Smart Metering Implementation Programme: Testing Baseline Requirements Document

Similar documents
Consultation on DCC Enduring Release Management Policy. Consultation opens: 18 September 2015

Section Development History/Status Origin Link (to relevant. documentation) SEC stage 4 consultation. SEC Stage 4 consultation Content first proposed

SMKI Recovery Procedure

Spotlight on the SEC Seminar. 23 rd October :00 15:00

Incident Management Policy

SEC Guidance I Processing of Service Requests, Responses and Alerts

SMKI Recovery Procedure

Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval

Operations update - DCC Industry Day 25 th March 15

Incident Management Policy

Smart Meters Programme Schedule 1 (Interpretation and Definitions) (CSP Central version)

Competition and Markets Authority Energy market investigation: Notice of possible remedies Response of Smart DCC Ltd

Government Response on Home Area Network Solutions: Implementation of 868MHz

DATA RECOVERY SOLUTIONS EXPERT DATA RECOVERY SOLUTIONS FOR ALL DATA LOSS SCENARIOS.

UK-London: IT services: consulting, software development, Internet and support 2011/S CONTRACT NOTICE. Services

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version)

Data Communications Company (DCC) price control guidance: process and procedures

Smart Metering Implementation Programme

Re: New Reporting Requirements Related to Smart Meter Deployment and the Application of Time-of-Use Pricing

European Code of Conduct on Data Centre Energy Efficiency

DCC User Gateway Interface Design Specification. Annex - Service Request Definitions 1 Product Management Service

PUBLIC. Response to consultation on EMR data flows

Smart Metering Implementation Programme. Smart Metering Equipment Technical Specifications Version 1.58

Proposal Form for Directors & Officers Liability Insurance

Questions raised on committee updates in EMR

iso20000templates.com

IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B);

Smart Meter Wide Area Network DCC Assurance Strategy

Key USP s. Multiple PCI level GRC tool

European Code of Conduct on Data Centre Energy Efficiency

HP Service Manager. Software Version: 9.40 For the supported Windows and Linux operating systems. Processes and Best Practices Guide (Codeless Mode)

Business Process Design Team Level 2 Process Diagram

NOTICE OF AMENDMENT TO A CODE AMENDMENTS TO THE DISTRIBUTION SYSTEM CODE BOARD FILE NO.: EB

EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence

Report on the EMR Delivery Body s performance of its functions in relation to the Capacity Market

Smart Metering Implementation Programme

CMI Level 5 Professional Consulting Top Up Document June 2015 Version 3

EMR: Consultation on Balancing and Settlement Code subsidiary documents

Guidance for Sponsor Applications for Tier 2 and Tier 5 of the Points Based System in the Isle of Man. Appendix A

BSc (Hons)/MSc Business Economics and Investment Analysis (F/T) SH541

TERMS OF REFERENCE OF THE AUDIT COMMITTEE

Incident Management Process Report Q1, 2011

MSc Financial Economics SH506

Procedures for validation and accreditation

Appendix 10: Improving the customer experience

Accreditation of qualifications for registration as an oral health practitioner

ICT Category Sub Category Description Architecture and Design

CHINA PIONEER PHARMA HOLDINGS LIMITED

The Software Experts. Software Asset Management Services & Solutions

Business Continuity Management Framework

Identity and Access Management Services. G-Cloud 7

Information Governance Strategy. Version No 2.0

Balancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs

Superseded by T MU AM PL v2.0

Certification Fee Structure for Green-e Climate and Green-e Energy

Smart Meters Programme Schedule 4.1

Co-operative Energy, Co-operative House Warwick Technology Park, Warwick CV34 6DA.

Committee Response 26 th October 2015

Standard conditions of the Electricity Distribution Licence

Polish Financial Supervision Authority. Guidelines

3000_115 Competency Standard: Certified Practitioner in Asset Management (CPAM)

CHINA CITY INFRASTRUCTURE GROUP LIMITED 中 國 城 市 基 礎 設 施 集 團 有 限 公 司 (Incorporated in the Cayman Islands with limited liability)

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS No. [XXXX]

Gatekeeper PKI Framework. February Registration Authority Operations Manual Review Criteria

CHAPTER 9 FRAUD, ABUSE, AND OVERUTILIZATION

Review of remote casino, betting and bingo regulatory return and gambling software regulatory return. Consultation document

Transcription:

Smart Metering Implementation Programme: Testing Baseline Requirements Document 10 th August 2015

Testing Baseline Requirements Document Technical and Procedural requirements for demonstrating the testing objectives under the Smart Energy Code (SEC) 1. The documents listed in this Testing Baseline Requirements Document shall: a) for the purposes of the SIT Objective set out in Section T2.2 of the SEC, be the documents referred to in Section T2.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T2.2, specifically Sections E, G and H.; b) for the purposes of the Interface Testing Objective set out in Section T3.2 of the SEC, be the documents referred to in Section T3.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T3.2, specifically Sections E, G, H and O; and, c) for the purposes of the SRT Objective set out in Section T5.2 of the SEC, be the documents referred to in Section T5.3(b) of the SEC regarding the technical and procedural requirements which support the Sections referred to in Section T5.2, specifically Section L. Subsidiary documents forming part of the SEC (copies of which are available on the developing SEC section of the SECAS website) 1.1. the SMKI Device Certificate Policy; 1.2. the SMKI Organisation Certificate Policy; 1.3. the SMKI Compliance Policy; 1.4. the DCC Gateway Connection Code of Connection. Draft versions of subsidiary documents yet to be incorporated into the SEC, (copies of which are available on the developing SEC section of the SECAS website) 1.5. Draft Version 1.0 of the Incident Management Policy; 1.6. Draft Version 1.0 of the Registration Data Incident Management Policy; 1.7. Draft Version 1.0 of the Registration Data Interface Code of Connection; 1.8. Draft Version 1.0 of the DCC User [Gateway] Interface Code of Connection; The Draft documents listed in 1.5 1.8 above have each been reviewed by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, following development by the DCC, and have been submitted to the Smart Metering Implementation Programme s Technical Business and Design Group with a recommendation that they are baselined (in some instances subject to caveats). It is the intention of the Secretary of State to update the documents listed above to the version that is designated at the point at which that designation occurs. 1

1.9. Draft version of the Message Mapping Catalogue submitted to the Secretary of State on 29 May 2015; 1.10. Draft version of the DCC User [Gateway] Interface Specification (DUIS) submitted to the Secretary of State on 29 May 2015; 1.11. Draft version of the Registration Data Interface Specification (REGIS) Submitted to the Secretary of State on 30 January 2015; 1.12. Draft version of the Self-Service Interface Design Specification submitted to Secretary of State on 18 June 2015; 1.13. Draft version of the Self-Service Interface Code of Connection submitted to the Secretary of State on 22 July 2015; 1.14. Draft version of the Non Gateway Interface Specification submitted to the Secretary of State on 28 May 2015; 1.15. Draft version of the Error Handling Strategy submitted to the Secretary of State on 19 December 2014; 1.16. Draft version of the Threshold Anomaly Detection Procedures submitted to the Secretary of State on 10 April 2014; 1.17. Draft version of the DCC Gateway Connections Code of Connection submitted to the Secretary of State on 30 June 2015; 1.18. Draft version of the Common Test Scenarios Document submitted to the Secretary of State on 30 June 2015; 1.19. Draft version of the SMKI and Repository Test Scenario Document submitted to the Secretary of State on 15 July 2015; The draft documents listed in 1.9 1.19 above have been submitted to the Secretary of State following their development by the DCC and are pending review by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, prior to their submission to the Smart Metering Implementation Programme s Technical Business Design Group with a recommendation that they are baselined. It is the intention of the Secretary of State to update the documents in the aforementioned list to the versions that are approved by the Technical Business and Design Group at the point at which the approval is given. 1.20. Draft version of the IKI Certificate Policy submitted to the Secretary of State on 29 January 2015; 1.21. Draft version of the DCCKI Certificate Policy submitted to the Secretary of State on 27 February 2015; 1.22. Draft versions of the DCCKI Interface Design Specification and DCCKI Repository Interface Design Specification submitted to the Secretary of State on 27 February 2015; 1.23. Draft versions of the DCCKI Code of Connection and DCCKI Repository Code of Connection submitted to the Secretary of State on 27 February 2015; 1.24. Draft version of the DCCKI Registration Policies and Procedures (RAPP) submitted to the Secretary of State on 27 February 2015; 1.25. Draft version of the SMKI Interface Design Specification submitted to the Secretary of State on 29 July 2015; 1.26. Draft version of the SMKI Code of Connection submitted to the Secretary of State on 29 July 2015; 2

1.27. Draft version of the SMKI Repository Interface Design Specification submitted to the Secretary of State on 29 July 2015; 1.28. Draft version of the SMKI Repository Code of Connection submitted to the Secretary of State on 29 July 2015; 1.29. Draft version of the SMKI Registration Policies and Procedures (RAPP) submitted to the Secretary of State on 8 July 2015; 1.30. Draft version of the SMKI Recovery Procedure submitted to the Secretary of State on 1 July 2015; The draft documents listed in 1.20-1.30 above have been submitted to the Secretary of State following their development by the DCC and are pending review by the Secretary of State to assess their suitability as a document for the purposes of design, build and test, prior to their submission to the Smart Metering Implementation Programme s Transitional SMKI Policy Management Authority Group (TPMAG) with a recommendation that they are baselined. It is the intention of the Secretary of State to update the documents in the aforementioned list to the versions that are approved by the TPMAG at the point at which the approval is given. 1.31. The Draft consultation version of the Enduring Test Approach Document published on 12 June 2015; 1.32. The Draft consultation version of the Enduring Test Approach Document published on 10 July 2015; The draft documents listed in 1.31 1.32 above are being developed by the DCC before being submitted to the Secretary of State prior to their designation into the SEC, which is subject to a Secretary of State review of the documents to ensure that they are fit to be designated. It is the intention of the Secretary of State to update the documents listed in 1.31-1.32 to the version that is designated at the point at which that designation occurs. Draft versions of the following technical specifications and other documentation (copies of which are available on request to the Secretary of State): 1.33. Version 0.8.1 of the Great Britain Companion Specification (GBCS) plus all Category 1, Category 2 and Category 4 Issue Resolution Proposals (IRPs) discussed and categorised at the DCC s Issue Resolution Board; 1.34. Version 1.58 of the Smart Metering Equipment Technical Specifications plus all Category 1, Category 2 and Category 4 IRPs discussed and categorised at the DCC s Issue Resolution Board; 1.35. Version 1.46 of the Communications Hubs Technical Specifications plus all Category 1, Category 2 and Category 4 IRPs discussed and categorised at the DCC s Issue Resolution Board; 1.36. Version 1.1 of the CPA Security Characteristics. The current baseline for SIT is GBCS v0.8.1, SMETS v1.58, CHTS v1.46 and CPA SC v1.1. The DCC is currently impact assessing the IRPs referenced above and developing proposals for when these will be implemented. Once the DCC s proposals are agreed by the Secretary of State, then it is the intention of the Secretary of State to update the versions of the documents in the aforementioned list and approve these changes at the Technical Business and Design Group. 3

1.37. Draft version of the DCC User Interface Services Schedule (SEC Appendix E), detailed in Appendix F of the March 2015 Smart Energy Code Government Response. 1.38. Draft version of the CPL Requirements Document, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July 2015. 1.39. Draft version of the Inventory Enrolment and Withdrawal Procedures, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July 2015. 1.40. Draft version of the Service Request Processing Document, detailed in Appendix B of the Government Consultation on new Smart Energy Code content and related licence amendments July 2015. The draft subsidiary documents listed in 1.37-1.40 above have each been developed by DECC. It is the intention of the Secretary of State to update the documents listed above to the version that is designated at the point at which that designation occurs, or if further versions are issued for consultation or in a Government Response, prior to their designation. 4