Evaluation of innovative sprayed-concrete-lined tunnelling



Similar documents
ESTIMATION OF UNDRAINED SETTLEMENT OF SHALLOW FOUNDATIONS ON LONDON CLAY

Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels

Drained and Undrained Conditions. Undrained and Drained Shear Strength

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Validation of methods for assessing tunnelling-induced settlements on piles

Numerical Simulation of CPT Tip Resistance in Layered Soil

Behaviour of buildings due to tunnel induced subsidence

4.3 Results Drained Conditions Undrained Conditions References Data Files Undrained Analysis of

Program COLANY Stone Columns Settlement Analysis. User Manual

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

NUMERICAL MODELLING OF PIEZOCONE PENETRATION IN CLAY

Impacts of Tunnelling on Ground and Groundwater and Control Measures Part 1: Estimation Methods

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

IS THAT LINER THICK ENOUGH?

When to Use Immediate Settlement in Settle 3D

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

Numerical Analysis of Texas Cone Penetration Test

Laterally Loaded Piles

Open Access Numerical Analysis on Mutual Influences in Urban Subway Double-Hole Parallel Tunneling

CHAPTER 7 ASPHALT PAVEMENTS

GUIDELINE FOR HAND HELD SHEAR VANE TEST

RMS Guide for design of concrete pavements in areas of settlement. Version 1.0. Roads and Maritime Services

METHOD OF STATEMENT FOR STATIC LOADING TEST

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Figure CPT Equipment

Numerical analysis of boundary conditions to tunnels

Getec. The Geo Structural Monitoring Experts

Applying a circular load. Immediate and consolidation settlement. Deformed contours. Query points and query lines. Graph query.

How To Calculate Tunnel Longitudinal Structure

An Innovative Method For Assessing Tunnelling-Induced Risks To Adjacent Structures

Cone Penetration Testing (CPT) Michael Bailey, P.G. U.S. Army Corps of Engineers, Savannah District

SOUTH AFRICAN NATIONAL INSTITUTE OF ROCK MECHANICS CHAMBER OF MINES OF SOUTH AFRICA CERTIFICATE IN ROCK MECHANICS PART 1 ROCK MECHANICS THEORY

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAYS AND TUNNEL LININGS. HIGH-PERFORMANCE INSPECTION VEHICLE FOR RAILWAY AND ROAD TUNNEL LININGS.

KWANG SING ENGINEERING PTE LTD

Consolidation and Settlement Analysis

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Stress and deformation of offshore piles under structural and wave loading

Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle

STRUCTURAL DAMAGE OF A 5-STOREY BUILDING: DIFFERENTIAL SETTLEMENT DUE TO CONSTRUCTION OF AN ADJACENT BUILDING OR BECAUSE OF CONSTRUCTION DEFECTS?

Measurement of Soil Parameters by Using Penetrometer Needle Apparatus

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Numerical Analysis of Independent Wire Strand Core (IWSC) Wire Rope

System. Stability. Security. Integrity. 150 Helical Anchor

Pile test at the Shard London Bridge

The advantages and disadvantages of dynamic load testing and statnamic load testing

Soil Mechanics SOIL STRENGTH page 1

Tensile Testing Laboratory

International Journal of Scientific & Engineering Research, Volume 4, Issue 9, September ISSN

Forensic engineering of a bored pile wall

τ Small strain WEEK 8 Soil Behaviour at Small Strains: Part Strain levels and soil behaviour

Tests and Analyses on Shear Strength Increment of Soft Soil under Embankment Fill

8.2 Elastic Strain Energy

Module 7 (Lecture 24 to 28) RETAINING WALLS

DEM modelling of the dynamic penetration process on Mars as a part of the NASA InSight Mission

BEARING CAPACITY AND SETTLEMENT RESPONSE OF RAFT FOUNDATION ON SAND USING STANDARD PENETRATION TEST METHOD

Why measure in-situ stress?

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Cone Penetration Testing in Geotechnical Practice. Tom Lunne Peter K. Robertson John J.M. Powell

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

10.1 Powder mechanics

Numerical Analysis in the Design of Urban Tunnels. Numerical Analysis in the Design of Urban Tunnels

Secondary Consolidation and the effect of Surcharge Load

Worked Example 2 (Version 1) Design of concrete cantilever retaining walls to resist earthquake loading for residential sites

Compression load testing straw bale walls. Peter Walker Dept. Architecture & Civil Engineering University of Bath Bath BA2 7AY.

How To Design A Foundation

Analysis of an Underground Structure Settlement Risk due to Tunneling Vahdatirad, Mohammadjavad; Ghodrat, Hadi; Firouzianbandpey, Sarah; Barari, Amin

Technical Notes 3B - Brick Masonry Section Properties May 1993

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

TECHNICAL REPORT ON SCALA DYNAMIC CONE PENETROMETER IRREGULARITY

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

ITEM # OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following.

METU DEPARTMENT OF METALLURGICAL AND MATERIALS ENGINEERING

PILE FOUNDATIONS FM 5-134

Sheet metal operations - Bending and related processes

SYDNEY SANDSTONE AND SHALE PARAMETERS FOR TUNNEL DESIGN

A NEW DESIGN METHOD FOR INDUSTRIAL PORTAL FRAMES IN FIRE

CPTic_CSM8. A spreadsheet tool for identifying soil types and layering from CPTU data using the I c method. USER S MANUAL. J. A.

USE OF CONE PENETRATION TEST IN PILE DESIGN

Large deformation analysis of cone penetration testing in undrained clay

Chapter 2. Derivation of the Equations of Open Channel Flow. 2.1 General Considerations

ON THE INTERPRETATION OF SEISMIC CONE PENETRATION TEST (SCPT) RESULTS

CHAPTER 9 FEM MODELING OF SOIL-SHEET PILE WALL INTERACTION

Tunnelling & Underground. Specialists

APPENDIX A PRESSUREMETER TEST INTERPRETATION

Numerical study of long-term settlement following twin tunnel construction

Objectives. Experimentally determine the yield strength, tensile strength, and modules of elasticity and ductility of given materials.

DOING PHYSICS WITH MATLAB COMPUTATIONAL OPTICS RAYLEIGH-SOMMERFELD DIFFRACTION INTEGRAL OF THE FIRST KIND

Analysis of Stresses and Strains

Transcription:

Proceedings of the Institution of Civil Engineers Geotechnical Engineering 11 June Issue GE3 Pages 137 19 doi: 1.1/geng..11.3.137 Paper 79 Received 3// Accepted /9/7 Keywords: concrete structures/mathematical modelling/tunnels & tunnelling Benoît D. Jones Engineering Manager, Morgan Est Plc, Rugby, UK Alun H. Thomas Senior Engineer, Mott MacDonald, Croydon, UK Yu Sheng Hsu Senior Geotechnical Engineer, Mott MacDonald, Croydon, UK Matouš Hilar Senior Tunnel Engineer, D Consult, Prague, Czech Republic (formerly of Mott MacDonald) Evaluation of innovative sprayed-concrete-lined tunnelling B. D. Jones MEng, EngD, A. H. Thomas BA, PhD, CEng, MICE, Y. S. Hsu BEng, PhD, ACGI and M. Hilar MSc, PhD, CEng, MICE The front-shunt tunnel was the first tunnel of the Terminal project at Heathrow to be constructed, and was the first section of sprayed-concrete-lined (SCL) tunnel to be constructed using the method known as LaserShell. This innovation represented a significant deviation from the methods previously used in SCL construction. Therefore it was subjected to a careful examination before and during construction using sophisticated 3D numerical modelling and monitoring during construction. The paper presents typical results from surface settlement levelling, inclinometers and extensometers, pressure cells and tunnel lining displacement measurements, and comments on the performance of the methods and instruments used. The paper then presents the methodology and typical results of the numerical modelling, and shows that the predictions of displacements and stresses compared well with the field measurements. In terms of the control of ground deformations and structural safety the tunnel performed well. Terminal (T) project at Heathrow to be constructed. More importantly, the frontshunt was the first section of sprayed concrete lined (SCL) tunnel to be constructed using the method known as LaserShell. The method (described in detail by Williams et al. 1 ) represented a significant deviation from the methods previously used in SCL construction. The face was inclined at an angle of approximately 7 to the horizontal to provide a protective canopy for operatives close to the face, and a laser surveying system was used to control the shape of the excavation and lining, obviating the need for operatives to enter the face to measure the excavation or install lattice girders (Fig. 1). Therefore the method was subjected to careful examination before and during construction. During the definition design stage of the work the tunnelling contractor carried out a comprehensive programme of testing to identify the optimum concrete mix and hone the construction methodology. The lead designer reviewed the detailed design provided by the NOTATION c cohesion of sprayed concrete E htan horizontal tangent Young s modulus E i initial tangent Young s modulus of sprayed concrete E vtan vertical tangent Young s modulus G tan tangent shear modulus K tan tangent bulk modulus p9 mean effective stress r correlation coefficient å current strain of the sprayed concrete å a axial strain å i strain in Cartesian direction i å pk strain at peak strength of sprayed concrete å v volumetric strain í Poisson s ratio ó stress ó c unconfined compressive strength of sprayed concrete ó t tensile strength of sprayed concrete ó y yeild stress ö angle of friction of sprayed concrete Layers of sprayed concrete: Stagger of joints: Previous advances 7 mm initial layer mm primary layer mm finishing layer 1 m 1 m 1 m Primary layer Initial layer 3 m 1. INTRODUCTION The front-shunt tunnel, a m long and.1 m internal dia. tunnel boring machine (TBM) launch chamber for the stormwater outfall tunnel (SWOT), was the first tunnel of the Approx. m Fig. 1. The LaserShell method Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 137

contractor s designer, and this review included advanced numerical modelling using. The predictions of behaviour provided by the numerical modelling, together with consideration of many other issues, led to this innovative method of construction being accepted by the client for use on all the SCL tunnels for the T project. The paper presents the methodology and results of this modelling. Mott MacDonald s role on site was to oversee technical compliance and safety. The paper presents typical results of monitoring during construction, which included surface settlement levelling, three-dimensional (3D) tunnel lining displacement monitoring, subsurface instruments (extensometers and inclinometers), and tunnel lining pressure cells. The performance of the instrumentation is then discussed, and the results are compared with the results of the advanced numerical modelling.. LOCATION AND INSTALLATION OF INSTRUMENTS The location and layout of instrumentation is shown in Fig.. Surface settlement was monitored using levelling points, and ground movements were monitored using inclinometers and extensometers grouted into boreholes. Tunnel lining displacements were monitored by 3D optical surveying of targets. Ground pressure on the tunnel lining was measured using radial pressure cells, and stresses in the sprayed concrete lining were measured using tangential pressure cells. Typical results and comments on the usefulness and accuracy of the instrumentation are presented below..1. Surface settlement levelling points The grid pattern of settlement points for the tunnel was extensive: it included 97 points (Fig. ). Two arrays were installed adjacent to the shaft, and ten arrays of points were installed across the tunnel axis. The spacing of the settlement points was generally 7 m in the longitudinal direction (spacing between each transverse array) and m in the perpendicular direction (spacing between the points in a transverse array). In general, accuracy was in the range 1 mm. The settlement data were zeroed at the end of shaft construction, so the results presented show only the effect of the frontshunt tunnel construction. Shaft construction took eight weeks, and then there was a delay of a further four weeks before the frontshunt tunnel excavation began. During this four-week delay ongoing settlements continued for up to a week and then stabilised. Furthermore, there were no discernible ongoing settlements due to shaft construction at the points to the north-east, south-west and north-west of the shaft during frontshunt construction (see Fig. ). Surface settlements when the face was directly under each transverse array (1 ) are shown in Fig. 3. These show an approximately Gaussian settlement pattern; for comparison a curve for a volume loss of. % and a trough width parameter k of. (Peck 3 ) has been added to Fig. 3. Array 1 showed a slight heave rather than settlement, but this is within the accuracy of the surveying, and so all that can be concluded is that negligible movement occurred. As the tunnel moved further from the shaft, settlements increased, and by the time the face was under array 3 about 1 m or three tunnel Array 1 Array Array 3 Array Array Array Array 7 Array Array 9 7 7 7 7 7 7 7 7 Array 1 SWOT front-shunt tunnel 1 3 Pressure cells array 7 1 SWOT inlet shaft 3 Pressure cells array 1 Surface settlement monitoring point Inclinometer Combined extensometer/ inclinometer 1 Site roads Fig.. Location of instrumentation (dimensions in m) 13 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

Surface settlement: mm 3 Face under array 1 Face under array Face under array 3 Face under array 1 1 1 1 3 Face under array Face under array Gaussian curve 1 1 1 Distance from tunnel centreline: m North-east South-west Fig. 3. Transverse settlement profiles when tunnel face was under array 1 to array. Gaussian curve based on V l ¼. % and k ¼. diameters from the shaft the settlements stabilised where the influence of the shaft was negligible. The settlement trough for array 3 was skewed to the left (north of the tunnel centreline), with an anomalous large settlement at 1 m in Fig. 3, array had a larger settlement over the tunnel centreline than the other arrays, and array had an unexpectedly large settlement of 1 mm at 1 m to the right (south) of the tunnel centreline. This phenomenon is also evident in Fig., which shows the surface settlement at the same locations two weeks after construction of the frontshunt tunnel had finished. This was probably caused by the traffic of cranes and muck lorries over these locations. The plan in Fig. shows that these points lay in the site road, so heavy traffic causing additional settlement would seem the most likely explanation. The settlement point 1 m from the tunnel centreline in array 3 was damaged shortly after the reading in Fig. 3 was taken, and so no data were available for this point in Fig.. The centreline settlements when the tunnel face was under each settlement array, and the centreline settlements two weeks after construction had ceased (denoted Final in Fig. ), are shown in longitudinal section in Fig.. These data are summarised in Table 1, together with the settlements when each array was m ahead of the tunnel face and m behind Surface settlement: mm 3 Array 1 Array Array 3 Array Array 1 1 1 1 1 3 Array 1 1 Distance from tunnel centreline: m North-east South-west Fig.. Transverse settlement profiles two weeks after construction Settlement: mm Array 1 Array Array 3 Array Array Array 1 1 3 3 1 Face at array 1 Face at array 1 Face at array 3 Face at array 1 Face at array 1 Face at array 1 Final Chainage along centreline: m Fig.. Longitudinal settlement profiles above tunnel centreline the tunnel face. Fig. and Table 1 show that ahead of the face, even at m distance, very little surface settlement was observed. The stabilised maximum settlement, ignoring the local effect that caused an anomalous reading at array, was approximately mm. The percentage of settlement occurring ahead of the tunnel face for arrays 3 to is shown in the last row of Table 1, found by dividing the cumulated settlement in the second row by the final cumulated settlement in the fourth row. Array had the greatest value of 3% because the tunnel ended only m beyond the array. The typical value for continuous tunnelling from array 3 to was around %... Inclinometers and extensometers Two inclinometer boreholes and five combined inclinometer and extensometer boreholes were installed in the positions shown in Fig.. Readings from inclinometer are shown in Fig.. Since the base of the inclinometer was 7. m below the invert of the tunnel, it was assumed that the base was fixed. The average standard deviation of baseline horizontal movements measured by the total station surveying of the top of the instrument casing was. mm, implying a 9% confidence of repeatability within mm, and no obvious movement either towards or away from the face of the tunnel could be identified. Therefore whole-body translations and rotations of the inclinometer could not be estimated, but were probably of small magnitude relative to the horizontal movements at tunnel depth. Van der Berg et al. assumed that the top of the inclinometers installed at Heathrow Terminal station in London Clay were fixed in the longitudinal direction. Nyren et al. measured longitudinal horizontal surface movements of up to mm at St James s Park, although this was in the context of much larger ground movements approximately three times larger than at the SWOT. It is thought unlikely, therefore, that inclinometer could have undergone a whole-body rotation such that the top of the instrument moved more than 3 mm horizontally. Fixing the displacement at either the top or the base of the inclinometer resulted in a scatter of the readings of mm at the opposite end owing to accumulated errors along the length of the inclinometer. Therefore, in the interpretation, it was assumed that the base and the top of the inclinometer were fixed, in order to minimise these accumulated errors. Very little movement occurred until the tunnel face was less than m Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 139

Array 1 3 Array m ahead of tunnel face N/A. 7. 1.. 1 1. 7 Tunnel face under array. 3.. 9 3. 9 3. Array m behind tunnel face.3 9.3. N/A weeks after end of construction. 7.. 1 1. 3. 1. Settlement occurring ahead of face: % N/A N/A 3% 3% % 3% Table 1. Ground surface settlement (in mm) over centreline of frontshunt tunnel same number of radii distance as inclinometers and ) to be approximately mm. This was % of the horizontal movement at the tunnel axis depth. Applying the same ratio to inclinometers and, the surface horizontal movement of the inclinometers would have been less than 1 mm. Depth: m 1 1 1 1 1 1 1 1 1 Deflection in direction of tunnel drive: mm Distance from tunnel face to inclinometer: 1 7 m ()* 1 7 m () 1 7 m 7 m 7 m (3) 3 7 m 1 7 m 9 m () Tunnel axis level * Brackets denote number of readings averaged Fig.. Readings from inclinometer on tunnel centreline (positive deflection is away from the face) from the inclinometer. The recorded movements before this were indicative of the accuracy of the inclinometer, and were generally within mm similar to the accuracy reported by van der Berg et al. The maximum horizontal movement was 11 mm when the last reading was taken and the face was. 9m from the inclinometer. Readings from inclinometers and, offset m from the tunnel centreline, are shown in Fig. 7. The inclinometers were approximately 3. m from the extrados of the tunnel at its closest point. They measured very little horizontal movement in the ground of the order of less than 3 mm. As mentioned previously, the repeatability was approximately mm, and so these movements were barely outside the accuracy of the instrument. The top of the inclinometer was assumed fixed but there may have been a small horizontal movement towards the tunnel at the surface. At the Heathrow Express trial tunnel, Deane and Bassett measured horizontal surface movements at approximately. radii distance from the tunnel centreline (the The readings from extensometer 3 on the tunnel centreline are shown in Fig.. The extensometer data were adjusted according to the settlement of the top of the instrument casing measured by precise levelling. The tunnel axis was at 1. 13 m depth at this location. Very little subsurface movement occurred while the tunnel approached the instrument, although some was discernible in magnet B, which was located about 3. m above the crown of the tunnel. The instrument casing and surrounding grout were mined through as the tunnel passed, but the extensometer was removed just prior to this. Figure 9 shows the subsurface vertical movements measured by extensometer, m offset from the tunnel centreline. In this case, the extensometer could be continuously read as the tunnel passed, and vertical movements were greater than those measured by extensometer 3. The accuracy of the extensometer measurement when the tunnel face was substantially far away (. m) to influence the readings was mm. The deepest magnets A and B showed no discernible movement. Magnet C, located at about the same level as the tunnel axis, showed a downward vertical movement, as did magnets D and E between the tunnel crown level and the surface..3. Convergence monitoring Conventional monitoring of the lining was achieved using a 3D optical surveying technique to measure convergence of the lining. Seven arrays were installed approximately m apart, each with five convergence targets (left knee, left shoulder, crown, right shoulder and right knee), shown in Fig. 1. During the driving of the tunnel there were continual problems with the placing of the targets, and many targets were damaged and had to be replaced. This resulted in a large amount of lost information. In general, measurements in the frontshunt tunnel showed noise of 3 mm, which, according to Bock, 7 is typical for this method of surveying under these conditions... Pressure cells Twenty oil-filled pressure cells were placed in two arrays in the tunnel, the first m into the tunnel and the second m into the tunnel. In each array, pressure cells were placed in five positions: left knee, left shoulder, crown, right shoulder and right knee, equally spaced with an angle of approximately 7 between them. At each position, two pressure cells were placed: a radial earth pressure cell and a tangential sprayed concrete pressure cell. Also, two tangential pressure cells were placed in a 1 mm 3 1 mm 3 3 mm test panel, which was sprayed at the same time as array and kept for the first month at the bottom of the SWOT inlet shaft. This meant it was 1 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

Deflection towards tunnel: mm 1 1 3 3 Deflection towards tunnel: mm 1 1 Depth : m 1 1 1 Tunnel axis depth 1 m 1 1 1 Depth: m 1 1 1 1 Face m before section () Face m before section (3) Face at section (3) Face at section (3) Face m past section (1) Face m past section () Tunnel completed () Tunnel completed () Fig. 7. Deflection of inclinometers offset m from the tunnel centreline (positive deflection is towards the tunnel): (a) inclinometer (offset to left); (b) inclinometer (offset to right). (Brackets denote number of readings averaged; inclinometer head and base assumed fixed) Vertical movement: mm 1 NB: tunnel axis at 1 m depth 1 Magnet A: 3 19 m depth Magnet B: 31 m depth Magnet C: 3 m depth 1 Tunnel face distance from extensometer: m 1 3 Fig.. Extensometer 3 movements as tunnel face approached Fig. 1. Convergence target locations in an array Vertical movement: mm 1 1 1 Magnet A: 1 9 m depth Magnet B: 1 3 m depth Magnet C: 1 3 m depth Magnet D: m depth Magnet E: 31 m depth NB: tunnel axis at 1 m depth 1 Tunnel face distance from extensometer: m Fig. 9. Extensometer movements ( m offset from centreline) as tunnel face approached and passed 1 exposed to the same environmental conditions as the tunnel pressure cells. The array radial pressure cell data are shown in Fig. 11. Cells and, the crown and right knee radial pressure cells, have been omitted because the recorded pressures dropped below zero owing to temperature changes. Therefore they temporarily lost contact, and did not record pressure changes over a significant period of time. There was a period of approximately six months between late February and early September where no readings could be taken because the junction box was sited behind the conveyor installed for the TBM drive, and no automatic data acquisition system was provided. Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 11

Read pressure: kpa 3 3 1 1 //3 //3 //3 3//3 /1/3 Date Fig. 11. Radial pressure cells at array Cell left knee Cell 7 left shoulder Cell 9 right shoulder Hydrostatic full overburden Cell 7 temperature 7 9 On 1 February 3 the radial pressure cells were crimped. Crimping involves crushing the crimping tube using a specially made crimping tool. This forces a fixed amount of hydraulic oil into the pressure cell cavity in order to prevent loss of contact between the pressure cell and the medium in which it is embedded. It is not clear whether radial pressure cells should be crimped at all. If they are well installed, there is no reason why they should lose contact. Also, crimping will effectively jack the surface of the pressure cell against the London Clay. Since London Clay is a saturated porous medium, this will generate excess pore pressures and, in time, consolidation will occur. These crimping pressures were found to dissipate within two weeks and so have not been removed from the dataset. The ground pressure acting on the sprayed concrete lining after nine months at array was between 1 and 1 kpa at an average temperature of 1C: that is, between 3% and % of the hydrostatic full overburden pressure at tunnel axis level (39. 9 kpa). The pressures in Fig. 11 are dependent on temperature, as expansion and contraction of the sprayed concrete ring increases and decreases the radial pressure between the ground and the sprayed concrete lining. Therefore the effect of temperature on radial pressure cells should not be removed, since it represents a true change in the ground pressure acting on the tunnel lining. These results were presented in detail by Jones. 9 3 3 1 1 Temperature: C ease with which non-linearity and plasticity of the soil and sprayed concrete could be implemented. The numerical modelling results presented in this paper may be considered as a prediction, even though this particular analysis was undertaken after construction. The objective was not to change the ground parameters until the ground movements were perfectly predicted but to check the validity of the prediction with the as-built geometry. The original analyses used for the design were adjusted only in the following ways. (a) The tunnel diameter was increased from. m to. m and the primary lining thickness increased from. m to.7 m to take account of the over-excavation of at least. 1 m observed during construction. (b) The London Clay horizon and water table locations were adjusted to the levels encountered during construction. The London Clay horizon was found at. m below the surface. The water table was found at 1. m below the surface. (c) The depth to tunnel axis was increased from 11. m to 1. m. (d) The advance rate was set to 3. 3 m/day. (e) The undrained shear strength profile was changed from the design values, which represented a lower bound to the site investigation data, to a best fit of the site investigation data. 3.1. Tunnel geometry and excavation sequence In order to model the construction method reasonably accurately, the following steps were taken. The tunnel face was inclined at an angle of 71 to the horizontal (Fig. 1). The sprayed concrete lining was placed in two layers: an initial layer 7 mm thick, which was installed up to 1 m from the face, followed by a primary layer 7 mm thick, installed to within 1.7 m of the face. The tunnel was circular, with an excavated diameter of. m. To reduce boundary effects an initial length of 3 m was excavated, % of the initial ground stress was allowed to dissipate at the tunnel perimeter, and the lining was installed. Subsequently the tunnel was excavated in 1 m advance lengths, with the lining installed after each advance. Terrace Gravel London Clay 7 m 7 m Plastic zone The tangential pressure cell data are not presented in this paper owing to insufficient space; there is no technical reason for their omission. 3. NUMERICAL MODEL The innovative construction method demanded the use of an explicit 3D numerical model, since the unique features of the construction method could not be represented in a semiempirical D model or analytical solution and be differentiated from standard construction methods. Key concerns were the influence of early-age loading, the sloping face, and the staggered joints. It was decided to use because of the m Fig. 1. mesh 71 Initial layer 1 m 7 m Primary layer 1 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

3.. Ground properties The geological profile adopted in the model comprised. m of Terrace Gravel overlying the London Clay, which extended to a depth of m. The geotechnical parameters for each of the strata are listed in Table. The water table was taken to be 1 m below ground level, with a hydrostatic pore pressure distribution through the Terrace Gravel and the London Clay. Back-analysis of previous excavations at Heathrow has demonstrated that an anisotropic soil model with a higher stiffness in the horizontal plane best represents the behaviour of the London Clay. 1,11 However, the anisotropic model implemented in was purely elastic, and did not permit yielding of the soil. Since plastic behaviour may be important when modelling the tunnel lining ground interaction, an isotropic elastic perfectly plastic model was adopted for the London Clay within a tunnel radius distance of the periphery of the tunnel, and an elastic anisotropic model was adopted for the London Clay and the Terrace Gravel in the remainder of the model. This approach was used by Scott et al. 11 and was found to be effective. The pre-peak non-linearity of the Terrace Gravel and the London Clay was modelled broadly following the method suggested by Jardine et al., 1 as adapted by Scott et al. 11 for isotropic and anisotropic materials in 3D using effective stresses. The equations are given in Appendix 1. Depth: m 1 1 K 1 3 (a) c u : kpa 1 3 During the analysis, the stiffness of both the isotropic and anisotropic soils was updated every ten calculation steps as a compromise between accuracy and calculation time. This resulted in an error of % when compared with updating the stiffness at every step in a model that simulated triaxial compression and extension. The initial in situ stress profile and the undrained shear strength profile for the London Clay applied in the model were based on the site investigation data, and are shown in Fig. 13. The K value for the Terrace Gravel was taken to be.. The K values used were obtained from suction probe measurements on pushed thin-walled tube samples, as described by Hight et al. 13 Depth: m 1 1 (b) 3.3. Sprayed concrete properties A programme of laboratory tests was carried out on the sprayed concrete mix to determine its full stress strain curve at an age of less than one day. The results of this testing were Fig. 13. (a) K and (b) c u profiles reviewed, and a curve based on the BS 11 Part 1 stress strain equation was fitted to the data, as shown in Appendix. Parameter Terrace Gravel London Clay The design rate of unconfined compressive strength development is shown in Table 3. Bulk unit weight: kn/m 3 19.. Porosity: % 3 Cohesion: kpa 13 + 1z* Friction: degrees 3 Dilation: degrees Young s modulus: MPa Variable Variable Poisson s ratio Variable Variable * Undrained shear strength for London Clay, where z is depth from top of London Clay. Table. Geotechnical properties A strain-hardening Mohr Coulomb material model was used for the sprayed concrete. Thus the level of plastic strain was used to calculate the stress at every calculation step for values of stress between the yield stress ó y and the compressive strength ó c. The yield stress ó y was assumed to be equal to. times the compressive strength. Details of the Mohr Coulomb model are given in Appendix. Similarly, a curve was fitted to a graph of initial tangent Young s modulus against compressive strength, and the values in Table were obtained for use in the analysis. Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 13

Age. DISCUSSION Sprayed concrete design strength, ó c : MPa Age.1. Surface settlement The design prediction of surface settlements used the empirical method based on a Gaussian curve. 3 The volume loss was assumed to be 1. 1%, and a trough width parameter k of. was used. This value of volume loss was based on an upper bound of volume losses measured during the construction of previous SCL tunnels in London Clay at Heathrow, in particular the Heathrow Express tunnels, and is shown in Fig. 1. The SWOT frontshunt tunnel had a considerably lower volume loss than this, and Fig. 1 shows that a curve based on a volume loss of. 3% and a trough width parameter of. fits the data better, at least in terms of the maximum settlement over the Sprayed concrete design strength, ó c : MPa h. 3 days..1 h. days. 1h. 7 days 3. 3h 1. 1 days 31. h 3. 1 days 33. 1 h. days 3. 1 day 1. days 3. Table 3. Sprayed concrete design strength development Unconfined compressive strength: MPa Initial tangent Young s modulus, E i : GPa Unconfined compressive strength: MPa Initial tangent Young s modulus, E i : GPa. 1. 3... 1. 3.....77..3.. 7... 1 13... 7. 3 19. 1. 1.1. 9. 1. 1.7 1. 3. 1. Table. Development of initial tangent Young s modulus with compressive strength Surface settlement: mm 3 1 Array 3 Array Array Gaussian fit Vl 3%, k = Gaussian curve Vl 1 1%, k = Distance from tunnel centreline: m 1 1 1 1 Fig. 1. Comparison of surface settlements from site two weeks after tunnel construction with and empirical prediction 1 3 centreline. However, further away from the tunnel centreline the trough appears to be wider than the Gaussian curve predicts. Indeed, the volume losses calculated by direct trapezoidal integration of the settlement data were. 97%, 1. 9% and 1. 1% for arrays 3, and respectively. In order to match these volume losses with a maximum settlement of mm, a trough width parameter k of between. and. 9 would be required. The width of the trough may have been caused by ongoing local consolidation settlements: less than a month before construction began at least 1 m of fill was placed over the whole site. The numerical modelling overpredicted the maximum settlement, at 13. mm compared with mm measured in the field. The volume loss predicted by was 1.7%. Although this volume loss may appear high, this was due largely to the width of the settlement trough predicted. The overprediction of maximum settlement may indicate that the stiffness of the soil was underestimated in the model, but the narrower settlement trough observed in the field indicates perhaps that some element of ground behaviour was not modelled correctly. Comparing the longitudinal settlement profile with the analysis (Fig. 1) shows that the predicted pattern of settlements agrees reasonably well with the observed behaviour. The larger observed settlements over the tunnel centreline at array are evident. These data were omitted from Fig. 1 since they were due to heavy traffic movements, and were not indicative. As noted before, the numerical analysis resulted in larger settlements over the excavated tunnel than were observed in reality at arrays 3, and, and the final settlements when construction finished were also overpredicted. Prediction of surface settlement is often used as the main measure of success of a numerical model, although the key design parameter is the stress in the lining. Negro and de Queiroz 1 reviewed papers on numerical modelling of tunnels. Of the papers that compared predicted maximum surface settlement with measured values, 39 of the predictions, corresponding to more than 7%, were within 1% of the measured values. Shirlaw and Wen 1 questioned the accuracy of comparisons made between measured surface settlements and those predicted by numerical methods. They pointed out that the natural variations in settlements were generally much higher than 1%, and suggested that this contradiction may exist because few people would publish cases where the 1 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

Settlement: mm 1 1 1 1 1 1 3 Array 3 1 Array Array 3 Chainage along centreline: m F Array Face at array 3 Face at array Face at array Face at array Final 3 Deflection in direction of tunnel drive: mm 1 1 Distance from tunnel face to inclinometer : 7 m (average of 3 readings) 9 m (average of readings) 3D FLAC m 3D FLAC 1 m Fig. 1. Comparison of longitudinal results with settlements along centreline. For results, number denotes array under which face is located; F denotes final short-term settlement two weeks after construction predicted and actual settlements were significantly different, or because predictions may have been made after the event and adjusted to match performance. In addition, if settlements were measured at several locations, the typical profile may have been selected carefully. With this in mind, the predictions presented in this paper were acceptable, given the small magnitudes of the settlements. Depth: m 1 1 1 1 1 Tunnel axis level.. Subsurface ground movement Figure 1 shows selected data from inclinometer on the tunnel centreline compared with corresponding data from. The inclinometer data have been adjusted to fit the data at 1 m and m depth, since whole-body translations and rotations of the inclinometer could not be measured. For small movements, when the tunnel face was about m away from the inclinometer, the predictions matched the measured behaviour reasonably well. However, closer to the tunnel face, where larger movements occurred, the numerical analysis overestimated the movements. This may have been caused by the isotropic model around the tunnel, which would have had a lower horizontal stiffness than the anisotropic London Clay has in reality. The patterns of deformations predicted were similar to those observed, except just below the invert level of the tunnel, where small deformations towards the tunnel face were measured that were not predicted. Figure 17 shows the data from inclinometers and offset m from the tunnel centreline compared with corresponding data from. The inclinometer data were adjusted for this figure in the same way as for inclinometer in Fig. 1. Since the variability of the field data, as illustrated by the difference between the movements of inclinometers and, was relatively high, the numerical modelling cannot be expected to perfectly match the data. The numerical modelling did overpredict the magnitude of the movements, but the pattern of movements was replicated well. It is likely, given that the surface settlements were overpredicted by the numerical modelling, that the main reason for the discrepancy was a general overprediction by the model owing to the lack of anisotropy close to the tunnel. Figure 1 shows the movements of magnet D of extensometer offset m from the tunnel centreline compared with the Fig. 1. Adjusted inclinometer data compared with ; on tunnel centreline (positive deflection is away from face) numerical modelling prediction. Magnet D was approximately 1. m above the crown level of the tunnel, and the data were taken from a gridpoint 1. 3 m above the crown level, offset m from the tunnel axis. The movements in front of the face were predicted well by the numerical modelling but the movements after the face had passed were overpredicted. This may also be seen in the surface settlements above the tunnel centreline shown in Fig. 1..3. Tunnel lining deformations The vertical movements of the tunnel crown at different locations are plotted in Fig. 19. Most of the movement occurred within the first seven days of the tunnel construction, and varied between and mm. The tunnel crown displacements predicted by were calculated immediately after the excavation. In reality, however, the first reading was taken some time after excavation because the sprayed concrete layer had to be applied before convergence targets could be installed. The first readings were usually taken within 1 h. Therefore initial movements were not recorded. To account for this fact, the curve from the prediction has been adjusted by subtracting the initial displacements of the lining before the subsequent advance was excavated. Fig. 19 shows that the numerical modelling prediction was good. The prediction stopped at six days in Fig. 19 because of the limited length of the model. Clayton et al. have questioned the ability of lining convergence measurements to give adequate warning of excessive stresses in an SCL. They recommended ensuring that Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 1

Deflection towards tunnel: mm Time: days 1 1 Depth: m 1 1 Inclinometer Inclinometer Crown settlement: mm FLAC 3D adjusted Chainage 3 Chainage 3 Chainage 1 1 Tunnel axis level 1 1 Fig. 19. Crown settlement measured by 3D total station compared with prediction Fig. 17. Adjusted inclinometer and data compared with ; m offset from tunnel centreline after tunnel face has passed section by at least m 1 1 Magnet D: m depth 1 1 the accuracy of the measurement system is at least an order of magnitude less than the estimated convergence at compressive failure of the completed SCL ring. The measurement system employed at this site would have failed to provide this. Despite the shortcomings of convergence measurements in this type of SCL tunnel, Clayton et al. made the important point that increasing convergence following ring closure would still indicate a manifestation of problems with the completed SCL, and therefore it remains important to record convergence measurements. The convergence measurements made at this site were appropriate for this purpose. Tunnel face distance from extensometer: m Fig. 1. Extensometer magnet D data compared with prediction Vertical movement: mm.. Tunnel lining loads The radial pressure cells recorded radial stresses equal to 3 % of hydrostatic full overburden pressure. This range of values was broadly in line with the previous measurements of ground load on m diameter segmentally lined tunnels in London Clay 17 of % of the overburden pressure at one year after installation. It was also broadly in line with previous radial pressure cell measurements in SCL tunnels: for instance in the Terminal station platform tunnels of 3 % of full overburden pressure, 1 at Redcross Way of 3%, 19 and in the Terminal concourse tunnel of 3 7%. 9 The low radial pressures and the concomitant low volume loss show that no benefit would have been gained from allowing the ground to deform more by delaying the closure of the tunnel lining at the invert. Previous tunnels in London Clay with higher volume losses have generally had much higher radial pressures. The model did not include the effects of temperature changes on the sprayed concrete lining during hydration. This was the cause of the large discrepancy shown in Figs and 1 during the first few days. In the long term, underpredicted the radial stress, predicting kpa (equal to 33 3% of hydrostatic full overburden pressure at tunnel axis level). The pressure cell readings therefore revealed a phenomenon that had not been considered during the design: the effect of temperature changes and hydration heat in particular on the ground pressure acting on the lining. Immediate closure of the ring of sprayed concrete, although resulting in smaller volume losses, will also expose the sprayed concrete lining to the highest potential stresses at early age of up to 1% of the 1 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

Radial stress: kpa 3 3 1 1 3 3 1 1 Temperature: C.. Numerical modelling Since many papers have been published on the subject of the behaviour of SCL tunnels in London Clay, and the authors organisation has been involved in the design and supervision of a large number of SCL and segmentally lined tunnels constructed in London Clay, the numerical modelling was informed by a large body of experience and previous backanalyses. The predictions of ground deformations made by the model were reasonable. The level of sophistication of the model exemplified by the complexity of the constitutive models and the detailed geometry represent current best practice in the tunnelling industry, but did not require specialist computer hardware or excessive run times. //3 //3 //3 Time 7//3 Cell 7 Cell 9 Hydrostatic full overburden Cell 7 temperature Fig.. Radial pressures at shoulder level compared with radial stresses Radial stress: kpa 3 3 1 1 //3 //3 //3 Time 7//3 Cell Cell Hydrostatic full overburden Cell temperature //3 hydrostatic overburden pressure. This occurred at 1 1 h after spraying. However, consideration of the interpolated design strength at 1 h (see Table 3) and the design thickness of 7 mm results in a factor of safety of 3 at this time, so the sprayed concrete lining was never overstressed. //3 Fig. 1. Radial pressures at knee level compared with radial stresses 3 3 1 1 Temperature: C Even if great care is taken in the gathering and interpretation of field data, field measurements will be subject to variations, mainly because of the variability of the material properties and the accuracy of the instrument, and so predictions can never exactly match the field data at all locations. Many published papers quote comparisons between predictions and field data implying an accuracy that is better than this natural variability should allow. In this case, the patterns of ground movement (at the surface and below ground), lining deformation and loading were predicted well by the numerical model, but there is scope for improvement. Most notably, ground movements close to the tunnel were overpredicted. However, it is noteworthy that a good agreement was achieved across the whole spectrum of ground and lining deformations and lining stresses.. CONCLUSIONS The SWOT front-shunt was constructed using an innovative SCL method. To provide assurance of the suitability of this method, it was thoroughly investigated during the design phase using sophisticated 3D numerical models, and during construction an extensive array of instrumentation was installed in and around the tunnel to record the behaviour of the tunnel and the ground. Despite some difficulties in the monitoring, a valuable set of data was obtained that was used to produce an informative case history. All the information gathered from the instrumentation was useful, providing the client with confidence in the ability of the method to control ground deformations and confirming that the design predictions were reasonable. In general, the pattern of behaviour of the ground was consistent with observations of other SCL tunnels in London Clay. The performance of the tunnelling method in controlling ground movements, with a volume loss of.3%, was at the lower end of the range of previous experiences of SCL tunnelling in London Clay. The deformations of both the ground and the lining were small, and stabilised quickly. The tight control of deformations was achieved mainly by the relatively early ring closure in the full-face excavation. The radial ground pressures on the tunnel lining stabilised quickly at a relatively low value, and showed no inclination to increase in the long term. In general, tunnels with higher volume losses in London Clay have also experienced higher radial pressures, so it should generally be considered good practice to keep deformations as small as possible in London Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 17

Clay. The pressure cells also revealed that hydration temperatures may bring about the worst-case loading at early age in a shallow full-face SCL tunnel. The vertical and horizontal Young s moduli and the shear modulus varied with shear strain, as described by the following equations. Opinion is sometimes divided about the merits of numerical modelling in design. In this case the 3D numerical model provided good predictions of behaviour explicitly: that is, without induction. Any other design method in this case would have comprised an empirical element and assumptions about behaviour or geometry that might or might not have been appropriate. The numerical model described in this paper achieved a good agreement with the field measurements in the ground and lining in terms of both deformations and stresses. Sophisticated modelling of both the ground and the sprayed concrete lining was essential to this success. E vtan ¼ p9 A þ B cosðæx ª Þ E htan ¼ 1:E vtan G vhtan ¼ E vtan : BªÆX ª 1 ln 1 sinðæx ª Þ. APPENDIX 1. SMALL-STRAIN STIFFNESS EQUATIONS 7 í hh ¼ : 1 K tan ¼ p9 R þ S cos ðºy ì Þ G tan ¼ p9 3 where Y ¼ log 1 A þ B cosðæx ª Þ where X ¼ log 1 ì 1 SºìY ln 1 å v T ª 1 BªÆX ln 1 å a C sin ðºy ì Þ sinðæx ª Þ where R, S, T, º, ì, A, B, C, Æ and ª are constants, the values of which are given in Table ; K tan is the tangent bulk modulus; G tan is the tangent shear modulus; p9 is the mean effective stress; å v is the volumetric strain; and å a is the axial strain. Since the original equations by Jardine et al. 1 were based on an undrained triaxial test, å a was obtained from the Cartesian strain tensor using the relationship 3 pffiffiffi å a ¼ 3 [(å x å y ) þ (å y å z ) þ (å z å x ) þ (å xy þ å yz þ å zx )]1 The shear and bulk moduli reduce with shear and volumetric strains respectively. The anisotropic model had five independent elastic parameters. í hv ¼ 7. APPENDIX. SPRAYED CONCRETE MODEL EQUATIONS The stress strain curve was based on the following equations from BS 11 Part. 1 9a 9b 9c " # kç ç ó ¼ ó c 1 þ ðk Þç ç ¼ å å pk k ¼ å pk E i ó c where E i is the initial tangent Young s modulus, å pk is the strain at peak strength, å is the current level of strain, and ó c is the unconfined compressive strength. The angle of friction ö in the strain-hardening Mohr Coulomb model was taken to be 37. 3, and the angle of dilation was taken to be zero. The cohesion was related to the stress by the relationship A B C Æ ª å amin å amax Terrace Gravel 11 1 9. 3 1 1..7 9. 3 1. 3 1 3 London Clay 77 73 7. 3 1 1.33. 7. 3 1 1. 3 1 3 R S T º ì å vmin å vmax Terrace Gravel 7. 3 1 1.1 1. 3. 3 1 7. 3 1 3 London Clay 1 1.9 3 1. 1.. 3 1.1 3 1 Table. Jardine isotropic model parameters 1 Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al.

1 c ¼ ó 1 sin ö cos ö A curve was fitted to the strain at peak strength data from the tests, and the following relationship was found with a correlation coefficient r ¼.1. 11 å pk ¼ :13ó : 7 c The sprayed concrete density was. Mg/m 3. Poisson s ratio was assumed to remain constant at a value of.. The tensile strength of the sprayed concrete was given by the relationship 1 ó t ¼ :3ó : 7 c ACKNOWLEDGEMENTS The authors would like to acknowledge the kind permission of Ian Williams on behalf of BAA in permitting this paper to be published. They would also like to acknowledge the contribution of many individuals, both on site and in the design office, to the successful construction of the tunnel and the gathering of the monitoring data. The analysis of the pressure cell data by Benoît Jones was supported by the EPSRC and the University of Southampton, supervised by Professor Chris Clayton. REFERENCES 1. WILLIAMS I., NEUMANN C., JÄGER J. and FALKNER L. Innovativer Spritzbeton-Tunnelbau für den neuen Flughafenterminal T in London (Innovative shotcrete tunnelling for London Heathrow s new Terminal ). Proceedings Österreichischer Tunneltag, Salzburg,, 1 1.. HILAR M., THOMAS A. H. and FALKNER L. The latest innovation in sprayed concrete lining: the LaserShell method. Tunel (Magazine of the Czech Tunnelling Committee and the Slovak Tunnelling Committee ITA/ AITES),,, 11 19. 3. PECK R. B. Deep excavations and tunnelling in soft ground. Proceedings of the 7th International Conference on Soil Mechanics and Foundation Engineering, Mexico, 199, State-of-the-art report, 9.. VAN DER BERG J. P., CLAYTON C. R. I. and POWELL D. B. Displacements ahead of an advancing NATM tunnel in the London Clay. Géotechnique, 3, 3, No. 9, 77 7.. NYREN R. J., STANDING J. R. and BURLAND J. B. Surface displacements at St James s Park greenfield reference site above twin tunnels through the London Clay. In Building Response to Tunnelling: Case Studies from Construction of the Jubilee Line Extension, London. CIRIA, London, 1, Vol. 1, pp. 37.. DEANE A. P. and BASSETT R. H. The Heathrow Express trial tunnel. Proceedings of the Institution of Civil Engineers, Geotechnical Engineering, 199, 113, No. 3, 1 1. 7. BOCK H. Geotechnical instrumentation of tunnels. In Summerschool on Rational Tunnelling (KOLYMBAS D. (ed.)). Logos Verlag, Berlin, 3, pp. 17.. CLAYTON C. R. I., HOPE V. S., HEYMANN G., VAN DER BERG J. P. and BICA A. V. D. Instrumentation for monitoring sprayed concrete lined soft ground tunnels. Proceedings of the Institution of Civil Engineers, Geotechnical Engineering,, 13, No. 3, 119 13. 9. JONES B. D. Measurements of ground pressure on sprayed concrete tunnel linings using radial pressure cells. Proceedings of Underground Construction, London, (CD-ROM). 1. CHANG J., SCOTT J. M. and POUND C. Numerical study of Heathrow cofferdam. Proceedings of the nd International Symposium FLAC and Numerical Modeling in Geomechanics, Lyon, 1, 13 19. 11. SCOTT J. M., POUND C. and SHANGHAVI H. B. Heathrow Airside Road Tunnel: wall design and observed performance. Proceedings of the International Conference on Underground Construction, London, 3, pp. 1 9. 1. JARDINE R. J., POTTS D. M., FOURIE A. B. and BURLAND J. B. Studies of the influence of non-linear stress strain characteristics in soil structure interaction. Géotechnique, 19, 3, No. 3, 377 39. 13. HIGHT D. W., GASPARRE A., NISHIMURA S., MINH N. A., JARDINE R. J. and COOP M. R. Characteristics of the London Clay from the Terminal site at Heathrow Airport. Géotechnique, 7, 7, No. 1, 3 1. 1. BRITISH STANDARDS INSTITUTION. Structural Use of Concrete. Code of Practice for Special Circumstances. BSI, London, 19, BS 11 Part. 1. NEGRO A. and DE QUEIROZ P. I. B. Prediction and performance: a review of numerical analyses for tunnels. Proceedings of the International Symposium Geotechnical Aspects of Underground Construction in Soft Ground, Tokyo,, pp. 9 1. 1. SHIRLAW J. N. and WEN D. Checking and reviewing the output from numerical analysis. Proceedings Underground Singapore, Singapore,, 1 9. 17. MAIR R. J. and TAYLOR R. N. Theme lecture: Bored tunnelling in the urban environment. Proceedings of the 1th International Conference on Soil Mechanics and Geotechnical Engineering, Hamburg, 1997,, 33 3. 1. POWELL D. B., SIGL O. and BEVERIDGE J. P. Heathrow Express: design and performance of platform tunnels at Terminal. Proceedings of Tunnelling 97, London, 1997, 93. 19. KIMMANCE J. P. and ALLEN R.. The NATM and compensation grouting trial at Redcross Way. Proceedings of the International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, London, 199, pp. 3 39. What do you think? To comment on this paper, please email up to words to the editor at journals@ice.org.uk Proceedings journals rely entirely on contributions sent in by civil engineers and related professionals, academics and students. Papers should be words long, with adequate illustrations and references. Please visit www.thomastelford.com/journals for author guidelines and further details. Geotechnical Engineering 11 Issue GE3 Evaluation of innovative sprayed-concrete-lined tunnelling Jones et al. 19