Disaster Recovery and Business Continuity Plan
|
|
|
- Mervyn Robbins
- 9 years ago
- Views:
Transcription
1 Disaster Recovery and Business Continuity Plan
2 Table of Contents 1. Introduction Objectives Risks Steps of Disaster Recovery Plan formulation Audit Procedure Appendix A IT Disaster Recovery Plan Template... 7
3 1. Introduction IT disaster recovery plans provide step-by-step procedures for recovering disrupted systems and networks, and help them resume normal operations. The goal of these processes is to minimize any negative impacts to company operations. The IT disaster recovery process identifies critical IT systems and networks; prioritizes their recovery time objective; and delineates the steps needed to restart, reconfigure, and recover them. A comprehensive IT DR plan also includes all the relevant supplier contacts, sources of expertise for recovering disrupted systems and a logical sequence of action steps to take for a smooth recovery. 2. Objectives The objective of having a Business Continuity and Disaster Recovery Plan and associated controls is to ensure that the organization can still accomplish its mission and it would not lose the capability to process, retrieve and protect information maintained in the event of an interruption or disaster leading to temporary or permanent loss of computer facilities. 3. Risks The absence of a well-defined and tested Business Continuity and Disaster Recovery Plan may pose the following major threats to the very existence of the organization in the event of a disaster: The organization s ability to accomplish its mission after re-starting its operations. To retrieve and protect the information maintained. To keep intact all the organizational activities after the disaster. To start its operations on full scale at the earliest to minimize the business loss in terms of money, goodwill, human resources and capital assets. 4. Steps of Disaster Recovery Plan formulation According to National Institute for Standards and Technology (NIST) Special Publication , Contingency Planning for Information Technology Systems, the following summarizes the ideal structure for an IT disaster recovery plan: 1. Develop the contingency planning policy statement. A formal policy provides the authority and guidance necessary to develop an effective contingency plan. 2. Conduct the business impact analysis (BIA). The business impact analysis helps to identify and prioritize critical IT systems and components.
4 3. Identify preventive controls. These are measures that reduce the effects of system disruptions and can increase system availability and reduce contingency life cycle costs. 4. Develop recovery strategies. Thorough recovery strategies ensure that the system can be recovered quickly and effectively following a disruption. 5. Develop an IT contingency plan. The contingency plan should contain detailed guidance and procedures for restoring a damaged system. 6. Plan testing, training and exercising. Testing the plan identifies planning gaps, whereas training prepares recovery personnel for plan activation; both activities improve plan effectiveness and overall agency preparedness. 7. Plan maintenance. The plan should be a living document that is updated regularly to remain current with system enhancements. Following the mentioned steps we can expand those activities into the following structured sequence of activities. 1. The plan development team should meet with the internal technology team, application team, and network administrator(s) and establish the scope of the activity, e.g., internal elements, external assets, third-party resources etc. IT department senior management should be properly informed. 2. Gather all relevant network infrastructure documents, e.g., network diagrams, equipment configurations, databases. 3. Obtain copies of existing IT and network DR plans if they exist. 4. Identify what management perceives as the most serious threats to the IT infrastructure, e.g., fire, human error, loss of power, system failure. 5. Identify what management perceives as the most serious vulnerabilities to the infrastructure, e.g., lack of backup power, out-of-date copies of databases. 6. Review previous history of outages and disruptions, and how the firm handled them. 7. Identify what management perceives as the most critical IT assets, e.g., call center, server farms, Internet access. 8. Determine the maximum outage time management can accept if the identified IT assets are unavailable. 9. Identify the operational procedures currently used to respond to critical outages. 10. Determine when these procedures were last tested to validate their appropriateness. 11. Identify emergency response team(s) for all critical IT infrastructure disruptions; determine their level of training with critical systems, especially in emergencies. 12. Compile results from all assessments into a gap analysis report that identifies what is currently done versus what ought to be done, with recommendations as to how to achieve the required level of preparedness, and estimated investment required. 13. Have management review the report and agree on recommended actions. 14. Prepare IT disaster recovery plan(s) to address critical IT systems and networks. 15. Conduct tests of plans and system recovery assets to validate their operation. 16. Update DR plan documentation to reflect changes. 17. Schedule next review/audit of IT disaster recovery capabilities.
5 Important IT disaster recovery planning considerations Senior management support. Be sure to obtain senior management support so that your plan goals can be achieved. Take the IT DR planning process seriously. Although the IT DR plan can take a great deal of time for data gathering and analysis, it doesn't have to be dozens of pages long. Plans simply need the right information, and that information should be current and accurate. Keep it simple. Gathering and organizing the right information is critical. Review results with business units. Once the IT disaster recovery plan is complete, review the findings with business units leaders to make sure your assumptions are correct. 5. Audit Procedure. The organization with computerized systems should have assessed threats to the system, its vulnerability and the impact a loss of operations would have on the organization s ability to operate and achieve organizational objectives. Appropriate measures should then be put in place to reduce risks to a level that is acceptable to the organization s senior management. The extent of business continuity and disaster recovery planning and the detailed measures required will vary considerably. Organizations with large IT departments, with mainframe computers and complex communication networks may require comprehensive, up to date continuity and recovery plans which incorporate standby facilities at alternative sites. At the other end of the scale, a small agency or non-departmental public body with a desk-top PC, running a simple off the shelf package, would have a simpler plan. Continuity and disaster recovery plans should be documented, periodically tested and updated as necessary. To determine whether recovery plans will work as intended, they should be tested periodically in disaster simulation exercises. The importance of adequate documentation is increased where significant reliance is placed on a few key members of the IT department. The loss of key staff, perhaps due to the same reason the computers were disrupted, may adversely affect an organization s ability to resume operations within a reasonable timeframe. Back-up copies of systems software, financial applications and underlying data files should be taken regularly. Back-ups should be cycled through a number of generations by, for example, using daily, weekly, monthly and quarterly tapes. Back- ups should be stored, together with a copy of the disaster recovery plan and systems documentation, in an off-site fire-safe. The IT auditor while assessing the adequacy of business continuity and disaster recovery plan should consider: Evaluating the business continuity and disaster recovery plans to determine their adequacy by reviewing the plans and comparing them to organizational standards and/or government regulations. Verifying that the business continuity and disaster recovery plans are effective to ensure that information processing capabilities can be resumed promptly after an
6 unanticipated interruption by reviewing the results from previous tests performed, if any, by the IT organization and the end users. Evaluating off site storage to ensure its adequacy by inspecting the facility and reviewing its contents and security and environmental controls. It may be ascertained whether backups taken earlier have ever been tested for data recovery by the auditee organization. Evaluating the ability of IT and user personnel to respond effectively in emergency situations by reviewing emergency procedures, employee training and results of their drill.
7 <Municipality> IT Disaster Recovery Plan Template
Business Continuity Planning and Disaster Recovery Planning
4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business
PBSi Business Continuity Planning
Business Continuity Planning Definition Business Continuity planning is a planning process designed to reduce the risk that disruptive failures or events could seriously harm your business. It is designed
Creating a Business Continuity Plan for your Health Center
Creating a Business Continuity Plan for your Health Center 1 Page Left Intentionally Blank 2 About This Manual This tool is the result of collaboration between the Primary Care Development Corporation
Business Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions
MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION
MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit
Data Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: [email protected] Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS
Appendix L DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS I. GETTING READY A. Obtain written commitment from top management of support for contingency planning objectives. B. Assemble
DRAFT Disaster Recovery Policy Template
DRAFT Disaster Recovery Policy Template NOTE: This is a boiler plate template much information is needed from to finalizeconsider this document pre-draft FOREWARD... 3 Policy Overview...
Unit Guide to Business Continuity/Resumption Planning
Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions
AUDITING A BCP PLAN. Thomas Bronack Auditing a BCP Plan presentation Page: 1
AUDITING A BCP PLAN Thomas Bronack Auditing a BCP Plan presentation Page: 1 What are the Objectives of a Good BCP Plan Protect employees Restore critical business processes or functions to minimize the
Business Continuity Management
Business Continuity Management cliftonlarsonallen.com Introductions Brian Pye CliftonLarsonAllen Senior Manager Business Risk Services group 15 years of experience with Business Continuity Megan Moore
Disaster Recovery Planning Process
Disaster Recovery Planning Process By Geoffrey H. Wold Part I of III This is the first of a three-part series that describes the planning process related to disaster recovery. Based on the various considerations
Department of Information Technology Data Center Disaster Recovery Audit Report Final Report. September 2006
Department of Information Technology Data Center Disaster Recovery Audit Report Final Report September 2006 promoting efficient & effective local government Executive Summary Our audit found that a comprehensive
Business Continuity Planning in IT
Introduction: Business Continuity Planning in IT The more your business relies on its IT systems, the more you need to consider how unexpected disruptions might affect your business. These disruptions
DISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES
APPENDIX 1 DISASTER RECOVERY PLANNING FOR CITY COMPUTER FACILITIES March 2008 Auditor General s Office Jeffrey Griffiths, C.A., C.F.E. Auditor General City of Toronto TABLE OF CONTENTS EXECUTIVE SUMMARY...1
SAMPLE IT CONTINGENCY PLAN FORMAT
SAMPLE IT CONTINGENCY PLAN FORMAT This sample format provides a template for preparing an information technology (IT) contingency plan. The template is intended to be used as a guide, and the Contingency
Business Continuity Planning 101. +1 610 768-4120 (800) 634-2016 www.strohlsystems.com [email protected]
Business Continuity Planning 101 Presentation Overview What is business continuity planning Plan Development Plan Testing Plan Maintenance Future advancements in BCP Question & Answer What is a Disaster?
Technology Recovery Plan Instructions
State of California California Information Security Office Technology Recovery Plan Instructions SIMM 5325-A (Formerly SIMM 65A) September 2013 REVISION HISTORY REVISION DATE OF RELEASE OWNER SUMMARY OF
Application / Hardware - Business Impact Analysis Template. MARC Configuration Requirements. Business Impact Analysis
Application / Hardware - Business Impact Analysis Template The single most important thing we can do is help you understand the criticality of each application, supporting hardware/server/pc and the required
Hanh Do, Director, Information System Audit Division, GAA. SUBJECT: Review of HUD s Information Technology Contingency Planning and Preparedness
Issue Date: August 31, 2006 Audit Report Number 2006-DP-0005 TO: Lisa Schlosser, Chief Information Officer, A FROM: Hanh Do, Director, Information System Audit Division, GAA SUBJECT: Review of HUD s Information
Virginia Commonwealth University School of Medicine Information Security Standard
Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Business Continuity Management Standard for IT Systems This standard is applicable to all VCU School of Medicine
Business Unit CONTINGENCY PLAN
Contingency Plan Template Business Unit CONTINGENCY PLAN Version 1.0 (Date submitted) Submitted By: Business Unit Date Version 1.0 Page 1 1 Plan Review and Updates... 3 2 Introduction... 3 2.1 Purpose...
Business Continuity Planning Instructions
Business Continuity Planning Instructions Business continuity planning is a proactive planning process that ensures critical services or products are delivered during a disruption. In creating the plan,
Chapter I: Fundamentals of Business Continuity Management
Chapter I: Fundamentals of Business Continuity Management Objectives Define Business Continuity Management (BCM) Define the relationship between BCM and risk management Review BCM responsibilities Identify
Documentation. Disclaimer
HOME UTORprotect DOCUMENTATION AMS/ROSI SERVICES CONTACT Documentation Disaster Recovery Planning Disaster Recovery Planning Disclaimer The following project outline is provided solely as a guide. It is
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015
STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY 27 2015 AGENDA: Emergency Management Business Continuity Planning Q & A MONTH DAY, YEAR TITLE OF THE PRESENTATION 2 CANADIAN RED CROSS Disaster
PPSADOPTED: OCT. 2012 BACKGROUND POLICY STATEMENT PHYSICAL FACILITIES. PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan
PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan OCT. 2012 PPSADOPTED: What is a professional practice statement? Professional Practice developed by the Association Forum of Chicagoland
Overview of how to test a. Business Continuity Plan
Overview of how to test a Business Continuity Plan Prepared by: Thomas Bronack Phone: (718) 591-5553 Email: [email protected] BRP/DRP Test Plan Creation and Exercise Page: 1 Table of Contents BCP/DRP Test
Domain 3 Business Continuity and Disaster Recovery Planning
Domain 3 Business Continuity and Disaster Recovery Planning Steps (ISC) 2 steps [Har10] Project initiation Business Impact Analysis (BIA) Recovery strategy Plan design and development Implementation Testing
BUSINESS CONTINUITY PLAN
How to Develop a BUSINESS CONTINUITY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A BUSINESS CONTINUITY PLAN? CHAPTER PREPARING TO WRITE YOUR BUSINESS CONTINUITY PLAN CHAPTER
Disaster Recovery Plan Documentation for Agencies Instructions
California Office of Information Security Disaster Recovery Plan Documentation for Agencies Instructions () November 2009 SCOPE AND PURPOSE The requirements included in this document are applicable to
Office of Inspector General
DEPARTMENT OF HOMELAND SECURITY Office of Inspector General Security Weaknesses Increase Risks to Critical United States Secret Service Database (Redacted) Notice: The Department of Homeland Security,
Why Should Companies Take a Closer Look at Business Continuity Planning?
whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan GIS Bankers Insurance Group Powered by DISASTER PREPAREDNESS Implementation Small Business Guide to Business Continuity Planning Surviving a Catastrophic
PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA
Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
Security Architecture. Title Disaster Planning Procedures for Information Technology
Category Applicability Title Disaster Planning Procedures for Information Technology All Public Entities (See the Applicability section below.) Standard - A degree or level of requirement that all jurisdictions
MARQUIS DISASTER RECOVERY PLAN (DRP)
MARQUIS DISASTER RECOVERY PLAN (DRP) Disaster Recovery is an ongoing process to plan, develop, test and implement changes, processes and procedures supporting the recovery of the critical functions in
Audit, Finance and Legislative Committee Mayor Craig Lowe, Chair Mayor-Commissioner Pro Tem Thomas Hawkins, Member
City of Gainesville Inter-Office Communication April 3, 2012 TO: FROM: SUBJECT: Audit, Finance and Legislative Committee Mayor Craig Lowe, Chair Mayor-Commissioner Pro Tem Thomas Hawkins, Member Brent
Federal Financial Institutions Examination Council FFIEC BCP. Business Continuity Planning MARCH 2003 IT EXAMINATION H ANDBOOK
Federal Financial Institutions Examination Council FFIEC Business Continuity Planning MARCH 2003 BCP IT EXAMINATION H ANDBOOK TABLE OF CONTENTS INTRODUCTION... 1 BOARD AND SENIOR MANAGEMENT RESPONSIBILITIES...
The University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1
Version 3.1 November 22, 2004 TABLE OF CONTENTS PART 1: DISASTER RECOVERY EXPECTATIONS... 3 OVERVIEW...3 EXPECTATIONS PRIOR TO AN INCIDENT OCCURRENCE...3 EXPECTATIONS PRIOR TO A DISASTER OCCURRENCE...4
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Disaster Recovery Testing Is Being Adequately Performed, but Problem Reporting and Tracking Can Be Improved May 3, 2012 Reference Number: 2012-20-041 This
HA / DR Jargon Buster High Availability / Disaster Recovery
HA / DR Jargon Buster High Availability / Disaster Recovery Welcome to Maxava s Jargon Buster. Your quick reference guide to Maxava HA and industry technical terms related to High Availability and Disaster
Fundamentals of Business Continuity Planning Have a Plan!
Fundamentals of Business Continuity Planning Have a Plan! Michael Kadar, MBCP, CISSP 2008 MK Continuity & Availability LLC [email protected] InfraGard Meeting Walsh College, Novi March 25, 2008
Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits
Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits Betty A. Kildow, CBCP, FBCI, Emergency Management Consultant Kildow Consulting 765/483-9365; [email protected] 95 th
Business Continuity Information Gathering Template
Business Continuity Information Gathering Template August 2009 Introduction Our organization has begun an intensive effort to document Business Continuity Plans for all departments and s. The Department
Institute for Business Continuity Training 1623 Military Road, # 377 Niagara Falls, NY 14304-1745
ECP - 601: Effective Business Continuity Management: ISO 22301 This 3-day course provides an intensive, hands-on workshop covering all major aspects for the design of an effective Business Continuity Plan
Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four
Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four Data Handling in University Business Impact Analysis ( BIA ) Agenda Overview Terminologies Performing
PAPER-6 PART-3 OF 5 CA A.RAFEQ, FCA
Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-3 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
CONTINUITY OF OPERATIONS AUDIT PROGRAM EVALUATION AND AUDIT
CONTINUITY OF OPERATIONS AUDIT PROGRAM EVALUATION AND AUDIT April 16, 2014 INTRODUCTION Purpose The purpose of the audit is to give assurance that the development of the Metropolitan Council s Continuity
DISASTER RECOVERY PLANNING GUIDE
DISASTER RECOVERY PLANNING GUIDE AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING FOR JD EDWARDS SOFTWARE CUSTOMERS www.wts.com WTS Disaster Recovery Planning Guide Page 1 Introduction This guide will provide
Business Continuity and Emergency Preparedness Planning. Vandita Zachariah, MA, MBA, CIA HHSC Internal Audit Division May 21, 2010
Business Continuity and Emergency Preparedness Planning Vandita Zachariah, MA, MBA, CIA HHSC Internal Audit Division May 21, 2010 Overview Define key terms and list essential elements of business continuity
CISM Certified Information Security Manager
CISM Certified Information Security Manager Firebrand Custom Designed Courseware Chapter 4 Information Security Incident Management Exam Relevance Ensure that the CISM candidate Establish an effective
NCUA LETTER TO CREDIT UNIONS
NCUA LETTER TO CREDIT UNIONS NATIONAL CREDIT UNION ADMINISTRATION 1775 Duke Street, Alexandria, VA 22314 DATE: December 2001 LETTER NO.: 01-CU-21 TO: SUBJ: ENCL: All Federally Insured Credit Unions Disaster
NEEDS BASED PLANNING FOR IT DISASTER RECOVERY
The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be
OFFICE OF AUDITS & ADVISORY SERVICES IT DISASTER RECOVERY AUDIT FINAL REPORT
County of San Diego Auditor and Controller OFFICE OF AUDITS & ADVISORY SERVICES IT DISASTER RECOVERY AUDIT FINAL REPORT Chief of Audits: Juan R. Perez Audit Manager: Lynne Prizzia, CISA, CRISC Senior Auditor:
Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan
Clovis Municipal School District Information Technology (IT) Disaster Recovery Plan Revision History REVISION DATE NAME DESCRIPTION Draft 1.0 Eric Wimbish IT Backup Disaster Table of Contents Information
PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA
1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
Disaster Recovery Planning Procedures and Guidelines
Disaster Recovery Planning Procedures and Guidelines A Mandatory Reference for ADS Chapter 545 New Reference: 06/01/2006 Responsible Office: M/DCIO File Name: 545mal_060106_cd44 Information System Security
Disaster Recovery Plan The Business Imperatives
Disaster Recovery Plan The Business Imperatives Table of Contents Disaster Recovery Plan The Business Imperatives... 3 Introduction... 3 A Disaster Recovery Program The Need of the Hour... 3 Approach to
Post-Class Quiz: Business Continuity & Disaster Recovery Planning Domain
1. What is the most common planned performance duration for a continuity of operations plan (COOP)? A. 30 days B. 60 days C. 90 days D. It depends on the severity of a disaster. 2. What is the business
a Disaster Recovery Plan
Construction of a Disaster Recovery Plan David Godwin, Sr. Sales Engineer March 18, 2014 Objectives Understand What Disaster Recovery is? Why is Disaster Recovery Needed? Effectively assist customers or
The PNC Financial Services Group, Inc. Business Continuity Program
The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page
Domain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
General Computer Controls
1 General Computer Controls Governmental Unit: University of Mississippi Financial Statement Date: June 30, 2007 Prepared by: Robin Miller and Kathy Gates Date: 6/29/2007 Description of computer systems
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0
Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies Effective Date: October 1, 2015 Version 1.0 Unless otherwise stated, these Oracle Maps Cloud Service Enterprise Hosting and Delivery Policies
How To Ensure That Non-Peoplesoft Applications Can Withstand Adverse Events
FINAL AUDIT REPORT Audit of the arrangements for business continuity and disaster recovery for non- PeopleSoft applications in UNHCR BACKGROUND The field offices of the United Nations High Commissioner
PDS (The Planetary Data System) Information Technology Security Plan for The Planetary Data System: [Node Name]
PDS (The Planetary Data System) Information Technology Security Plan for The Planetary Data System: [Node Name] [Date] [Location] 1 Prepared by: [Author] [Title] Date Approved by: [Name] [Title] Date 2
IT Service Management
IT Service Management Service Continuity Methods (Disaster Recovery Planning) White Paper Prepared by: Rick Leopoldi May 25, 2002 Copyright 2001. All rights reserved. Duplication of this document or extraction
EXECUTIVE SUMMARY 1.1 PROJECT OBJECTIVES
1 1.1 PROJECT OBJECTIVES The main objective of the project is to develop a comprehensive IT Business Continuity/Disaster Recovery Plan for the Rochester-Genesee Regional Transportation Authority (RGRTA)
Balancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs
Balancing and Settlement Code BSC PROCEDURE BSCP537 QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs APPENDIX 3 GUIDANCE NOTES ON COMPLETING THE SAD Version 2.0 Date: 10 September 2007
Disaster Recovery. 1.1 Introduction. 1.2 Reasons for Disaster Recovery. EKAM Solutions Ltd Disaster Recovery
Disaster Recovery 1.1 Introduction Every day, there is the chance that some sort of business interruption, crisis, disaster, or emergency will occur. Anything that prevents access to key processes and
2015 CEO & Board University Taking Your Business Continuity Plan To The Next Level. Tracy L. Hall, MBCP
2015 CEO & Board University Taking Your Business Continuity Plan To The Next Level Tracy L. Hall, MBCP MEMBER OF PKF NORTH AMERICA, AN ASSOCIATION OF LEGALLY INDEPENDENT FIRMS 2015 Wolf & Company, P.C.
How Routine Data Center Operations Put Your HA/DR Plans at Risk
How Routine Data Center Operations Put Your HA/DR Plans at Risk Protect your business by closing gaps in your disaster recovery infrastructure Things alter for the worse spontaneously, if they be not altered
Shankar Gawade VP IT INFRASTRUCTURE ENAM SECURITIES PVT. LTD.
Business Continuity Management & Disaster Recovery Planning Presented by: Shankar Gawade VP IT INFRASTRUCTURE ENAM SECURITIES PVT. LTD. 1 What is Business Continuity Management? Is a holistic management
The Weill Cornell Medical College and Graduate School of Medical Sciences. Responsible Department: Information Technologies and Services (ITS)
Information Technology Disaster Recovery Policy Policy Statement This policy defines acceptable methods for disaster recovery planning, preparedness, management and mitigation of IT systems and services
Business Continuity Management
Business Continuity Management Factsheet To prepare for change, change the way you prepare In an intensely competitive environment, a permanent market presence is essential in order to satisfy customers
Business Continuity Planning and Disaster Recovery Planning. Ed Crowley IAM/IEM
Business Continuity Planning and Disaster Recovery Planning Ed Crowley IAM/IEM 1 Goals Compare and contrast aspects of business continuity Execute disaster recovery plans and procedures 2 Topics Business
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION
TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Corrective Actions to Address the Disaster Recovery Material Weakness Are Being Completed June 27, 2011 Report Number: 2011-20-060 This report has cleared
State of South Carolina Policy Guidance and Training
State of South Carolina Policy Guidance and Training Policy Workshop All Agencies Business Continuity Management Policy June 2014 Agenda Questions & Follow-Up Policy Workshop Overview & Timeline Policy
Appendix 6c. Final Internal Audit Report Disaster Recovery Planning. June 2007. Report 6c Page 1 of 15
Appendix 6c Final Internal Audit Report Disaster Recovery Planning June 2007 Report 6c Page 1 of 15 Contents Page Executive Summary 3 Observations and Recommendations 8 Appendix 1 - Audit Framework 13
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff Because a business continuity plan affects all functional units within the organization, each functional unit must participate
SOUTH LAKELAND DISTRICT COUNCIL INTERNAL AUDIT FINAL REPORT IT 11-02. IT Backup, Recovery and Disaster Recovery Planning
SOUTH LAKELAND DISTRICT COUNCIL INTERNAL AUDIT FINAL REPORT IT 11-02 IT Backup, Recovery and Disaster Recovery Planning Executive Summary Introduction As part of the 2011/12 Audit Plan and following discussions
Business Continuity Overview
Business Continuity Overview Beverley A. Retjos Senior Manager WW SWG Security & Controls 03/12/07 Business Continuity Management (BCM) Process of ensuring that a business is prepared to survive any disruption
Disaster Recovery Policy
Disaster Recovery Policy Organizational Functional Area: Policy for: Executive Division Bank Disaster Recovery Program Board Reviewed: September 14, 2011 Department/Individual Responsible for Maintaining/Updating
The PNC Financial Services Group, Inc. Business Continuity Program
The PNC Financial Services Group, Inc. Business Continuity Program subsidiaries) 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis
How to write a DISASTER RECOVERY PLAN. To print to A4, print at 75%.
How to write a DISASTER RECOVERY PLAN To print to A4, print at 75%. TABLE OF CONTENTS SUMMARY SUMMARY WHAT IS A DRP AND HOW CAN IT HELP MY COMPANY? CHAPTER PREPARING TO WRITE YOUR DISASTER RECOVERY PLAN
Ohio Conference for Payroll Professionals Disaster Recovery
Ohio Conference for Payroll Professionals Disaster Recovery Speaker Bruce E. Phipps CPP 2011 APA Payroll Man of the Year Principal Product Manager US Legislative Analyst ORACLE Corporation [email protected]
Disaster Prevention and Recovery for School System Technology
The Optimal Reference Guide: Disaster Prevention and Recovery for School System Technology Extraordinary insight into today s education topics Glynn D. Ligon, Ph.D., ESP Solutions Group Evangelina Mangino,
BUSINESS CONTINUITY MANAGEMENT GUIDELINES FOR BANKS AND FINANCIAL INSTITUTIONS
BUSINESS CONTINUITY MANAGEMENT GUIDELINES FOR BANKS AND FINANCIAL INSTITUTIONS DIRECTORATE OF BANKING SUPERVISION AUGUST 2009 TABLE OF CONTENTS PAGE 1.0 INTRODUCTION..3 1.1 Background...3 1.2 Citation...3
BNA FEDERAL CREDIT UNION DISASTER RECOVERY PLAN
BNA FEDERAL CREDIT UNION DISASTER RECOVERY PLAN INTRODUCTION The need for a contingency plan for business interruptions is vital to the operations of the BNA Federal Credit Union. Without such a plan,
FORMULATING YOUR BUSINESS CONTINUITY PLAN
WHITE PAPER Page 0 Planning for the Worst Case Scenario: FORMULATING YOUR BUSINESS CONTINUITY PLAN 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of Contents Overview... 2 What is Disaster