT services. Availability measurements should always be business- and customer-focused and report availability as experienced by the business and users. Service Summary Service Outage Impact Description Target Projected Availability Component Summary Service Outage Impact Description Target Projected Availability Availability plan template v1.00 Page 4 30 November 2012

ACHIEVEMENTS / PERFORMANCE IMPROVEMENTS: Document those activities being progressed to address shortfalls in availability for existing IT services. Where investment decisions are required, options with associated costs and benefits should be included. Summary Service Outage Impact Description Benefit Cost Availability plan template v1.00 Page 5 30 November 2012

OPTIONS FOR IMPROVEMENT: This section should contain details of changing availability requirements for existing IT services. The plan should document the options available to meet these changed requirements. Where investment decisions are required, the associated costs of each option should be included. Details of the availability requirements for forthcoming new IT services. The plan should document the options available to meet these new requirements. Where investment decisions are required, the associated costs of each option should be included. Summary Service Outage Impact Description Benefit Cost Availability plan template v1.00 Page 6 30 November 2012

IMPROVEMENT SCHEDULE A forward-looking schedule for the planned SFA assignments. Regular reviews of SFA assignments should be completed to ensure that the availability of technology is being proactively improved in conjunction with the SIP. Summary Date Area/System Description Achievements Status Availability plan template v1.00 Page 7 30 November 2012

TECHNOLOGICAL OPPORTUNITIES: The technology futures section provides an indication of the potential benefits and exploitation opportunities that exist for planned technology upgrades. Anticipated availability benefits should be detailed, where possible based on business-focused measures, in conjunction with Capacity Management. The effort required to realize these benefits where possible should also be quantified. Summary Date Description Area/System Potential Benefit Resource requirement Availability plan template v1.00 Page 8 30 November 2012

Glossary of terms Availability Impact Maintainability PSO Key indicator of the service provided. It should be defined in the Service Level Agreement A measure of the effect of an Incident, Problem or Change on Business Processes. Impact is often based on how Service Levels will be affected. Impact and Urgency are used to assign Priority. The ability of the IT group to maintain the IT infrastructure in operational state and available according to the agreed service levels Projected Service Outage Reliability Resilience Security Service Serviceability Vital Business Function Reliability of the service is made up out of the reliability of Service Components and the resilience of the IT infrastructure. The ability of individual components to absorb or be flexible in times of stress. Confidentiality, Integrity and Availability (CIA) of Data or a Service. A business defined deliverable supported by one or more I.T. Systems, which enables the business to deliver its objectives The ability of a Third-Party Supplier to meet the terms of its Contract. This Contract will include agreed levels of Reliability, Maintainability or Availability for a Configuration Item. The business critical element of the business process that is supported by the IT service. Acronyms AMIS BIA CFIA MTBF MTBSI MTRS SFA Availability Management Information System Business Impact Analysis Component Failure Impact Analysis Mean Time Between Failures - mean time between the recovery from one incident and the occurrence of the next incident. Mean Time Between System Incidents - mean time between the occurrence of two consecutive incidents. The MTBSI = MTTR + MTBF. Mean Time to Recover System -average time between the occurrence of a fault and service recovery (or the downtime). An Activity that identifies underlying causes of one or more IT Service interruptions. SFA identifies opportunities to improve the IT Service Provider s Processes and tools, and not just the IT Infrastructure. SFA is a time-constrained, project-like activity, rather than an ongoing process of analysis. Availability plan template v1.00 Page 9 30 November 2012

SPOF Single Point of Failure - Any Configuration Item that can cause an Incident when it fails, and for which a Countermeasure has not been implemented. A SPOF may be a person, or a step in a Process or Activity, as well as a Component of the IT Infrastructure. Availability plan template v1.00 Page 10 30 November 2012

General Guidance for Availability Management and using the Availability Plan During the initial production of the Availability Plan, it is recommended that liaison with all functional, technical and process areas is undertaken. The Availability Plan should cover a period of one to two years, with a more detailed view and information for the first six months. The plan should be reviewed regularly, with minor revisions every quarter and major revisions every half year. Where the technology is only subject to a low level of change, this may be extended as appropriate. It is recommended that the Availability Plan is considered complementary to the Capacity Plan and Financial Plan, and that publication is aligned with the capacity and business budgeting cycle. If a demand is foreseen for high levels of availability that cannot be met due to the constraints of the existing IT infrastructure or budget, then exception reports may be required for the attention of both senior IT and business management. In order to facilitate the production of the Availability Plan, Availability Management may wish to consider having its own database repository. The AMIS can be utilized to record and store selected data and information required to support key activities such as report generation, statistical analysis and availability forecasting and planning. The AMIS should be the main repository for the recording of IT availability metrics, measurements, targets and documents, including the Availability Plan, availability measurements, achievement reports, SFA assignment reports, design criteria, action plans and testing schedules. Availability plan template v1.00 Page 11 30 November 2012