Sara Brock Counsel for NRC Staff



Similar documents
Part 1 General and Administrative Information. Part 3 Applicant s Environmental Report Combined License Stage

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

March 6, 2013 BABCOCK AND WILCOX, LICENSEE PERFORMANCE REVIEW OF LICENSED ACTIVITIES (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-27/ )

July 31, Dear Dr. Biegalski:

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

October 20, 2004 LOUISIANA ENERGY SERVICES - REQUEST FOR ADDITIONAL INFORMATION ON DECOMMISSIONING FUNDING PLAN

POLICY ISSUE (Information)

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT / )

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 22, 2015

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C March 3, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C July 7, 2015

MATERIALS LICENSE. 1. Honeywell International, Inc. 3. License Number: SUB-526, Amendment 6-1

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

DOE Policy- Reporting of. Update

October 22, 2015 EA

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C November 13, 2012

NRC REGULATORY ISSUE SUMMARY , REQUESTING QUALITY ASSURANCE PROGRAM APPROVAL RENEWALS ONLINE BY ELECTRONIC INFORMATION EXCHANGE

April 15, Dear Dr. Williams:

Executive Director for Operations AUDIT OF NRC S CYBER SECURITY INSPECTION PROGRAM FOR NUCLEAR POWER PLANTS (OIG-14-A-15)

June 8, SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No )

APPENDIX B SUPPLEMENTAL INSPECTION PROGRAM A. OBJECTIVES AND PHILOSOPHY OF THE SUPPLEMENTAL INSPECTION PROGRAM

May 30, Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff

Options for Cyber Security. Reactors. April 9, 2015

NEI 06-13A [Revision 2] Template for an Industry Training Program Description

Sara E. Brock Office of the General Counsel Mail Stop 0-15 D21 US Nuclear Regulatory Commission Washington, DC Dear Ms.

April 11, Conversion, Deconversion and MOX Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Material Safety and Safeguards

NRC REGULATORY ISSUE SUMMARY , IDENTIFYING AND REPORTING SECURITY INCIDENTS UNDER 10 CFR PART 37

VAAS CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM. March 2, 2016 CY CFR (e)

License Application Package Overview MOX Fuel Fabrication Facility 27 September 2006

Security Requirements for Spent Fuel Storage Systems 9264

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

MATERIALS LICENSE. 1. American Centrifuge Operating, LLC 3. License Number: SNM-2011, Amendment 4

March 25, Executive Director for Operations. Jesse L. Funches Chief Financial Officer

POLICY ISSUE INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C June 26, 2014

NRC s Program for Remediating Polluted Sites J.T. Greeves, D.A. Orlando, J.T. Buckley, G.N. Gnugnoli, R.L. Johnson US Nuclear Regulatory Commission

IMC 1246, APPENDIX B3, TRAINING REQUIREMENTS AND QUALIFICATION JOURNAL FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTOR

4 FAH-2 H-210 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS

NEI 06-13A [Revision 0] Template for an Industry Training Program Description

NRC INSPECTION MANUAL

DATED: FEB 6, 1992; SIGNED BY CARLTON KAMMERER. Barbara DeBuono, M.D., M.P.H. Director Department of Health 3 Capitol Hill Providence, RI 02908

A Regulatory Approach to Cyber Security

M0okc. OPower. -Nuclear. February 6,

Should you have any questions in regard to this submittal, please contact Ms. Margaret Earle at

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

January 3, 2007 EA

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT /

Licensing a Repository at Yucca Mountain

POLICY ISSUE (INFORMATION)

ALLEGATION REVIEW BOARD BRIEFING AND MEETING SUMMARY

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk Rockville Pike Rockville, MD 20852

New Trustee for NFS Standby Trust Agreement

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] Pacific Gas and Electric Company;

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC July 17, 2012

Subject: 30-day Report of Event Criticality Accident Alarm System Degradation

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND

NUCLEAR REGULATORY COMMISSION. [Docket No ; NRC ] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

Regulatory Guide Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C June 1, 2005

Proposal to Consolidate Post-Fukushima Rulemaking Activities

NRC REGULATORY ISSUE SUMMARY SECURITY REQUIREMENTS FOR PORTABLE GAUGES

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 8.4 (Draft was issued as DG-8036, dated April 2010)

GAO. NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC. Testimony

REGULATION. Regulation for the System of Accounting for and Control of Nuclear Material and Application of Additional Protocol (FANR-REG-10) Version 0

MDEP Generic Common Position No DICWG 02

TOPIC NO TOPIC Physical Inventory Table of Contents Overview...2 Policy...2 Procedures...3 Internal Control...13 Records Retention...

REGULATORY GUIDE (Draft was issued as DG-1207, dated August 2012)

POLICY ISSUE NOTATION VOTE

Charging Party NOTICE OF TRANSMITTAL OF DECISION

ISO 9000 Quality Standard Background Information Quality Systems Implementation

hereby submits for filing a report of its Operational Purchases and Sales for the thirteen-month period ending December 31, 2011.

[SOE LETTERHEAD] July 12, 1990

Standard Review Plan for Renewal of Specific Licenses and Certificates of Compliance for Dry Storage of Spent Nuclear Fuel

Regulatory Guide Verification, Validation, Reviews, And Audits For Digital Computer Software Used in Safety Systems of Nuclear Power Plants

The Conceptualization and Development of Safeguards Implementation at the State Level

Security for Independent Spent Fuel Storage Installations (ISFSI)

STATUS OF RECOMMENDATIONS: INFORMATION SYSTEMS SECURITY EVALUATION OF REGION III LISLE, IL (OIG-09-A-15)

MATERIALS LICENSE. Docket or Reference Number Maximum Amount that Licensee May Possess at Any One Time Under This License: Source

June 27, Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors

US-APWR Human Performance Monitoring Implementation Plan

DRAFT REGULATORY GUIDE

Examination of National and International Impacts of Adoption of ICRP Recommendations

MATERIALS LICENSE. Delaware City, Delaware Docket No Reference No.

INSPECTION REPORT. Alleged Nuclear Material Control and Accountability Weaknesses at the Department of Energy's Portsmouth Project

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Interim Staff Guidance on Implementation of a Probabilistic Risk Assessment-Based Seismic Margin Analysis for New Reactors DC/COL-ISG-020

The Objectives of this Rulemaking

DIRECTIVE TRANSMITTAL

KRASKIN, LESSE &. COSSON,

Report. November 2013

ABA Section of Public Utility, Communications & Transportation Law Safety and Security in Transport

Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC Compliance Filing Docket No.

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C December 7, 2015

How To Write A Contract For Software Quality Assurance

Orders of Interest to the Board Current as of October 20, 2010

Transcription:

NUCLEAR UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-D001 May 16, 2002 OFFICE OF THE GENERAL COUNSEL Charles Administrative Bechhoefer, Judge Chairman Richard Administrative F. Cole Judge U.S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, D. C. 20555 Charles N. Kelber Administrative Judge U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dear Administrative Judges: In the Matter of DOMINION NUCLEAR CONNECTICUT, INC. (Millstone Nuclear Power Station, Unit 3) Docket No. 50-423-LA-3 In connection with the Licensing Board's request that the NRC staff provide any inspection reports regarding the licensee's inability to account for two spent fuel rods at the Millstone 1 spent fuel pool Tr. 587 (May 24, 2001), the NRC Staff is forwarding to the Board and parties copies of a Memorandum from the Executive Director of Operations to the Commission, "Lessons Learned About Material Control and Accounting from the Millstone Unit 1 Loss of Two Spent Fuel Rods". The Lessons Learned memorandum is an outgrowth of the NRC inspection effort at Millstone 1, and it is being provided to the Board because of its connection to the Millstone 1 inspection report. Inspection Report No. 05000245/2001013 was attached to the memorandum. The Staff is not attaching a copy of the inspection report as the report was previously provided to all parties. Attachment B to the Memorandum is Inspection Procedure 85102; this attachment is enclosed. Sincerely, Enclosures: As stated cc w/encls: Service List Sara Brock Counsel for NRC Staff

NULER UNITED STATES NUCLEAR REGULATORY COMMISSION SWASHINGTON, D.C. 2055540001 'W April 30., 2002 MEMORANDUM TO: Chairman Meserve Commissioner Dicus Commissioner Diaz Commissioner McGaffigan Commissioner Merrifield FROM: SUBJECT: William D. Travers Executive Director for Operations LESSONS LEARNED ABOUT MATERIAL CONTROL AND ACCOUNTING FROM THE MILLSTONE UNIT 1 LOSS OF TWO SPENT FUEL RODS The purpose of this memorandum is to inform the Commission of lessons learned about material control and accounting (MC&A) at power reactors as a result of the investigation of Millstone Unit 1's loss of two spent fuel rods. The lessons learned concerning the power reactor MC&A program are discussed in greater detail in the following Attachment. In summary, control over the two spent fuel rods failed because the licensee's MC&A procedures (and their implementation) were not adequate. No problems with the NRC regulations were identified; however, MC&A guidance could be improved and clarified. The MC&A inspection program at power reactors has been dormant since 1988. However, it is not clear that inspections would have detected this loss of accountability. Finally, the Nuc!ear Material Management and Safeguards System performed as it was designed to. Staff plans to examine MC&A vulnerabilities as part of the top-to-bottom review of the Agency's safeguards and security program that is being undertaken in response to the terrorist activities of September 11, 2001. While the MC&A review will benefit from the broader view of the entire safeguards program, as a first step the staff intends to develop a Temporary Instruction (TI) to ascertain the breadth and scope of the MC&A issues which were identified at Millstone. The TI will be implemented over the next year at selected sites and, depending on how widespread the problem is, staff will consider the need for revised guidance and whether appropriately focused inspections are needed. Changes to the MC&A program will be evaluated as a whole and in the context of the overall safeguards program. Because recommendations will follow the review of the entire program and because the current risk to human health and safety from the missing fuel rods is negligible (see following Attachment), no recommendations concerning MC&A at power reactors are being made at this time. Attachment: Lessons Learned cc: SECY OGC OCA OPA CFO CONTACT: M. Williams, NMSS/FCSS (301) 415-7878

If the licensee's procedures and practices had effectively implemented the regulations, control over the rods would likely have been maintained. 2. Lesson Learned: Guidance on MC&A could be clarified and improved. 2 MC&A guidance documents on establishing and implementing an MC&A program at power reactors are: (1) Regulatory Guide 5.29, "Nuclear Material Control Systems for Nuclear Power Plantse; (2) Regulatory Guide 5.49, "Internal Transfers of Special Nuclear Materiar; and (3) ANSI N15.8-1974, "Nuclear Material Control Systems for Nuclear Power Plants." The ANSI standard was withdrawn in 1987, because no action had been taken within 10 years to revise or reaffirm it, and Regulatory Guide 5.29 was withdrawn in 1998. The guidance documents have several related shortcomings: They identify the assembly as the basic unit for control and provide no guidance on accounting for rods that have been removed from their parent assembly. They are not clear about what constitutes a "physical" inventory and fail to establish guidelines for conducting an inventory. * They do not consider whether "spent fuel poor is sufficient as the location of record. * They do not address problems that may arise when spent fuel rods are stored outside the racks. They do not explain how to compare book inventory and physical inventory. If the guidance had addressed these aforementioned topics, the licensee's inventory and control procedures might have been more comprehensive. 3. Lesson Learned: Even if an MC&A inspection program had been implemented, this loss of accountability might not have been identified. The inspection program for MC&A at power reactors is guided by NRC Inspection Manual Chapter (IMC) 2515C, "Special and Infrequently Performed Inspections." The applicable Inspection Procedure (IP) is 85102, "Material Control and Accounting - Reactors" (Attachment B). This chapter and procedure were not considered during development of the revised Reactor Oversight Process. IMC 2515C states that this IP is "...implemented infrequently for special situations" and is "...not part of the baseline or supplemental inspection program elements." The MC&A inspection program at power reactors has been dormant since 1988, at which time responsibility for inspection of MC&A programs was split up, with responsibility for inspections at fuel cycle facilities being transferred to NMSS and responsibility for inspection of MC&A at reactors remaining in the Regions. The absence of an inspection program in this area does not mean that loss of accountability for the two Millstone Unit 1 rods would have been identified if MC&A inspections had been conducted. MC&A inspections were conducted at Millstone before 1988, and the problem was not identified. The inspection guidance uses the MC&A guidance for power reactors, discussed in Lesson 2, as its standard. In particular, the inspection guidance defines the assembly as the basic unit for control and accounting and does not address the special circumstance of individual rods separated from their parent assembly. If the inspection procedure had addressed the topics noted as shortcomings under Lesson 2, inspections would have been more effective.

9 4 NRC INSPECTION MANUAL INSPECTION PROCEDURE 85102 MATERIAL CONTROL AND ACCOUNTING - REACTORS PROGRAM APPLICABILITY: 2513,2515, and 2525 85102-01 INSPECTION OBJECTIVES 01.01 Determine whether the licensee has limited his possession and use of special nuclear material (SNM) to the locations and purposes authorized under license. 01.02 Determine whether the licensee has implemented an adequate and effective program to account for and control the SNM in his possession. 85102-02 INSPECTION REQUIREMENTS 02.01 Possession and Use of SNM a. Review inventory, receipt, and shipment records (NRC Forms 741 and 742) to determine whether the licensee has limited his possession and use of SNM to the location and purpose authorized under license. b. Conduct a random spot-check of new fuel, irradiated fuel in spent fuel pool, sources, test specimens, etc., by comparing actual location with that indicated on loading diagrams, transfer forms, or other accounting records, as applicable. Check ten assemblies or bundles of new and irradiated fuel, and one source, test specimen, etc. 02.02 Control and Accounting of SNM. Determine whether the licensee has prepared, maintained, and implemented an adequate and effective program and procedures to control and account for the SNM in his possession, as required by 10 CFR 70.41(a); 70.42; 70.51(b), (c), and (d); 70.52; 70.53; 70.54; and 73.71(b). 85102-03 INSPECTION GUIDANCE 03.01 Inspection Requirement 02.02 - Possession and Use of SNM. When conducting physical verification of fuel bundles or assemblies, verify that there are bundles or assemblies in racks identified as containing same. Do not verify by serial numbers unless discrepancies surface that warrant an extensive verification. ATTACHMENT B Issue Date: 03/29/85 85102

'm o. Inventory procedures provide for management review of MC&A system at intervals not to exceed 12 months, and records document management followup action based on results of the annual reviews. p. Inventory documentation Includes review of the applicable NRC Forms 741,742, and 742C for cold fuel storage area; irradiated fuel assemblies in the reactor and in storage; fission chambers; sealed sources; test specimens; etc., such as: 1. Internal card files or log books, source documents, and any other records that include serial number identification, location, and amount of SNM contained in fission chambers, sealed sources, test specimrens, etc., until the Commission authorized their disposition. 2. Operating logs and core loading diagram for irradiated fuel assemblies in the reactor (trace listings of assemblies to the source documents). 3. Loading diagrams and source documents for irradiated fuel assemblies in storage. 2 q. Records retained for the period specified by the appropriate regulation or license condition. If a specific retention period was not otherwise required by regulation or license condition, records should have been maintained until the Commission authorized their disposition. 85102-04 REFERENCES Regulatory Guide 5.29, Nuclear Material Control Systems for Nuclear Power Plants. Regulatory Guide 5.49, Internal Transfers of Special Nuclear Material. NUREG Guide BR-0006, Instructions for Completing Nuclear Material Transaction Reports. NUREG Guide BR-0007, Instructions for Completing Material Balance Report, Physical Inventory Listing and Concise Note Forms. END 2 Perpetual inventory records are maintained for in-reactor and storage showing the identity and location of all items containing the SNM. If the records do not also include SNM quantitative data, supporting records should be available. "*3- Issue Date: 03/29/85 85102