NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE



Similar documents
Legislative Council Panel on Health Services Subcommittee on Health Protection Scheme. Role and Development of Public and Private Healthcare Services

Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference

Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014

Supported Employment Service (As at August 2014)

Water Supplies Department Active WSD Capital Works Contracts

Legislative Council Panel on Environmental Affairs. 209DS Outlying Islands sewerage, stage 1, phase 1 - consultants fees and investigations

Property Development

Legislative Council Panel on Security Creation of a permanent Chief Superintendent of Police post of the Cyber Security and Technology Crime Bureau

LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS

List of Aided Special Schools (2015/2016)

List of contractors/acoustic consultants having implemented successful noise abatement works in 2001

Transit Oriented Development and Value Capture Hong Kong

770 TH Tseung Kwan O Development, Phase II, Grade Separated Interchange T1/P1/P2

Sponsorship and Exhibition Opportunities. Showcase your brand at the biggest NEC event in Asia Pacific NEC ASIA PACIFIC USERS GROUP CONFERENCE

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

Data Analysis for Healthcare: A Case Study in Blood Donation Center Analysis

Information for Community Care Fund Medical Assistance Programme Application for HA Drug Items

A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint

Planning for Office Land in Hong Kong

CHAIRMAN S STATEMENT. I announce that provisions of approximately HK$1,153. million has been made for the property development

Additional and Planned Places of Rehabilitation Services (From January to June 2015)

Legislative Council Panel on Security

District Address Tele No. (+852) G/F YU SUNG BOON BLDG CENTRAL DES VOEUX ROAD MELBOURNE PLAZA

Leeds Metropolitan University. BA (Hons) Business and Management. 2012/13

SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD

ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE

Legislative Council Panel. on Information Technology and Broadcasting. Building a Government Data Centre Complex

Exemption Policy and List of Exemptions Awarded

ITEM FOR FINANCE COMMITTEE

Data Centre Development in Tseung Kwan O Area 85. This paper updates Members on the third high-tier data centre

Housing in Figures Hong Kong Housing Authority

ITEM FOR FINANCE COMMITTEE

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

HONG KONG HOUSING AUTHORITY

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

The Victims of Crime Charter

PROVISION OF CYCLE TRACK NETWORK IN THE NEW TERRITORIES. Executive Summary

Company Name Address Telephone No.

ENVIRONMENTAL PROTECTION IN HONG KONG

Legislative Council Panel on Security. Construction of an Ambulance Depot at Choi Shun Street, Sheung Shui

WANG ON GROUP LIMITED ( 宏 安 集 團 有 限 公 司 ) *

Executive Management s Report Railway Operations

Connectivity - Not Simply Bridging the Gaps

Urban Renewal Strategy

DISCLOSEABLE TRANSACTION PROVISION OF FINANCIAL ASSISTANCE

Leeds Metropolitan University. BA (Hons) Accounting and Finance 2012/13.

Environmental Impact Assessment Ordinance (Cap. 499) Environmental Impact Assessment Report Sludge Treatment Facilities

Unless otherwise defined in this announcement, terms defined in the Prospectus have the same meanings when used in this announcement.

KWAN ON HOLDINGS LIMITED

Examples of major projects with environmental permits :

CONTENTS. Corporate Information 2 Management Discussion and Analysis 4 Unaudited Condensed Consolidated Statement of

Professional Diploma in Human Resource Management and Development SE (51)

Environmentally Responsible Development

2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at )

International Boundary Study. China Hong Kong Boundary

WASTE MANGEMENT PLAN

Central and Western District

Existing Self-storage Sites are 10,000 sq ft or less

Proper Keeping of Wage and Employment Records

Ex-gratia payment scheme for phasing out pre-euro IV diesel commercial vehicles. Notes for Application

Event Management (Cycle 3)

Expansion of Hong Kong International Airport into a Three-Runway System

INFORMATION NOTE. Development of self-financing post-secondary sector

CONTINUING CONNECTED TRANSACTIONS TENANCY AGREEMENTS, COLOCATION SERVICES AGREEMENT, IP TELEPHONE LICENCE AND PARKING LICENCES

HONG KONG ZHUHAI MACAO LINK

H ng Kong GLOBAL SWITCH

Risk Management GUIDE GUIDE. for PHYSICIAN. Austin, TX

Risk Management for Contractors in Marine Projects

Christopher Wing TO (41 years old)

Latest Developments in Logistics in Hong Kong and Related Matters

DRIVING SERVICES SECTION. Guide to Taxi Written Test

SUMMARY ACCREDITATION REPORT. Caritas Institute of Higher Education. Programme Revalidation. Higher Diploma in Human Services

Clearing Code and Branch Code

List of Proposed ArchSD Projects for the Refurbishment of Government Buildings

BAGS. Felt bag B 4 Size: 44 x 36 x 9 cm. Felt bag B 1 Size: 38 x 50 x 15 cm. Felt bag B 5 Size: 39 x 33 x 1 cm. Felt bag B 2 Size: 17 x 32 x 3 cm

(a) CWRF Head 710 Computerisation

Programme on Source Separation of Commercial and Industrial Waste List of Properties and Buildings Receiving Certificate

LEGISLATIVE COUNCIL BRIEF

Construction and Demolition Waste

Annual Report on Accident Statistics and Analyses for Public Works Contracts 2014

Stock Exchange HKSCC Prospectus U.S. Securities Act Stabilizing Manager

Bicycle Injury Analysis. The Forgiving Roadside Principle

Providers of Continuing Nursing Education Accredited by the Nursing Council of Hong Kong (as at 13 November 2015)

Legislative Council Panel on Education Start-up Loan for Post-secondary Education Providers

DISCLOSEABLE TRANSACTION FORMATION OF A JOINT VENTURE COMPANY FOR THE ACQUISITION, CONTROL AND MANAGEMENT OF CERTAIN OF THE GROUP S HOTELS

Legislative Council Panel on Health Services Subcommittee on Health Protection Scheme

2012 Resource Allocation Exercise - Block Vote Project Proposals

Sheffield Hallam University BSc (Hons) Hospitality Business Management

Transcription:

For information PWSCI(2014-15)4 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Major s Awarded on Capital Works s Second Quarter of 2014 Since June 2000, we have been providing Members with reports on the prices of major contracts awarded (each with a contract sum exceeding $30 million) during the last quarter, set against the estimated provision se contracts in the approved project estimates. 2. This report covers the second quarter of 2014 (viz. 1 April to 30 June 2014). The report covers 10 major contracts awarded by two works departments and two non-governmental organisations. The relevant details are set out in the following enclosures (a) (b) (c) Enclosure 1 Civil Engineering and Development Department; Enclosure 2 Highways Department; and Enclosure 3 Non-governmental organisations. ------------------------------- Financial Services and the Treasury Bureau August 2014

Enclosure 1 to PWSCI(2014-15)4 Major s Awarded on Capital Works s Second Quarter of 2014 Department : Civil Engineering and Development Department / 5001BX Item 2.249 Landslip preventive measures programme, 2012, package A, landslip prevention and mitigation works 151.000 GE/2013/35 programme, 2012, package A, landslip prevention and mitigation works/ 4 April 2014 100.650 112.000 (11.350) [1] 5001BX Item 2.252 Landslip preventive measures programme, 2008, package A and 2009, package D, landslip prevention and mitigation works in Hong Kong Island 233.660 GE/2013/18 programme, 2008, package A and 2009, package D, landslip prevention and mitigation works in Hong Kong Island/ 20 June 2014 213.720 168.801 44.919 Note: [1] The difference will be met from project contingencies.

Enclosure 1 to PWSCI(2014-15)4 Page 2 / 5001BX Item 2.254 Landslip preventive measures programme, 2011, package E, landslip prevention and mitigation works in Hong Kong Island and outlying islands 62.430 GE/2013/33 programme, 2011, package E, landslip prevention and mitigation works in Hong Kong Island and outlying islands/ 4 April 2014 53.930 44.154 9.776 5480CL Disposal of contaminated mud management and capping of contaminated mud pit IV 570.100 5729CL Disposal of contaminated sediment dredging, management and capping of sediment disposal facility at Sha Chau 770.900 5737CL Dredging, management and capping of contaminated sediment disposal facility to the south of The Brothers 617.700 CV/2013/12 Sediment disposal facilities to the south of The Brothers, east of Sha Chau and east of Tung Lung Chau testing/ 11 April 2014 Total : 1,958.700 95.600 32.535 63.065

Enclosure 1 to PWSCI(2014-15)4 Page 3 / 7448RO Improvement works at Mui Wo, phase 1 193.100 IS/2013/02 Improvement works at Mui Wo, phase 1/ 27 June 2014 155.100 152.800 2.300 7160TB Footbridge across Po Yap Road linking Tseung Kwan O Area 55 and Area 65 80.500 TK/2013/02 Footbridge across Po Yap Road linking Tseung Kwan O Area 55 and Area 65/ 17 June 2014 64.100 63.209 0.891

Enclosure 2 to PWSCI(2014-15)4 Major s Awarded on Capital Works s Second Quarter of 2014 Department : Highways Department / 6845TH Hong Kong Zhuhai Macao Bridge Hong Kong Boundary Crossing Facilities Reclamation and Superstructures 30,433.900 HY/2013/01 Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities Passenger Clearance Building/ 17 April 2014 8,399.864 8,399.864 6101TX Universal Accessibility Programme Item 6YFG064X facilities for subway HS10 in Wan Chai District 57.490 Item 6YFH198X facilities for footbridge NF84 in North District 49.070 Item 6YFH199X facilities for footbridge NF295 in North District 41.980 Item 6YFH200X facilities for footbridge HF2A in Wan Chai District 40.260

Enclosure 2 to PWSCI(2014-15)4 Page 2 / Item 6YFH201X facilities for footbridge HF2 in Wan Chai District 38.580 HY/2013/16 facilities for highway structures phase 2 contract 2/ 20 June 2014 Total: 227.380 170.000 114.265 55.735

Enclosure 3 to PWSCI(2014-15)4 Major s Awarded on Capital Works s Second Quarter of 2014 Non-governmental organisations / 8092EB Redevelopment of Tung Wah Group of Hospitals Wong Fut Nam College at Oxford Road, Kowloon 323.700 Main contract works/ 27 June 2014 249.030 269.000 (19.970) [1] 8014MD Redevelopment of Kwong Wah Hospital preparatory works 552.700 8110019165 Decanting works at Kowloon Hospital redevelopment of Kwong Wah Hospital/ 17 April 2014 152.000 115.765 36.235 Note: [1] The difference will be covered by savings from the demolition and foundation contracts.